Priorities, funding opportunities and management by INEA
INEA in short
• 1 January 2014 – INEA replaced TEN-T EA (the Trans-European Transport Network Executive Agency) with an extended mandate
• Budget to be managed 2014-2020: 34.1 billion euros
• Rapid expansion from 100 staff in TEN-T EA to about 300 staff in INEA managing around 2000+ projects by 2020
• Solid experience in programme implementation and project management and excellent record of past performance
>
2
INEA's programmes
- H2020 Transport - H2020 Energy
3
4
• Major cross-border projects and projects addressing main bottlenecks on the 9 TEN-T multimodal Corridors
• Pre-identified projects on the core network as well as other projects on the core and comprehensive network
• Implementation of horizontal priorities (ERTMS, MoS, etc)
• Increasing the opportunity for private investment support • Connecting the TEN-T network with neighbouring countries 5
CEF Transport prioritiesTotal Budget: €22.4 bln (of which 12 bln for 2014 calls)
Record: 735 submitted proposals
6
211
250 57 133 84
Annual
MAP
Core network, rail interoperability, ERTMS
Innovation
Horizontal priorities
Cohesion
Requested funding vs indicative budget (€ million)
7
379.6
7,106.4
930.0
Annual call
7,501.3
4,000.0
Cohesion
20,216.2
6,000.0
Core network, rail interoperability, ERTMS
250.0
Innovation
1,449.0 750.0
Horizontal priorities
Times 7.64
Times 3.37
Times 1.52
Times 1.93
Times1.88
8
*Adopted Decisions excluding cancelled projects
421 projects ongoing 53% allocated to 203 cross-border Actions
Building upon TEN-T experience
9
Sound financial management
• Excellent track record for time to pay and time to grant
• 100% budget execution• 15-20 external audits each year
10
High level technical expertisein transport infrastructure projects
• Multi-disciplinary teams of project managers with wide-ranging experience covering all modes of transport as well as horizontal transport priorities like ITS, SESAR, ERTMS or Motorways of the Sea.
• Special focus on innovation with support to pilot actions implementing transport policy priorities (electric vehicles, LNG for shipping, etc.)
• Deep practical understanding of complex cross-border transport infrastructure projects and multi-beneficiary projects at European level
11
First class programme implementation - I
• INEA = access point to EU infrastructure co-funding by grants
• Alignment of EU funding with EU policy priorities and dynamic budget management - 'use it or lose it' principle
• Efficient management of project lifecycle
• Close cooperation with beneficiaries
• Systematic feedback loop to policy making
• Expert contribution to the development of innovative financing solutions and mobilisation of EU financial instruments to pull together EU/national/private funding
12
• Support to project promoters during the entire project period through targeted events (Project Management Workshops, seminars and Info Days)
• Reinforced collaboration and coordination with beneficiaries, national authorities, European Coordinators and Commission services
• Improved visibility of EU support to transport infrastructure
• Improved information & communication: Website, Twitter, LinkedIn Dissemination of Programme information to beneficiaries Use of GIS for maps Promoting the visibility of project achievements and results
First class programme implementation - II
13
Showcasing project successes"10 out of TEN"
campaign
November 2011
"10 (More) out of TEN" campaign
November 2012
"TENtastic" campaign
October 2013
"Better Together" campaign
June 2015
14
For more information
http://inea.ec.europa.eu
@inea_eu
Look for INEA!
inea@ec.europa.eu
15