Southwest Southwest Calgary Ring Road Calgary Ring Road ......Jul 18, 2018  · Calgary Ring Road...

1
Questions? Contact us: 24/7 phone: 403-212-0565 [email protected] SWCRRproject.com Southwest Calgary Ring Road Protecting the Beaver Pond (Wetland 6) Building the Green Wall For discussion purposes only subject to change Water Monitoring Program • The SWCRR design avoids impacts on the Beaver Pond A green wall with local vegetation will create a natural barrier between the SWCRR and pond Effective sediment control measures in place to protect the pond throughout the construction period Natural drainage has been maintained to provide flows to the pond • Monitoring program developed to ensure the quantity and quality of water to the Beaver Pond Monitoring data and an annual report is posted on the project website at www.SWCRRproject.com • The monitoring program will continue throughout the construction period and for five years after construction To 90 Avenue To Sarcee Trail Northbound SWCRR Beaver Pond Green Wall 54 metres 50 metres Max height of wall is 8.5 metres 34 metres

Transcript of Southwest Southwest Calgary Ring Road Calgary Ring Road ......Jul 18, 2018  · Calgary Ring Road...

Page 1: Southwest Southwest Calgary Ring Road Calgary Ring Road ......Jul 18, 2018  · Calgary Ring Road Segment 1: Highway 8 to 69th St SW Southwest Calgary Ring Road Protecting the Beaver

000_INDEX_DP044.1

Approved for Construction by KGL07/18/2018 3:15:33 PM

Questions? Contact us:24/7 phone: 403-212-0565 [email protected] SWCRRproject.com

Southwest Calgary Ring Road Segment 1: Highway 8 to 69th St SWSouthwest Calgary Ring Road Protecting the Beaver Pond (Wetland 6)

Building the Green Wall

For discussion purposes only – subject to change

000_INDEX_DP044.1

Approved for Construction by KGL07/18/2018 3:15:33 PM

Water Monitoring Program• The SWCRR design avoids impacts on the Beaver Pond

• A green wall with local vegetation will create a natural barrier between the SWCRR and pond

• Effective sediment control measures in place to protect the pond throughout the construction period

• Natural drainage has been maintained to provide flows to the pond

• Monitoring program developed to ensure the quantity and quality of water to the Beaver Pond

• Monitoring data and an annual report is posted on the project website at www.SWCRRproject.com

• The monitoring program will continue throughout the construction period and for five years after construction

To 90 Avenue To Sarcee Trail

Northbound SWCRR

Beaver Pond

Green Wall

54 metres

50 metres

Max height of wall is 8.5 metres

34 metres