HIGHWAY 401 EXPANSION PROJECT
PUBLIC INFORMATION CENTREOctober 17, 2019
Purpose of this Public Information Centre (PIC)
• Provide information on the Highway 401 Expansion Project
• Describe the Environmental Assessment process
• Summarize how traffic and environmental impacts are being mitigated
• Identify Next Steps
• Outline how you can stay informed and involved
PIC Content available on the Project website includes:
1. Video presentation
2. PDF / Downloadable copy of the presentation slides
3. PDF Map of the entire Highway 401 Expansion corridor
4. Summary of the Question and Answer Sessions
5. PIC Comment form
2
Project Limits
3
Benefits of the Project
The Highway 401 Expansion Project will have both local and regional benefits:
Improved Travel
Provides Carpooling
Options
Economic Benefits
• Reduced traffic congestion
• Reduced travel times
• New and expanded Commuter Carpool Lots
• High Occupancy Vehicle (HOV) Lanes
• More efficient movement of people and goods, within the Highway 401 corridor
• Generation of employment opportunities
4
Project Background and Environmental Assessment
This Project is following the approved planning process for a Group ‘B’ project under
the MTO Class Environmental Assessment (EA) for Provincial Transportation
Facilities (2000)
Preliminary Design (2013) Detail Design and Construction of three bridges (2015 – 2018)
WCC selected to design and build the Highway 401 Expansion (Spring 2019)
5
EA and Design Build Process PRELIMINARY DESIGN (2013)
DETAIL DESIGN (Commenced Spring 2019)
Review Secondary Source InformationConduct Field Investigations
Commence Detail Design
Notice of Study Commencement and Design and Construction Report No. 1
Design and Construction Report No. 1 (30-day Stakeholder Review)
Environmental Clearance
CONSTRUCTION
Construction can commence on DCR No. 1 Works
Hold Public Information Centre We are here
Design and Construction Report No. 2(30-day Stakeholder Review)
Environmental Clearance
Construction can commence on DCR No. 2 Works
Design and Construction Report No. 3 (30-day Stakeholder Review)
Environmental Clearance
Construction can commence on DCR No. 3 Works
Construction Completion
Stak
eh
old
er
Co
nsu
ltat
ion
Th
rou
gho
ut
Co
nstru
ction
and
Enviro
nm
en
tal M
on
itorin
g Thro
ugh
ou
t
DCR No. 1
• Clearing and Grubbing
• Structure Replacements:
• CN Rail Bridge
• Trafalgar Road Bridge
• CP Rail Bridge
• Environmental Clearance issued and construction of DCR No. 1 works has commenced
6
Highway 401 Widening
Typical 10 Lane Cross Section
Westbound Lanes Eastbound Lanes
Median widths will vary throughout the corridor
Typical 12 Lane Cross Section
Median widths will vary throughout the corridor
Westbound Lanes Eastbound Lanes
7
Interchanges and Road Realignment
• Interchange reconfiguration:
• Regional Road 25
• James Snow Parkway
• Trafalgar Road
• Winston Churchill Boulevard
• Mississauga Road
• Highway 401 and Highway 407 ETR
• Local road realignments:
• Sixth Line north and south of Highway 401
• Trafalgar Road north and south of Highway 401
• Creditview Road north and south of Highway 401
Mississauga Road, southwest quadrant
8
StructuresStructure Description of work
New and Replacement Bridges
Highway 401 and Highway 407 ETR Interchange Ramp
• Existing Highway 407 ETR westbound to Highway 401 westbound ramp relocated
Sixth Line Bridge • Bridge Replacement • Number of lanes on Sixth Line will remain the same • Existing structure will be maintained during
construction
Creditview Road Bridge • Bridge Replacement • Final bridge will provide two lanes in each direction
Watercourse Bridge Replacements
Oakville Creek East Bridges • Bridge Replacement and Widening • Will accommodate wildlife passage under the
structure
Credit River Bridges • Bridge Replacement and Widening • Will accommodate wildlife passage under the
structure Credit River Bridge
Hwy 401 / Hwy 407ETR Interchange
9
StructuresStructure Details
Bridge Rehabilitations and Widening
Ninth Line Bridge • Bridge Rehabilitation• Lane closures during construction, as necessary
Winston Churchill Boulevard Bridges • Bridge Rehabilitation• Lane closures during construction, as necessary
Derry Road Bridges • Bridge Rehabilitation & Widening of Highway 401 bridge over Derry Road to six lanes in each direction
• Lane closures during construction, as necessary
Other Structures:• Culverts• Retaining Walls and Toe Walls
Derry Road, looking south Winston Churchill Blvd, looking south
10
Bridge Aesthetics• Architectural detail on the parapet wall and embossments on the wingwalls will be
included on the following bridges:
• Trafalgar Road Bridge
• Sixth Line Bridge
• Creditview Road Bridge
Architectural detail for parapets
Embossment Concepts
11
Drainage and Stormwater Management• Stormwater quantity and quality control
• Sewers, culverts, roadside and flat-bottom grassed ditches, and existing and new stormwater management ponds.
• Proposed Stormwater Management Ponds:
• Two (2) new wet ponds south of Highway 401 (one west of Fifth Line and one west of Sixth Line).
• Modifications to two (2) existing wet ponds near the Highway 407 ETR and Highway 401 Interchange
Pond 2 – West of Fifth Line Pond 1 – West of 6th Line 407ETR Pond 1 and Pond 5
12
Supplementary Works• Commuter Carpool Lots:
• New Trafalgar Road Commuter Carpool Lot
(Northwest Quadrant)
• New Winston Churchill Boulevard Commuter
Carpool Lot (Northwest Quadrant)
• Expansion of existing Mississauga Road
Commuter Carpool Lot (Northwest Quadrant)Mississauga Road Commuter Carpool Lot
• Active Transportation:
• Accommodate future bike lanes on Regional Road 25
• Accommodate future bike lanes on Trafalgar Road Underpass Structure
• Multi-use path along the west side of Creditview Road
• Illumination: Continuous high mast lighting corridor wide
13
Traffic Impacts
• During peak traffic hours six lanes will be maintained on mainline Highway 401, as per existing conditions
• During off peak traffic hours there will be short term closures and lane reductions
• Lane closures anticipated:
• Some off-ramps will be reduced to a single lane throughout construction
• Ninth Line will be reduced from 2 Lanes to 1 Lane
• Derry Road will be reduced from 6 Lanes to 4 Lanes
• Winston Churchill Boulevard will be reduced from 6 Lanes to 4 Lanes
• Creditview Road Bridge lane closures to be confirmed
Information about traffic disruptions will be posted on the website and traffic updates will be sent to those subscribed by email to the Project contact list
14
Landscaping and Restoration• Landscaping and restoration will occur corridor wide, including around the
stormwater ponds, within interchanges, and in valley corridors
• Ecological Restoration will include habitat enhancement for species at risk and wildlife passage features
Typical Interchange LandscapingStormwater Management Pond Naturalization
15
Environmental MitigationFactor Existing Conditions and / or Impacts Mitigation Measures
Terrestrial
• Isolated Natural areas• Existing highway is a barrier to wildlife movement
• Minimize vegetation removals and install tree protection barriers• Invasive species management• Landscaping and restoration • Wildlife fence and wildlife passage features
Aquatic• Fish bearing watercourses – Direct and Indirect• Watercourse realignments • Risk of erosion and sedimentation
• Permits and approvals• In-water work timing windows• Install and maintain ESC measures until the site is stabilized
Species at Risk • Four Species at Risk (SAR) • Consultation with regulatory agencies is ongoing
• Permits and approvals• Adhere to timing windows
Water / Erosion and Sediment • Groundwater dewatering
• Construction impacts to surface water • Risk of erosion and sedimentation
• Environmental Activity and Sector Registry (EASR) / Permit To Take Water (PTTW)• Properly installed and monitored ESC measures• Spills Prevention and Management Plan, Groundwater Monitoring Program,
Surface Water Monitoring Program
Land Use • Mix of urban, agricultural and some natural areas• Property has already been acquired by the
province; no additional property is needed
• Construction works will be limited to the Project Lands• Permission to Enter will be obtained if required
16
Environmental Mitigation
Factor Existing Conditions and / or Impacts Mitigation Measures
Noise and Vibration • No permanent noise mitigation • Construction noise mitigation• Potential for vibration impacts
• Noise bylaw exemption for work within municipal right-of-way• Limit noisy construction activities to daytime, equipment in good operating
condition, noise complaints will be investigated• Vibration monitoring at select locations
Air Quality• No significant impacts to regional air quality • Limited construction air quality impacts
• Keep construction machinery and equipment in good condition• Dust suppressant measures
Excess Earth, Waste and Contamination
• Excess earth generation • Contaminated areas requiring remediation • Demolition of structures/buildings with
designated substances
• Excess materials management• Remediation of soil • Designated substances management
Archaeology • The areas to be impacted have been cleared of
archaeological value• If undocumented archaeological resources are discovered, construction will
stop and findings investigated
Built Heritage• Two Provincial Heritage Properties
• Documentation produced• Mitigation measures including landscaping
17
Next Steps and How to Stay Informed
• Ongoing construction
• Review and response to comments
• DCR No. 2 review period anticipated for January 2020
• DCR No. 3 review period anticipated for Winter/Spring 2020
• Travelers can expect to have full use of the expanded facility by late 2022
There is a PIC Comment Form available on the website. Please provide comments on the PIC by October 31, 2019.
For more information on the Project or to contact the WCC Project Team:
Email : info@401expansion-mississauga-milton.ca
Phone: 1-888-619-1668 (24 hour)
Project Website: www.401expansion-mississauga-milton.ca