CAPSTONE
CEEn-2017CPST-
Temporary Slope Repair for Highway Expansion
April 20, 2018 1
006
Stephen Isaacson
Amanda McFarland
Mary Ririe
McKay Parkinson
CAPSTONE
IntroductionAnalysis of the Problem Soil profiles were constructed by interpolation of boring logs from holes 7310 and 7370.
April 20, 2018 2
Figure 1. Soil profile from boring logs, station 489+50 Figure 2. Boring Hole Locations
CAPSTONE
IntroductionAnalysis of the Problem Soil properties
April 20, 2018 3
Soil Type Unit Weight Cohesion Friction
AngleClay (Sandy, tan) (CL) 135 959 29Sand (tan) 125 30Clay (CL) 120 2867Sand (tan) 125 36Clay (sandy, tan, and gray)(CH) 135 1922Shale (gray) 150
Table 1: Soil Properties
CAPSTONE
Design, Analysis & ResultsSlope failure was found to be on the upper clay layer after several iterations and study of all stations. Lowest factor of safety was 0.874.
April 20, 2018 4
Figure 2. Slope Failure Analysis
CAPSTONE
Design, Analysis & ResultsAnalysis of possible solutions
April 20, 2018 5
Ratings Table:1 = lowest (worst), 4 = highest (best) Drill Shafts Driven Piles Shotcrete Steel Mesh
Cost (weighting = 0.85) 1 2 3 4
Ease of Construction (Weighting = 0.3 1 4 3 2
Capacity Design Load (Weighting = 0.5) 4 2 3 1
Meets Design Life (Weighting = (0.25) 1 2 3 4
Aesthetic/Environment (Weighting = 0.15) 1 3 2 4
Sum of (Rating Times Weighting) 3.55 4.85 6 6.1
Table 2: Cost Comparison Analysis
CAPSTONE
Design, Analysis & ResultsSolution DesignNail parameters from FHWA:
• 20 ft. in length• #6 bar• 15° from horizontal• Pullout resistance: 1000 k/fto Ultimate: 2000 k/fto FS: 2
• Spacing:o Vertical: 5 ft.o Horizontal: 4 ft.
April 20, 2018 6
Figure 3. Reinforced Slope Analysis
CAPSTONE
Design, Analysis & ResultsSolution Design Facing and Grout from FHWA:
• Plate size: 8”x 8” x 3/4”• 6” grout diameter• 4” initial facing• 6” final facing
April 20, 2018 7
Figure 4. Slope Stability Design Detail
CAPSTONE
Conclusions & Recommendations
April 20, 2018 8
CAPSTONE
Conclusions & Recommendations
April 20, 2018 9
CAPSTONE
Conclusions & Recommendations Soil nails with shotcrete facing Total cost estimate: $167,000Duration: 4 weeks
April 20, 2018 10
Cost Estimation6x6x.105 Wire Mesh: $1,675Grade 60 Rebar (#8): $20,0008x8x3/4 Steel Plates: $10,710
Shotcrete: $3,031Material Subtotal: $35,416
Installation: $121,584Contingency: $10,000Project Total: $167,000
Table 3: Final Cost Estimate