January 2011 450 Concar - Hines Northern · PDF fileJanuary 2011 400 n 450 Concar San Mateo A...

Post on 06-Feb-2018

221 views 4 download

Transcript of January 2011 450 Concar - Hines Northern · PDF fileJanuary 2011 400 n 450 Concar San Mateo A...

J a n u a r y 2 0 1 1

400 n 450 ConcarS a n M a t e o

A Transit-Oriented Development

BART

CalTrain

Palo Alto

San Mateo

San Jose

Oakland

Pleasanton

Walnut Creek

Berkeley

Richmond

San Francisco

San Rafael

Fremont

Pittsburg

101

101

101

280

580

580

580880

680

80

80

92

84

location map

Delaware Street

Concar Drive

plaza

lobby

lobbylobby

crosswalk

garage

garage

450 Concar(Building 2 N)

Hayward ParkCaltrain Station& Parking 450 Concar

(Building 2 S)400 Concar(Building 1)

Site plan

400 concarFloor Plan

450 concarFloor Plan

concarView from CA-92 Off Ramp

concarView from Concar Drive and Delaware Street

400 concarView from Hayward Park Caltrain Station

450 concarEntrance at Delaware and Concar

400 n 450 Concar Facts

SuStainability

—— LEED—-—LEED—v2.0—Core—and—Shell—Gold—pre-certified—-—LEED—v2.0—Core—and—Shell—Gold—certification—targeted—

—— Transit—Oriented—Development—(TOD)—-—Located—at—Hayward—Park—Caltrain—Station

—— Transportation—Demand—Management—(TDM)—-—Bicycle—Parking—available—to—all—tenants—-—Shower—Changing—Facilities—available—to—all—tenants—-—Caltrain—GO—Pass—provided—by—landlord—to—all—employees—of—— tenants—(unlimited—use—of—Caltrain)—-—Carsharing—provided

—— Low-E—glass—(clear—but—highly—energy—efficient)

—— Landscaping—-—All—storm—water—flow—off—the—site—will—be—naturally—filtered—-—Parking—podium—will—be—a—fully—landscaped—green—roof

Signage OppOrtunitieS

—— Ten—locations—above—Fl—3—window—line—along—CA—Hwy—92

SurrOundingS

—— Station—Park—Green—-—Proposed—development—located—directly—across—Concar—-—600—residential—units,—60,000—sf—of—retail,—neighborhood—park

deSign team

—— Hines—(Developer,—Owner,—Operator)

—— Form4,—Inc.—(Design—Architect)

—— Studio—Five—(Landscape—Architect)

—— Magnussum—Klemencic—Associates—(Structural—Engineer)

meaSurementS and metricS

— — Building—1— Building—2—N— Building—2—S

Fl—4—floor—plate—(NRA)— 28,000— 30,000— 30,000

Fl—3—floor—plate—(NRA)— 28,000— 30,000— 30,000

Fl—2—floor—plate—(NRA)— 28,000— 30,000— 30,000

Fl—1—floor—plate—(NRA)— 2,000— 9,000— 0

Building—Size—(NRA)— 86,000— 99,000— 90,000

Load—Factor— 15%— 15%— 15%

Floor—to—Floor—Height— 13’6”— 13’6”— 13’6”

Floor—to—Ceiling—Height— 9’6”— 9’6”— 9’6”

Bay—Depths— 45’— 55’— 55’

Mullion—Spacing— 5’— 5’— 5’

Parking—Ratio— 3.0/1,000—rsf— 3.0/1,000—rsf— 3.0/1,000—rsf