Page 1
NASA report to the CCSDS Management Council
November 2009ESA ESTEC, Noordwijk, Netherlands
Mike KearneyNASA
256-544-2843
Mike.Kearney@nasa.gov
Page 2
Agenda
NASA CCSDS support Note – No NASA org update (no change)
Overall NASA program schedule (AMPM) Recent missions Upcoming missions Advanced Comm Technology Efforts
Page 3
NASA CCSDS ParticipationNASA Rapporteurs (lead representatives)
1.2 Security WG Howie Weiss Sparta1.3 Information Architecture WG Dan Crichton JPL1.4 SANA WG Kelvin Nichols MSFC1.5 Delta-DOR WG Jim Border JPL1.6 Time Code Format WG Ed Greenberg JPLXML SIG Lou Reich GSFC/CSCRegistry/Repository SIG Dan Crichton JPL2.1 Data Archive Ingestion WG John Garrett GSFC2.2 Navigation WG Dave Berry JPL2.3 Info. Pack. & Registries WG Lou Reich GSFC/CSC2.4 S/C Mon + Control WG Lindolfo Martinez JSC2.5 Digital Repository Audit/Cert (RAC) WG John Garrett GSFC/CSC3.3 Service Mgmt. WG Erik Barkley JPL3.6 Cross Support Transfer Services WG Tim Ray GSFC3.7 Cross Support Architecture WG Fred Brosi JPL/GST4.1 Onboard Subnetwork Services WG Glenn Rakow GSFC4.3 Onboard Application Services WG Scott Burleigh JPL4.4 Onboard Wireless WG Kevin Gifford CU5.1 RF & Modulation WG Dennis Lee JPL5.2 Space Link Code/Sync. WG Victor Sank GSFC5.3 Multi/Hyper Data Compression WG Aaron Kiely JPL5.4 Space Link Protocols WG Greg Kazz JPL5.6 Ranging Working Group Steve Levitski GSFC5.8 High Rate Uplink WG Greg Kazz JPLLong Erasure Codes BOF Fabrizio Pollara JPLSpace Data Link Layer Security BOF Howie Weiss Sparta6.5 Asynch. Messaging Service WG Scott Burleigh JPL6.6 IP-over-CCSDS Links WG Greg Kazz JPL6.8 Delay Tolerant Networking WG Keith Scott JPL/Mitre6.9 Motion Imagery and Applications WG Rodney Grubbs MSFC6.10 Voice WG Michael Petersen JSC/LMIT
NO
CHANGE
Page 4
Page 5
Recent Missions
Page 6
Recent Missions - Ares 1-X Sucessful launch on Oct 28, 2009 2 minute powered flight, 6 min. total Splashdown 150 mi. downrange Parachute deployment problem
Booster damaged on impact
Successful shakedown flight, testing Ares design concepts
Page 7
Recent Missions - LCROSS
LCROSS impact on moon on 9 October Centaur stage impacted first while
“shepherd” vehicle recorded data Nine LCROSS instruments successfully
captured each phase of the impact sequence: the impact flash, the ejecta plume, and the creation of the Centaur crater
Centaur impact left crater 92 ft. (28 m) wide Plume of vapor and fine debris detected Spectrographic and other analysis is
underway.
Page 8
Recent Missions - Messenger Launch: August 3, 2004 aboard a Boeing Delta II rocket Gravity assist flybys
Earth, August 2005; Venus, October 2006, June 2007; Mercury, January 2008, October 2008, September 2009
Enter Mercury orbit: March 2011. Mission Plan : Orbit for one Earth year, studying
Composition and structure of Mercury’s crust Topography and geologic history The nature of its thin atmosphere and active magnetosphere, The makeup of its core and polar materials
Page 9
Recent Missions - Spirit
Mars Rover Spirit has been operating on Mars for 69 mos. Became stuck in soft soil in Spring 2009. Light soil in image below was exposed after Spirit
attempted to free it’s wheels. Also battling memory problems
Page 10
Recent Missions - Opportunity
Ran across three meteorites laying on the ground within a few weeks of each other (700 meters apart)
Heading towards
Endeavour Crater
Page 11
Upcoming Missions
Page 12
Remaining Shuttle FlightsFlight Date Year Shuttle Crew size Duration Notes
STS-129 November 16 2009 Atlantis 6/7 ~11d ISS assembly flight ULF3: ExPRESS Logistics Carriers (ELCs) 1 & 2.
STS-130 February 4 2010 Endeavour 6 ~11d ISS assembly flight 20A: Node 3 and Cupola.
STS-131 March 18 2010 Discovery 7 ~11dISS assembly flight Utility and Logistics Flight 4: Multi-Purpose Logistics Module Leonardo.
STS-132 May 14 2010 Atlantis 6 ~11dISS assembly flight 19A: Mini-Research Module 1. Final planned flight of Atlantis.
STS-134 July 29 2010 Endeavour 6 ~12dISS assembly flight ULF6, ELC 4, ROEU, Alpha Magnetic Spectrometer. Final planned flight of Endeavour.
STS-133 September 16 2010 Discovery 6 ~10d
ISS assembly flight ULF5, MPLM Leonardo, (to be left pemanently attached), ELC 3. Final flight of Discovery; final Shuttle flight of the program.
Page 13
Constellation Activities
An Orion crew module Ground Test Article at the NASA Michoud Assembly Facility in New Orleans. Photo Credit: NASA
A demonstration test of the main parachute test equipment for the Orion crew exploration vehicle completed Oct. 2, 2009
Ground vibration test of the Orion Launch Abort System, August 2009
Orion flight test crew module - used for the Orion Pad Abort flight test starting early 2010
NASA conducted complete launch simulations of an Orion mission to ISS to verify operations tools and processes for Constellation Mission Ops. IMSim (Integrated Mission Simulation), gave a networked system of high
fidelity “physics” simulations, performed the real time launch and ascent simulation and post insertion burn.
The DON (Distributed Observer Network) distributed the IMSim visualizations to remote team members and saved them for playback later.
Both tools are part of the Constellation Modeling and Simulation Team (MaST).
Page 14
TDRSS Fleet Update Tracking and Data Relay Satellite (TDRSS K/L)
Procurement for two replenishment s/c functionally equivalent to TDRSS series 2 (H,I,J)
Launch date: TDRSS K April 2012 TDRSS L April 2013 TDRSS Fleet Status
Preparations underway to retire F-1 after 26 years of service
Page 15
Advanced Comm Technology efforts
Page 16
LADEE Optical Comm Demonstration ~ 201210/31/2008
16
LADEE Terrestrial Photon-Counting Array Rx
Orbital terminal• Inertial-stabilization• Fully-gimbaled • Low size, weight, & power design
Lunar Atmosphere and Dust Environment Explorer (LADEE) Will characterize the lunar atmosphere and lunar dust environment.Will demonstrate optical comm technology
Orbiter-to-Earth Laser Communications• 622 Mbps downlink (O-E)• 16 Mbps uplink (E-O)• Sub-cm ranging
Page 17
Software Defined Radio Testbed on ISS
17
SCAN Testbed is located on the ISS port (P3) ELC, mounted on the starboard side of the P3 ELC on the zenith/ram corner.
HTV Launch to ISS in 2011
SCaN on-orbit Testbed consist of:• Three Software Defined Radios• Ka-Band Capability• S-band Capability• GPS Experiment Testbed