Post on 13-Apr-2018
7/26/2019 NDA Profile 2012
1/110
Consulting Engineers & Project Managers
52-D1Gulberg IIILahore,Pakistan
Voice : +92-42-5875181-5876457Fax : +92-42-5876889Email : info@ndapak.comhttp://www.ndapak.com
7/26/2019 NDA Profile 2012
2/110
Overseas Projects
Energy Sector
Industrial / Textiles
Environmental and Public Health Engineering
Oil and Gas
Bridges and Transportation
Multistoried Buildings
Education Buildings
Housing and Leisure
Value Engineering
Registration with Pakistan Engineering Council
Registration with Karachi Building Control Authority
Enlistment with Capital Development Authority
Consulting Engineers
7/26/2019 NDA Profile 2012
3/110
DAMS&HYDRO ENGINEERING
!
"#
INDUSTRIAL SECTOR
Civil / Structural:
$
#
% $ & $
'((
$
Piping:
) *+,
) -$
Mechanical:
)
. $
' #
Consulting Engineers
7/26/2019 NDA Profile 2012
4/110
POWERPLANTS
Civil / Structural:
/
TRANSPORT SECTOR
Civil / Structural:
.
+
OIL&GAS SECTOR
Civil / Structural:
)
,
TELECOMMUNICATIONS
Civil / Structural:
+
+
ARCHITECTURALENGINEERING
Buildings
(
(
0
"
'
Materials
(
)
" +$
Consulting Engineers
7/26/2019 NDA Profile 2012
5/110
PROJECTMANAGEMENT
+ 1
(
2
+
) #
$
(
3
GEOTECHNICAL ENGINEERING
!
*
$
$
(
SPECIALSTRUCTURES ANDREHABILITATION
(
*
PEERREVIEW&VALUEENGINEERING
$ (
! " )
( +
Consulting Engineers
7/26/2019 NDA Profile 2012
6/110
A: Detailed Design B: Value Engineering
C: Resident Construction Supervision D: Project Management
E: Design Review
Sr. # Project Description ServicesCost
(Rs. Mil.)
Status
1. 11 Storied FFBL Head Office
Building, Islamabad
Built up area 170,000 sq. ft
B, C, D, E 1,000 Under
construction
2. 11 Storied Park & Ride Parking
Plaza, Lahore
Built up area 154,000 sq. ft
A 500 Complete
3. 33 Storied Ali Trace Center, Lahore
Built up area 400,000 sq. ft
A, C, D 1,000 Under
construction
4. 9 Storied 200 Bed Surgical Hospital,
Sukker
Built up area 275,000 sq. ft
A 1,000 Under
construction
5. 29 Storied Pace Towers, Lahore
Built up area 500,000 sq. ft
A, C, D 1,500/- Substantially
complete
6. 70 Storied Mabarak Center, LahoreBuilt Up area 7,000,000 sq. ft.
B, C 50,000/- Underconstruction
7. 20 Storied Ali Tower, Lahore
Built up area 240,000 sq ft.
A, C, D 480/- Complete
8. Pakistan School of Fashion Design,
LahoreBuilt up area 350,000 sq. ft.
C, D 960/- Complete
9. 16 storied Madinah Center, Lahore
Built up area 200,000 sq. ft.
A 600/- Under
construction
10. Office Building, 201 A, Upper Mall,Lahore
Built up area 50,000 sq. ft.
A, C, D 200/- Complete
11. 8 StoriedDescon Headquarter,
Lahore
Built up area 137,500 sq. ft.
A 237/- Complete
12. Sweetwater Dairy Farm,Renala
Khurd, Okara
B, C, D, E 140/- Complete
13. 20 Storied Islamabad Stock
ExchangeBuilding: Built up area 400,000 sq. ft.
E 1,200/- Complete
Consulting Engineers
7/26/2019 NDA Profile 2012
7/110
Sr. # Project Description ServicesCost
(Rs. Mil.)
Status
14. 33 Storied PTET Tower, Islamabad
Built up area 600,000 sq. ft.
E 1,800/- Complete
15. 9 Storied New Auriga Shopping
Complex, Lahore:Built up area
400,000 sq. ft.
A, C, D 650 Complete
16. Metro Cash and Carry Islamabad:
Store spread over12.5 Acres with PEB
Roof
C, D 50 Million
(USD)
Complete
17. Metro Cash and Carry, KarachiStore spread over12.5 Acres with PEB
Roof
C, D 50 Million
(USD)
Complete
18. Metro Cash and Carry Store,
LahoreStore spread over12.5 Acres with PEB
Roof
A, C, D 50 Million
(USD)
Complete
19. Eighteen storied Apartment
Buildings In San Diego, Californiafor Flores Lund Consultants
A Complete
20. Suzuki Sethi Motors, Ferozepur
Road, Lahore:Multistoried Office/Showroom with a
Built Up Area of 100,000sq.ft.
A,C,D 180/- Complete
21. Century Tower, Kalima Chowk,Lahore: Multistoried
Office/Commercial Building with a
Built Up Area of 175,000sq.ft.
A,C,D 210/- Complete
22. Suzuki Township MotorsMultistoried Office/Commercial
Building with a Built Up Area of
50,000sq.ft.
A,C,D 80/- Complete
23. PACE, Model Town Link Road,
LahoreMultistoried Commercial Building
with a Built Up Area of 120,000sq.ft
A 250 Complete
24. PACE, GujranwalaMultistoried Commercial Building
with a Built Up Area of 140,000sq.ft
A 250 Complete
25.PACE Gujrat
Multistoried Commercial Buildingwith a Built Up Area of 140,000sq.ft
A 250 Complete
Consulting Engineers
7/26/2019 NDA Profile 2012
8/110
Sr. # Project Description ServicesCost
(Rs. Mil.)
Status
26.NHA Head Office Building,
Islamabad:
Multistoried Office Building with a
Built Up Area of 125,000sq.ft
A 250 Complete
27.Al Rehman Plaza, SargodhaMultistoried Commercial Building
with a Built Up Area of 300,000sq.ft
A 550 Complete
28.Warid Telecom, (Pvt.) Ltd.
MSC III Gujranwala and Karachi
A 50 Complete
29.Naafeh Tower, Gujranwala
Multistoried Commercial/Apartment
Building with a Built Up Area of
300,000sq.ft
A 600 Under
construction
30.Usmania Tower, Lahore
Multistoried Commercial Building
with a built up area of 250,000 sq. ft.
A 500 Complete
31.Regency Hotel, Mirpur
Multistoried commercial building with
a built up area of 200,000 sq. ft.
A 360 Complete
32. Prime Ministers Housing Scheme A Complete
33.Park & Ride Parking Plaza, LibertyMarket, Lahore
Multistoried Parking Plaza with a built
up area of 155,000 sq. ft.
A 500 Under
construction
34. Shopping Center, Old District
Court, Muzaffarabad, AJK
Multistoried Commercial Building
with a built up area of 75,000 sq. ft.
A 300 Under
Construction
35. Shopping Center, Bank Road,
Muzaffarabad, AJKMultistoried Commercial Building
with a built up area of 275,000 sq. ft.
A 1,250 Under
Construction
36. Prime Minister House,
Muzaffarabad, AJK
A 500 Under
Construction
37. President House and Secretariat
Muzaffarabad, AJKA 500 Under
Construction
38. Officers Club, Muzaffarabad
Multistoried Commercial Building
with a built up area of 48,000 sq. ft.
A 200 Under
Construction
Consulting Engineers
7/26/2019 NDA Profile 2012
9/110
Sr. # Project Description ServicesCost
(Rs. Mil.)
Status
39. National Khurshid Library,
Muzaffarabad
Multistoried Commercial Building
with a built up area of 25,000 sq. ft.
A 100 Under
Construction
40. Sports Complex, Bagh AJK
Multistoried Sport Complex Building
with a built up area of 100,000 sq. ft.
A 400 Under
Construction
41. Langer Pura Birdge, Muzaffabad,
AJK
Pre-stressed .Concrete Box Girder
Bridge built by the Cantilever
Construction Method, with amaximum span of 89 meter.
A 600 Under
Construction
42. Jalalabad Birdge, Muzaffabad, AJK
Pre-stressed .Concrete Box Girder
Bridge built by the Cantilever
Construction Method, with a
maximum span of 109 meter.
A 600 Under
Construction
43. Hullar Bridge, Bagh
Pre-cast pre-stressed concrete girder
bridge having a span 42 m each, total
length 210 meter.
A 450 Under
Construction
44. Fauji Fertilizer Co., Islamabad B 500 Complete
45. Brarkot Road,Muzaffarabad, AJK A 260 Under
construction
46. Zero Point to Airport,Muzaffarabad,
AJK
A 288 Under
construction
47. Airport to Langerpura,Muzaffarabad, AJK
A 288 Under
construction
48. Ring Road Section I,Bagh, AJK A 216 Under
construction
49. Soutern By Pass Link Road,Rawalakot, AJK
A 115 Under
construction
50. Police Station to Baldia Adda,Rawalakot, AJK
A 110 Under
construction
51. Sialkot-Lahore Motorway Project E Under
construction
52. Expansion of Makkah Power Plant,
Makkah, Saudi Arabia
A 900 Under
construction
Consulting Engineers
7/26/2019 NDA Profile 2012
10/110
Consulting Engineers
7/26/2019 NDA Profile 2012
11/110
Consulting Engineers
7/26/2019 NDA Profile 2012
12/110
! " ! " ! " ! "
!" #$%## !
'
#" #" #" #"
!!!!
$ %##
! (
)' )' $ %##
$ !% &!'$ !% &!'$ !% &!'$ !% &!'
$! ('!) ! "$! ('!) ! "$! ('!) ! "$! ('!) ! "
%## *
& ' ( # %## )#
+' %' %##
!', # +#"
##
% ('
%# %, -
Consulting Engineers
7/26/2019 NDA Profile 2012
13/110
$ *$ &!' $! ('!) ! "$ *$ &!' $! ('!) ! "$ *$ &!' $! ('!) ! "$ *$ &!' $! ('!) ! "
%## *
& ' ( # %##
)# +' %' %## !', #
+#" ##
% ('
' + "## ! ' + "## ! ' + "## ! ' + "## !
*% ('!) ! "*% ('!) ! "*% ('!) ! "*% ('!) ! "
%## *
& ' ( # %##
)# +' %' %## !', #
+#" ##
% ('
Consulting Engineers
7/26/2019 NDA Profile 2012
14/110
" ) ,% ('!) ! "" ) ,% ('!) ! "" ) ,% ('!) ! "" ) ,% ('!) ! "
%, -
%, # ,
-& % &-& % &-& % &-& % &
% ( +# . + -#
%## # %
Consulting Engineers
7/26/2019 NDA Profile 2012
15/110
$$$$....& '& '& '& '
" /" " /" " /" " /"
/
$%##
0#' #
## 1#
0 0 0 0
! ! ! !2/ #
, ,
3 ''
#,' , 3
!$ 11!1 %1 4 5'
6 7#
, ' ' 8
6
Consulting Engineers
7/26/2019 NDA Profile 2012
16/110
1 1 1 1 1 1 1 1
) ) ) )
)# (
/ #' % '
$%## #
&) 1 1 &) 1 1 &) 1 1 &) 1 1
) ) ) )
)# ( 9 #'
% '
$%## #
1 1 1 1
$ ,%$ ,%$ ,%$ ,%
: 4 ; #'
9 ' 4 29 '
"
7/26/2019 NDA Profile 2012
17/110
3
! ! %# ,
!"#
$%
& '(
) *% #
+(
0, 6
! " # ,
&% &%
& '(
( $
! # )# ( %# ,
# + -
! "
#$ % !&
$ '
(
&! +( '.
, *% #
+(
! %# )# ( %# ,
# + -
! "
#$ % !&
&! +( '.
, *% #
+(
=# &,00 ( >%
# + -
! "
#$ % !&
&! +( '.
, *% #
+(
Consulting Engineers
7/26/2019 NDA Profile 2012
18/110
3
6, ?' 3 ! >' %# ,
#( '
$ $
&! +( '.
, *% #
+(
-) )
# , /
0 / '
# +
#
&! +( '.
, *% #
+(
(# 8 % '' 6
% 1. (%
2 & %
%
(
! !
( 3 .
) # #
4 % +%%5 )
%@) #
6 )( + (.
!"# 7% .
+54 4 (
% * %# 3 ?!
! 8 3 9 % :
% 3 ;: % !
% # %
1#+*
Consulting Engineers
7/26/2019 NDA Profile 2012
19/110
3
%#' * * ' ?!
& ,! ;:=
% # %
1#+*
Consulting Engineers
7/26/2019 NDA Profile 2012
20/110
02
Consulting Engineers
7/26/2019 NDA Profile 2012
21/110
,
'
# %
, '
#, 3
# 1
B @#
'
#
## # '
' #
# 1
& %
C
%' %#
D
'
#
' -
%#,
,# %' (#
! D7
345 1 % )345 1 % )345 1 % )345 1 % )
( !! ( !! ( !! ( !!
',
#
( $
%##
67 1 ! 67 1 ! 67 1 ! 67 1 !
$! ,%$! ,%$! ,%$! ,%
D#
'
''#' , 0#
1/ $%##
#
1
Consulting Engineers
7/26/2019 NDA Profile 2012
22/110
% ! % ! % ! % !
$! ,%$! ,%$! ,%$! ,%
>' /'
' E '"
C
47 1 47 1 47 1 47 1
$! ,%$! ,%$! ,%$! ,%
* D ( 21F >'
" % # %
# ,
% # #
D#
# ,
Consulting Engineers
7/26/2019 NDA Profile 2012
23/110
3
ENERGY
! &&& D 3
% 6 %. % 2 ? %
& (
$&
& '
"
& " '
2
- D D
' 2 2 @ %
1-/ @(
, #.
!"#
-++
E; !* ! &&& D 3
2 # @
% ! %%% (
7 .6
!"#
.
#
/2 !* (# ' > #
%(
,! !"#
2(( ,7
! ! %# ,
!"#
$%
& '(
Consulting Engineers
7/26/2019 NDA Profile 2012
24/110
&/0 8
Consulting Engineers
7/26/2019 NDA Profile 2012
25/110
& ) $
%
(
# 0#@# @ @
) @
) 8 ) ,# ,
#
- ' !- ' !- ' !- ' !
%' 44%' 44%' 44%' 44
@ @
,
2 '
) % #1 $ %##
%
-' &!'-' &!'-' &!'-' &!'
@ ) 8 )
,# , !
''#' E: '1 ' %
# 1 )
' G /"
#1 !# ' #'
# (
) %'
"! &!'"! &!'"! &!'"! &!'
@ )
8 ) ,# ,
!
''#' :'1 '
% #
1 )
' G
/" #1 !#
' #'
#
(
) %'
Consulting Engineers
7/26/2019 NDA Profile 2012
26/110
& !& !& !& !
9"9"9"9"!!!!
F >' (
# ' ( ) %#, )
' #
' , 1
%# 8
& 8'
%## '
#
-' -' -' -'
9"!9"!9"!9"!
F >' (
# '
( ) %#, )
' #
' , 1 %# 8
& 8'
'
#
: : : :
9"!9"!9"!9"!
F >' (# '
( ) %#, )
' #
' , 1
%# 8
& 8'
'
#
Consulting Engineers
7/26/2019 NDA Profile 2012
27/110
&$ &$ &$ &$
! ! ! !
21H >' (
# ' ( ) %#, )
' #
' , 1
%# 8
& 8'
'
#
' ' ' ' ! %! %! %! %....4 &'4 &'4 &'4 &'
/1F >' ( # ' ( ) %#,
) ' # ' , 1 %# 8 & 8'
%## ' #
Consulting Engineers
7/26/2019 NDA Profile 2012
28/110
3
0, 6
! " # ,
&% &%
& '(
) 8A )
8 % # # &
,
- ( ( 3
# 4 & 3 !
% -# ) 181 >
15! ! 5
( .
5 & 4 & ( (
! %%%
?8 %.
A@ &
3
4
. '.
6, ) !#A, 6>
5 & 4 & ( (
! %%%
8 %.
A@ &
3
4
. '.D# ) ) 6>
5 5 ( !
6; % ; %.
A@ &
3
4
. '.
) ( !#A, 6>
> *% , +% ,
& #( & !% ! %
( .
) *
A@ &
3
4
. '.
Consulting Engineers
7/26/2019 NDA Profile 2012
29/110
3
G !#A, 6>
> *% , +% ,
& #( & !% ! %
( .)
*
A@ &
3
4. '.
-# !#A, 6>
> *% , +% ,
& #( & !% ! %
( .
)
*
A@ &
3
4
. '.
( ( % ) 6>
6.> *% , +% , & #( & !% !
% ( .
)
*
A@ & 3
4
. '.
%# ) ( 6>
;.= *% , +%
, & #( & !% !
% ( .
)
*
A@ &
3
4
. '.
% ) ( ( 6>
;.= *% , +%
, & #( & !% !
% ( .
)
*
A@ &
3
4
. '.
) ( 6>
> *% , +% ,
& #( & !% ! %
( .)
*
A@ &
3
4. '.
) > # ( 6>
; *% , +% ,
& #( & !% ! %
( .
)
*
A@ &
3
4
. '.
Consulting Engineers
7/26/2019 NDA Profile 2012
30/110
;-/ &;-/0
Consulting Engineers
7/26/2019 NDA Profile 2012
31/110
& '# ,#
# %1
& '# ,#
C
%#
!
# 4
%
$%##
8 &
!
#, D
7#
# %#
" -" -" -" -
! # ' # : "
,# # ; 01 1 3
H ! >(1
% C - # %## 8
( # H; 1 ,
( -"
- C '' %# # +#
% - 2'' , #
;H #' H"1
# 1
+# 7#
# %#C # ''
8&
7/26/2019 NDA Profile 2012
32/110
- 0! - 0! - 0! - 0!
F ' D
,# # ; 01 '
%## %
## ' 2: , 8# - / ,'1 ( +' ( #' ,
" # % *
- -1 # ' (1
( ?# H 0#'" +
2: + (" # # ''
1 % ,
' ##1
% -% -% -% -
' #
,# '
'
,# #
/H 0 '1
%##
% 3!'
# %#
%1
## ' 29
, 8# -
H ,'1
( +' ( #'
, "
#
% * - -1 (
+# 1 (
?# '
/ + (1
1! -1! -1! -1! -
D =# *
' 8 )# # ? ; 01'1
%## %
## ' 92 , 8# -
2 ,'1 ( +' ( #'
, " #
% * - -1 ( +#
1 ( ?# ' H +
(1
Consulting Engineers
7/26/2019 NDA Profile 2012
33/110
) 9"! () 9"! () 9"! () 9"! (
' ! ? ( )# ,# #
01 '
%# 8 & ! #
%## ! % - !1
! 9! 9! 9! 9"! ("! ("! ("! (
? ( )# ,# # 2H
01 '
%# 8 & ! #
%## ! % - !1
Consulting Engineers
7/26/2019 NDA Profile 2012
34/110
' & ! 9"! (' & ! 9"! (' & ! 9"! (' & ! 9"! (
9 ,# #
2H 01 '1
%# 8 & ! #
%## ! %1
' !' !' !' !
/% /% /% /%
9"! (9"! (9"! (9"! (
,# # ; 01 '1 %#
8 & !
# %##
! %1
(! -"$(! -"$(! -"$(! -"$
9"! (9"! (9"! (9"! ( -, )#
,# # 2H 01 '1
%#
8 & !
# %##
! %1
Consulting Engineers
7/26/2019 NDA Profile 2012
35/110
< ! ' 9 < ! ' 9 < ! ' 9 < ! ' 9
-"$ -"$ -"$ -"$ - - - -
)#
,# # H 01
'1
%## %1
## ' 1 (
+' ( #' ,
" #
% * - -1
( +# 1
5== &! '%5== &! '%5== &! '%5== &! '%
D
)#
,# # 2HH
01 '1
%##
%1
## ' : 1 ( +' (
#' ,
"
/$ >) /$ >) /$ >) /$ >)
(! (! (! (!
+'
2E ,#
/ @ ,# # #
2H 01 1
( 7#
3 !'
( # %# %1
Consulting Engineers
7/26/2019 NDA Profile 2012
36/110
3
+#3 +A ) =' -1 D ? )# &', &',
+ % ( ;
( 99 7. .
+ #
//&' ,
4 ( A -, ! -
+ % B
( =6 7. .
+ $%%
!1!1 ' ( -+ % ( :
( 6 7. .
+
#
+ 3 /%
!
2 ) %# D %#
+ % 2 ( (
;9= 7. .
' -
$
!, -
+ % % ( 8 ( >= 7. .
' )
%*, -. / $
'&
$+
2C*
( (
( 7. .
#*
$
- 3
.
Consulting Engineers
7/26/2019 NDA Profile 2012
37/110
3
D# !#A, 6>
( (
( 7. .
#*
$
- 3
.
% ' ) 6>
% ( (
7. .
#*
$
- 3
.
% ) ( !#A,
/! # %% ( (
;9= 7.
#*
$
- 3
.
% ? # !#A,
/ # %% ( (
9= 7.
#*
$
- 3
.
? #, !#A,
# '( ( (
= 7.
#*
$
- 3
.
># -, !#A,
# '( ( (
;= 7.
#*
$
- 3
.
-
# %% ( (
;9= 7..
+ #
+ 4
' ' # " &',
# (
1#+* $%(
&', % &%" )# &',
# (
1#+* $%(
Consulting Engineers
7/26/2019 NDA Profile 2012
38/110
3
) ' -
1 # (% %%
( ( = 7..
0 *, 1"
+ #
'.
+
#,##
C &.
+5$%%
@(' A ( %
#! # %% & (
;=7..
+ +
# % ! ! )1 8#, -
1 # (% %%
( ( 6 7..
$
+ #
+( 4
- D +' 6 ( -
/ # %% ( (
: 7..
' 4
Consulting Engineers
7/26/2019 NDA Profile 2012
39/110
3
# >' -
1 # %% ( (
9= 7. .
" ! 4
+# # ! )1 8#, -
%% (
# 2 + #
( D !# A >'
! # 2 '
, 2
D D ? )# &',
# # ( (5 ;=
7. .
$ *
1#+*
7/26/2019 NDA Profile 2012
40/110
- / 0
Consulting Engineers
7/26/2019 NDA Profile 2012
41/110
& ? 8 %
0#
' #
?1
& >! /*)& >! /*)& >! /*)& >! /*)????
%
##
%##
#
#
) 0 >!) 0 >!) 0 >!) 0 >!
/*) @0/*) @0/*) @0/*) @0
/$! A/$! A/$! A/$! A
0#'
# @
## 1
$%##
#
(! ;'! ! >! /*)(! ;'! ! >! /*)(! ;'! ! >! /*)(! ;'! ! >! /*)%## % +,
Consulting Engineers
7/26/2019 NDA Profile 2012
42/110
! 0 >! !! 0 >! !! 0 >! !! 0 >! !
""""
%##
+,
% % % %
$ $ $ $
#
#
@##
$%##
#
0 /* 0 /* 0 /* 0 /*))))
# ( $%##
#
Consulting Engineers
7/26/2019 NDA Profile 2012
43/110
3
(' 8 + ' 8 "
7% 5
.
? (
!
5
+,'
8 ' + =#7% 5
(
5 ; %!
.
#
>
7/26/2019 NDA Profile 2012
44/110
/;- 8 B-
Consulting Engineers
7/26/2019 NDA Profile 2012
45/110
! $ - ! $ - ! $ - ! $ -....=C=C=C=C
! "#### $ %
&'"### $ %
( !
)%
' # ( ) 3
!' # %#1
! $ ! $ ! $ ! $
(%(%(%(%....=4=4=4=4
! "#### $ % &'"### $
%
(
!
)%
( ) 3
!' # %#1
! $ ! $ ! $ ! $
)"!)"!)"!)"!
! "####
$ %
&'"### $
%
(
!
)%
( 3
!' #
%# 1
Consulting Engineers
7/26/2019 NDA Profile 2012
46/110
3
%# !
# 4
2
#
#3 4 ( ! /F >' !# ( -
@ ,( +@ 3 ,
% !
#5 2
#
! % -@9# ! ;.= + &
+
#
3
4%(2
! % >@
# ! ;.= + &
#*
+ #
3
4%(2
! % &',
# ! ;.= + &+ #
3 4%(2
Consulting Engineers
7/26/2019 NDA Profile 2012
47/110
- / ;&-
-
Consulting Engineers
7/26/2019 NDA Profile 2012
48/110
& ' $ #, D
%
'
,
' #
'
#$
,' , 1
&
C
* %#
%$% '
% * !' #',
*
1 1 1 1 1 1 1 1
) ) ) )
)# (
/ #'
% '
$%## #
&) 1 1 &) 1 1 &) 1 1 &) 1 1
))))
)# (
9 #' % '
$%## #
1 1 1 1
$ ,%$ ,%$ ,%$ ,%
: 4 ; #'
9 ' 4 29 '
"
7/26/2019 NDA Profile 2012
49/110
!" # $%!" # $%!" # $%!" # $%
3
% * %# 3 ?!
! 8 3 9 % : % 3
;: % ! %
# %
1#+*
%#' * * ' ?!
& ,! ;:= % # %
1#+*
Consulting Engineers
7/26/2019 NDA Profile 2012
50/110
/; &;-/0
Consulting Engineers
7/26/2019 NDA Profile 2012
51/110
% > /' - % > /' - % > /' - % > /' -
!# ,# ,# # 9H 01 1
3 !' 4 # %#
% @," 1 1 &!% @," 1 1 &!% @," 1 1 &!% @," 1 1 &!
,# ) ' - !#A
"
%## #', #
Consulting Engineers
7/26/2019 NDA Profile 2012
52/110
&'( &'( &'( &'( ')&(')&(')&(')&(
3
% + 6 -
( (
:= 7. .
+ # 0
%
&
- *'
7/26/2019 NDA Profile 2012
53/110
;0 / -;
Consulting Engineers
7/26/2019 NDA Profile 2012
54/110
$'( (& )'$'( (& )'$'( (& )'$'( (& )'
3
' !B D# %'
(
%
1#+*
8' >&% % ) 4 8A % '"
4% # %
1#+*
Consulting Engineers
7/26/2019 NDA Profile 2012
55/110
-; 00
Consulting Engineers
7/26/2019 NDA Profile 2012
56/110
)' ((()' ((()' ((()' (((
3
!, -
+ % % ( 8
( 9 7. .
%
) %3&
4 !
" $ 5-66 $
7566 86 /( ,
$ 3 7- # /
$
+
2C*
7/26/2019 NDA Profile 2012
57/110
!" # $
%& '& %( $
% )* (+ %!
($ !
% ! !
+ *, !
Consulting Engineers
7/26/2019 NDA Profile 2012
58/110
NAEEM-UR-RAHMAN DURRANI
DATE OF BIRTH: August 12, 1950NATIONALITY: Pakistani (Permanent Resident, Canada)MARITAL STATUS: Married
RELIGION: IslamLANGUAGES: English, Urdu
KEY QUALIFICATIONS
Design, Supervision and Management of a variety of Civil / Structural Engineering Projectsin Pakistan and abroad, both as Consulting Engineer and Owners representative. Jobsexecuted include Power Plants (Hydro, Thermal and Nuclear) Oil and Gas (includingOffshore Platform, Gas Dehydration Plant and H2S removal Plant), Pre stressed Concrete andStructural Steel Bridges, Industrial Buildings, Cement Plants, Multistoried Commercial and
Office Buildings, Cross Drainage Works, Water Supply and Irrigation Schemes, StorageStructures, Infrastructure Projects etc.
Ten years with NESPAK as Lead Civil/Structural Engineer on Energy,Irrigation and Industrial Projects. Responsibilities included:
1. Design and Tender Documentation,2. Construction Monitoring and Support
Seven years with UNITED BANK LIMITED as Executive Vice Presidentand Chief Engineer responsible for all Construction/Maintenance activities ofthe Bank and Evaluation of Securities. Responsibilities included:
1. Management and Administration of Engineering Division comprising ofthree graduate engineers and eight support staff2. Maintaining a liaison with Building Control Authorities3. Making presentations to the Board of Directors regarding various
building projects4. Preparing Design briefs and Prequalification of Architects/Consultants.
Entering into agreements and award of work to the selectedArchitects/Consultants.
5. Review and approval of Designs prepared by the Architects/Consultants.6. Prequalification of Contractors, Tendering and Award of work to the
selected Contractors,7. Review of physical progress of construction work at site and ensuring
conformance to construction schedules. Monitoring the work of thesupervising Architects/Consultants.
8. Payment of Contractors bills, approval of variation orders and overallfinancial control of the projects
9. Issuing Completion Reports, Taking over Certificates and Maintenanceof the completed buildings
10.Evaluation of securities (Land, Building and Machinery) of the BanksClients
Abroadon various Infrastructure, Oil& Gas and Power projects with HARRIS &SUTHERLAND London, SEEE, Paris and FLUOR ARABIA, Dhahran.Responsibilities included:
1. Design and Documentation2. Construction Monitoring and Support
Consulting Engineers
7/26/2019 NDA Profile 2012
59/110
Seven years as Chief Executive and Chief Structural Engineer of NOORDURRANI & ASSOCIATES Consulting Engineers on various Hydro Power,Oil and Gas, Transportation and Industrial Projects. Responsibilities include:
1. BUSINESS PROMOTION: Making proposals and presentations to
prospective Clients. Negotiating and entering into agreements withthem.2. MANAGEMENT: Day to day management of a firm employing 15
people (including five graduate engineers). Allocating resources forvarious projects. Reviewing progress and ensuring that targets are met.
3. FINANCIAL CONTROL: Managing Funds and receivables fromClients.
4. QUALITY ASSURANCE: As Chief Structural Engineer providingSenior Level Input and ensuring that quality Standards are met with.
EDUCATION/PROFESSIONAL TRAINING
!"#$%
& ' () * + , ' %
-+ ' ./ 01, /0 2/3,.4 / 455,00 65,0 6
4 0%
6 517 .6468.4 9 4&15: 644,48
64 85600 511 ,464 5;.%
PROFESSIONAL AFFILIATIONS
1
5 %,?
* 0 4 @ 6
AB#
PUBLICATIONS
4%5% 6% 6 C6D 0 6 0 6 $= 0* )0* )
0* E 0( ,
D 1 , * 7% !""#
4%5% 6% 6 C6 0+0+- .* 0** (E 0( ,
D 1 , * 7% !""#
4%5% 5% .F C 6* D
, %E 0
Consulting Engineers
7/26/2019 NDA Profile 2012
60/110
0 & * 8
-+ 4% =???%
5% .F 4%5% C %E
0 & * 8
-+ 4% =???%
EMPLOYMENT RECORD
DATE EMPLOYER POSITION HELD
7 "# 4 @ 6
(
0
. "# 6* "# G++ 5D % %
0
+% "H +% "B @ 7
"B 7 "#
6
%
* 0
; 0
;
%
6* "B
7 "B
, @
%
0
4% "$
+% "H
5*+
* %
-
. A$
0*% "?
:
( . A? @
1% A? 7% A$
4
0
%
8 !?;
0 0
. A? 0*% A? G 0
. #> 7 #> 0 / /
D* / *
%
7 #$ . #> 4
0 %
7 0
Consulting Engineers
7/26/2019 NDA Profile 2012
61/110
PROFESSIONAL EXPERIENCE
PROJECTS CLIENT RESPONSIBILITY
ENERGY
1500MWGhazi Barotha Hydropower
Project
Design and production of constructiondrawings for the52 Km Power Cannel & Associatedworks. Structuresincluded Prestressed Concrete Bridgesand PrestressedConcrete U Shaped SuperpassageFlumes
Water & PowerDevelopmentAuthority
Principal EngineerStructures
184MWlow head Chashma
Hydropower Project
Design and production of constructiondrawings.
Water & PowerDevelopmentAuthority
Design Engineer
Kundian Nuclear Complex
Work included Main Plant, auxiliaryBuildings, Stack etc.
PakistanAtomic EnergyCommission
Lead StructuralEngineer
Tarbela Power House extension Project
Design and Tender Documents for
Units 5-8
Water & PowerDevelopment
Authority
Design Engineer
412 MW Rousch Power
Combined Cycle Thermal Power Plantat Kot Addu
Habib RafiqueLtd
Design Engineer
MULTISTORIED BUILDINGS
Buildings for United Bank Limited
UBL Building, Blue Area, Islamabad.High-rise centrally air-conditionedoffice building with a gross built up
area of175,000 square feet.Architects/Consultants: NationalEngineering Services (Pakistan)Limited in association withSeifert International, London.
United BankLimited
Executive VicePresident & ChiefEngineer
UBL Head Office Building Karachi.High-rise centrally air-conditionedoffice building with a gross built uparea of 200,000 square feet. Architects:National Engineering Services(Pakistan) Limited in association with
W.S Atkins & Partners, U.K.
Consulting Engineers
7/26/2019 NDA Profile 2012
62/110
UBL Building, Hali Road, Quetta.Centrally air-conditionedRegional Office building with a grossbuilt gross built up areaof 30,000 square feet. Architects: M/SHabib Fida Ali
National Institute of Banking &Finance, Islamabad. TrainingInstitute with a built up area of app.80,000 square feet.Architects: M/S Habib Fida Ali
UBL Building, Sukkar. Regional OfficeBuilding with a built uparea of 18,000 square feet. Architects:
M/S Nayyar Ali Dada & AssociatesUBL Building Muzaffarabad, AzadKashmir. Regional OfficeBuilding with a gross built up area of11,000 square feet.
MULTISTORIED BUILDINGS
Two nineteen storied Buildings at
Islamabad
Built up area of each buildingApprox. 150,000 sq. ft
State LifeInsuranceCorporation
Lead StructuralEngineer
Fifteen Storied Building at Kalima
Chowk Lahore
Built up area approx. 275,000 sq. ft
CREATIVEGroup
Chief StructuralEngineer
Thirteen Storied Building at Queens
Road, Lahore
Built up area approx. 290,000 sq. ftLAKK Group Chief Structural
Engineer
Hall of Justice, Trinidad TrinidadGovernment
Design Engineer
Fountain Avenue
Multistoried Commercial BuildingSyed Hadi AliShah
Chief StructuralEngineer
WATER RESOURCES,IRRIGATION ANDDRAINAGE
Terbela Dam Left Bank Irrigation
Tunnel Project
Water & PowerDevelopmentAuthority
Design Engineer
Consulting Engineers
7/26/2019 NDA Profile 2012
63/110
Lower Indus Reclamation & Drainage
Project
Design and Tender Document forStructures of structures includingbridges and cross drainage work.
Water & PowerDevelopmenauthority
Design Engineer
Sukkar Barrage Project
Review of Design of Barrage Structurewith a view to assessing its capacity topass a discharge of 1.5 million cusecs
Department ofIrrigation &PowerGovernment ofSindh
Lead StructuralEngineer
Khanpur Dam Project
Review of Design of Trunion GriderWater & PowerDevelopmentAuthority
Lead StructuralEngineer
Kahuta Water Supply SchemeParticipated in Design of ButtressDam, Overflow Section, IntakeStructures, Stilling Basin
Special WorksOrganization Lead StructuralEngineer
ZONKA Water Supply Scheme Nigeria
Work included Intake Tower GravityDam, Treatment works, Access bridge,etc.
State WaterBoard, Nigeria
Lead StructuralEngineer
JIJI Water Supply Scheme, Nigeria
Review of design of Treatment Plant,
Filters, Chemical house, etc.
State WaterBoard, Nigeria
Lead StructuralEngineer
Saminaka Water Supply Scheme Nigeria
Review of Design of Main Weir, Intake,Filters, etc.
State WaterBoard, Nigeria
Lead StructuralEngineer
Water Reservoirs for WASA Rawalpindi
Three Elevated Water Reservoirs eachwith a capacity of 250,000 gallons
MottMcDonaldConsultingEngineer
StructuralEngineeringAdvisor
CHASHNUPP Cooling Water Drain
Review of Design
Associated
ConsultingEngineers
Chief Structural
Engineer
INDUSTRIAL STRUCTURES
Maple Leaf Cements Expansion Project
Structural Design & ConstructionDrawings for 3300 tones per dayFacility
Maple LeafCement
Lead StructuralEngineer
Consulting Engineers
7/26/2019 NDA Profile 2012
64/110
Mustehkam Cement Expansion Project
Participated in preliminary design ofstructure
State CementCorporationPakistan
Lead StructuralEngineer
Central Hofuf and Mubbaraz Sub-
station
SaudiConsolidatedElectric SupplyCompany
Senior StructuralEngineer
Seed Processing Plant, Khanewal
Review of Design of IndustrialStructures, and Storage silos
Punjab SeedCorporation
Lead StructuralEngineer
Grain Storage Silos, Chichawatni
Review of Design of 50,000 tons
capacity wheat storage silos
NationalLogistics Cell
Lead StructuralEngineer
Port Qasim Transit Sheds
Review of DesignPort QasimAuthority
Lead StructuralEngineer
BRIDGES AND TRANSPORTATION
109 meter Span Steel Truss Railway
Bridge over Ghazi Barotha Power
Channel
PakistanRailways
Chief StructuralEngineer
Lahore by Pass Project
Coordination and contractadministration.
National
HighwayAuthority
Project
Coordinator
Bridge over River Coquet
(Felton Edinburgh Highway)BritishMinistry ofTransport
Design Engineer
Lahore Ring Road and Elevated
Expressway Project
MottMcDonaldConsultingEngineer
StructuralEngineeringAdvisor
Shadan Lund Bridge over DG Khan
Canal
Non destructive testing and analyticalevaluation of the as built Substructure
Umar Munshiand AssociatesConsultingEngineers
StructuralEngineeringAdvisor
OIL AND GAS
Off-shore Tie in platform at Rass
Tanura Design/Drawings,Specifications, Material take off,
ARAMCO Senior StructuralEngineer
Consulting Engineers
7/26/2019 NDA Profile 2012
65/110
Gas Treatment Facility at Qadirpur
Equipment Foundations, StructuralSteel work, Pipe Rack and Pipe SleeperFoundations, Utility Buildings, Roadsand Infrastructure for Gas Dehydrationand H2S Removal Plant
PETROSINSingapore
Chief StructuralEngineer
Kadanwari Upgrade and Miano Field
Development Project
Structural Steelwork fabricationdrawings
DESCON/J-TECH/OMV
Chief StructuralEngineer
BHIT Field Development Project
Site Facilities and OfficesDESCON/LASMO OIL
Chief StructuralEngineer
Structural Steelwork for Haradh Gas
Field Saudi Arabia
BTT, France Chief Structural
Engineer
HOUSING AND LEISURE
King Abdul Aziz University, Jeddah
Multistoried Student Housing Project inPrecast Concrete.
DAELIM Design Engineer
Ipswich Swimming Pool and Leisure
Centre
Suffolk CountryCouncil
Design Engineer
Prime Ministers Housing SchemeMultistoried Housing Units both inReinforced Concrete and ReinforcedMasonry
NESPAKConsultingEngineers
Chief StructuralEngineer
COMMUNICATIONS
Television Transmission Tower at
Multan.
Design of 540 ft high self supportinglattice framework Structure
PakistanTelevisionCorporation
Design Engineer
TRAINING
SOCIETE D ETUDES ET DEQUIPMENTS D ENTERPRISES, LADEFANSE, PARIS, FRANCEOn the job training in the DynamicAnalysis and Design of NuclearStructures.
PakistanAtomic EnergyCommission
Trainee Engineer
Consulting Engineers
7/26/2019 NDA Profile 2012
66/110
SHEIKH ILYAS AHMAD
DATE OF BIRTH : March 16, 1947RELIGION : Islam
NATIONALITY : PakistaniMARITAL STATUS : MarriedSPECIALIZATION IN FIRM : Design of Hydraulic Structures/
HydropowerProjects
LANGUAGES : English, Urdu, PersianAffiliation with : Member Institution of Engineers
PakistanProfessional Member Pakistan Engineering
CongressInstitutions Member Pakistan Engineering
Council
KEY QUALIFICATIONS
Practising professional engineer since 1968.
As Deputy Chief Executive Nespak Foundation, controlled & managed the the administrative& financial operations of the Foundation(August 2007 to March 2010)
As Vice President/ Head Structural Engineering Division(2003 to 2007)supervised thePlanning & Design and Project Management activities of various projects comprisingBridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants,
Hydraulic Structure.
As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants from 1995 to2003, responsible for the preparation of detailed designs and construction drawings of 1,450MW Ghazi-Barotha Hydropower Project consisting of the following major components.
- Ghazi Barrage across river Indus- 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage
structures/ bridges.- Power complex comprising of powerhouse, spillway, tail regulator, low level outlets,
switchyard, sill structures.
As Chief Engineer Structures Division (1987 - 1995) responsible for the planning, design,Tender documents and Construction drawings of Tarbela Hydro power Third Extension,Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial Measures,Kundal Shahi Hydel Scheme Muzaffarabad, Water Supply Schemes of Al-Majmaah-ShaqrahSaudi Arabia & Kachhi, Ziarat, Quetta (Balochistan), Auxiliary Buildings of Multan-2Thermal Power Station, Mirani Dam and Hingol Dam Projects Balochistan.
As Principal Engineer Structures Division (1985 - 87) worked on the design review ofpumping station structures of North Jazira Irrigation Project Iraq; Zubair Irrigation ProjectIraq, design, contract documents, construction drawings of Chattar Bagh Suspension BridgeIslamabad, Kahlian-Sahlian Suspension Bridge, UGC Centres at Lahore & Karachi, Tourist
Resort at Sahiwal, 50m high Steel Chimney of Guddu Thermal Power Station.
Consulting Engineers
7/26/2019 NDA Profile 2012
67/110
As Principal Engineer with Kalabagh Consultants on deputation from NESPAK from 1981-85, worked on planning, design and preparation of tender documents of major structures (i.ePowerhouse, Power Intakes, Power Tunnels and Low Level Outlet Works) of Kalabagh DamProject, Pakistan.
As Principal Engineer (1981-1982) and Senior Engineer (1974-1981) in Structures Divisionof NESPAK, responsible for planning and detailed structural design of civil works of 700MW Tarbela Hydropower First Extension Project; structural design of eight bridges on Al-Khabura-Dariz Highway Oman and three superhighway bridges of Zubair Irrigation Project-Iraq; planning & design of 20 storey 233 ft. high HBFC House, Islamabad; two industrialcomplexes in Peshawar and tower foundations for 500 KV Transmission Line (Pakistan) anddesign review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan).
As Assistant Executive Engineer/Design Engineer with Irrigation Department/ Pakistan Waterand Power Development Authority (1968-1974), worked on the design and constructionsupervision of Marala Drainage Syphon, District road bridge over Upper Gogera BranchCanal, design of concrete lining of irrigation tunnels of Khanpur Dam Project and planning
and design of irrigation systems of Hub Dam and Chashma Right Bank Canal.
EDUCATION
Name of Institution Year Degree/Diploma
University of Engineering & 1968 B.Sc. Civil Engineering - DegreeTechnology, Lahore-Pakistan
University of Engineering & 1977 Computer Programming in FORTRANTechnology, Lahore-Pakistan IV Language (Certificate)
EXPERIENCE
I Name of Employing Agency Noor Durrani & AssociatesTitle of Position Structural EngineerLocation of Assignment Lahore PakistanPeriod of Assignment March 2010 todate
Activities
Planning, design and preparation of construction drawings for the following projects:
- Ranolia Hydro Power Project 17 MW
- Machai Hydro Power Project 2.6 MW
II Name of Employing Agency Nespak FoundationTitle of Position Deputy Chief ExecutiveLocation of Assignment Lahore PakistanPeriod of Assignment August 2007 to March 2010
III. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited
Title of Position Vice President (Str. Eng. Division)Location of Assignment Lahore - PakistanPeriod of Assignment August 2003 todate
Consulting Engineers
7/26/2019 NDA Profile 2012
68/110
Activities
As Head of Structural Engineering Division, supervising the activities of the Divisionincluding Planning & Design, Project Management, Business Promotion, etc. onvarious Projects. Major projects include the following:
- KCP - Workshops (PAEC Project)- White Oil Pipeline Crossing over river Indus at Ghazi Ghat- Suigas Pipeline crossing over river Chenab at Shershah- Suigas Pipeline crossing over river Indus at Khairabad- Design of Road Bridge over river chenab at Shershah- Design of 9 bridges on Mansehra-Naran-Jhalkhad Road- 500 TPD White Cement Plant at Maple Leaf Factory- Acetic Acid Recovery Plant (PAEC Project)- Nuclear Safety Related Buildings- Upgradation/ Renovation of Govt. College University Lahore- Government College University at Faisalabad
- Servants Housing Scheme at Mohlanwal, Lahore- Peshawar Flyover Project- Rustik-Miskin Road bridges, Oman- Lahore Ring Road Project- Structures on Sewerage projects of Nizwa, Sur, Khasab, Buraimi and Misfat,
Oman.- Sabakzai Dam Project- 12 Small Dams Project, NWFP- Rehabilitation of Torkham - Jalalabad road Project, Afghanistan- National Bank of Pakistan, Islamabad- KAPCO High School, Kot Addu- Rehabilitation of bridges on N-70
- Saudi German Hospital Complex Project
IV. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited
Title of Position Team Leader (Civil Designs)Pakistan Hydro Consultants
Location of Assignment Lahore - PakistanPeriod of Assignment 1995 to 2003
Activities
Supervision/coordination of all civil design activities ofUS $ 2.5 billion Ghazi Barotha
HydropowerProject which included analysis & design, review of tender stage designs,production of construction drawings in the Hydraulics, Geotechnical and StructuralSections. The following major activities were carried out:
- Review/checking of the tender stage designs.- Review and updating of Tender design Criteria for forming basis of detailed
designs- Detailed designs of component features of the project.
Important structures include:
- Barrange (Standard Bays, Head Regulator, Undersluices, Left & Right GuideEmbankments, Separation Dyke).
Consulting Engineers
7/26/2019 NDA Profile 2012
69/110
- 1,600 cumecs power channel containing nearly 50 cross drainage structures andas many bridges including National Highway Bridge and Lahore-Peshawar MainRailway Bridge.
- Power complex (1,450 MW Powerhouse having 5 unit bays, two erection bayand one unloading bay, syphon spillway, tail regulator, intake structure, sillstructures, low level outlets, switchyard, tailrace channel and headpond andforebay embankments)
- Checking/Quality Assurance of nearly 2,200 construction drawings pertaining tobarrage, power channel and power complex.
- Review/ Quality Assurnace & finalization design of reports of Barrage, PowerChannel, Power Complex and Project Instrumentation.
- Review/comments on Contractor's detailed construction schedule.
- Review/approval of Contractor's submissions on Contractor's colonies at Hattian,Tarbela & Barotha, . Contractor's alternative designs for Super-passages andbridges, Contractors design of Railway bridge based on alternate chineseprofiles.
- Review/approval of Contractor's River Diversion Scheme, work Programme,Aggregate production plant, concrete Batching Plant, Powerhouse Excavation &dewatering schemes etc.
V Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited
Title of Position Chief Engineer
Location of Assignment Lahore - PakistanPeriod of Assignment 1987 to 1995
Activities
Planning, design and preparation of construction drawings for the following projects:
- Civil Works of U.S. $ 760 million 1700 MW Tarbela Hydro power ThirdExtension Project, (4 x 432 MW)
- Civil Works of U.S. $ 80 million 200 MW Mangla Hydroelectric 2nd Extension(2 x 100 MW)
- Tarbela Dam Spillway Stoplogs (Main & Auxiliary Spillways)
- Remedial Measures of Tarbela Tunnel-4 Hoist Bridge
- Kundal Shahi Hydel Scheme (2MW) Muzaffarabad.
- Water Supply Schemes of Al-Majmaah-Shaqrah, Saudi Arabia.
- Quetta, Kachhi and Ziarat Water Supply Schemes, Balochistan
- Auxiliary Buildings of Multan-2 Thermal Power Station
- Inlet, outlet & spillway structures and tunnel of Mirani Dam Project, Balochistan
- Intake, tunnel and outlet structures of Hingol Dam Project, Balochistan
Consulting Engineers
7/26/2019 NDA Profile 2012
70/110
VI. Name of Employing Agency National Engineering Services Pakistan (Pvt)
LimitedTitle of Position Principal EngineerLocation of Assignment Lahore - PakistanPeriod of Assignment 1986 to 1987
Activities
- Design review of Pumping Station Structures of North Jazira Irrigation Project,Iraq.
- Detailed Design, Tender Documents and construction drawings of:
* Chitral Airport Terminal Building.* University Grants Commission Buildings at Lahore & Karachi.* Tourist Resorts at Multan, Khanewal, Sahiwal, Rahim Yar Khan and
Panjnad.* Chattar Bagh Padestrian Suspension Bridge.* Kahlian-Sahilian Suspension Bridge.* 50 meter high Steel Chimney of Guddu Thermal Power Station.
* Preliminary design and Tender Documents of Civil works of Zubair* Irrigation Scheme, Iraq.
VII. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited
Title of Position Principal Engineer (Kalabagh Consultants)Location of Assignment Lahore - Pakistan
Period of Assignment 1982 to 1985
Activities
Planning, design and preparation of tenders of major structures including Powerhouse,Power Intakes, Low Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project,Pakistan.
VIII. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited
Title of Position Senior EngineerLocation of Assignment Lahore - Pakistan
Period of Assignment 1974 to 1981
Activities
- Design review of U.S.$ 4 million Grain Silos Project, Pakistan (capacity50,000 tons).
- Design of Super Highway Bridges for Zubair Irrigation Project, Iraq.
- Planning design and preparation of construction drawings of:
* Civil Works of U.S. $ 50 million, 700 MW Tarbela Hydropower ExtensionProject (4 x 175 MW).
Consulting Engineers
7/26/2019 NDA Profile 2012
71/110
* Highway Bridges of U.S. $ 15 million Al-Khabura-Dariz Road Project, Oman.
* Civil Works of U.S. $ 8 million Industrial Complex, including cold storages, for SarhadDevelopment Authority, Peshawar (Pakistan).
* 20 Storey 233 ft. high building of House Building Finance Corporation, Islamabad,Pakistan.
* Tower foundations for U.S.$ 183 million 500 KV (Guddu- Jamshoro)Transmission Line.
- Preparation of Prefeasibility Report on 480 Km long, U.S.$50 million InlandWater Route connecting Port Mohammad Bin Qasim with Sukkur, Pakistan.
IX. Name of Employing Agency Water & Power Development Authority
(WAPDA)/ Irrigation Department PunjabTitle of Position Assistant Executive Engineer/DesignEngineer
Location of Assignment Lahore - PakistanPeriod of Assignment 1968 to 1974
Activities
Design and construction supervision of irrigation and drainage systems, bridges, crossdrainage works, design of concrete lining for irrigation tunnels of Khanpur DamProject and irrigation system design of Hub Dam & Chashma Right Bank Canal.
Consulting Engineers
7/26/2019 NDA Profile 2012
72/110
ENGR.ZAKI UD DIN SHEIKH
DATE OF BIRTH : October 20, 1946RELIGION : Islam
NATIONALITY : PakistaniMARITAL STATUS : MarriedLANGUAGES : English, Urdu, Punjabi, Arabic
EDUCATION M.Sc. (Civil Engg.)University of Maryland, U.S.A. 1975*G.P. Average = 3.70 / 4*
Post Graduate Courses (26 Credits)Geo-technical and Transportation EngineeringAsian Institute of Technology (A.I.T.) Bangkok, Thailand
1970*G.P. Average = 3.42 / 4*
B.Sc. (Civil Engg.)University of Engineering & Technology, Lahore,Pakistan 1967*1st Division*
F.Sc. (Pre-Engg.)Government College, Lahore, Pakistan 1963*1st Division*
Matric (Science & Drawing)Naya Madrasa High School, Lahore Pakistan 1961*1st Division*
HONOURS Appointed External Examiner by Vice Chancellor,UET, Lahorefor Final Year Civil Engg. Examinationin Highways, Runways and Railways Engg. 2004,2003, 2002, 1999 and 1998
Appointed External Advisor/Examiner for Final year
Projects in Transportation and Geo-Technical Engg.by UET, Lahore 2003, 1999 and 1998
Won Outstanding Service Award by Department ofTransportation, Montgomery County, Maryland, USA 1977
Won Scholarship for Post Graduate Studies at A.I.T. 1969
Won Merit Scholarship for Graduate Engineering
Studies 1963
& AWARDS
Consulting Engineers
7/26/2019 NDA Profile 2012
73/110
PROFESSIONAL Approved Resident Engineer, National HighwayAuthority, CERTIFICATION Pakistan for LahoreBypass Motorway Project 1993
Approved Chief Resident Engineer, Ministry of
Communications, Riyadh, Saudi Arabia 1986
Approved Resident Engineer, Amanah of MadinahMunawarah, Saudi Arabia 1982
Registered Professional Engineer (P.E.) State ofMaryland, U.S.A. 1977
PROFESSIONAL Life Member Pakistan Engineering Council(Reg. No.Civil/5472).
Registered Engineering Consultant,PakistanEngineering Councilsince 2002
Member, Institute of Engineers, Pakistan
Member, Pakistan Engineers Forum, Pakistan
Former Member, Pakistan Engineers Forum, SaudiArabia
Former Member,Institute of Transportation Engineers,Washington D.C., U.S.A.
Former MemberAssociation of Muslim Scientists andEngineers, U.S.A.
RESEARCH Parking and Traffic Control for Efficient TrafficManagement at Engineering University Campus, Lahore November, 1981
Comparative Analysis of various field and laboratory
methods for Unit Weight Determination of soil samples November, 1981
Transportation Control Strategies to meet E.P.A. AirQuality Standards in Urban Areas (U.S.A.) July 1975
Effect of Rumble Stripes on speed and deceleration ofvehicles approaching a T type Intersection (Bangkok) September, 1970
Benefit Cost Analysis of an Urban Expressway InBangkok Metropolitan Area May, 1970
MEMBERSHIPS
Consulting Engineers
7/26/2019 NDA Profile 2012
74/110
Geometric Design Options for Bender AvenueInterchange an Asian Institute of Technology, Bangkok April, 1970
TRAINING Safety Design & Operational Practices for Streets &
HighwaysProgramme conducted by U.S.D.O.T. in associationwith Texas A & M University, U.S.A. 1977
Transportation Systems Management
Programme conducted by U.S.D.O.T. in collaboration
with M/s Wilber Smith & Associates in Washington
D.C., U.S.A. 1976
SYNOPSIS October, 2004 to date as Project Manager, NoorDurrani & Associates.
From June, 2002 to September, 2004, he worked asGeneral Manager in M/s. Echo West International (Pvt.)Ltd., heading the Contracts Department dealing with allimportant contractual matters and correspondencepertaining to mega projects of Roads, Housing, WaterSupply, Canals and Dams etc.
From April, 2001 to June, 2002, he worked as ChiefExecutive of his own consulting firm, Zaki Engineering
Associates.He served Republic Engineering Corporation (Pvt.) Ltd.,
Lahore from July 1991 to March 2001 as ChiefCoordinator (Highways) and also worked as ResidentEngineer responsible for construction supervision of 17Km Long Lahore Bypass Motorway (M-2) Project inPakistan. The design of this 6 lanes dual carriageexpressway commenced in 1993 and was completed in1997. During 1992, he served as Project Coordinator forthe Detailed Design of Pakistan Motorway Project,
Lahore Islamabad Section (M-2). This 339 Km longProject was also completed in 1997. During 1991, heserved as Chief Coordinator (Highways) in REC andprepared several proposals for the design and constructionsupervision of highway projects including Bela-AwaranRoad and Awaran-Khuzdar Section of Gawadar-RatoderoRoad, Sections 7& 9 of Indus Highway Project etc. Hewas also involved in the design of several sections ofFarm to Market Roads in Punjab.
From 1986 to 1989, he worked as Chief ResidentEngineer with Khatib and Alami Consulting Engineers,Riyadh, Saudi Arabia on several large projects including
Consulting Engineers
7/26/2019 NDA Profile 2012
75/110
Makkah Inner Ring Road (an urban expressway throughseveral large tunnels) and Madinah 2ndRing Road.
During 1982-86, he worked as Resident Engineer / TeamLeader with Al-Muhandis Nizar Kurdi ConsultingEngineers, Riyadh, Saudi Arabia on several projectsincluding Madinah 1st Ring Road, Al-Manakha Tunnel(an urban bypass through center of Madinah) andMakkah-Jeddah-Madinah (MJM) Expressway ProjectSections 7 & 10.
He has been teaching graduate and post graduate coursesas Associate Professor in University of Engineering andTechnology, Lahore in 1981.
He has also served as Chief of Traffic Planning Unit inDepartment of Transportation, Montgomery County,
Maryland, Highway Design Engineer with DMJMConsulting Engineers, Washington D.C. and SiteEngineer with Ralph D. Mitchells Construction Co.,Maryland working on different highway and buildingprojects in U.S.A. between 1972 1980.
He worked as Junior Engineer with Harza EngineeringCo. International, (General Consultants to Pakistan Water& Power Development Authority WAPDA) deputed totheir Lahore office between 1967 1972.
PROFESSIONAL
HISTORY
October, 2004 to dateProject Manger,
Noor Durrani & Associates Lahore, Pakistan:
Project Manager for a High Rise Building Project with abuilt up area of 500,000 sq. ft and comprising of fivebasements and 24 stories above Ground Level, involvingDeep Basement Excavations.
June, 2002 to Oct.2004 General Manager (Contracts)Echo West International (Pvt.) Ltd., Lahore, Pakistan.
Worked as Contracts and Coordination Expert on largeconstruction contracts involving FIDIC Conditions ofContract, Scheduling, Extension of Time, Variations,Claims, Disputes and Arbitration etc Liaison with theLegal Advisors. Dealing with the Engineers andEmployers on important contractual issues. Makingpresentations in high level meeting on work progress,quality assurance and efficient execution of works.
Handling Torkham-Jalalabad, Nowshehra-Peshawar (N-5), Hala-Moro (N-5) Contracts of National Highway
Consulting Engineers
7/26/2019 NDA Profile 2012
76/110
Authority (NHA), 304 Apartments Housing Contract ofPakistan Housing Authority (PHA), Dhabeji-High PointRising Mains of Karachi Water & Sewerage Board(KW&SB) and Right Bank Outfall Drain (RBOD)Extension Contract from RD 62 to 85 of Irrigation &
Power Department, Government of Sindh. Participating inPre-Bid meetings and Bid submissions of large projectse.g. Mangla Dam Raising (WAPDA) and other megaprojects.
He has also been appointed by Vice Chancellor, UET,Lahore, External Examiner for the Final YearExaminations in the subjects of Highway, Runway andRailway Engineering at present and several times between1998 and 2004.
March, 2001 to Chief Executive
Zaki Engineering Associates, Lahore, Pakistan.
Worked on various Civil Engineering projects. Prepared aphysical model of Ormara Naval Base includinginfrastructure facilities.
1991 to March, 2001 Resident Engineer/Chief Coordinator (Highways)
Republic Engineering Corporation (Pvt.) Ltd.,
Lahore, Pakistan.
Worked as Resident Engineer on 17 Km Lahore BypassExpressway Project. Also worked as Project Coordinatorin formulation of the Inception Report, Final ConstructionDrawings and Final Design Report for Lahore -Islamabad Motorway Project (M-2, 339 Km) andInception Report, Tender Documents, Final ConstructionDrawings, Final Design Report and Bid Evaluation forLahore Bypass Expressway Project. Prepared severalsuccessful proposals for the design and construction
supervision of highway projects for submission toU.S.AID, National Highway Authority, Pakistan andHighway Department, Government of the Punjab.
1990-1991 Self Employed Lahore Pakistan.
Worked on Design and Construction Supervision ofcommercial and residential buildings. Conducted studytours of transportation facilities/ projects, includingSakardu Road leading to Siachin Glacier and KarakurramHighway (KKH) up to Khunjrab Pass on the border ofChina.
June, 2002
Consulting Engineers
7/26/2019 NDA Profile 2012
77/110
1986-1989 Chief Resident Engineer
Khatib & Alami Consulting Engineers, Riyadh, SaudiArabia.
Responsible for Construction Supervision of Expresswayand Highway Projects including Makkah Inner Ring Road(involving drilling of large tunnels through rocks)Madinah 2ndRing Road, Riyadh Dammam Fencing andCamel Crossing Bridges over the Expressway, Bark-AlSahil Feeders (Project 28) Jeezan-Al-Arish (Project 41)and South Tihama Jebals (Project 53) as well as Designand Feasibility Studies of new highway projects.
1982-1986 Resident Engineer / Team Leader
Al- Muhandis Nizar Kurdi Consulting Engineers,Riyadh, KSA.
Responsible for Construction Supervision of 61 KmMakkah Jeddah Madinah (MJM) Expressway(Section-7) including 3 interchanges and 30 bridges,South Safia Ambaria Bridge and Approaches on 1stMadinah Ring Road and Al- Manakha Tunnel (adjoiningMasjid Annabawi).
Also engaged as Team Leader on the Feasibility Study for
High Capacity Transit Services for Jeddah Makkah andHoly Areas to facilitate immense vehicular and pedestriantraffic during the annual pilgrimage (Haj) season.
1981 Associate Professor
University of Engineering & Technology, Lahore,Pakistan.
Engaged in teaching of Highways and GeotechnicalEngineering courses to Graduate and Post Graduate
students of Civil Engineering Department. Also workedas Advisor for several Projects conducted by final yearstudents involving soil mechanics and transportationengineering research.
1980 Self Employed
Engaged in design and construction supervision ofresidential and commercial buildings. Conducted a studytour of Transportation, Projects and facilities throughCanada, USA, England, France, Switzerland, Italy,
Yugoslavia (Former) Bulgharia, Turkey, Syria, Jordan, S.Arabia, Iraq, Iran and Pakistan.
Consulting Engineers
7/26/2019 NDA Profile 2012
78/110
1975-1980 Chief of Traffic Planning Unit (Engineer-III)
Department of Transportation, Montgomery County,
Maryland, U.S.A.
Coordination of Highway Safety Projects. ManagedIntersection Improvement Projects. Review of SectorPlans and Master Plans. Study of Traffic andTransportation Controls near Metro (Washington D.C.Metropolitan Area Mass Transit/Subway) Stations.
1973-1975 Senior Engineer (Engineer-II) MC DOT
Maryland, U.S.A.
Engaged on Collection, Compilation and Analysis ofTransportation Engineering Data and preparation ofTraffic Control Plans and Urban IntersectionImprovement Projects.
1973 Highway Design Engineer
Daniel, Mann, Johnson & Mendenhall (DMJM)
Consulting Engineers, Washington D. C., U.S.A.
Engaged in the design of horizontal and vertical
alignment of Maryland Rout 214 and geometric design ofClover Leaf Interchange between Maryland Routes 214and 202 (MD 214 & MD 202).
Also worked on alignment studies for National RoadwayProject in Malawi, South Africa and the feasibility studyfor approach roads to T.V. Tower Stations in SaudiArabia.
1972-1973 Site Engineer
Ralph D. Mitchells Construction Co., Bethesda,Maryland, U.S.A.
Responsible for construction of concrete piles, R.C.C.foundations, horizontal and vertical controls ofTappahanock Hotel Resort in Virginia and a ShoppingMall in Rockville, Maryland, U.S.A.
1967-1972 Junior Engineer, Harza Engineering Co. International
(General Consultants to WAPDA) Lahore, Pakistan.
Worked on BOQ and cost estimates of Hub Damspillways, traverse and triangulation surveys of Shahdarah
(including 18 months
study leave forPost Graduate Studies
in Asian Institute of
Technology (A.I.T.)
Bangkok, Thailand
in 1969-70)
Consulting Engineers
7/26/2019 NDA Profile 2012
79/110
and Multan power stations, precise leveling fordetermination of longitudinal slopes of newly constructedlink canals of Indus Basin Projects, siltation study ofWarsak Lake on Kabul River by electronic soundings(from motor boat) Also engaged in the review of Mangla
Dam and Tarbela Dam contract / construction drawingsand design of pile foundations for high voltage electrictowers at Sanghar Nullah crossing.
Consulting Engineers
7/26/2019 NDA Profile 2012
80/110
SULTAN M.K.DURRANI
DATE OF BIRTH: December 30th, 1951NATIONALITY: PakistaniMARITAL STATUS: Married
RELIGION: IslamLANGUAGES: English, Urdu, Persian, Sindhi, Punjabi
(In descending order of proficiency)
EDUCATION &ACADEMICS B.Sc., (Second Class) from Sindh University Hyderabad; Year
1971.
B.E. (First Class) from Sindh University Engineering College,Jamshoro. Year 1975.
PROFESSIONAL TRAINING
Six Months On Job Training: National Construction CompanyLimited;
Field of specialized training was the Billing, Estimation, Costingand preparation of Contracts documents.
Professional certification Course on Project Formulation &Management in National Construction Company Limited.
Special Course of Public Administration at National Institution ofPublic Administration, Karachi.
Course of Motivation and Leadership at United Bank Limited,School of Banking, Islamabad.
Course of Energy Efficient Building Design held by The NationalEnergy Conservation Centre (ENERCON)
MERITORIOUS AWARDS
Conferred the Award of Excellenceon sustained outstandingperformance in the field of engineering planning & executionof a number of successful Projects in the UBL Construction &Engineering Division all over Pakistan and abroad.
Conferred a Gold Medalfor outstanding performance uponcompletion of UBL Building, Islamabad
Certificate of Merit for excellence
Consulting Engineers
7/26/2019 NDA Profile 2012
81/110
FOREIGN TRAVELS
Traveled to several countries as Chief, Engineering Divisionto supervise the Banks overseas works and pre shipmentinspections.
PROFESSIONAL AFFILIATION/MEMBERSHIP Member, Institute of Engineers, Pakistan.
Member, Pakistan Engineering Council. PEC NO. M - 1124
Member, Pakistan Engineering Congress.
EMPLOYMENT RECORD December, 2007 to todate
Noor Durrani & Associates
MEP Engineer
October 1997 to November, 2007ENGINEERING MANAGEMENT CONSULTANTS
Managing Partner
October 1989 to October 1997
UNITED BANK LIMITEDSenior Vice President / Chief Engineer
December 1984 to October 1989UNITED BANK LIMITED
Vice President, Engineering Division.
October 1976 to December 1984NATIONAL CONSTRUCTION (PVT.) LTD.
Project Manager
NATURE &SCOPE OF JOBS/WORKS
A} From 1997- November, 2007
I am the Managing Partner, of the Engineering ManagementConsultants, based at Karachi with sub-office at Lahore. It has beenproviding a comprehensive range of services in the Engineering andConsultancy, mostly involved in execution of multistoried buildings onTurnkey Basis, Project Management, Architecture / Structural Design of
residential units. Valuation of properties for the financial institutions.
Consulting Engineers
7/26/2019 NDA Profile 2012
82/110
I also had the opportunity of working with two leading Americancompanies, M/s DynCorp International, Texas-USA and M/s Brown &Roots, Arlington, Virginia-USA on their projects based in Kabul,Afghanistan and Islamabad, Pakistan. The projects were to be onturnkey basis including concept, design, costing, construction and post-construction maintenances.
Since 2002, EMC is associated with US Forces based at Kandhar,
Afghanistan, meetings their requirements for all types of construction
materials / equipments.
B} From 1984-1997
This period coincided with the prime application of all myknowledge and capabilities gained over time in the multi-discipline engineering application and approach to the engineeringproblems and compatible solutions. The Scope of job and work ofthe period is summarized below:-
SCOPE OF WORK Selection and appointment of Consultants, Review of
Consultants proposals, submissions, documents and overallproject management for the client.
Pre-qualification of Contractors, Review of tenders, contractnegotiations, selection and award of work to contractors,review of quality and progress at site and overall constructionmanagement for the client.
Selection of plant and equipments in line with requirements forintroduction of latest technology.
Verification of contractors bills and financial & quality controlof projects.
Maintenance of buildings/office premises: Maintenance ofall newly constructed building/office premises, whichcomprised maintenance/operation of air-conditioning plants,High-speed lifts, civil & electrical works etc.
Interior Design: Interior design of executive offices and
branch premises.
Liaison with building control authorities.
Valuation of Civil Works, Land, Building, Factories (including Plant& Equipment) offered to bank for mortgage proposed. Entire loaningof the bank depended upon valuation of the properties carried out byEngineering Division.
OTHERBUILDING
PROJECTS
COMPLETED
UBL Building, Blue Area, Islamabad:Centrally air-conditioned High rise office Building with a gross built
up area of 192,000 square feet. Complete with interior works. CostRs.177.068 Million, project completed in 1993.
Consulting Engineers
7/26/2019 NDA Profile 2012
83/110
UBL Building, Quetta:Centrally Air-conditioned, Regional Office Building with agross built up area of 30,000 square feet. Complete withinterior work. Cost Rs.30.00 Million.
UBL Building, Muzaffarabad, Azad Kashmir:Air-conditioned Regional Office Building with a gross built uparea of 14,000 square feet. Complete with interior works. CostRs.12.6 Million.
UBL Building, Sukkur:Air-conditioned Multi Storied building with a gross built-uparea of 20,000 square feet. Complete with interior works. CostRs.20 Million.
UBL Building, Kutchery Bazar, Faisalabad:Air-conditioned Ground plus two storied building office havingcovered area of 19,700 square feet.
UBL Building, Multan:Ground plus three Storied Building having covered area of16,000 square feet including interior works.
UBL Building, Abbottabbad:Air-conditioned Office Building Ground plus two Storiedhaving covered area of 15,000 square feet. Works completed in
1996.
UBL Building, Layyah:Air-conditioned Office Building having covered area of 7,000square feet. Complete with interiors. (Ground Floor only). CostRs.6.3 Million.
UBL Office Building At Export Processing Zone, KarachiAir-conditioned office building with gross built-up area of9,000 sq.ft. including interior works.
UBL Circle Office Building, SialkotAir-conditioned office building, ground plus one story having grossbuilt-up area of 9,500 sq.ft
UBL Provincial Headquarter, SindhAir-conditioning and interior works of an office area spreadover three floors measuring 30,000 sq.ft., complete in allrespect.
Interior works of UBLs Chief Executives residence atKarachi
Interior works of UBLs Staff Collage, Karachi.
Interior works of UBL Public Library at Hayatabad, Peshwar.
Consulting Engineers
7/26/2019 NDA Profile 2012
84/110
UBL SPORTS COMPLEX, KARACHI:Completed project from conceptional stage till completion ofthe work including land escaping of the complex spread over17 Acres of land having different sports facilities like Cricket,Hockey, Basket Ball, Tennis, Table Tennis etc.
Silent features of the project:
Complex is self sufficient for its water requirementshaving full fledge system supported by three tube wells.
Standby D.G. Set covering requirements of the complex.
Flood Lighting System at Tennis and Basket Ball Courts.
Surfacing System for Hockey Field imported from U.S.A.of prestigious ASTRO TRUF BRAND.
UBL SPORTS COMPLEX, LARKANA:A Sports Complex was designed in Larkana City spread over 2.2acres of land. The design catered mostly for indoor games plussports facilities like: Squash, Tennis etc. However, project was notexecuted anticipated cost of works were Rs. 20 Million.
IN HOUSEDESIGNOF PROJECTS BY
UBLENGINEERINGDIVISION
Scores of Branch Buildings and Residential units were designed and
executed by Engineering Division all over Pakistan.
MAINTENANCEPROJECTS &WORKS
Civil works pertaining to buildings
Electrical installations & standby generators
Air-conditioning plant & systems
Elevators.
VALUATION WORKS Valuation of thousands of civil works, lands, buildings, factories(including plant and equipment), industrial complexes etc.
REVIEW OFFEASIBILITYSTUDIES
Review of technical aspects of feasibility studies for a number ofindustrial units.
C} From 1984-1976:
This was the initial phase of my career that required strenuousphysical and mental inputs and modes of skill-enhancement.
Various aspects of construction activity were duly covered throughingenious application of innovation and acquired skills in different
Consulting Engineers
7/26/2019 NDA Profile 2012
85/110
fields of engineering; i.e; from initial layout of the project to itscompletion stage.
The National Construction Company Ltd. provided a forum whereI could excel my expertise and knowledge and optimize thelearning processes. It was duly acknowledged when I kept risingthe ladder to success and was the Project Manager when I resignedfrom this Company of my own accord.
Some of the salient projects and undertakings are spelled below:-
NATIONALREFINERY PROJECT
As Junior Engineer in charge of overhead pipeline and vesselerection section.
JACOB LINESHOUSING COMPLEX
As in charge civil and mechanical works which consistedconstruction of 22 multistoried apartment buildings, Ground plusfour stories , including installation of lifts and infrastructure
development of the complex etc.
PAKISTAN STEELMILLS
Steel Making Plan: As site Engineer in charge equipmentinstallation and Erection of inter shop water pipelines.
Hot Rolling Mills: As in charge steel structure and erection ofOverhead Bridge Cranes.
Cold Rolling Mills: As senior Engineer & Deputy Project Manager, incharge of all civil works and steel structure erection of Cold RollingMills one of the largest projects of Steel Mills. Executed this Projectfrom the initial layout to its completion stage.
AS PROJECTMANAGER
Construction of 22 Million Gallon Water Reservoir & Lagoonsat Hyderabad Sindh, including laying entire net work of underground 30 inch dia pipeline and pumping stations.
Vocational Training Centre, Hyderabad.
Consulting Engineers
7/26/2019 NDA Profile 2012
86/110
MUHAMMAD WAQAS CHEEMA
DATE OF BIRTH : 10thJune, 1971NATIONALITY : PakistaniCNIC : 34601-4874709-7MARITAL STATUS : MarriedRELIGION : IslamLANGUAGES : English, Urdu
QUALIFICATION:
Degree Major/Minor Institution Date(MM/YYYY)
B.Sc. (Civil) University of Engineering& Technology, Lahore
1998
Membership of Professional Associations:
Pakistan Engineering Council (Registration No. CIVIL/19745
Other Training
a. Primavera (P3) Certificate Pakistan Engineering Congress
b. AutoCAD Certificate Pakistan Engineering Congress
c. Sap-90 Certificate Pakistan Engineering Congress
d. Scaffold Certification
SaudiAramco Scaffolding CertificationPassed Test Level - Inspector
Languages Speaking Reading Writing
English Good Good GoodUrdu Good Good Good
Consulting Engineers
7/26/2019 NDA Profile 2012
87/110
Employment Record
Employer Position From
(MM/YYYY)
To(M /YYYY)
Noor Durrani &Associates
Project Manager /Resident Engineer
1st Dec, 2004 todate
CCE (CONTRACTING &CONSTRUCTIONENTERPRISES Ltd.)Riyadh, Saudi Arabia
ConstructionManager / StructuralEngineer
7th Nov, 2002 17th Oct, 2004
Ghazi BarothaContractors
(Joint Venture ofIMPERGILO S.p.A.(Leaders),ZUBLIN AG,NAZIR & COMPANY,SKB)
Planning Engineer April, 2000 November,2002
National Logistic Cell Site Engineer March, 1999 April, 2000
Work Undertaken that Best Illustrates Capability to Handle the TasksAssigned
NOOR DURRANI & ASSOCIATESConsulting Engineers and Project Manager
Project -1: Mabarak CenterLocation: Farozpur Road, LahoreClients: Taavun (Pvt.)Ltd.
(A joint venture between Govt. of Punjab and DhabiGroup)Position: Project Manager
Project Information: Building Complex consist of one 67 storied tower, four40
storied towers, one 25storied ellipse building with threebasements opposite to Kagaddafi Stadium, Lahore,
Pakistan
Consulting Engineers
7/26/2019 NDA Profile 2012
88/110
Project-2: Pakistan Institute of Fashion Design, LahoreLocation: Johar Town, LahoreClients: Trade Development Authority of Pakistan
Ministry of Commerce
Project Information: Total Project Cost (Rs. 860.37 Million), 5-Stories Buildingconsist of Three hundred twenty five thousand Square feetcovered area
Project-3: Pace TowersLocation: 27-H Bulberg II, LahoreClients: Pace Pakistan Limited.
Project Information: Total Project Cost (Rs. 600 Million), 24 -Stories Building
with 5 basements, consist of Five Hundred thousandSquare feet covered area
Project-4: METRO CASH & CARRYWhole Sale Distribution Center
Location: I-11, Islamabad, PakistanClients: METRO CASH & CARRY INTERNATIONAL.
Project-5: METRO CASH & CARRYWhole Sale Distribution Center
Location: Metro-3, Defense Road near Allama Iqbal
InternationalAirport, Pakistan
Clients: METRO CASH & CARRY INTERNATIONAL
Position: Manager Projects (1st Dec, 2004 to
Date)
RESPONSABILITIES
Developed and executed Deep Basement Excavation Methodology, including
testing of Pre stressed Ground Anchors & Pile load test for design of workingpiles. (Mabarak Center, Lahore).
Developed Structural works Methodology of High Rise Buildings.
Heading a team of site staff comprising of Resident Engineers, AssistantResident Engineers, Materials Engineer, Inspectors and trainee engineers.
Resolve complex issues (Claims, Escalation etc.) and provide technicalexpertise to management.
Co-ordination with Clints, Resident supervision staff & Contractors for thesuccessfully execution of the projects
Development of Project Planning and Reporting Software.
Design, Quantity, and Cost Estimation works related to Structure Preparation of realistic Project Schedule of works using Primavera (p3).
Consulting Engineers
7/26/2019 NDA Profile 2012
89/110
Co-ordination with Clints & Contractors for the successfully execution of theproject.
Keep close liaison with the Clients, Companies & Head office for the projects.
Execute the job in professionally sound manner and economically to theClints.
CCE (CONTRACTING & CONSTRUCTION ENTERPRISES Ltd.)Riyadh, Saudi Arabia
Project-6: Construction Warehouses & Store yardLocation: Juaymah Gas Plant, Ras Tanura- Saudi ArabiaClient: Saudi Aramco, Ras Tanura Saudi Arabia
Position: Construction Manager (CIVIL)(20
thApr, 2004to 17thOct, 2004)
Project-7: Administration & Industrial Complex for Qatif GOSP Plant(38US$ million)
Location: Juaymah Gas Plant, Ras Tanura- Saudi ArabiaClient: Saudi Aramco, Ras Tanura Saudi Arabia
Position: Senior Engineer (CIVIL)(7thNov, 2002 to 19thApr, 2004)
PROJECTS INFORMATION:
Project includes:Construction of Administration building, Dinning facilities, Mosque. PEStructures of Mint. Machine Shop, Maint. Service Shop, Maint.Well Service Shop, and Sanblasting & Coating Shelters etc. Construction of Water Treatment Plant and Evaporation PonConstruction of a Helipad, Construction of Sewage, Storm, Fire, Utilities Water, IrrigatioWater, Oily water and Drinking Water systems, Construction of shaded parking areas anshaded walkways (PEB & Pre-cast Panels), Construction of road network &Construction of13.8kV Sub-Station and underground transmission line &Landscaping works.
RESPONSABILITIES
Ensure work execution is in compliance with Contract Documents &Drawings, specifications & applicable Standards.
Coordinate architectural & Structural drawings with all other disciplines
Follow up shop / As-Built Drawings preparation, Submittals & Approvals.
Provide priorities & direction to support completion of the work.
Plan & Manage activities of Sub-Structure (Excavation, Compaction, Testing,Bar-Bending Schedule, formwork. Concrete pouring schedule for footings,Grade Beam, Pedestal & Anchor Bolts installation).
Plan Manage & Supervise Super Structure Concrete activities, Steel structure & PrEngineering Building Erection activities, Pre-cast Panels erection activities of stestructural buildings, Installation of cellular metal decking system, Installation of ro
water proofing system. Overhead cranes erection & Pre-cast & PEB Parking erection. Supervise the Finishing works which includes, Installation of Ceramic tiles,
Consulting Engineers
7/26/2019 NDA Profile 2012
90/110
Granite & Marble flooring & cladding work, carpet tile &carpet floors.Installation of regular, Fire rated & moisture resistant dry walls &demountable partitions... Installation of acoustical, Gypsum & Woodenceiling, Installation of space frame. Installation of wooden, steel doorframe &leaves including hardware. (Fire rated Non fire rated, Security doors
etc.).Installation of Automatic Aluminum doors &aluminum windows. Painton internal walls, ceiling. Installation of Furniture. Installation of workstationaccording to Aramco approved material schedules &drawings.
Resolve complex issues & provide technical expertise to management.
Organize & Conduct coordination meetings with sub-contractors & Suppliersto plan and clarify schedule & project delivery.
Coordination with site/safety managers for approval of safe construction workmethod statements.
Arrange & apply planned manpower, equipment &material for new and inprogress activities and take necessary actions for achieving planned progress.
Forecast material requirement for Civil, Structural & Finishing activities onweekly basis.
Prepare formats for the monitoring of progress against applied resources on inprogress civil structural & finishing activities.
RESPONSABILITIES
Monthly data collection and updating of project program in primavera.
Weekly and monthly progress monitoring.
Preparation of sketches and tables in MS Excel for easy monitoring forBarrage, Power Channel, Bridges, Super passages, Service roads, Approachroads & Control Buildings.
Preparation of weekly concrete pouring & roadwork program for approval. Quantity takeoff and allocation of resources such as material, equipment &
manpower.
Quantity calculation of Bridges, Super passages, Escapes, Drainage Inlets,Railway Bridge (Steel Structure), 100Km service road on both sides of thepower channel 27 Approach roads to Bridges for planning of works.
Progress monitoring of Reinforced concrete Channel (52 Km *100m* 11m)lining activity.
GHAZIBAROTHACONTRACTORS
(Joint Venture of IMPERGILO S.p.A. (Leaders),ZUBLIN AG, NAZIR &COMPANY, SKB)
Project-8 Ghazi Barotha Hydropower Project(US$620 million)
Client: Water and Power Development Authority(WAPDA)Pakistan.
Position: Planning Engineer(5thApr, 2000 to 1stNov, 2002)
PROJECT INFORMATION:
Hydropower project consisting of a Barrage & Power Channel. Construction of Barrage
Consulting Engineers
7/26/2019 NDA Profile 2012
91/110
including concrete structures such as Head Regulator, under sluices, standard Bays &Embankments as Fuse Plug, Dividing Island and Guided Banks. Construction of Power Channeincludes concrete lined 52 km channel with related structures as 27 Super Passages, 5 Escapes,24 Drainage inlets, 21 Road Bridges, 1 Railway Bridge, 1 Arterial Road Bridge and 1Culvert.
N.L.C(NATIONAL LOGISTIC CELL ENGRS)
Project-9 Project Control Lahore Roads
Locations: Jail Road, Airport Terminal, Access Road Route-1& Defense Road Lahore
Position: Site Engineer
(3rdMarch 1999 to 1stApril 2000)
PROJECT INFORMATION:
LRRP (Lahore Road Rehabilitation Project)
Jail Road, Subway opposite to Services Hospital Jail Road, Extension ofSherpao Bridge.
Roads around new Airport Terminal (Access Road Route-1 & Defense Road)
RESPONSABILITIES
Supervise the construction of concrete structures.
Planning and Supervision of Road Construction and drainage works.
Supervise the construction of Jail Road.
Preparation of weekly program for activities of Sub-Grade, Sub-Base, AggBase &Asphalt.
Conduct coordination meetings with sub-