Post on 15-Mar-2016
description
M A R C I A G I B S 0 N S A M P L E W O R K
E: MGIBS16@LSU.EDUP: 281.785.1848
262 W STATE ST #3207BATON ROUGE, LA 70802
Marcia Christine Gibson262 W State St. #3207 Baton Rouge, LA 70802 281.785.1848 mgibs16@lsu.edu
Architecture Internship available June 17th
Graduate Assistantship Louisiana State University
Chickasaw Scholarship FoundationReceived 12 consectutive times for 3.0 and higher
AIA Henry Adams Award: awarded to the second highest graduating student in the Graduate School of Architecture
Graduate Research Assistant | LSU | Baton Rouge, LA | August 2011-Present+Spring ‘12: Working currently with Professor Meredith Sattler. Focusing on an academic analysis of the Louisiana Master Plan 2012. +Fall ‘12: Worked with Professor Meredith Sattler + Spring ‘12: Worked with Professor Frank Melendez + Fall ‘11: Worked with Professor Meredith Sattler
Summer Intern Architect | Chenevert | Baton Rouge, LA | May 2012-August 2012+ Worked on various aspects of design from 3d modeling, CD drawings, ASI’s, programming requirements in Excel, and putting together schematic design binders. Participated in some site visits and building surveying. +Primarily worked in AutoCad, Sketchup, Excel, & Photoshop.
Summer Intern Architect | Architexas | Dallas, TX | June 2011- August 2011+ Worked on various aspects of �ve di�erent projects including: a church, petroleum building, two courthouses, and convention center. +Surveying work for a restoration of a 1920’s church. +Primarily worked in AutoCad & Photoshop.
Server | Abuelos Mexican Embassy | College Station, TX | April 2008 - May 2011+ During school I worked part time as a server. My responsibilities included customer service, making transactions, and handling money. +Employee trainer and awarded employee of the month
Program Assistant | CS Conf. Center | College Station, TX | Jan. 2008 - May 2008+ Responsible for answering phone calls and arranging events at the confer-ence center for di�erent local organizations, private meetings, and parties.
LOUISIANA STATE UNIVERSITY | August 2011 - PresentCollege of Architecture Masters Degree Candidate - expected graduation date: May 2013
TEXAS A&M UNIVERSITY | August 2007 - May 2011Bachelors of Environmental DesignMinor in Business Administration
2d drafting : Rhinoceros 4.0 + AutoCAD Visualization: Adobe Photoshop + Illustrator Publishing: InDesign Building Information Modeling: Revit3d Representation: Rhinoceros 4.0, Sketch-Up Rendering: Rhino Vray, Kerkythea Microsoft O�ce: Word, Powerpoint, Excel
a c comp l i s hmen t s
ob j e c t i v e
wo r ke xpe r i e n ce
edu c a t i o n
s k i l l s
G L I E S D R E C K R E S I D E N Z MASTER PLAN COMMUNITY
TIME: FALL 2012 PROGRAM: 2,000 UNIT RESIDENCE
NORTH-SOUTH SECTION
ZINC PANEL DETAIL SITE PLAN AERIAL
M A R C I A G I B S O N MGIBS16@LSU.EDU
(281) 785-1848262 W STATE ST BATON ROUGE LA 70802
FLOOR PLAN
FLOOR PLAN: DETAIL
G L I E S D R E C K R E S I D E N Z MASTER PLAN COMMUNITY
TIME: FALL 2012 PROGRAM: 2,000 UNIT RESIDENCE
NORTH-SOUTH SECTION
ZINC PANEL DETAIL SITE PLAN AERIAL
Janet Craig Dracaena Deremensisheight 1ft. diameter 15 in.
Warneki Dracaena Deremensisheight 1ft. diameter 15 in.
Spider Plant Algaonema Modestumheight 2ft. diameter 27 in.
18330 mg
trichloroethelene 3686.20 mg
benzene6938.6 mg
formaldehyde
13760 mg
trichloroethelene
39,107 mg
benzene
10,378 mg
r
formaldehyde
Total Microgram
s Rem
oved Per Plant
CLEAN
P L A N T I N G P U R I F I C A T I O N HABITAT FOR HUMANITY
TIME: SPRING 2012 PROGRAM: 1200 SF FAMILY UNIT
ENHANCING AIR QUALITY
VOC’S, TOXINS, & HEALTH
Floor Plan
SitePlan 1:120
GSRI Ave.
Jade
Ave
.
M A R C I A G I B S O N MGIBS16@LSU.EDU
(281) 785-1848262 W STATE ST BATON ROUGE LA 70802
1. GREEN SPACE
2. GREEN SPACE + TRANSLUCENCY
3. GREEN SPACE + TRANSLUCENCY + OUTDOOR
4. GREEN SPACE + TRANSLUCENCY + FRONT & BACK PORCHES
5. WHOLE GREEN HOUSE
F I R E S T A T I O N # 6CIVIC & COMMUNITY
TIME: FALL 2010 PROGRAM: FIRE STATION & COMMUNITY CENTER
A
B
RAIN WATER COLLECTION
CIRCULATION
HVAC DISTRIBUTATION
West Central East Auditorium
LEVEL 1
SITE PLAN
M A R C I A G I B S O N MGIBS16@LSU.EDU
(281) 785-1848262 W STATE ST BATON ROUGE LA 70802
1.Coping2.
3.
4.
5.
6.
7.
8.
9.
101112
InsulationAlucoBond XPS Extruded (R 5.0/1”)
Metal Cladding
Y Flange
Plaster CeilingLow E GlassFacade Panel Connection
Protection BoardBentonite
Sealant
10
12
9.
1.
2.
3.
4.
5.
6.
7.
8.
1.
2.
4.
5.
6.
7.
8.
1. Coping2.
3.
4.
5.
6.
7.
8
.
InsulationAlucoBond XPS Extruded (R 5.0/1”)
Metal Cladding
Y Flange
Plaster CeilingLow E Glass
1.
3.2.
4.
5.
6.
7.
8.
EAST-WEST SECTION
AUDITORIUM WALL SECTION
M A R C I A G I B S O N MGIBS16@LSU.EDU
(281) 785-1848262 W STATE ST BATON ROUGE LA 70802
1.Coping2.
3.
4.
5.
6.
7.
8.
9.
101112
InsulationAlucoBond XPS Extruded (R 5.0/1”)
Metal Cladding
Y Flange
Plaster CeilingLow E GlassFacade Panel Connection
Protection BoardBentonite
Sealant
10
12
9.
1.
2.
3.
4.
5.
6.
7.
8.
1.
2.
4.
5.
6.
7.
8.
1. Coping2.
3.
4.
5.
6.
7.
8
.
InsulationAlucoBond XPS Extruded (R 5.0/1”)
Metal Cladding
Y Flange
Plaster CeilingLow E Glass
1.
3.2.
4.
5.
6.
7.
8.
EAST-WEST SECTION
AUDITORIUM WALL SECTION
E M B A T T L E M E N T PRESERVATION AS PROVOCATION
TIME: SPRING 2013 (IN PROGRESS)PROGRAM: PAVILION, LODGING, BELVEDERE
WELCOME PAVILION ELEVATION
ISLAND MODEL SITE MODEL
EAST-WEST ELEVATION
BELVEDERE COLLAGE INSPIRATION
M A R C I A G I B S O N MGIBS16@LSU.EDU
(281) 785-1848262 W STATE ST BATON ROUGE LA 70802
WELCOME PAVILION COLLAGE INSPIRATION
MIDTERM DETAIL MODEL OF A LODGING ROOM
SYSTEMS MOVING THROUGH A ROOM
LODGING BUILDING SECTION