NDA Profile 2012

download NDA Profile 2012

of 110

Transcript of NDA Profile 2012

  • 7/26/2019 NDA Profile 2012

    1/110

    Consulting Engineers & Project Managers

    52-D1Gulberg IIILahore,Pakistan

    Voice : +92-42-5875181-5876457Fax : +92-42-5876889Email : [email protected]://www.ndapak.com

  • 7/26/2019 NDA Profile 2012

    2/110

    Overseas Projects

    Energy Sector

    Industrial / Textiles

    Environmental and Public Health Engineering

    Oil and Gas

    Bridges and Transportation

    Multistoried Buildings

    Education Buildings

    Housing and Leisure

    Value Engineering

    Registration with Pakistan Engineering Council

    Registration with Karachi Building Control Authority

    Enlistment with Capital Development Authority

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    3/110

    DAMS&HYDRO ENGINEERING

    !

    "#

    INDUSTRIAL SECTOR

    Civil / Structural:

    $

    #

    % $ & $

    '((

    $

    Piping:

    ) *+,

    ) -$

    Mechanical:

    )

    . $

    ' #

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    4/110

    POWERPLANTS

    Civil / Structural:

    /

    TRANSPORT SECTOR

    Civil / Structural:

    .

    +

    OIL&GAS SECTOR

    Civil / Structural:

    )

    ,

    TELECOMMUNICATIONS

    Civil / Structural:

    +

    +

    ARCHITECTURALENGINEERING

    Buildings

    (

    (

    0

    "

    '

    Materials

    (

    )

    " +$

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    5/110

    PROJECTMANAGEMENT

    + 1

    (

    2

    +

    ) #

    $

    (

    3

    GEOTECHNICAL ENGINEERING

    !

    *

    $

    $

    (

    SPECIALSTRUCTURES ANDREHABILITATION

    (

    *

    PEERREVIEW&VALUEENGINEERING

    $ (

    ! " )

    ( +

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    6/110

    A: Detailed Design B: Value Engineering

    C: Resident Construction Supervision D: Project Management

    E: Design Review

    Sr. # Project Description ServicesCost

    (Rs. Mil.)

    Status

    1. 11 Storied FFBL Head Office

    Building, Islamabad

    Built up area 170,000 sq. ft

    B, C, D, E 1,000 Under

    construction

    2. 11 Storied Park & Ride Parking

    Plaza, Lahore

    Built up area 154,000 sq. ft

    A 500 Complete

    3. 33 Storied Ali Trace Center, Lahore

    Built up area 400,000 sq. ft

    A, C, D 1,000 Under

    construction

    4. 9 Storied 200 Bed Surgical Hospital,

    Sukker

    Built up area 275,000 sq. ft

    A 1,000 Under

    construction

    5. 29 Storied Pace Towers, Lahore

    Built up area 500,000 sq. ft

    A, C, D 1,500/- Substantially

    complete

    6. 70 Storied Mabarak Center, LahoreBuilt Up area 7,000,000 sq. ft.

    B, C 50,000/- Underconstruction

    7. 20 Storied Ali Tower, Lahore

    Built up area 240,000 sq ft.

    A, C, D 480/- Complete

    8. Pakistan School of Fashion Design,

    LahoreBuilt up area 350,000 sq. ft.

    C, D 960/- Complete

    9. 16 storied Madinah Center, Lahore

    Built up area 200,000 sq. ft.

    A 600/- Under

    construction

    10. Office Building, 201 A, Upper Mall,Lahore

    Built up area 50,000 sq. ft.

    A, C, D 200/- Complete

    11. 8 StoriedDescon Headquarter,

    Lahore

    Built up area 137,500 sq. ft.

    A 237/- Complete

    12. Sweetwater Dairy Farm,Renala

    Khurd, Okara

    B, C, D, E 140/- Complete

    13. 20 Storied Islamabad Stock

    ExchangeBuilding: Built up area 400,000 sq. ft.

    E 1,200/- Complete

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    7/110

    Sr. # Project Description ServicesCost

    (Rs. Mil.)

    Status

    14. 33 Storied PTET Tower, Islamabad

    Built up area 600,000 sq. ft.

    E 1,800/- Complete

    15. 9 Storied New Auriga Shopping

    Complex, Lahore:Built up area

    400,000 sq. ft.

    A, C, D 650 Complete

    16. Metro Cash and Carry Islamabad:

    Store spread over12.5 Acres with PEB

    Roof

    C, D 50 Million

    (USD)

    Complete

    17. Metro Cash and Carry, KarachiStore spread over12.5 Acres with PEB

    Roof

    C, D 50 Million

    (USD)

    Complete

    18. Metro Cash and Carry Store,

    LahoreStore spread over12.5 Acres with PEB

    Roof

    A, C, D 50 Million

    (USD)

    Complete

    19. Eighteen storied Apartment

    Buildings In San Diego, Californiafor Flores Lund Consultants

    A Complete

    20. Suzuki Sethi Motors, Ferozepur

    Road, Lahore:Multistoried Office/Showroom with a

    Built Up Area of 100,000sq.ft.

    A,C,D 180/- Complete

    21. Century Tower, Kalima Chowk,Lahore: Multistoried

    Office/Commercial Building with a

    Built Up Area of 175,000sq.ft.

    A,C,D 210/- Complete

    22. Suzuki Township MotorsMultistoried Office/Commercial

    Building with a Built Up Area of

    50,000sq.ft.

    A,C,D 80/- Complete

    23. PACE, Model Town Link Road,

    LahoreMultistoried Commercial Building

    with a Built Up Area of 120,000sq.ft

    A 250 Complete

    24. PACE, GujranwalaMultistoried Commercial Building

    with a Built Up Area of 140,000sq.ft

    A 250 Complete

    25.PACE Gujrat

    Multistoried Commercial Buildingwith a Built Up Area of 140,000sq.ft

    A 250 Complete

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    8/110

    Sr. # Project Description ServicesCost

    (Rs. Mil.)

    Status

    26.NHA Head Office Building,

    Islamabad:

    Multistoried Office Building with a

    Built Up Area of 125,000sq.ft

    A 250 Complete

    27.Al Rehman Plaza, SargodhaMultistoried Commercial Building

    with a Built Up Area of 300,000sq.ft

    A 550 Complete

    28.Warid Telecom, (Pvt.) Ltd.

    MSC III Gujranwala and Karachi

    A 50 Complete

    29.Naafeh Tower, Gujranwala

    Multistoried Commercial/Apartment

    Building with a Built Up Area of

    300,000sq.ft

    A 600 Under

    construction

    30.Usmania Tower, Lahore

    Multistoried Commercial Building

    with a built up area of 250,000 sq. ft.

    A 500 Complete

    31.Regency Hotel, Mirpur

    Multistoried commercial building with

    a built up area of 200,000 sq. ft.

    A 360 Complete

    32. Prime Ministers Housing Scheme A Complete

    33.Park & Ride Parking Plaza, LibertyMarket, Lahore

    Multistoried Parking Plaza with a built

    up area of 155,000 sq. ft.

    A 500 Under

    construction

    34. Shopping Center, Old District

    Court, Muzaffarabad, AJK

    Multistoried Commercial Building

    with a built up area of 75,000 sq. ft.

    A 300 Under

    Construction

    35. Shopping Center, Bank Road,

    Muzaffarabad, AJKMultistoried Commercial Building

    with a built up area of 275,000 sq. ft.

    A 1,250 Under

    Construction

    36. Prime Minister House,

    Muzaffarabad, AJK

    A 500 Under

    Construction

    37. President House and Secretariat

    Muzaffarabad, AJKA 500 Under

    Construction

    38. Officers Club, Muzaffarabad

    Multistoried Commercial Building

    with a built up area of 48,000 sq. ft.

    A 200 Under

    Construction

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    9/110

    Sr. # Project Description ServicesCost

    (Rs. Mil.)

    Status

    39. National Khurshid Library,

    Muzaffarabad

    Multistoried Commercial Building

    with a built up area of 25,000 sq. ft.

    A 100 Under

    Construction

    40. Sports Complex, Bagh AJK

    Multistoried Sport Complex Building

    with a built up area of 100,000 sq. ft.

    A 400 Under

    Construction

    41. Langer Pura Birdge, Muzaffabad,

    AJK

    Pre-stressed .Concrete Box Girder

    Bridge built by the Cantilever

    Construction Method, with amaximum span of 89 meter.

    A 600 Under

    Construction

    42. Jalalabad Birdge, Muzaffabad, AJK

    Pre-stressed .Concrete Box Girder

    Bridge built by the Cantilever

    Construction Method, with a

    maximum span of 109 meter.

    A 600 Under

    Construction

    43. Hullar Bridge, Bagh

    Pre-cast pre-stressed concrete girder

    bridge having a span 42 m each, total

    length 210 meter.

    A 450 Under

    Construction

    44. Fauji Fertilizer Co., Islamabad B 500 Complete

    45. Brarkot Road,Muzaffarabad, AJK A 260 Under

    construction

    46. Zero Point to Airport,Muzaffarabad,

    AJK

    A 288 Under

    construction

    47. Airport to Langerpura,Muzaffarabad, AJK

    A 288 Under

    construction

    48. Ring Road Section I,Bagh, AJK A 216 Under

    construction

    49. Soutern By Pass Link Road,Rawalakot, AJK

    A 115 Under

    construction

    50. Police Station to Baldia Adda,Rawalakot, AJK

    A 110 Under

    construction

    51. Sialkot-Lahore Motorway Project E Under

    construction

    52. Expansion of Makkah Power Plant,

    Makkah, Saudi Arabia

    A 900 Under

    construction

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    10/110

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    11/110

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    12/110

    ! " ! " ! " ! "

    !" #$%## !

    '

    #" #" #" #"

    !!!!

    $ %##

    ! (

    )' )' $ %##

    $ !% &!'$ !% &!'$ !% &!'$ !% &!'

    $! ('!) ! "$! ('!) ! "$! ('!) ! "$! ('!) ! "

    %## *

    & ' ( # %## )#

    +' %' %##

    !', # +#"

    ##

    % ('

    %# %, -

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    13/110

    $ *$ &!' $! ('!) ! "$ *$ &!' $! ('!) ! "$ *$ &!' $! ('!) ! "$ *$ &!' $! ('!) ! "

    %## *

    & ' ( # %##

    )# +' %' %## !', #

    +#" ##

    % ('

    ' + "## ! ' + "## ! ' + "## ! ' + "## !

    *% ('!) ! "*% ('!) ! "*% ('!) ! "*% ('!) ! "

    %## *

    & ' ( # %##

    )# +' %' %## !', #

    +#" ##

    % ('

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    14/110

    " ) ,% ('!) ! "" ) ,% ('!) ! "" ) ,% ('!) ! "" ) ,% ('!) ! "

    %, -

    %, # ,

    -& % &-& % &-& % &-& % &

    % ( +# . + -#

    %## # %

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    15/110

    $$$$....& '& '& '& '

    " /" " /" " /" " /"

    /

    $%##

    0#' #

    ## 1#

    0 0 0 0

    ! ! ! !2/ #

    , ,

    3 ''

    #,' , 3

    !$ 11!1 %1 4 5'

    6 7#

    , ' ' 8

    6

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    16/110

    1 1 1 1 1 1 1 1

    ) ) ) )

    )# (

    / #' % '

    $%## #

    &) 1 1 &) 1 1 &) 1 1 &) 1 1

    ) ) ) )

    )# ( 9 #'

    % '

    $%## #

    1 1 1 1

    $ ,%$ ,%$ ,%$ ,%

    : 4 ; #'

    9 ' 4 29 '

    "

  • 7/26/2019 NDA Profile 2012

    17/110

    3

    ! ! %# ,

    !"#

    $%

    & '(

    ) *% #

    +(

    0, 6

    ! " # ,

    &% &%

    & '(

    ( $

    ! # )# ( %# ,

    # + -

    ! "

    #$ % !&

    $ '

    (

    &! +( '.

    , *% #

    +(

    ! %# )# ( %# ,

    # + -

    ! "

    #$ % !&

    &! +( '.

    , *% #

    +(

    =# &,00 ( >%

    # + -

    ! "

    #$ % !&

    &! +( '.

    , *% #

    +(

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    18/110

    3

    6, ?' 3 ! >' %# ,

    #( '

    $ $

    &! +( '.

    , *% #

    +(

    -) )

    # , /

    0 / '

    # +

    #

    &! +( '.

    , *% #

    +(

    (# 8 % '' 6

    % 1. (%

    2 & %

    %

    (

    ! !

    ( 3 .

    ) # #

    4 % +%%5 )

    %@) #

    6 )( + (.

    !"# 7% .

    +54 4 (

    % * %# 3 ?!

    ! 8 3 9 % :

    % 3 ;: % !

    % # %

    1#+*

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    19/110

    3

    %#' * * ' ?!

    & ,! ;:=

    % # %

    1#+*

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    20/110

    02

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    21/110

    ,

    '

    # %

    , '

    #, 3

    # 1

    B @#

    '

    #

    ## # '

    ' #

    # 1

    & %

    C

    %' %#

    D

    '

    #

    ' -

    %#,

    ,# %' (#

    ! D7

    345 1 % )345 1 % )345 1 % )345 1 % )

    ( !! ( !! ( !! ( !!

    ',

    #

    ( $

    %##

    67 1 ! 67 1 ! 67 1 ! 67 1 !

    $! ,%$! ,%$! ,%$! ,%

    D#

    '

    ''#' , 0#

    1/ $%##

    #

    1

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    22/110

    % ! % ! % ! % !

    $! ,%$! ,%$! ,%$! ,%

    >' /'

    ' E '"

    C

    47 1 47 1 47 1 47 1

    $! ,%$! ,%$! ,%$! ,%

    * D ( 21F >'

    " % # %

    # ,

    % # #

    D#

    # ,

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    23/110

    3

    ENERGY

    ! &&& D 3

    % 6 %. % 2 ? %

    & (

    $&

    & '

    "

    & " '

    2

    - D D

    ' 2 2 @ %

    1-/ @(

    , #.

    !"#

    -++

    E; !* ! &&& D 3

    2 # @

    % ! %%% (

    7 .6

    !"#

    .

    #

    /2 !* (# ' > #

    %(

    ,! !"#

    2(( ,7

    ! ! %# ,

    !"#

    $%

    & '(

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    24/110

    &/0 8

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    25/110

    & ) $

    %

    (

    # 0#@# @ @

    ) @

    ) 8 ) ,# ,

    #

    - ' !- ' !- ' !- ' !

    %' 44%' 44%' 44%' 44

    @ @

    ,

    2 '

    ) % #1 $ %##

    %

    -' &!'-' &!'-' &!'-' &!'

    @ ) 8 )

    ,# , !

    ''#' E: '1 ' %

    # 1 )

    ' G /"

    #1 !# ' #'

    # (

    ) %'

    "! &!'"! &!'"! &!'"! &!'

    @ )

    8 ) ,# ,

    !

    ''#' :'1 '

    % #

    1 )

    ' G

    /" #1 !#

    ' #'

    #

    (

    ) %'

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    26/110

    & !& !& !& !

    9"9"9"9"!!!!

    F >' (

    # ' ( ) %#, )

    ' #

    ' , 1

    %# 8

    & 8'

    %## '

    #

    -' -' -' -'

    9"!9"!9"!9"!

    F >' (

    # '

    ( ) %#, )

    ' #

    ' , 1 %# 8

    & 8'

    '

    #

    : : : :

    9"!9"!9"!9"!

    F >' (# '

    ( ) %#, )

    ' #

    ' , 1

    %# 8

    & 8'

    '

    #

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    27/110

    &$ &$ &$ &$

    ! ! ! !

    21H >' (

    # ' ( ) %#, )

    ' #

    ' , 1

    %# 8

    & 8'

    '

    #

    ' ' ' ' ! %! %! %! %....4 &'4 &'4 &'4 &'

    /1F >' ( # ' ( ) %#,

    ) ' # ' , 1 %# 8 & 8'

    %## ' #

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    28/110

    3

    0, 6

    ! " # ,

    &% &%

    & '(

    ) 8A )

    8 % # # &

    ,

    - ( ( 3

    # 4 & 3 !

    % -# ) 181 >

    15! ! 5

    ( .

    5 & 4 & ( (

    ! %%%

    ?8 %.

    A@ &

    3

    4

    . '.

    6, ) !#A, 6>

    5 & 4 & ( (

    ! %%%

    8 %.

    A@ &

    3

    4

    . '.D# ) ) 6>

    5 5 ( !

    6; % ; %.

    A@ &

    3

    4

    . '.

    ) ( !#A, 6>

    > *% , +% ,

    & #( & !% ! %

    ( .

    ) *

    A@ &

    3

    4

    . '.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    29/110

    3

    G !#A, 6>

    > *% , +% ,

    & #( & !% ! %

    ( .)

    *

    A@ &

    3

    4. '.

    -# !#A, 6>

    > *% , +% ,

    & #( & !% ! %

    ( .

    )

    *

    A@ &

    3

    4

    . '.

    ( ( % ) 6>

    6.> *% , +% , & #( & !% !

    % ( .

    )

    *

    A@ & 3

    4

    . '.

    %# ) ( 6>

    ;.= *% , +%

    , & #( & !% !

    % ( .

    )

    *

    A@ &

    3

    4

    . '.

    % ) ( ( 6>

    ;.= *% , +%

    , & #( & !% !

    % ( .

    )

    *

    A@ &

    3

    4

    . '.

    ) ( 6>

    > *% , +% ,

    & #( & !% ! %

    ( .)

    *

    A@ &

    3

    4. '.

    ) > # ( 6>

    ; *% , +% ,

    & #( & !% ! %

    ( .

    )

    *

    A@ &

    3

    4

    . '.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    30/110

    ;-/ &;-/0

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    31/110

    & '# ,#

    # %1

    & '# ,#

    C

    %#

    !

    # 4

    %

    $%##

    8 &

    !

    #, D

    7#

    # %#

    " -" -" -" -

    ! # ' # : "

    ,# # ; 01 1 3

    H ! >(1

    % C - # %## 8

    ( # H; 1 ,

    ( -"

    - C '' %# # +#

    % - 2'' , #

    ;H #' H"1

    # 1

    +# 7#

    # %#C # ''

    8&

  • 7/26/2019 NDA Profile 2012

    32/110

    - 0! - 0! - 0! - 0!

    F ' D

    ,# # ; 01 '

    %## %

    ## ' 2: , 8# - / ,'1 ( +' ( #' ,

    " # % *

    - -1 # ' (1

    ( ?# H 0#'" +

    2: + (" # # ''

    1 % ,

    ' ##1

    % -% -% -% -

    ' #

    ,# '

    '

    ,# #

    /H 0 '1

    %##

    % 3!'

    # %#

    %1

    ## ' 29

    , 8# -

    H ,'1

    ( +' ( #'

    , "

    #

    % * - -1 (

    +# 1 (

    ?# '

    / + (1

    1! -1! -1! -1! -

    D =# *

    ' 8 )# # ? ; 01'1

    %## %

    ## ' 92 , 8# -

    2 ,'1 ( +' ( #'

    , " #

    % * - -1 ( +#

    1 ( ?# ' H +

    (1

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    33/110

    ) 9"! () 9"! () 9"! () 9"! (

    ' ! ? ( )# ,# #

    01 '

    %# 8 & ! #

    %## ! % - !1

    ! 9! 9! 9! 9"! ("! ("! ("! (

    ? ( )# ,# # 2H

    01 '

    %# 8 & ! #

    %## ! % - !1

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    34/110

    ' & ! 9"! (' & ! 9"! (' & ! 9"! (' & ! 9"! (

    9 ,# #

    2H 01 '1

    %# 8 & ! #

    %## ! %1

    ' !' !' !' !

    /% /% /% /%

    9"! (9"! (9"! (9"! (

    ,# # ; 01 '1 %#

    8 & !

    # %##

    ! %1

    (! -"$(! -"$(! -"$(! -"$

    9"! (9"! (9"! (9"! ( -, )#

    ,# # 2H 01 '1

    %#

    8 & !

    # %##

    ! %1

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    35/110

    < ! ' 9 < ! ' 9 < ! ' 9 < ! ' 9

    -"$ -"$ -"$ -"$ - - - -

    )#

    ,# # H 01

    '1

    %## %1

    ## ' 1 (

    +' ( #' ,

    " #

    % * - -1

    ( +# 1

    5== &! '%5== &! '%5== &! '%5== &! '%

    D

    )#

    ,# # 2HH

    01 '1

    %##

    %1

    ## ' : 1 ( +' (

    #' ,

    "

    /$ >) /$ >) /$ >) /$ >)

    (! (! (! (!

    +'

    2E ,#

    / @ ,# # #

    2H 01 1

    ( 7#

    3 !'

    ( # %# %1

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    36/110

    3

    +#3 +A ) =' -1 D ? )# &', &',

    + % ( ;

    ( 99 7. .

    + #

    //&' ,

    4 ( A -, ! -

    + % B

    ( =6 7. .

    + $%%

    !1!1 ' ( -+ % ( :

    ( 6 7. .

    +

    #

    + 3 /%

    !

    2 ) %# D %#

    + % 2 ( (

    ;9= 7. .

    ' -

    $

    !, -

    + % % ( 8 ( >= 7. .

    ' )

    %*, -. / $

    '&

    $+

    2C*

    ( (

    ( 7. .

    #*

    $

    - 3

    .

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    37/110

    3

    D# !#A, 6>

    ( (

    ( 7. .

    #*

    $

    - 3

    .

    % ' ) 6>

    % ( (

    7. .

    #*

    $

    - 3

    .

    % ) ( !#A,

    /! # %% ( (

    ;9= 7.

    #*

    $

    - 3

    .

    % ? # !#A,

    / # %% ( (

    9= 7.

    #*

    $

    - 3

    .

    ? #, !#A,

    # '( ( (

    = 7.

    #*

    $

    - 3

    .

    ># -, !#A,

    # '( ( (

    ;= 7.

    #*

    $

    - 3

    .

    -

    # %% ( (

    ;9= 7..

    + #

    + 4

    ' ' # " &',

    # (

    1#+* $%(

    &', % &%" )# &',

    # (

    1#+* $%(

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    38/110

    3

    ) ' -

    1 # (% %%

    ( ( = 7..

    0 *, 1"

    + #

    '.

    +

    #,##

    C &.

    +5$%%

    @(' A ( %

    #! # %% & (

    ;=7..

    + +

    # % ! ! )1 8#, -

    1 # (% %%

    ( ( 6 7..

    $

    + #

    +( 4

    - D +' 6 ( -

    / # %% ( (

    : 7..

    ' 4

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    39/110

    3

    # >' -

    1 # %% ( (

    9= 7. .

    " ! 4

    +# # ! )1 8#, -

    %% (

    # 2 + #

    ( D !# A >'

    ! # 2 '

    , 2

    D D ? )# &',

    # # ( (5 ;=

    7. .

    $ *

    1#+*

  • 7/26/2019 NDA Profile 2012

    40/110

    - / 0

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    41/110

    & ? 8 %

    0#

    ' #

    ?1

    & >! /*)& >! /*)& >! /*)& >! /*)????

    %

    ##

    %##

    #

    #

    ) 0 >!) 0 >!) 0 >!) 0 >!

    /*) @0/*) @0/*) @0/*) @0

    /$! A/$! A/$! A/$! A

    0#'

    # @

    ## 1

    $%##

    #

    (! ;'! ! >! /*)(! ;'! ! >! /*)(! ;'! ! >! /*)(! ;'! ! >! /*)%## % +,

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    42/110

    ! 0 >! !! 0 >! !! 0 >! !! 0 >! !

    """"

    %##

    +,

    % % % %

    $ $ $ $

    #

    #

    @##

    $%##

    #

    0 /* 0 /* 0 /* 0 /*))))

    # ( $%##

    #

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    43/110

    3

    (' 8 + ' 8 "

    7% 5

    .

    ? (

    !

    5

    +,'

    8 ' + =#7% 5

    (

    5 ; %!

    .

    #

    >

  • 7/26/2019 NDA Profile 2012

    44/110

    /;- 8 B-

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    45/110

    ! $ - ! $ - ! $ - ! $ -....=C=C=C=C

    ! "#### $ %

    &'"### $ %

    ( !

    )%

    ' # ( ) 3

    !' # %#1

    ! $ ! $ ! $ ! $

    (%(%(%(%....=4=4=4=4

    ! "#### $ % &'"### $

    %

    (

    !

    )%

    ( ) 3

    !' # %#1

    ! $ ! $ ! $ ! $

    )"!)"!)"!)"!

    ! "####

    $ %

    &'"### $

    %

    (

    !

    )%

    ( 3

    !' #

    %# 1

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    46/110

    3

    %# !

    # 4

    2

    #

    #3 4 ( ! /F >' !# ( -

    @ ,( +@ 3 ,

    % !

    #5 2

    #

    ! % -@9# ! ;.= + &

    +

    #

    3

    4%(2

    ! % >@

    # ! ;.= + &

    #*

    + #

    3

    4%(2

    ! % &',

    # ! ;.= + &+ #

    3 4%(2

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    47/110

    - / ;&-

    -

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    48/110

    & ' $ #, D

    %

    '

    ,

    ' #

    '

    #$

    ,' , 1

    &

    C

    * %#

    %$% '

    % * !' #',

    *

    1 1 1 1 1 1 1 1

    ) ) ) )

    )# (

    / #'

    % '

    $%## #

    &) 1 1 &) 1 1 &) 1 1 &) 1 1

    ))))

    )# (

    9 #' % '

    $%## #

    1 1 1 1

    $ ,%$ ,%$ ,%$ ,%

    : 4 ; #'

    9 ' 4 29 '

    "

  • 7/26/2019 NDA Profile 2012

    49/110

    !" # $%!" # $%!" # $%!" # $%

    3

    % * %# 3 ?!

    ! 8 3 9 % : % 3

    ;: % ! %

    # %

    1#+*

    %#' * * ' ?!

    & ,! ;:= % # %

    1#+*

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    50/110

    /; &;-/0

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    51/110

    % > /' - % > /' - % > /' - % > /' -

    !# ,# ,# # 9H 01 1

    3 !' 4 # %#

    % @," 1 1 &!% @," 1 1 &!% @," 1 1 &!% @," 1 1 &!

    ,# ) ' - !#A

    "

    %## #', #

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    52/110

    &'( &'( &'( &'( ')&(')&(')&(')&(

    3

    % + 6 -

    ( (

    := 7. .

    + # 0

    %

    &

    - *'

  • 7/26/2019 NDA Profile 2012

    53/110

    ;0 / -;

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    54/110

    $'( (& )'$'( (& )'$'( (& )'$'( (& )'

    3

    ' !B D# %'

    (

    %

    1#+*

    8' >&% % ) 4 8A % '"

    4% # %

    1#+*

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    55/110

    -; 00

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    56/110

    )' ((()' ((()' ((()' (((

    3

    !, -

    + % % ( 8

    ( 9 7. .

    %

    ) %3&

    4 !

    " $ 5-66 $

    7566 86 /( ,

    $ 3 7- # /

    $

    +

    2C*

  • 7/26/2019 NDA Profile 2012

    57/110

    !" # $

    %& '& %( $

    % )* (+ %!

    ($ !

    % ! !

    + *, !

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    58/110

    NAEEM-UR-RAHMAN DURRANI

    DATE OF BIRTH: August 12, 1950NATIONALITY: Pakistani (Permanent Resident, Canada)MARITAL STATUS: Married

    RELIGION: IslamLANGUAGES: English, Urdu

    KEY QUALIFICATIONS

    Design, Supervision and Management of a variety of Civil / Structural Engineering Projectsin Pakistan and abroad, both as Consulting Engineer and Owners representative. Jobsexecuted include Power Plants (Hydro, Thermal and Nuclear) Oil and Gas (includingOffshore Platform, Gas Dehydration Plant and H2S removal Plant), Pre stressed Concrete andStructural Steel Bridges, Industrial Buildings, Cement Plants, Multistoried Commercial and

    Office Buildings, Cross Drainage Works, Water Supply and Irrigation Schemes, StorageStructures, Infrastructure Projects etc.

    Ten years with NESPAK as Lead Civil/Structural Engineer on Energy,Irrigation and Industrial Projects. Responsibilities included:

    1. Design and Tender Documentation,2. Construction Monitoring and Support

    Seven years with UNITED BANK LIMITED as Executive Vice Presidentand Chief Engineer responsible for all Construction/Maintenance activities ofthe Bank and Evaluation of Securities. Responsibilities included:

    1. Management and Administration of Engineering Division comprising ofthree graduate engineers and eight support staff2. Maintaining a liaison with Building Control Authorities3. Making presentations to the Board of Directors regarding various

    building projects4. Preparing Design briefs and Prequalification of Architects/Consultants.

    Entering into agreements and award of work to the selectedArchitects/Consultants.

    5. Review and approval of Designs prepared by the Architects/Consultants.6. Prequalification of Contractors, Tendering and Award of work to the

    selected Contractors,7. Review of physical progress of construction work at site and ensuring

    conformance to construction schedules. Monitoring the work of thesupervising Architects/Consultants.

    8. Payment of Contractors bills, approval of variation orders and overallfinancial control of the projects

    9. Issuing Completion Reports, Taking over Certificates and Maintenanceof the completed buildings

    10.Evaluation of securities (Land, Building and Machinery) of the BanksClients

    Abroadon various Infrastructure, Oil& Gas and Power projects with HARRIS &SUTHERLAND London, SEEE, Paris and FLUOR ARABIA, Dhahran.Responsibilities included:

    1. Design and Documentation2. Construction Monitoring and Support

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    59/110

    Seven years as Chief Executive and Chief Structural Engineer of NOORDURRANI & ASSOCIATES Consulting Engineers on various Hydro Power,Oil and Gas, Transportation and Industrial Projects. Responsibilities include:

    1. BUSINESS PROMOTION: Making proposals and presentations to

    prospective Clients. Negotiating and entering into agreements withthem.2. MANAGEMENT: Day to day management of a firm employing 15

    people (including five graduate engineers). Allocating resources forvarious projects. Reviewing progress and ensuring that targets are met.

    3. FINANCIAL CONTROL: Managing Funds and receivables fromClients.

    4. QUALITY ASSURANCE: As Chief Structural Engineer providingSenior Level Input and ensuring that quality Standards are met with.

    EDUCATION/PROFESSIONAL TRAINING

    !"#$%

    & ' () * + , ' %

    -+ ' ./ 01, /0 2/3,.4 / 455,00 65,0 6

    4 0%

    6 517 .6468.4 9 4&15: 644,48

    64 85600 511 ,464 5;.%

    PROFESSIONAL AFFILIATIONS

    1

    5 %,?

    * 0 4 @ 6

    AB#

    PUBLICATIONS

    4%5% 6% 6 C6D 0 6 0 6 $= 0* )0* )

    0* E 0( ,

    D 1 , * 7% !""#

    4%5% 6% 6 C6 0+0+- .* 0** (E 0( ,

    D 1 , * 7% !""#

    4%5% 5% .F C 6* D

    , %E 0

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    60/110

    0 & * 8

    -+ 4% =???%

    5% .F 4%5% C %E

    0 & * 8

    -+ 4% =???%

    EMPLOYMENT RECORD

    DATE EMPLOYER POSITION HELD

    7 "# 4 @ 6

    (

    0

    . "# 6* "# G++ 5D % %

    0

    +% "H +% "B @ 7

    "B 7 "#

    6

    %

    * 0

    ; 0

    ;

    %

    6* "B

    7 "B

    , @

    %

    0

    4% "$

    +% "H

    5*+

    * %

    -

    . A$

    0*% "?

    :

    ( . A? @

    1% A? 7% A$

    4

    0

    %

    8 !?;

    0 0

    . A? 0*% A? G 0

    . #> 7 #> 0 / /

    D* / *

    %

    7 #$ . #> 4

    0 %

    7 0

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    61/110

    PROFESSIONAL EXPERIENCE

    PROJECTS CLIENT RESPONSIBILITY

    ENERGY

    1500MWGhazi Barotha Hydropower

    Project

    Design and production of constructiondrawings for the52 Km Power Cannel & Associatedworks. Structuresincluded Prestressed Concrete Bridgesand PrestressedConcrete U Shaped SuperpassageFlumes

    Water & PowerDevelopmentAuthority

    Principal EngineerStructures

    184MWlow head Chashma

    Hydropower Project

    Design and production of constructiondrawings.

    Water & PowerDevelopmentAuthority

    Design Engineer

    Kundian Nuclear Complex

    Work included Main Plant, auxiliaryBuildings, Stack etc.

    PakistanAtomic EnergyCommission

    Lead StructuralEngineer

    Tarbela Power House extension Project

    Design and Tender Documents for

    Units 5-8

    Water & PowerDevelopment

    Authority

    Design Engineer

    412 MW Rousch Power

    Combined Cycle Thermal Power Plantat Kot Addu

    Habib RafiqueLtd

    Design Engineer

    MULTISTORIED BUILDINGS

    Buildings for United Bank Limited

    UBL Building, Blue Area, Islamabad.High-rise centrally air-conditionedoffice building with a gross built up

    area of175,000 square feet.Architects/Consultants: NationalEngineering Services (Pakistan)Limited in association withSeifert International, London.

    United BankLimited

    Executive VicePresident & ChiefEngineer

    UBL Head Office Building Karachi.High-rise centrally air-conditionedoffice building with a gross built uparea of 200,000 square feet. Architects:National Engineering Services(Pakistan) Limited in association with

    W.S Atkins & Partners, U.K.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    62/110

    UBL Building, Hali Road, Quetta.Centrally air-conditionedRegional Office building with a grossbuilt gross built up areaof 30,000 square feet. Architects: M/SHabib Fida Ali

    National Institute of Banking &Finance, Islamabad. TrainingInstitute with a built up area of app.80,000 square feet.Architects: M/S Habib Fida Ali

    UBL Building, Sukkar. Regional OfficeBuilding with a built uparea of 18,000 square feet. Architects:

    M/S Nayyar Ali Dada & AssociatesUBL Building Muzaffarabad, AzadKashmir. Regional OfficeBuilding with a gross built up area of11,000 square feet.

    MULTISTORIED BUILDINGS

    Two nineteen storied Buildings at

    Islamabad

    Built up area of each buildingApprox. 150,000 sq. ft

    State LifeInsuranceCorporation

    Lead StructuralEngineer

    Fifteen Storied Building at Kalima

    Chowk Lahore

    Built up area approx. 275,000 sq. ft

    CREATIVEGroup

    Chief StructuralEngineer

    Thirteen Storied Building at Queens

    Road, Lahore

    Built up area approx. 290,000 sq. ftLAKK Group Chief Structural

    Engineer

    Hall of Justice, Trinidad TrinidadGovernment

    Design Engineer

    Fountain Avenue

    Multistoried Commercial BuildingSyed Hadi AliShah

    Chief StructuralEngineer

    WATER RESOURCES,IRRIGATION ANDDRAINAGE

    Terbela Dam Left Bank Irrigation

    Tunnel Project

    Water & PowerDevelopmentAuthority

    Design Engineer

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    63/110

    Lower Indus Reclamation & Drainage

    Project

    Design and Tender Document forStructures of structures includingbridges and cross drainage work.

    Water & PowerDevelopmenauthority

    Design Engineer

    Sukkar Barrage Project

    Review of Design of Barrage Structurewith a view to assessing its capacity topass a discharge of 1.5 million cusecs

    Department ofIrrigation &PowerGovernment ofSindh

    Lead StructuralEngineer

    Khanpur Dam Project

    Review of Design of Trunion GriderWater & PowerDevelopmentAuthority

    Lead StructuralEngineer

    Kahuta Water Supply SchemeParticipated in Design of ButtressDam, Overflow Section, IntakeStructures, Stilling Basin

    Special WorksOrganization Lead StructuralEngineer

    ZONKA Water Supply Scheme Nigeria

    Work included Intake Tower GravityDam, Treatment works, Access bridge,etc.

    State WaterBoard, Nigeria

    Lead StructuralEngineer

    JIJI Water Supply Scheme, Nigeria

    Review of design of Treatment Plant,

    Filters, Chemical house, etc.

    State WaterBoard, Nigeria

    Lead StructuralEngineer

    Saminaka Water Supply Scheme Nigeria

    Review of Design of Main Weir, Intake,Filters, etc.

    State WaterBoard, Nigeria

    Lead StructuralEngineer

    Water Reservoirs for WASA Rawalpindi

    Three Elevated Water Reservoirs eachwith a capacity of 250,000 gallons

    MottMcDonaldConsultingEngineer

    StructuralEngineeringAdvisor

    CHASHNUPP Cooling Water Drain

    Review of Design

    Associated

    ConsultingEngineers

    Chief Structural

    Engineer

    INDUSTRIAL STRUCTURES

    Maple Leaf Cements Expansion Project

    Structural Design & ConstructionDrawings for 3300 tones per dayFacility

    Maple LeafCement

    Lead StructuralEngineer

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    64/110

    Mustehkam Cement Expansion Project

    Participated in preliminary design ofstructure

    State CementCorporationPakistan

    Lead StructuralEngineer

    Central Hofuf and Mubbaraz Sub-

    station

    SaudiConsolidatedElectric SupplyCompany

    Senior StructuralEngineer

    Seed Processing Plant, Khanewal

    Review of Design of IndustrialStructures, and Storage silos

    Punjab SeedCorporation

    Lead StructuralEngineer

    Grain Storage Silos, Chichawatni

    Review of Design of 50,000 tons

    capacity wheat storage silos

    NationalLogistics Cell

    Lead StructuralEngineer

    Port Qasim Transit Sheds

    Review of DesignPort QasimAuthority

    Lead StructuralEngineer

    BRIDGES AND TRANSPORTATION

    109 meter Span Steel Truss Railway

    Bridge over Ghazi Barotha Power

    Channel

    PakistanRailways

    Chief StructuralEngineer

    Lahore by Pass Project

    Coordination and contractadministration.

    National

    HighwayAuthority

    Project

    Coordinator

    Bridge over River Coquet

    (Felton Edinburgh Highway)BritishMinistry ofTransport

    Design Engineer

    Lahore Ring Road and Elevated

    Expressway Project

    MottMcDonaldConsultingEngineer

    StructuralEngineeringAdvisor

    Shadan Lund Bridge over DG Khan

    Canal

    Non destructive testing and analyticalevaluation of the as built Substructure

    Umar Munshiand AssociatesConsultingEngineers

    StructuralEngineeringAdvisor

    OIL AND GAS

    Off-shore Tie in platform at Rass

    Tanura Design/Drawings,Specifications, Material take off,

    ARAMCO Senior StructuralEngineer

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    65/110

    Gas Treatment Facility at Qadirpur

    Equipment Foundations, StructuralSteel work, Pipe Rack and Pipe SleeperFoundations, Utility Buildings, Roadsand Infrastructure for Gas Dehydrationand H2S Removal Plant

    PETROSINSingapore

    Chief StructuralEngineer

    Kadanwari Upgrade and Miano Field

    Development Project

    Structural Steelwork fabricationdrawings

    DESCON/J-TECH/OMV

    Chief StructuralEngineer

    BHIT Field Development Project

    Site Facilities and OfficesDESCON/LASMO OIL

    Chief StructuralEngineer

    Structural Steelwork for Haradh Gas

    Field Saudi Arabia

    BTT, France Chief Structural

    Engineer

    HOUSING AND LEISURE

    King Abdul Aziz University, Jeddah

    Multistoried Student Housing Project inPrecast Concrete.

    DAELIM Design Engineer

    Ipswich Swimming Pool and Leisure

    Centre

    Suffolk CountryCouncil

    Design Engineer

    Prime Ministers Housing SchemeMultistoried Housing Units both inReinforced Concrete and ReinforcedMasonry

    NESPAKConsultingEngineers

    Chief StructuralEngineer

    COMMUNICATIONS

    Television Transmission Tower at

    Multan.

    Design of 540 ft high self supportinglattice framework Structure

    PakistanTelevisionCorporation

    Design Engineer

    TRAINING

    SOCIETE D ETUDES ET DEQUIPMENTS D ENTERPRISES, LADEFANSE, PARIS, FRANCEOn the job training in the DynamicAnalysis and Design of NuclearStructures.

    PakistanAtomic EnergyCommission

    Trainee Engineer

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    66/110

    SHEIKH ILYAS AHMAD

    DATE OF BIRTH : March 16, 1947RELIGION : Islam

    NATIONALITY : PakistaniMARITAL STATUS : MarriedSPECIALIZATION IN FIRM : Design of Hydraulic Structures/

    HydropowerProjects

    LANGUAGES : English, Urdu, PersianAffiliation with : Member Institution of Engineers

    PakistanProfessional Member Pakistan Engineering

    CongressInstitutions Member Pakistan Engineering

    Council

    KEY QUALIFICATIONS

    Practising professional engineer since 1968.

    As Deputy Chief Executive Nespak Foundation, controlled & managed the the administrative& financial operations of the Foundation(August 2007 to March 2010)

    As Vice President/ Head Structural Engineering Division(2003 to 2007)supervised thePlanning & Design and Project Management activities of various projects comprisingBridges, Hydropower, Nuclear Power, Oil & Gas transmission, Buildings, Cement Plants,

    Hydraulic Structure.

    As Team Leader (Civil Designs) on deputation to Pakistan Hydro Consultants from 1995 to2003, responsible for the preparation of detailed designs and construction drawings of 1,450MW Ghazi-Barotha Hydropower Project consisting of the following major components.

    - Ghazi Barrage across river Indus- 1,600 cumecs capacity, 52 km long power channel including nearly 80 cross drainage

    structures/ bridges.- Power complex comprising of powerhouse, spillway, tail regulator, low level outlets,

    switchyard, sill structures.

    As Chief Engineer Structures Division (1987 - 1995) responsible for the planning, design,Tender documents and Construction drawings of Tarbela Hydro power Third Extension,Mangla Hydroelectric 2nd Extension, Tarbela Tunnel 4 Hoist Bridge Remedial Measures,Kundal Shahi Hydel Scheme Muzaffarabad, Water Supply Schemes of Al-Majmaah-ShaqrahSaudi Arabia & Kachhi, Ziarat, Quetta (Balochistan), Auxiliary Buildings of Multan-2Thermal Power Station, Mirani Dam and Hingol Dam Projects Balochistan.

    As Principal Engineer Structures Division (1985 - 87) worked on the design review ofpumping station structures of North Jazira Irrigation Project Iraq; Zubair Irrigation ProjectIraq, design, contract documents, construction drawings of Chattar Bagh Suspension BridgeIslamabad, Kahlian-Sahlian Suspension Bridge, UGC Centres at Lahore & Karachi, Tourist

    Resort at Sahiwal, 50m high Steel Chimney of Guddu Thermal Power Station.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    67/110

    As Principal Engineer with Kalabagh Consultants on deputation from NESPAK from 1981-85, worked on planning, design and preparation of tender documents of major structures (i.ePowerhouse, Power Intakes, Power Tunnels and Low Level Outlet Works) of Kalabagh DamProject, Pakistan.

    As Principal Engineer (1981-1982) and Senior Engineer (1974-1981) in Structures Divisionof NESPAK, responsible for planning and detailed structural design of civil works of 700MW Tarbela Hydropower First Extension Project; structural design of eight bridges on Al-Khabura-Dariz Highway Oman and three superhighway bridges of Zubair Irrigation Project-Iraq; planning & design of 20 storey 233 ft. high HBFC House, Islamabad; two industrialcomplexes in Peshawar and tower foundations for 500 KV Transmission Line (Pakistan) anddesign review of 50,000 ton capacity Grain Silos Project Chichawatni, (Pakistan).

    As Assistant Executive Engineer/Design Engineer with Irrigation Department/ Pakistan Waterand Power Development Authority (1968-1974), worked on the design and constructionsupervision of Marala Drainage Syphon, District road bridge over Upper Gogera BranchCanal, design of concrete lining of irrigation tunnels of Khanpur Dam Project and planning

    and design of irrigation systems of Hub Dam and Chashma Right Bank Canal.

    EDUCATION

    Name of Institution Year Degree/Diploma

    University of Engineering & 1968 B.Sc. Civil Engineering - DegreeTechnology, Lahore-Pakistan

    University of Engineering & 1977 Computer Programming in FORTRANTechnology, Lahore-Pakistan IV Language (Certificate)

    EXPERIENCE

    I Name of Employing Agency Noor Durrani & AssociatesTitle of Position Structural EngineerLocation of Assignment Lahore PakistanPeriod of Assignment March 2010 todate

    Activities

    Planning, design and preparation of construction drawings for the following projects:

    - Ranolia Hydro Power Project 17 MW

    - Machai Hydro Power Project 2.6 MW

    II Name of Employing Agency Nespak FoundationTitle of Position Deputy Chief ExecutiveLocation of Assignment Lahore PakistanPeriod of Assignment August 2007 to March 2010

    III. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited

    Title of Position Vice President (Str. Eng. Division)Location of Assignment Lahore - PakistanPeriod of Assignment August 2003 todate

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    68/110

    Activities

    As Head of Structural Engineering Division, supervising the activities of the Divisionincluding Planning & Design, Project Management, Business Promotion, etc. onvarious Projects. Major projects include the following:

    - KCP - Workshops (PAEC Project)- White Oil Pipeline Crossing over river Indus at Ghazi Ghat- Suigas Pipeline crossing over river Chenab at Shershah- Suigas Pipeline crossing over river Indus at Khairabad- Design of Road Bridge over river chenab at Shershah- Design of 9 bridges on Mansehra-Naran-Jhalkhad Road- 500 TPD White Cement Plant at Maple Leaf Factory- Acetic Acid Recovery Plant (PAEC Project)- Nuclear Safety Related Buildings- Upgradation/ Renovation of Govt. College University Lahore- Government College University at Faisalabad

    - Servants Housing Scheme at Mohlanwal, Lahore- Peshawar Flyover Project- Rustik-Miskin Road bridges, Oman- Lahore Ring Road Project- Structures on Sewerage projects of Nizwa, Sur, Khasab, Buraimi and Misfat,

    Oman.- Sabakzai Dam Project- 12 Small Dams Project, NWFP- Rehabilitation of Torkham - Jalalabad road Project, Afghanistan- National Bank of Pakistan, Islamabad- KAPCO High School, Kot Addu- Rehabilitation of bridges on N-70

    - Saudi German Hospital Complex Project

    IV. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited

    Title of Position Team Leader (Civil Designs)Pakistan Hydro Consultants

    Location of Assignment Lahore - PakistanPeriod of Assignment 1995 to 2003

    Activities

    Supervision/coordination of all civil design activities ofUS $ 2.5 billion Ghazi Barotha

    HydropowerProject which included analysis & design, review of tender stage designs,production of construction drawings in the Hydraulics, Geotechnical and StructuralSections. The following major activities were carried out:

    - Review/checking of the tender stage designs.- Review and updating of Tender design Criteria for forming basis of detailed

    designs- Detailed designs of component features of the project.

    Important structures include:

    - Barrange (Standard Bays, Head Regulator, Undersluices, Left & Right GuideEmbankments, Separation Dyke).

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    69/110

    - 1,600 cumecs power channel containing nearly 50 cross drainage structures andas many bridges including National Highway Bridge and Lahore-Peshawar MainRailway Bridge.

    - Power complex (1,450 MW Powerhouse having 5 unit bays, two erection bayand one unloading bay, syphon spillway, tail regulator, intake structure, sillstructures, low level outlets, switchyard, tailrace channel and headpond andforebay embankments)

    - Checking/Quality Assurance of nearly 2,200 construction drawings pertaining tobarrage, power channel and power complex.

    - Review/ Quality Assurnace & finalization design of reports of Barrage, PowerChannel, Power Complex and Project Instrumentation.

    - Review/comments on Contractor's detailed construction schedule.

    - Review/approval of Contractor's submissions on Contractor's colonies at Hattian,Tarbela & Barotha, . Contractor's alternative designs for Super-passages andbridges, Contractors design of Railway bridge based on alternate chineseprofiles.

    - Review/approval of Contractor's River Diversion Scheme, work Programme,Aggregate production plant, concrete Batching Plant, Powerhouse Excavation &dewatering schemes etc.

    V Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited

    Title of Position Chief Engineer

    Location of Assignment Lahore - PakistanPeriod of Assignment 1987 to 1995

    Activities

    Planning, design and preparation of construction drawings for the following projects:

    - Civil Works of U.S. $ 760 million 1700 MW Tarbela Hydro power ThirdExtension Project, (4 x 432 MW)

    - Civil Works of U.S. $ 80 million 200 MW Mangla Hydroelectric 2nd Extension(2 x 100 MW)

    - Tarbela Dam Spillway Stoplogs (Main & Auxiliary Spillways)

    - Remedial Measures of Tarbela Tunnel-4 Hoist Bridge

    - Kundal Shahi Hydel Scheme (2MW) Muzaffarabad.

    - Water Supply Schemes of Al-Majmaah-Shaqrah, Saudi Arabia.

    - Quetta, Kachhi and Ziarat Water Supply Schemes, Balochistan

    - Auxiliary Buildings of Multan-2 Thermal Power Station

    - Inlet, outlet & spillway structures and tunnel of Mirani Dam Project, Balochistan

    - Intake, tunnel and outlet structures of Hingol Dam Project, Balochistan

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    70/110

    VI. Name of Employing Agency National Engineering Services Pakistan (Pvt)

    LimitedTitle of Position Principal EngineerLocation of Assignment Lahore - PakistanPeriod of Assignment 1986 to 1987

    Activities

    - Design review of Pumping Station Structures of North Jazira Irrigation Project,Iraq.

    - Detailed Design, Tender Documents and construction drawings of:

    * Chitral Airport Terminal Building.* University Grants Commission Buildings at Lahore & Karachi.* Tourist Resorts at Multan, Khanewal, Sahiwal, Rahim Yar Khan and

    Panjnad.* Chattar Bagh Padestrian Suspension Bridge.* Kahlian-Sahilian Suspension Bridge.* 50 meter high Steel Chimney of Guddu Thermal Power Station.

    * Preliminary design and Tender Documents of Civil works of Zubair* Irrigation Scheme, Iraq.

    VII. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited

    Title of Position Principal Engineer (Kalabagh Consultants)Location of Assignment Lahore - Pakistan

    Period of Assignment 1982 to 1985

    Activities

    Planning, design and preparation of tenders of major structures including Powerhouse,Power Intakes, Low Level Outlet Works of U.S. $ 3400 million Kalabagh Dam Project,Pakistan.

    VIII. Name of Employing Agency National Engineering Services Pakistan (Pvt)Limited

    Title of Position Senior EngineerLocation of Assignment Lahore - Pakistan

    Period of Assignment 1974 to 1981

    Activities

    - Design review of U.S.$ 4 million Grain Silos Project, Pakistan (capacity50,000 tons).

    - Design of Super Highway Bridges for Zubair Irrigation Project, Iraq.

    - Planning design and preparation of construction drawings of:

    * Civil Works of U.S. $ 50 million, 700 MW Tarbela Hydropower ExtensionProject (4 x 175 MW).

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    71/110

    * Highway Bridges of U.S. $ 15 million Al-Khabura-Dariz Road Project, Oman.

    * Civil Works of U.S. $ 8 million Industrial Complex, including cold storages, for SarhadDevelopment Authority, Peshawar (Pakistan).

    * 20 Storey 233 ft. high building of House Building Finance Corporation, Islamabad,Pakistan.

    * Tower foundations for U.S.$ 183 million 500 KV (Guddu- Jamshoro)Transmission Line.

    - Preparation of Prefeasibility Report on 480 Km long, U.S.$50 million InlandWater Route connecting Port Mohammad Bin Qasim with Sukkur, Pakistan.

    IX. Name of Employing Agency Water & Power Development Authority

    (WAPDA)/ Irrigation Department PunjabTitle of Position Assistant Executive Engineer/DesignEngineer

    Location of Assignment Lahore - PakistanPeriod of Assignment 1968 to 1974

    Activities

    Design and construction supervision of irrigation and drainage systems, bridges, crossdrainage works, design of concrete lining for irrigation tunnels of Khanpur DamProject and irrigation system design of Hub Dam & Chashma Right Bank Canal.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    72/110

    ENGR.ZAKI UD DIN SHEIKH

    DATE OF BIRTH : October 20, 1946RELIGION : Islam

    NATIONALITY : PakistaniMARITAL STATUS : MarriedLANGUAGES : English, Urdu, Punjabi, Arabic

    EDUCATION M.Sc. (Civil Engg.)University of Maryland, U.S.A. 1975*G.P. Average = 3.70 / 4*

    Post Graduate Courses (26 Credits)Geo-technical and Transportation EngineeringAsian Institute of Technology (A.I.T.) Bangkok, Thailand

    1970*G.P. Average = 3.42 / 4*

    B.Sc. (Civil Engg.)University of Engineering & Technology, Lahore,Pakistan 1967*1st Division*

    F.Sc. (Pre-Engg.)Government College, Lahore, Pakistan 1963*1st Division*

    Matric (Science & Drawing)Naya Madrasa High School, Lahore Pakistan 1961*1st Division*

    HONOURS Appointed External Examiner by Vice Chancellor,UET, Lahorefor Final Year Civil Engg. Examinationin Highways, Runways and Railways Engg. 2004,2003, 2002, 1999 and 1998

    Appointed External Advisor/Examiner for Final year

    Projects in Transportation and Geo-Technical Engg.by UET, Lahore 2003, 1999 and 1998

    Won Outstanding Service Award by Department ofTransportation, Montgomery County, Maryland, USA 1977

    Won Scholarship for Post Graduate Studies at A.I.T. 1969

    Won Merit Scholarship for Graduate Engineering

    Studies 1963

    & AWARDS

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    73/110

    PROFESSIONAL Approved Resident Engineer, National HighwayAuthority, CERTIFICATION Pakistan for LahoreBypass Motorway Project 1993

    Approved Chief Resident Engineer, Ministry of

    Communications, Riyadh, Saudi Arabia 1986

    Approved Resident Engineer, Amanah of MadinahMunawarah, Saudi Arabia 1982

    Registered Professional Engineer (P.E.) State ofMaryland, U.S.A. 1977

    PROFESSIONAL Life Member Pakistan Engineering Council(Reg. No.Civil/5472).

    Registered Engineering Consultant,PakistanEngineering Councilsince 2002

    Member, Institute of Engineers, Pakistan

    Member, Pakistan Engineers Forum, Pakistan

    Former Member, Pakistan Engineers Forum, SaudiArabia

    Former Member,Institute of Transportation Engineers,Washington D.C., U.S.A.

    Former MemberAssociation of Muslim Scientists andEngineers, U.S.A.

    RESEARCH Parking and Traffic Control for Efficient TrafficManagement at Engineering University Campus, Lahore November, 1981

    Comparative Analysis of various field and laboratory

    methods for Unit Weight Determination of soil samples November, 1981

    Transportation Control Strategies to meet E.P.A. AirQuality Standards in Urban Areas (U.S.A.) July 1975

    Effect of Rumble Stripes on speed and deceleration ofvehicles approaching a T type Intersection (Bangkok) September, 1970

    Benefit Cost Analysis of an Urban Expressway InBangkok Metropolitan Area May, 1970

    MEMBERSHIPS

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    74/110

    Geometric Design Options for Bender AvenueInterchange an Asian Institute of Technology, Bangkok April, 1970

    TRAINING Safety Design & Operational Practices for Streets &

    HighwaysProgramme conducted by U.S.D.O.T. in associationwith Texas A & M University, U.S.A. 1977

    Transportation Systems Management

    Programme conducted by U.S.D.O.T. in collaboration

    with M/s Wilber Smith & Associates in Washington

    D.C., U.S.A. 1976

    SYNOPSIS October, 2004 to date as Project Manager, NoorDurrani & Associates.

    From June, 2002 to September, 2004, he worked asGeneral Manager in M/s. Echo West International (Pvt.)Ltd., heading the Contracts Department dealing with allimportant contractual matters and correspondencepertaining to mega projects of Roads, Housing, WaterSupply, Canals and Dams etc.

    From April, 2001 to June, 2002, he worked as ChiefExecutive of his own consulting firm, Zaki Engineering

    Associates.He served Republic Engineering Corporation (Pvt.) Ltd.,

    Lahore from July 1991 to March 2001 as ChiefCoordinator (Highways) and also worked as ResidentEngineer responsible for construction supervision of 17Km Long Lahore Bypass Motorway (M-2) Project inPakistan. The design of this 6 lanes dual carriageexpressway commenced in 1993 and was completed in1997. During 1992, he served as Project Coordinator forthe Detailed Design of Pakistan Motorway Project,

    Lahore Islamabad Section (M-2). This 339 Km longProject was also completed in 1997. During 1991, heserved as Chief Coordinator (Highways) in REC andprepared several proposals for the design and constructionsupervision of highway projects including Bela-AwaranRoad and Awaran-Khuzdar Section of Gawadar-RatoderoRoad, Sections 7& 9 of Indus Highway Project etc. Hewas also involved in the design of several sections ofFarm to Market Roads in Punjab.

    From 1986 to 1989, he worked as Chief ResidentEngineer with Khatib and Alami Consulting Engineers,Riyadh, Saudi Arabia on several large projects including

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    75/110

    Makkah Inner Ring Road (an urban expressway throughseveral large tunnels) and Madinah 2ndRing Road.

    During 1982-86, he worked as Resident Engineer / TeamLeader with Al-Muhandis Nizar Kurdi ConsultingEngineers, Riyadh, Saudi Arabia on several projectsincluding Madinah 1st Ring Road, Al-Manakha Tunnel(an urban bypass through center of Madinah) andMakkah-Jeddah-Madinah (MJM) Expressway ProjectSections 7 & 10.

    He has been teaching graduate and post graduate coursesas Associate Professor in University of Engineering andTechnology, Lahore in 1981.

    He has also served as Chief of Traffic Planning Unit inDepartment of Transportation, Montgomery County,

    Maryland, Highway Design Engineer with DMJMConsulting Engineers, Washington D.C. and SiteEngineer with Ralph D. Mitchells Construction Co.,Maryland working on different highway and buildingprojects in U.S.A. between 1972 1980.

    He worked as Junior Engineer with Harza EngineeringCo. International, (General Consultants to Pakistan Water& Power Development Authority WAPDA) deputed totheir Lahore office between 1967 1972.

    PROFESSIONAL

    HISTORY

    October, 2004 to dateProject Manger,

    Noor Durrani & Associates Lahore, Pakistan:

    Project Manager for a High Rise Building Project with abuilt up area of 500,000 sq. ft and comprising of fivebasements and 24 stories above Ground Level, involvingDeep Basement Excavations.

    June, 2002 to Oct.2004 General Manager (Contracts)Echo West International (Pvt.) Ltd., Lahore, Pakistan.

    Worked as Contracts and Coordination Expert on largeconstruction contracts involving FIDIC Conditions ofContract, Scheduling, Extension of Time, Variations,Claims, Disputes and Arbitration etc Liaison with theLegal Advisors. Dealing with the Engineers andEmployers on important contractual issues. Makingpresentations in high level meeting on work progress,quality assurance and efficient execution of works.

    Handling Torkham-Jalalabad, Nowshehra-Peshawar (N-5), Hala-Moro (N-5) Contracts of National Highway

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    76/110

    Authority (NHA), 304 Apartments Housing Contract ofPakistan Housing Authority (PHA), Dhabeji-High PointRising Mains of Karachi Water & Sewerage Board(KW&SB) and Right Bank Outfall Drain (RBOD)Extension Contract from RD 62 to 85 of Irrigation &

    Power Department, Government of Sindh. Participating inPre-Bid meetings and Bid submissions of large projectse.g. Mangla Dam Raising (WAPDA) and other megaprojects.

    He has also been appointed by Vice Chancellor, UET,Lahore, External Examiner for the Final YearExaminations in the subjects of Highway, Runway andRailway Engineering at present and several times between1998 and 2004.

    March, 2001 to Chief Executive

    Zaki Engineering Associates, Lahore, Pakistan.

    Worked on various Civil Engineering projects. Prepared aphysical model of Ormara Naval Base includinginfrastructure facilities.

    1991 to March, 2001 Resident Engineer/Chief Coordinator (Highways)

    Republic Engineering Corporation (Pvt.) Ltd.,

    Lahore, Pakistan.

    Worked as Resident Engineer on 17 Km Lahore BypassExpressway Project. Also worked as Project Coordinatorin formulation of the Inception Report, Final ConstructionDrawings and Final Design Report for Lahore -Islamabad Motorway Project (M-2, 339 Km) andInception Report, Tender Documents, Final ConstructionDrawings, Final Design Report and Bid Evaluation forLahore Bypass Expressway Project. Prepared severalsuccessful proposals for the design and construction

    supervision of highway projects for submission toU.S.AID, National Highway Authority, Pakistan andHighway Department, Government of the Punjab.

    1990-1991 Self Employed Lahore Pakistan.

    Worked on Design and Construction Supervision ofcommercial and residential buildings. Conducted studytours of transportation facilities/ projects, includingSakardu Road leading to Siachin Glacier and KarakurramHighway (KKH) up to Khunjrab Pass on the border ofChina.

    June, 2002

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    77/110

    1986-1989 Chief Resident Engineer

    Khatib & Alami Consulting Engineers, Riyadh, SaudiArabia.

    Responsible for Construction Supervision of Expresswayand Highway Projects including Makkah Inner Ring Road(involving drilling of large tunnels through rocks)Madinah 2ndRing Road, Riyadh Dammam Fencing andCamel Crossing Bridges over the Expressway, Bark-AlSahil Feeders (Project 28) Jeezan-Al-Arish (Project 41)and South Tihama Jebals (Project 53) as well as Designand Feasibility Studies of new highway projects.

    1982-1986 Resident Engineer / Team Leader

    Al- Muhandis Nizar Kurdi Consulting Engineers,Riyadh, KSA.

    Responsible for Construction Supervision of 61 KmMakkah Jeddah Madinah (MJM) Expressway(Section-7) including 3 interchanges and 30 bridges,South Safia Ambaria Bridge and Approaches on 1stMadinah Ring Road and Al- Manakha Tunnel (adjoiningMasjid Annabawi).

    Also engaged as Team Leader on the Feasibility Study for

    High Capacity Transit Services for Jeddah Makkah andHoly Areas to facilitate immense vehicular and pedestriantraffic during the annual pilgrimage (Haj) season.

    1981 Associate Professor

    University of Engineering & Technology, Lahore,Pakistan.

    Engaged in teaching of Highways and GeotechnicalEngineering courses to Graduate and Post Graduate

    students of Civil Engineering Department. Also workedas Advisor for several Projects conducted by final yearstudents involving soil mechanics and transportationengineering research.

    1980 Self Employed

    Engaged in design and construction supervision ofresidential and commercial buildings. Conducted a studytour of Transportation, Projects and facilities throughCanada, USA, England, France, Switzerland, Italy,

    Yugoslavia (Former) Bulgharia, Turkey, Syria, Jordan, S.Arabia, Iraq, Iran and Pakistan.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    78/110

    1975-1980 Chief of Traffic Planning Unit (Engineer-III)

    Department of Transportation, Montgomery County,

    Maryland, U.S.A.

    Coordination of Highway Safety Projects. ManagedIntersection Improvement Projects. Review of SectorPlans and Master Plans. Study of Traffic andTransportation Controls near Metro (Washington D.C.Metropolitan Area Mass Transit/Subway) Stations.

    1973-1975 Senior Engineer (Engineer-II) MC DOT

    Maryland, U.S.A.

    Engaged on Collection, Compilation and Analysis ofTransportation Engineering Data and preparation ofTraffic Control Plans and Urban IntersectionImprovement Projects.

    1973 Highway Design Engineer

    Daniel, Mann, Johnson & Mendenhall (DMJM)

    Consulting Engineers, Washington D. C., U.S.A.

    Engaged in the design of horizontal and vertical

    alignment of Maryland Rout 214 and geometric design ofClover Leaf Interchange between Maryland Routes 214and 202 (MD 214 & MD 202).

    Also worked on alignment studies for National RoadwayProject in Malawi, South Africa and the feasibility studyfor approach roads to T.V. Tower Stations in SaudiArabia.

    1972-1973 Site Engineer

    Ralph D. Mitchells Construction Co., Bethesda,Maryland, U.S.A.

    Responsible for construction of concrete piles, R.C.C.foundations, horizontal and vertical controls ofTappahanock Hotel Resort in Virginia and a ShoppingMall in Rockville, Maryland, U.S.A.

    1967-1972 Junior Engineer, Harza Engineering Co. International

    (General Consultants to WAPDA) Lahore, Pakistan.

    Worked on BOQ and cost estimates of Hub Damspillways, traverse and triangulation surveys of Shahdarah

    (including 18 months

    study leave forPost Graduate Studies

    in Asian Institute of

    Technology (A.I.T.)

    Bangkok, Thailand

    in 1969-70)

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    79/110

    and Multan power stations, precise leveling fordetermination of longitudinal slopes of newly constructedlink canals of Indus Basin Projects, siltation study ofWarsak Lake on Kabul River by electronic soundings(from motor boat) Also engaged in the review of Mangla

    Dam and Tarbela Dam contract / construction drawingsand design of pile foundations for high voltage electrictowers at Sanghar Nullah crossing.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    80/110

    SULTAN M.K.DURRANI

    DATE OF BIRTH: December 30th, 1951NATIONALITY: PakistaniMARITAL STATUS: Married

    RELIGION: IslamLANGUAGES: English, Urdu, Persian, Sindhi, Punjabi

    (In descending order of proficiency)

    EDUCATION &ACADEMICS B.Sc., (Second Class) from Sindh University Hyderabad; Year

    1971.

    B.E. (First Class) from Sindh University Engineering College,Jamshoro. Year 1975.

    PROFESSIONAL TRAINING

    Six Months On Job Training: National Construction CompanyLimited;

    Field of specialized training was the Billing, Estimation, Costingand preparation of Contracts documents.

    Professional certification Course on Project Formulation &Management in National Construction Company Limited.

    Special Course of Public Administration at National Institution ofPublic Administration, Karachi.

    Course of Motivation and Leadership at United Bank Limited,School of Banking, Islamabad.

    Course of Energy Efficient Building Design held by The NationalEnergy Conservation Centre (ENERCON)

    MERITORIOUS AWARDS

    Conferred the Award of Excellenceon sustained outstandingperformance in the field of engineering planning & executionof a number of successful Projects in the UBL Construction &Engineering Division all over Pakistan and abroad.

    Conferred a Gold Medalfor outstanding performance uponcompletion of UBL Building, Islamabad

    Certificate of Merit for excellence

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    81/110

    FOREIGN TRAVELS

    Traveled to several countries as Chief, Engineering Divisionto supervise the Banks overseas works and pre shipmentinspections.

    PROFESSIONAL AFFILIATION/MEMBERSHIP Member, Institute of Engineers, Pakistan.

    Member, Pakistan Engineering Council. PEC NO. M - 1124

    Member, Pakistan Engineering Congress.

    EMPLOYMENT RECORD December, 2007 to todate

    Noor Durrani & Associates

    MEP Engineer

    October 1997 to November, 2007ENGINEERING MANAGEMENT CONSULTANTS

    Managing Partner

    October 1989 to October 1997

    UNITED BANK LIMITEDSenior Vice President / Chief Engineer

    December 1984 to October 1989UNITED BANK LIMITED

    Vice President, Engineering Division.

    October 1976 to December 1984NATIONAL CONSTRUCTION (PVT.) LTD.

    Project Manager

    NATURE &SCOPE OF JOBS/WORKS

    A} From 1997- November, 2007

    I am the Managing Partner, of the Engineering ManagementConsultants, based at Karachi with sub-office at Lahore. It has beenproviding a comprehensive range of services in the Engineering andConsultancy, mostly involved in execution of multistoried buildings onTurnkey Basis, Project Management, Architecture / Structural Design of

    residential units. Valuation of properties for the financial institutions.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    82/110

    I also had the opportunity of working with two leading Americancompanies, M/s DynCorp International, Texas-USA and M/s Brown &Roots, Arlington, Virginia-USA on their projects based in Kabul,Afghanistan and Islamabad, Pakistan. The projects were to be onturnkey basis including concept, design, costing, construction and post-construction maintenances.

    Since 2002, EMC is associated with US Forces based at Kandhar,

    Afghanistan, meetings their requirements for all types of construction

    materials / equipments.

    B} From 1984-1997

    This period coincided with the prime application of all myknowledge and capabilities gained over time in the multi-discipline engineering application and approach to the engineeringproblems and compatible solutions. The Scope of job and work ofthe period is summarized below:-

    SCOPE OF WORK Selection and appointment of Consultants, Review of

    Consultants proposals, submissions, documents and overallproject management for the client.

    Pre-qualification of Contractors, Review of tenders, contractnegotiations, selection and award of work to contractors,review of quality and progress at site and overall constructionmanagement for the client.

    Selection of plant and equipments in line with requirements forintroduction of latest technology.

    Verification of contractors bills and financial & quality controlof projects.

    Maintenance of buildings/office premises: Maintenance ofall newly constructed building/office premises, whichcomprised maintenance/operation of air-conditioning plants,High-speed lifts, civil & electrical works etc.

    Interior Design: Interior design of executive offices and

    branch premises.

    Liaison with building control authorities.

    Valuation of Civil Works, Land, Building, Factories (including Plant& Equipment) offered to bank for mortgage proposed. Entire loaningof the bank depended upon valuation of the properties carried out byEngineering Division.

    OTHERBUILDING

    PROJECTS

    COMPLETED

    UBL Building, Blue Area, Islamabad:Centrally air-conditioned High rise office Building with a gross built

    up area of 192,000 square feet. Complete with interior works. CostRs.177.068 Million, project completed in 1993.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    83/110

    UBL Building, Quetta:Centrally Air-conditioned, Regional Office Building with agross built up area of 30,000 square feet. Complete withinterior work. Cost Rs.30.00 Million.

    UBL Building, Muzaffarabad, Azad Kashmir:Air-conditioned Regional Office Building with a gross built uparea of 14,000 square feet. Complete with interior works. CostRs.12.6 Million.

    UBL Building, Sukkur:Air-conditioned Multi Storied building with a gross built-uparea of 20,000 square feet. Complete with interior works. CostRs.20 Million.

    UBL Building, Kutchery Bazar, Faisalabad:Air-conditioned Ground plus two storied building office havingcovered area of 19,700 square feet.

    UBL Building, Multan:Ground plus three Storied Building having covered area of16,000 square feet including interior works.

    UBL Building, Abbottabbad:Air-conditioned Office Building Ground plus two Storiedhaving covered area of 15,000 square feet. Works completed in

    1996.

    UBL Building, Layyah:Air-conditioned Office Building having covered area of 7,000square feet. Complete with interiors. (Ground Floor only). CostRs.6.3 Million.

    UBL Office Building At Export Processing Zone, KarachiAir-conditioned office building with gross built-up area of9,000 sq.ft. including interior works.

    UBL Circle Office Building, SialkotAir-conditioned office building, ground plus one story having grossbuilt-up area of 9,500 sq.ft

    UBL Provincial Headquarter, SindhAir-conditioning and interior works of an office area spreadover three floors measuring 30,000 sq.ft., complete in allrespect.

    Interior works of UBLs Chief Executives residence atKarachi

    Interior works of UBLs Staff Collage, Karachi.

    Interior works of UBL Public Library at Hayatabad, Peshwar.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    84/110

    UBL SPORTS COMPLEX, KARACHI:Completed project from conceptional stage till completion ofthe work including land escaping of the complex spread over17 Acres of land having different sports facilities like Cricket,Hockey, Basket Ball, Tennis, Table Tennis etc.

    Silent features of the project:

    Complex is self sufficient for its water requirementshaving full fledge system supported by three tube wells.

    Standby D.G. Set covering requirements of the complex.

    Flood Lighting System at Tennis and Basket Ball Courts.

    Surfacing System for Hockey Field imported from U.S.A.of prestigious ASTRO TRUF BRAND.

    UBL SPORTS COMPLEX, LARKANA:A Sports Complex was designed in Larkana City spread over 2.2acres of land. The design catered mostly for indoor games plussports facilities like: Squash, Tennis etc. However, project was notexecuted anticipated cost of works were Rs. 20 Million.

    IN HOUSEDESIGNOF PROJECTS BY

    UBLENGINEERINGDIVISION

    Scores of Branch Buildings and Residential units were designed and

    executed by Engineering Division all over Pakistan.

    MAINTENANCEPROJECTS &WORKS

    Civil works pertaining to buildings

    Electrical installations & standby generators

    Air-conditioning plant & systems

    Elevators.

    VALUATION WORKS Valuation of thousands of civil works, lands, buildings, factories(including plant and equipment), industrial complexes etc.

    REVIEW OFFEASIBILITYSTUDIES

    Review of technical aspects of feasibility studies for a number ofindustrial units.

    C} From 1984-1976:

    This was the initial phase of my career that required strenuousphysical and mental inputs and modes of skill-enhancement.

    Various aspects of construction activity were duly covered throughingenious application of innovation and acquired skills in different

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    85/110

    fields of engineering; i.e; from initial layout of the project to itscompletion stage.

    The National Construction Company Ltd. provided a forum whereI could excel my expertise and knowledge and optimize thelearning processes. It was duly acknowledged when I kept risingthe ladder to success and was the Project Manager when I resignedfrom this Company of my own accord.

    Some of the salient projects and undertakings are spelled below:-

    NATIONALREFINERY PROJECT

    As Junior Engineer in charge of overhead pipeline and vesselerection section.

    JACOB LINESHOUSING COMPLEX

    As in charge civil and mechanical works which consistedconstruction of 22 multistoried apartment buildings, Ground plusfour stories , including installation of lifts and infrastructure

    development of the complex etc.

    PAKISTAN STEELMILLS

    Steel Making Plan: As site Engineer in charge equipmentinstallation and Erection of inter shop water pipelines.

    Hot Rolling Mills: As in charge steel structure and erection ofOverhead Bridge Cranes.

    Cold Rolling Mills: As senior Engineer & Deputy Project Manager, incharge of all civil works and steel structure erection of Cold RollingMills one of the largest projects of Steel Mills. Executed this Projectfrom the initial layout to its completion stage.

    AS PROJECTMANAGER

    Construction of 22 Million Gallon Water Reservoir & Lagoonsat Hyderabad Sindh, including laying entire net work of underground 30 inch dia pipeline and pumping stations.

    Vocational Training Centre, Hyderabad.

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    86/110

    MUHAMMAD WAQAS CHEEMA

    DATE OF BIRTH : 10thJune, 1971NATIONALITY : PakistaniCNIC : 34601-4874709-7MARITAL STATUS : MarriedRELIGION : IslamLANGUAGES : English, Urdu

    QUALIFICATION:

    Degree Major/Minor Institution Date(MM/YYYY)

    B.Sc. (Civil) University of Engineering& Technology, Lahore

    1998

    Membership of Professional Associations:

    Pakistan Engineering Council (Registration No. CIVIL/19745

    Other Training

    a. Primavera (P3) Certificate Pakistan Engineering Congress

    b. AutoCAD Certificate Pakistan Engineering Congress

    c. Sap-90 Certificate Pakistan Engineering Congress

    d. Scaffold Certification

    SaudiAramco Scaffolding CertificationPassed Test Level - Inspector

    Languages Speaking Reading Writing

    English Good Good GoodUrdu Good Good Good

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    87/110

    Employment Record

    Employer Position From

    (MM/YYYY)

    To(M /YYYY)

    Noor Durrani &Associates

    Project Manager /Resident Engineer

    1st Dec, 2004 todate

    CCE (CONTRACTING &CONSTRUCTIONENTERPRISES Ltd.)Riyadh, Saudi Arabia

    ConstructionManager / StructuralEngineer

    7th Nov, 2002 17th Oct, 2004

    Ghazi BarothaContractors

    (Joint Venture ofIMPERGILO S.p.A.(Leaders),ZUBLIN AG,NAZIR & COMPANY,SKB)

    Planning Engineer April, 2000 November,2002

    National Logistic Cell Site Engineer March, 1999 April, 2000

    Work Undertaken that Best Illustrates Capability to Handle the TasksAssigned

    NOOR DURRANI & ASSOCIATESConsulting Engineers and Project Manager

    Project -1: Mabarak CenterLocation: Farozpur Road, LahoreClients: Taavun (Pvt.)Ltd.

    (A joint venture between Govt. of Punjab and DhabiGroup)Position: Project Manager

    Project Information: Building Complex consist of one 67 storied tower, four40

    storied towers, one 25storied ellipse building with threebasements opposite to Kagaddafi Stadium, Lahore,

    Pakistan

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    88/110

    Project-2: Pakistan Institute of Fashion Design, LahoreLocation: Johar Town, LahoreClients: Trade Development Authority of Pakistan

    Ministry of Commerce

    Project Information: Total Project Cost (Rs. 860.37 Million), 5-Stories Buildingconsist of Three hundred twenty five thousand Square feetcovered area

    Project-3: Pace TowersLocation: 27-H Bulberg II, LahoreClients: Pace Pakistan Limited.

    Project Information: Total Project Cost (Rs. 600 Million), 24 -Stories Building

    with 5 basements, consist of Five Hundred thousandSquare feet covered area

    Project-4: METRO CASH & CARRYWhole Sale Distribution Center

    Location: I-11, Islamabad, PakistanClients: METRO CASH & CARRY INTERNATIONAL.

    Project-5: METRO CASH & CARRYWhole Sale Distribution Center

    Location: Metro-3, Defense Road near Allama Iqbal

    InternationalAirport, Pakistan

    Clients: METRO CASH & CARRY INTERNATIONAL

    Position: Manager Projects (1st Dec, 2004 to

    Date)

    RESPONSABILITIES

    Developed and executed Deep Basement Excavation Methodology, including

    testing of Pre stressed Ground Anchors & Pile load test for design of workingpiles. (Mabarak Center, Lahore).

    Developed Structural works Methodology of High Rise Buildings.

    Heading a team of site staff comprising of Resident Engineers, AssistantResident Engineers, Materials Engineer, Inspectors and trainee engineers.

    Resolve complex issues (Claims, Escalation etc.) and provide technicalexpertise to management.

    Co-ordination with Clints, Resident supervision staff & Contractors for thesuccessfully execution of the projects

    Development of Project Planning and Reporting Software.

    Design, Quantity, and Cost Estimation works related to Structure Preparation of realistic Project Schedule of works using Primavera (p3).

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    89/110

    Co-ordination with Clints & Contractors for the successfully execution of theproject.

    Keep close liaison with the Clients, Companies & Head office for the projects.

    Execute the job in professionally sound manner and economically to theClints.

    CCE (CONTRACTING & CONSTRUCTION ENTERPRISES Ltd.)Riyadh, Saudi Arabia

    Project-6: Construction Warehouses & Store yardLocation: Juaymah Gas Plant, Ras Tanura- Saudi ArabiaClient: Saudi Aramco, Ras Tanura Saudi Arabia

    Position: Construction Manager (CIVIL)(20

    thApr, 2004to 17thOct, 2004)

    Project-7: Administration & Industrial Complex for Qatif GOSP Plant(38US$ million)

    Location: Juaymah Gas Plant, Ras Tanura- Saudi ArabiaClient: Saudi Aramco, Ras Tanura Saudi Arabia

    Position: Senior Engineer (CIVIL)(7thNov, 2002 to 19thApr, 2004)

    PROJECTS INFORMATION:

    Project includes:Construction of Administration building, Dinning facilities, Mosque. PEStructures of Mint. Machine Shop, Maint. Service Shop, Maint.Well Service Shop, and Sanblasting & Coating Shelters etc. Construction of Water Treatment Plant and Evaporation PonConstruction of a Helipad, Construction of Sewage, Storm, Fire, Utilities Water, IrrigatioWater, Oily water and Drinking Water systems, Construction of shaded parking areas anshaded walkways (PEB & Pre-cast Panels), Construction of road network &Construction of13.8kV Sub-Station and underground transmission line &Landscaping works.

    RESPONSABILITIES

    Ensure work execution is in compliance with Contract Documents &Drawings, specifications & applicable Standards.

    Coordinate architectural & Structural drawings with all other disciplines

    Follow up shop / As-Built Drawings preparation, Submittals & Approvals.

    Provide priorities & direction to support completion of the work.

    Plan & Manage activities of Sub-Structure (Excavation, Compaction, Testing,Bar-Bending Schedule, formwork. Concrete pouring schedule for footings,Grade Beam, Pedestal & Anchor Bolts installation).

    Plan Manage & Supervise Super Structure Concrete activities, Steel structure & PrEngineering Building Erection activities, Pre-cast Panels erection activities of stestructural buildings, Installation of cellular metal decking system, Installation of ro

    water proofing system. Overhead cranes erection & Pre-cast & PEB Parking erection. Supervise the Finishing works which includes, Installation of Ceramic tiles,

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    90/110

    Granite & Marble flooring & cladding work, carpet tile &carpet floors.Installation of regular, Fire rated & moisture resistant dry walls &demountable partitions... Installation of acoustical, Gypsum & Woodenceiling, Installation of space frame. Installation of wooden, steel doorframe &leaves including hardware. (Fire rated Non fire rated, Security doors

    etc.).Installation of Automatic Aluminum doors &aluminum windows. Painton internal walls, ceiling. Installation of Furniture. Installation of workstationaccording to Aramco approved material schedules &drawings.

    Resolve complex issues & provide technical expertise to management.

    Organize & Conduct coordination meetings with sub-contractors & Suppliersto plan and clarify schedule & project delivery.

    Coordination with site/safety managers for approval of safe construction workmethod statements.

    Arrange & apply planned manpower, equipment &material for new and inprogress activities and take necessary actions for achieving planned progress.

    Forecast material requirement for Civil, Structural & Finishing activities onweekly basis.

    Prepare formats for the monitoring of progress against applied resources on inprogress civil structural & finishing activities.

    RESPONSABILITIES

    Monthly data collection and updating of project program in primavera.

    Weekly and monthly progress monitoring.

    Preparation of sketches and tables in MS Excel for easy monitoring forBarrage, Power Channel, Bridges, Super passages, Service roads, Approachroads & Control Buildings.

    Preparation of weekly concrete pouring & roadwork program for approval. Quantity takeoff and allocation of resources such as material, equipment &

    manpower.

    Quantity calculation of Bridges, Super passages, Escapes, Drainage Inlets,Railway Bridge (Steel Structure), 100Km service road on both sides of thepower channel 27 Approach roads to Bridges for planning of works.

    Progress monitoring of Reinforced concrete Channel (52 Km *100m* 11m)lining activity.

    GHAZIBAROTHACONTRACTORS

    (Joint Venture of IMPERGILO S.p.A. (Leaders),ZUBLIN AG, NAZIR &COMPANY, SKB)

    Project-8 Ghazi Barotha Hydropower Project(US$620 million)

    Client: Water and Power Development Authority(WAPDA)Pakistan.

    Position: Planning Engineer(5thApr, 2000 to 1stNov, 2002)

    PROJECT INFORMATION:

    Hydropower project consisting of a Barrage & Power Channel. Construction of Barrage

    Consulting Engineers

  • 7/26/2019 NDA Profile 2012

    91/110

    including concrete structures such as Head Regulator, under sluices, standard Bays &Embankments as Fuse Plug, Dividing Island and Guided Banks. Construction of Power Channeincludes concrete lined 52 km channel with related structures as 27 Super Passages, 5 Escapes,24 Drainage inlets, 21 Road Bridges, 1 Railway Bridge, 1 Arterial Road Bridge and 1Culvert.

    N.L.C(NATIONAL LOGISTIC CELL ENGRS)

    Project-9 Project Control Lahore Roads

    Locations: Jail Road, Airport Terminal, Access Road Route-1& Defense Road Lahore

    Position: Site Engineer

    (3rdMarch 1999 to 1stApril 2000)

    PROJECT INFORMATION:

    LRRP (Lahore Road Rehabilitation Project)

    Jail Road, Subway opposite to Services Hospital Jail Road, Extension ofSherpao Bridge.

    Roads around new Airport Terminal (Access Road Route-1 & Defense Road)

    RESPONSABILITIES

    Supervise the construction of concrete structures.

    Planning and Supervision of Road Construction and drainage works.

    Supervise the construction of Jail Road.

    Preparation of weekly program for activities of Sub-Grade, Sub-Base, AggBase &Asphalt.

    Conduct coordination meetings with sub-