Iron Canyon Soil Monitoring. Site I - Post Harvest Site II - Pre Harvest Site II - Post Harvest Cumulative Effects. Iron Canyon II Feller-Buncher Harvesting August 2003, 23% Soil H 2 0 at 0-60 cm. Iron Canyon II Soil Monitoring Pre- vs. Post-Harvest Disturbance. - PowerPoint PPT Presentation

Transcript of Site I - Post Harvest Site II - Pre Harvest Site II - Post Harvest Cumulative Effects

• Site I - Post Harvest

• Site II - Pre Harvest

• Site II - Post HarvestCumulative Effects

Iron Canyon Soil Monitoring

Iron Canyon IIFeller-Buncher Harvesting

August 2003, 23% Soil H20 at 0-60 cm

Pre-Harvest

Undist 675

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

undist67%

dist22%

skid11%

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216 46 147 23

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216 46 147 23

Skid 109 12 49 48

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Disturbance Class Matrix

2003-Harvest

Undist Dist Skid

1960’s-Harvest 215 607 178 Cumulative

Undist 675 157 411 107 157 Undist

Dist 216 46 147 23 604 Dist

Skid 109 12 49 48 239 Skid

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Disturbance Class Matrix

PREHarvest

POSTHarvest % Change

Undist 67% 16% -77

Dist 22% 60% +180

Skid 11% 24% +119

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Percent Change in Pre-Harvest Classes

Iron Canyon II Soil MonitoringPost-Harvest Disturbance Extent

undist16%

dist60%

skid24%

undist67%

dist22%

skid11%

PRE

POST

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

March 2004 (47% Soil Moisture)0

10

20

30

40

50

60

0 1000 2000 3000 4000

STRENGTH (kPa)

DE

PT

H (

cm

)

undist

dist

skid

landing

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

Soil Strength Through the Growing Season (10-20 cm)

0

500

1000

1500

2000

2500

3000

3500

4000

Oct-02

Dec-02

Feb

-03

Ap

r-03

Jun

-03

Au

g-03

Oct-03

Dec-03

Feb

-04

Ap

r-04

Jun

-04

Au

g-04

SO

IL S

TR

EN

GT

H (

kP

a)

skid

dist

undistharvest

Iron Canyon II Soil MonitoringSoil Strength Before & After Harvest

0

1000

2000

3000

4000

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

ST

RE

NG

TH

(k

Pa

)

PRE

POST

10 Month Averages at 10-20 cm

Disturbance Class Matrix

Post-Harvest

Undist Dist SkidPre-Harvest

Undist 675 157 411 107

Dist 216

Skid 109

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1,000 ft total in transects)

Iron Canyon II Soil MonitoringSoil Strength Before & After Harvest

0

1000

2000

3000

4000

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

ST

RE

NG

TH

(k

Pa

)

PRE

POST

10 Month Averages at 10-20 cm

Iron Canyon II Soil MonitoringBulk Density Before & After Harvest

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

BU

LK

DE

NS

ITY

(g

/cm

3 )

PRE POST

Averages at 10-20 cm

Iron Canyon II Soil MonitoringBulk Density Before & After Harvest

0.0

0.2

0.4

0.6

0.8

1.0

1.2

Undist Dist Skid

PRE-HARVEST DISTURBANCE CATEGORY

BU

LK

DE

NS

ITY

(g

/cm

3 )

PRE POST

24% of Harvest Area

Averages at 10-20 cm

Disturbance Class Matrix

Post-Harvest

Undist Dist Skid

Pre-Harvest 215 607 178 Cumulative

Undist 675 157 411 107 157 Undist

Dist 216 46 147 23 604 Dist

Skid 109 12 49 48 239 Skid

Iron Canyon II Soil MonitoringPre- vs. Post-Harvest Disturbance

Units- Feet (1000 ft total in transects)

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

Bulk Density, Post-Harvest (10-20cm)

0.00

0.20

0.40

0.60

0.80

1.00

1.20

undist dist skid undist dist skid undist dist skid

UNDISTURBED DISTURBED SKID

BU

LK

DE

NS

ITY

(g

/cm

3)

POSTPRE

Iron Canyon II Soil MonitoringPost-Harvest Disturbance

Bulk Density, Post-Harvest (10-20cm)

0.00

0.20

0.40

0.60

0.80

1.00

1.20

undist dist skid undist dist skid undist dist skid

UNDISTURBED DISTURBED SKID

BU

LK

DE

NS

ITY

(g

/cm

3)

POSTPRE

7% OF HARVEST AREA

Disturbance Category: Low Mod High units

bulk density 0.89 0.94 1.01 g/cm3

Iron Canyon I Soil MonitoringLooking Back….

Averages by Disturbance Category (10-20 cm depth)

Region 5 Standard: 10% Porosity Reduction

Initial Db: 0.76

Threshold Db: 0.95

2001 UNIT - HARVESTED IN MAY

Disturbance Basics• EXTENT

% area, depth

• SEVERITYundisturbed extreme

• DISTRIBUTIONdispersed concentrated

• DURATIONshort term long term

mitigation? natural

recovery?

5 15 25 35 45 55 65 75 85 95 105 115 125 135 145 155 165 175 185 195

UNDIST DIST SKIDUNDIST DIST SKIDPRE

POST

1. Meaningful disturbance classes can be established easily and objectively

Conclusions from Iron Canyon IISoil Monitoring Results

1. Meaningful disturbance classes can be established easily and objectively

2. Pre-harvest stands came with legacy impacts that remained significant after decades

Conclusions from Iron Canyon IISoil Monitoring Results

1. Meaningful disturbance classes can be established easily and objectively

2. Pre-harvest stands came with legacy impacts that remained significant after decades

3. Legacy impacts were compounded by recent thinning, creating cumulative impacts

Conclusions from Iron Canyon IISoil Monitoring Results

1. Meaningful disturbance classes can be established easily and objectively

2. Pre-harvest stands came with legacy impacts that remained significant after decades

3. Legacy impacts were compounded by recent thinning, creating cumulative impacts

4. Assessing cumulative impacts requires pre-harvest monitoring

Conclusions from Iron Canyon IISoil Monitoring Results

5. Cumulative impacts exceed thresholds on some skid trails

Conclusions from Iron Canyon IISoil Monitoring Results

5. Cumulative impacts exceed thresholds on some skid trails

6. Old and new skid trails were coincidental at best.

Conclusions from Iron Canyon IISoil Monitoring Results

5. Cumulative impacts exceed thresholds on some skid trails

6. Old and new skid trails were coincidental at best

7. Mechanical operations on these soils will produce detrimental impacts

Conclusions from Iron Canyon IISoil Monitoring Results

5. Cumulative impacts exceed thresholds on some skid trails

6. Old and new skid trails were coincidental at best

7. Mechanical operations on these soils will produce detrimental impacts

8. The result is more areal impacts, adding to legacy disturbance for next harvest.

Conclusions from Iron Canyon IISoil Monitoring Results

National Forest Soil Scientists are Charged with Monitoring

Monitoring need not be difficult or expensive.It’s less expensive than planning & lawsuits!

THANKS TO:

Dr. Robert Powers - PSW

Brad Rust – Shasta-Trinity NF

Scott Miles – R-5