Post on 02-Mar-2019
PT.Tekno Infrastruktur Sukses (TIS) awarded a new contract for Survey and Design Analysis work to PT.Teleconsult Nusantara.
PT.Tekno Infrastruktur Sukses or known as TIS has been awarded a new contract to PT.Teleconsult Nusantara for Full Survey Audit,Design Analysis and also Rectification Survey work.with total site :
- Full Survey Audit and Design Analysis : 106 Sites (Bali,Banten,East Java and Maluku).- Rectification Survey : 1992 Sites (Central Java,East Java,West Java,JABODETABEK,North Sumatera and Sulawesi).
| Project