Post on 23-Mar-2021
Page 1 of 16
PRE - FEASIBILITY REPORT
FOR
MODERNIZATION OF CAPTIVE POWER PLANT
WITHOUT INCREASING POLLUTION LOAD IN
EXISTING UNIT
OF
M/S. GHCL LTD.
SUTRAPADA-362 275,
TAL. SUTRAPADA, DIST. GIR SOMNATH
(GUJ.)
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
Prepared By:
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
NABL Accredited Testing Laboratory
ISO 9001:2008 Certified Company
Aqua-Air Environmental Engineers P. Ltd.
403, Centre Point, Nr. Kadiwala School, Ring
Road, Surat - 395002
Prepared By:
Page 2 of 16
CONTENTS
Sr.
No.
Description Page No.
1. Executive Summary 3
2. Introduction of the Project/Background information 6
3. Project Description 7
4. Site Analysis 12
5. Planning Brief 13
6. Proposed Infrastructure 14
7. Rehabilitation and resettlement (R & R) Plan 15
8. Project Schedule & Cost Estimates 15
9. Analysis of Proposal (Final Recommendations) 16
Page 3 of 16
1.0 Executive Summary
1.1 Project Details
M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada, District: Gir Somnath
(Guj.) is engaged in commercial manufacturing of Soda Ash & Captive Power Plant.
1.2 Products along with Production Capacity
1.3 Water Requirement, Waste Water Generation and Treatment
Total water requirement will be 408600 m3/day; which will be met through Hiran Dam &
Sea. Total wastewater generation will be 384008 m3/day which includes process effluent &
cooling sea water.
FINAL EFFLUENT DISPOSAL SYSTEM
DIFFUSER SYSTEM
Liquid waste from distiller and salt purification section is conveyed through pipeline and pre
diluted with once through cooling seawater in a mixing pond. It is discharged through a
combination of open channel of approximate 810 meters length and a submarine pipeline
inside the Arabian Sea with special designated diffuser system for spontaneous dilution.
1.4 Air Pollution Source and Control Management
The flue gas emission through stack attached to boiler shall conform to the following
standards:
SR.
NO.
PRODUCT EXISTING TOTAL PROPOSED
1. Captive Power plant 2x11 MW + 1x4.2 MW +
1x12.5 MW (stand by)
= 38.7 MW
2x11 MW + 1x12.5 MW +
1x4.2 MW (stand by) =
38.7 MW
2. Soda Ash 11,00,000 TPA 11,00,000 TPA
Page 4 of 16
Common Stack
Attached to
Stack Height in
Meter
Air Pollution
Control System Parameters
Permissible
Limit
Boiler
(1 to 5 nos.)
1-Stand by
145 ESP with each
boiler
PM
SO2
NOx
150 mg/Nm3
100 ppm
50 ppm
The process emission through various stacks/vent of process shall confirm to the
following standards:
Stack
No.
Stack Attached
to
Stack Height in
Meter
Air Pollution
Control System Parameters
Permissible
Limit
1 Filter Gas
scrubber 30 Scrubber NH3
175 mg/Nm3
2 Tower gas
scrubber 35.1 Scrubber NH3
175 mg/Nm3
3 Lime mill A 59.6 Bag filter PM
150 mg/Nm3
4 Lime mill B 59.6 Bag filter PM
150 mg/Nm3
5 Lime mill C 59.6 Bag filter PM
150 mg/Nm3
6 Dense ash
scrubber (old) 34 Bag filter PM
150 mg/Nm3
7 Dense ash
scrubber (New) 34 Bag filter PM
150 mg/Nm3
8 Lignite Tippler 15 Bag filter and
Dry Fog system PM
150 mg/Nm3
9 Lignite screen
House 15
Bag filter and
Dry Fog system PM
150 mg/Nm3
10 Boiler Bunker
Top 15
Bag filter and
Dry Fog system PM
150 mg/Nm3
11 Lime stone
Tippler 15 Bag filter PM
150 mg/Nm3
12 Limestone
screen house 15 Bag filter PM
150 mg/Nm3
13 Lignite feed
Building 15
Bag filter/
Dry Fog system PM
150 mg/Nm3
Page 5 of 16
14 Belt 213 / lime
kiln DSL 15 Bag filter PM
150 mg/Nm3
1.5 Hazardous Waste Management
Non-hazardous Waste
1.6 Green Belt
Total 11,78,669 m2
land area is available at site; out of this 4,85,619 m2 (41%) area is
developed as greenbelt and other forms of greenery.
1.7 Power & Fuel Requirements
Total Power requirement:
SR.
NO.
NAME OF
WASTE
WASTE
CATEGORY
QUANTITY
MODE OF DISPOSAL
1 Used Oil 5.1 40.5 MT/Year Collection, Storage, Transportation
and selling to registered re-refiners
units
2 Used Battery 17 8 MT/Year Collection, Storage, Transportation
and selling to registered re-refiners
units
1 Fly Ash -- 88560 MT/Year Bricks manufacturing plant within
factory premises & sell to National
Highway Authority of India (NHAI)
for road construction.
Sr.
No.
Description Requirement
( MW)
Source
1 Existing:
2x11 MW + 1x4.2 MW +
1x12.5 MW (stand by) = 38.7
MW
26.2 MW Captive power plant
Page 6 of 16
Note: Two DG Sets (1000 KVA & 500 KVA) are kept for emergency power back up.
Total Fuel requirement:
Sr.
No.
Fuel Quantity
1 Existing - Coal/Lignite 1500 MT/Day
2 Total Proposed – Coal/Lignite 1500 MT/Day
Note: After modernization of CPP the quantity of fuel will remain unchanged.
2.0 INTRODUCTION OF THE PROJECT/BACKGROUND INFORMATION
2.1 Identification of the project and project proponent. In case of mining project, a copy
of mining lease/letter of intent should be given.
Identification of the project
M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada, District: Gir Somnath
(Guj.) is engaged in commercial manufacturing of Soda Ash & Captive Power Plant.
Identification of the project proponent
Mr. N N Radia (COO)
2.2 Brief description of nature of the Project
M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada, District: Gir Somnath
(Guj.) is engaged in commercial manufacturing of Soda Ash & Captive Power Plant.
2.3 Need for the project and its importance to the country and or region
The demand for products intended to be manufacture is increasing in the country.
2 Total Proposed :
2x11 MW + 1x12.5 MW +
1x4.2 MW (stand by) = 38.7
MW
34.5 MW Condensing turbine
in operation
Page 7 of 16
2.4 Demands-Supply Gap
Based on our informal survey, we have found that there is a good potential for increase in
CPP by Condensing turbine. This is addition to existing CPP.
2.5 Imports vs. Indigenous production
Not applicable.
2.6 Export possibility
Not applicable.
2.7 Domestic/Export Markets
Not applicable.
2.8 Employment Generation (Direct and Indirect) due to project.
M/s. GHCL Limited will give direct employment to local people based on qualification and
requirement. In addition to direct employment, indirect employment shall generate ancillary
business to some extent for the local population.
3.0 Project Description
3.1 Type of Project including interlinked and interdependent projects, if any.
No interlinked project has been submitted.
Page 8 of 16
3.2 Location (map showing general location, specific location and project boundary &
project site layout) with coordinates.
• Map showing general location
Page 9 of 16
• Plot Layout
Page 10 of 16
3.3 Details of alternate sites considered and the basis of selecting the proposed site,
particularly the environmental considerations gone into should be highlighted.
Major factors involved in the selection of site are listed below:
• Existing operational facility
• Site is very well connected by road
• Proximity to Raw Material
• Availability of power evacuation facilities
• Availability of water for industrial use
Modern infrastructure support and amenities at par with industrial estates in other global
markets, including:
� Efficient transport facilities within the industry and to & fro the city area.
� Environment-friendly zone.
� Uninterrupted power supply.
3.4 Size or Magnitude of Operation
Please refer Section-1.1.1, Page No. 3.
3.5 Project Description with process details (a schematic diagram/flow chart showing
the project layout, components of the project, etc. should be given)
Please refer Form-I, Annexure-III.
3.6 Raw Material required along with estimated quantity, likely source, marketing area
of final product/s, mode of transport of raw material and Finished product.
For raw material required along with quantity; Please refer Form-I, Annexure-IV.
3.7 Resource optimization/recycling and reuse envisaged in the project, if any, should
be briefly outlined.
Every effort will be put for resource optimization/recycling.
3.8 Availability of water its source, energy/power requirement and source should be
given.
Water Source
Total water requirement shall be met through Hiran Dam & Sea.
Page 11 of 16
Total Power requirement:
Note: Two DG Sets (1000 KVA & 500 KVA) are kept for emergency power back up.
Total Fuel requirement:
Sr.
No.
Fuel Quantity
1 Existing - Coal/Lignite 1500 MT/Day
2 Total Proposed – Coal/Lignite 1500 MT/Day
Note: After modernization of CPP the quantity of fuel will remain unchanged.
3.9 Quantity of wastes to be generated (liquid and solid) and scheme for their
management/disposal.
Please refer Form-I, Annexure-IV.
Sr.
No.
Description Requirement
( MW)
Source
1 Existing:
2x11 MW + 1x4.2 MW +
1x12.5 MW (stand by) = 38.7
MW
26.2 MW Captive power plant
2 Total Proposed :
2x11 MW + 1x12.5 MW +
1x4.2 MW (stand by) = 38.7
MW
34.5 MW Condensing turbine
in operation
Page 12 of 16
3.10 Schematic representations of the feasibility drawing which give information of EIA
purpose.
4.0 Site Analysis
4.1 Connectivity
• Site is very well connected by road & rail
• Availability of power evacuation facilities
• Availability of water for industrial use
4.2 Land Form, Land Use and Land Ownership
It will be incorporated in EIA Studies.
4.3 Topography (along with map)
We will incorporate topography in EIA Studies.
RECONNAISSANCE SURVEY OF EXISTING PLANT ANNUAL REPORT
MARKET ASSESSMENT
FINANCIAL REPORT
PROJECT REPORT
INTRODUCTION
MONITORING OF AIR, WATER & SOIL QUALITY & NOISE
LEVELS. DATA ON METEOROLOGY SOCIO-ECONOMIC
STATUS & BASIC AMENITIES. SITE VISITS BY AND
INTERVIEWS WITH LOCALS
BASELINE
ENVIRONMENTAL
STATUS
ENVIRONMENTAL INFORMATION CENTRE
CENTRAL GROUND WATER BOARD
GUJARAT POLLUTION CONTROL BOARD (GPCB)
PUBLIC HEALTH ENGINEERING DEPT.
AGRICULTURE DEPARTMENT
FOREST DEPARTMENT
IRRIGATION DEPARTMENT
EMPLOYMENT EXCHANGE
HEALTH CENTER
CENSUS DEPT.
INDIAN METEOROLOGICAL DEPT.
SOCIOECONOMIC
STATUS &
INFRASTRUCTURE
PROPOSED
PLANT
FACILITY DESCRIPTION
IMPACTS
METHODOLOGY OF
IMPACT
ASSESSMENT
IDENTIFICATION & ASSESSMENT OF IMPACTS
EVALUATION OF IMPACTS BY MATRIX METHOD
SOURCE OF INFORMATION OVERVIEW OF
E. I. A. STUDIES
ACTIVITIES
ENVIRONMENTAL
MANAGEMENT
PLAN
DESCRIPTION OF EFFLUENT TREATMENT PLAN, AIR
POLLUTION CONTROL, HAZARDOUS WASTE
MANAGEMENT, GREEN BELT DEVELOPMENT
MONITORING PROGRAM
RISK ANALYSIS
STUDIES &
DISASTER
MANAGEMENT
PLAN
SAFETY, HEALTH & ENVIRONMENTAL POLICY, GUIDELINES BY
DIRECTOR GENERAL OF FACTORY SAFETY, MINISTRY OF
LABOR.
CONSEQUENCE ANALYSIS
PREPARATION OF DISASTER MANAGEMENT PLAN
Page 13 of 16
4.4 Existing land use pattern (agriculture, non-agriculture, forest, water bodies
(including area under CRZ)), shortest distances from the periphery of the project to
periphery of the forests, national park, wild life sanctuary, eco sensitive areas, water
bodies (distance from HFL of the river), CRZ. In case of the notified industrial area, a
copy of the Gazette notification should be given.
It will be incorporated in EIA Studies.
4.5 Existing Infrastructure
Existing Infrastructures facilities are listed below:
Site is very well connected by road
Proximity to Raw Material
Availability of power evacuation facilities
4.6 Soil Classification
It will be incorporated in EIA Studies.
4.7 Climatic data from secondary sources.
Primary source: our own weather station & Secondary Sources: Indian Meteorological
Department, Ahmedabad.
4.8 Social infrastructure available.
Depending on the growth of the company the required social infrastructure will be provided.
5.0 Planning Brief
5.1 Planning Concept (type of industries, facilities, transportation, etc.) Town and
Country planning/Development authority classification.
Type of Industry: M/s. GHCL Limited is located at Village: Sutrapada, Tal: Sutrapada,
District: Gir Somnath (Guj.) is engaged in commercial manufacturing of Soda Ash & Captive
Power Plant.
5.2 Population Projection
It will be incorporated in the EIA Study.
Page 14 of 16
5.3 Land use planning (breakup along with green belt, etc.)
Total 11,78,669 m2
land area is available at site; out of this 4,85,619 m2 area is developed as
greenbelt and other forms of greenery.
5.4 Assessment of Infrastructure Demand (Physical & Social)
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed modernization project activity.
• Social Welfare
• Cordial relation with the industry shall be established and representation shall be made to
villagers for help for creation of facilities related to health, education, etc.
5.5 Amenities/Facilities
It will be incorporated in EIA Studies.
6.0 Proposed Infrastructure
Proposed Modernization is within the existing premises.
6.1 Green Belt
M/s. GHCL Limited shall develop 4,85,619 m2 (41%) area of green belt within the factory
and on periphery of the factory.
6.2 Social Infrastructure
Depending on the growth of the company the required social infrastructure will be provided.
6.3 Connectivity (Traffic and Transportation Road/ Rail/Metro/ Water ways, etc.)
Site is very well connected by road & railway.
6.4 Drinking water Management (Source & Supply of water)
Total water requirement shall be met through Hiren Dam & Sea.
6.5 Sewerage System
Industry has installed Sewage Treatment Plant for treatment of sewage and finally disposed
into sea.
Page 15 of 16
6.6 Solid Waste Management
Please refer Form-I, Annexure-VI.
6.7 Power Requirement & Supply/Source
Please refer Section 1.7, Page No. 6.
7.0 Rehabilitation and Resettlement (R & R) Plan
7.1 Policy to be adopted (central/state) in respect of the project affected including home
oustees, land oustees and landless laborers (a brief outline to be given)
There is no habitation on the proposed modernization project activity area. So R & R policy
is not applicable to this project.
There shall not be displacement of any population in project area. Any major activity that
may lead to resettlement of the people is considered as permanent impact. Hence, there is no
permanent impact on this account. The increasing industrial activity will boost the
commercial and economical status of the locality up to some extent.
8. Project Schedule & Cost Estimates
8.1 Likely date of start of construction and likely date of completion (Time schedule for
the project to be given).
All activities related to modernization shall be started soon after getting Environmental
Clearance.
8.2 Estimated Project cost along with analysis in terms of economic viability of the
project.
Total costs is Rs. 1,075.37 Crores
Existing = Rs. 1,041.64 Crores
Proposed = Rs. 33.73 Crores (Already installed)
Page 16 of 16
9. Analysis of Proposal (Final Recommendations)
9.1 Financial and social benefits with special emphasis on the benefit to be local people
including tribal population, if any, in the area.
• Employment would be as per prevailing norms of state government for skilled and
unskilled people for the proposed modernization project.
• Social Welfare shall be done.
• Cordial relation with the industry shall be established and representation shall be made to