Post on 05-May-2018
Government Of India
Power Sector
Feb-2017
Ministry of Power
Central Electricity Authority
New Delhi
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Feb 2017 (BU) 1A amp 1B
2 Generating Capacity Addition for Feb 2017 (MW) 2
3 List of Projects Commissioned in Feb 2017 3
4 All India Installed Capacity (MW) Region-wise as on 2822017 3
5 All India Installed Capacity (MW) Sector-wise as on 2822017 4
6 Transmission Lines Added during Feb 2017 (Ckms) 5
7 Transformation Capacity Addition during Feb 2017 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Feb 2017 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Feb 2017 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 2822017
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
1 Programme and Achievements of Sub-Stations in Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
1 Power Supply Position (Provisional) for Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 24
3 Power Supply Position (Revised) for Jan 2017 25
4 Peak Demand and Peak Met (Revised) for Jan 2017 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA upto Feb 2017
1 Rate of sale of power for the year 2014-2015 33-41
Section H - Rate of sale of power for the year 2014-2015
Executive Summary for the Month of Feb 2017
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
Electricity Generation (Conventional Sources) for Feb 2017 (BU) 1A
Electricity Generation (Conventional amp Renewable Sources) for Jan 2017 (BU) 1B
2 Generating Capacity Addition for Feb 2017 (MW) 2
3 List of Projects Commissioned in Feb 2017 3
4 All India Installed Capacity (MW) Region-wise as on 2822017 3
5 All India Installed Capacity (MW) Sector-wise as on 2822017 4
6 Transmission Lines Added during Feb 2017 (Ckms) 5
7 Transformation Capacity Addition during Feb 2017 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Feb 2017 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Feb 2017 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 2822017
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
1
Achievement
Feb-17
Thermal 79893 79455
Hydro 6600
Nuclear 2839
Bhutan Import 0070
All India 88964 -005
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1A
Electricity Generation During April 2015 to Feb 2016 amp April 2016 to Feb 2017 (BU)
6087
3543
Targets
857902 903694
34136
534
Change
wrt 2016
89011
01560032
92630
2999
Apr 15 - Feb16 Apr 16 - Feb 17
114391
33826
Change
092
5585 759
114330
45910577451011310
5191
-005
1 Electricity Generation for Feb 2017 (BU)
Feb-17Type
Achievement
Feb-16
7307
81624
89011
92630
87000
88000
89000
90000
91000
92000
93000
BU
Feb-16 Feb-17
10113101057745
0000
200000
400000
600000
800000
1000000
1200000
BU
Apr 15 - Feb16 Apr 16 - Feb 17
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-16 99345 5157 104502 86695 4553 91247 1459 1328 1453
May-16 99903 6863 106766 95402 5143 100545 472 3345 619
Jun-16 97326 8110 105436 89908 6090 95998 825 3317 983
Jul-16 94606 9544 104150 93142 8872 102013 157 758 209
Aug-16 95237 9634 104871 95122 7529 102651 012 2796 216
Sep-16 98072 8313 106385 95741 5485 101226 243 5155 510
Oct-16 99710 6272 105982 98631 4354 102985 109 4405 291
Nov-16 93569 5002 98571 85906 4141 90047 892 2079 947
Dec-16 95252 5445 100697 95123 4976 100099 014 943 060
Jan-17 95690 5789 101479 92129 4377 96506 387 3226 515
Total 968711 70129 1038840 740546 55519 786713 3081 2631 3205
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total
1B
33654
701291
2948697
572653
304122
955908
748511
21941
720206
All Figure in MU
Commulative for the period
4115991
57887 43765
Apr 2016 to Jan 2017
1056590
343703
5551832
742766
30153
54543
35551
194847
44934
21435077
Jan 2016
230845 105632
118755
36486
157554
Source-Wise All India
Generation from Renwables
Electricity Generation (Conventional amp Renewable Sources)
April-January 2017 vis-agrave-vis April- January 2016
Month
Generation
(April-January 2017)Generation (April- January 2016) Growth
Electricity Generation From Renewable (source wise)
April-January 2017 vis-agrave-vis April-January 2016
Jan 2017 Apr 2015 to Jan2016
For the Month of
2 Generating Capacity Addition for Feb 2017(MW)
Achievement Targets Achievement
Feb-16
Thermal 620 660 930 5000
Hydro 40 3985 224 46000
Nuclear 0 0 0
All India 660 10585 1154 7485
Apr 15 - Feb 16 Apr 16 - Feb 17 Change
Thermal 127456 809575 -36
Hydro 1436 1594 11
Nuclear 0 0 NA
All India 141816 96898 -32
2
Generating Capacity Addition during April 15 to Feb 16 amp April 16 to Feb 17 (MW)
Change wrt 2016TypeFeb-17
6600
11540
0
200
400
600
800
1000
1200
1400
1Feb-16 Feb-17
141816
96898
0
2000
4000
6000
8000
10000
12000
14000
16000
1Apr 15 - Feb 16 Apr 16 - Feb 17
(i) Thermal
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 4652450 578126 000 5230576 162000 1924678 1024698 8341952
Western 7271301 1120341 000 8391642 184000 744750 1686114 11006505
Southern 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
Eastern 2984787 10000 000 2994787 000 473812 89663 3558262
North-East 31000 177105 3600 211705 000 124200 28044 363949
Islands 000 000 4005 4005 000 000 1140 5145
ALL INDIA 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Note Captive Genaration is not included in the total RES as on 31122016 3
3 List of Projects Commissioned During Feb 2017
4 All India Installed Capacity (MW) Region-wise as on 28022017
Sembcorp Gayatri TPP U-2( 660) MW was Commisioned on 15022017
Nasik TPP PH-I (270) MW was Commisioned on 15022017
Teesta -III U-4 ( 200MW ) was Commisioned on 16022017
Chanju -I U-1 ( 12 MW ) was Commisioned on 17022017
Chanju-I U-2 ( 12 MW ) was Commisioned on 01022017
Thermal
21521489
578000
4441343 5001800
31542632
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 31542632
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Section A - Highlights of Power Sector Page
1 Electricity Generation for Feb 2017 (BU) 1A amp 1B
2 Generating Capacity Addition for Feb 2017 (MW) 2
3 List of Projects Commissioned in Feb 2017 3
4 All India Installed Capacity (MW) Region-wise as on 2822017 3
5 All India Installed Capacity (MW) Sector-wise as on 2822017 4
6 Transmission Lines Added during Feb 2017 (Ckms) 5
7 Transformation Capacity Addition during Feb 2017 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Feb 2017 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Feb 2017 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 2822017
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
1 Programme and Achievements of Transmission Lines in Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
1 Programme and Achievements of Sub-Stations in Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
1 Power Supply Position (Provisional) for Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 24
3 Power Supply Position (Revised) for Jan 2017 25
4 Peak Demand and Peak Met (Revised) for Jan 2017 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since 2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA upto Feb 2017
1 Rate of sale of power for the year 2014-2015 33-41
Section H - Rate of sale of power for the year 2014-2015
Executive Summary for the Month of Feb 2017
32
11
20
21
31
Section B - Capacity Addition
Section C - Transmission Lines
Section D - Sub Stations
Section E - Electricity Generation
Section F - Power supply position
Contents
Section G - Growth of Power Sector
SN Contents Page
Electricity Generation (Conventional Sources) for Feb 2017 (BU) 1A
Electricity Generation (Conventional amp Renewable Sources) for Jan 2017 (BU) 1B
2 Generating Capacity Addition for Feb 2017 (MW) 2
3 List of Projects Commissioned in Feb 2017 3
4 All India Installed Capacity (MW) Region-wise as on 2822017 3
5 All India Installed Capacity (MW) Sector-wise as on 2822017 4
6 Transmission Lines Added during Feb 2017 (Ckms) 5
7 Transformation Capacity Addition during Feb 2017 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Feb 2017 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Feb 2017 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 2822017
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
1
Achievement
Feb-17
Thermal 79893 79455
Hydro 6600
Nuclear 2839
Bhutan Import 0070
All India 88964 -005
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1A
Electricity Generation During April 2015 to Feb 2016 amp April 2016 to Feb 2017 (BU)
6087
3543
Targets
857902 903694
34136
534
Change
wrt 2016
89011
01560032
92630
2999
Apr 15 - Feb16 Apr 16 - Feb 17
114391
33826
Change
092
5585 759
114330
45910577451011310
5191
-005
1 Electricity Generation for Feb 2017 (BU)
Feb-17Type
Achievement
Feb-16
7307
81624
89011
92630
87000
88000
89000
90000
91000
92000
93000
BU
Feb-16 Feb-17
10113101057745
0000
200000
400000
600000
800000
1000000
1200000
BU
Apr 15 - Feb16 Apr 16 - Feb 17
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-16 99345 5157 104502 86695 4553 91247 1459 1328 1453
May-16 99903 6863 106766 95402 5143 100545 472 3345 619
Jun-16 97326 8110 105436 89908 6090 95998 825 3317 983
Jul-16 94606 9544 104150 93142 8872 102013 157 758 209
Aug-16 95237 9634 104871 95122 7529 102651 012 2796 216
Sep-16 98072 8313 106385 95741 5485 101226 243 5155 510
Oct-16 99710 6272 105982 98631 4354 102985 109 4405 291
Nov-16 93569 5002 98571 85906 4141 90047 892 2079 947
Dec-16 95252 5445 100697 95123 4976 100099 014 943 060
Jan-17 95690 5789 101479 92129 4377 96506 387 3226 515
Total 968711 70129 1038840 740546 55519 786713 3081 2631 3205
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total
1B
33654
701291
2948697
572653
304122
955908
748511
21941
720206
All Figure in MU
Commulative for the period
4115991
57887 43765
Apr 2016 to Jan 2017
1056590
343703
5551832
742766
30153
54543
35551
194847
44934
21435077
Jan 2016
230845 105632
118755
36486
157554
Source-Wise All India
Generation from Renwables
Electricity Generation (Conventional amp Renewable Sources)
April-January 2017 vis-agrave-vis April- January 2016
Month
Generation
(April-January 2017)Generation (April- January 2016) Growth
Electricity Generation From Renewable (source wise)
April-January 2017 vis-agrave-vis April-January 2016
Jan 2017 Apr 2015 to Jan2016
For the Month of
2 Generating Capacity Addition for Feb 2017(MW)
Achievement Targets Achievement
Feb-16
Thermal 620 660 930 5000
Hydro 40 3985 224 46000
Nuclear 0 0 0
All India 660 10585 1154 7485
Apr 15 - Feb 16 Apr 16 - Feb 17 Change
Thermal 127456 809575 -36
Hydro 1436 1594 11
Nuclear 0 0 NA
All India 141816 96898 -32
2
Generating Capacity Addition during April 15 to Feb 16 amp April 16 to Feb 17 (MW)
Change wrt 2016TypeFeb-17
6600
11540
0
200
400
600
800
1000
1200
1400
1Feb-16 Feb-17
141816
96898
0
2000
4000
6000
8000
10000
12000
14000
16000
1Apr 15 - Feb 16 Apr 16 - Feb 17
(i) Thermal
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 4652450 578126 000 5230576 162000 1924678 1024698 8341952
Western 7271301 1120341 000 8391642 184000 744750 1686114 11006505
Southern 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
Eastern 2984787 10000 000 2994787 000 473812 89663 3558262
North-East 31000 177105 3600 211705 000 124200 28044 363949
Islands 000 000 4005 4005 000 000 1140 5145
ALL INDIA 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Note Captive Genaration is not included in the total RES as on 31122016 3
3 List of Projects Commissioned During Feb 2017
4 All India Installed Capacity (MW) Region-wise as on 28022017
Sembcorp Gayatri TPP U-2( 660) MW was Commisioned on 15022017
Nasik TPP PH-I (270) MW was Commisioned on 15022017
Teesta -III U-4 ( 200MW ) was Commisioned on 16022017
Chanju -I U-1 ( 12 MW ) was Commisioned on 17022017
Chanju-I U-2 ( 12 MW ) was Commisioned on 01022017
Thermal
21521489
578000
4441343 5001800
31542632
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 31542632
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
Electricity Generation (Conventional Sources) for Feb 2017 (BU) 1A
Electricity Generation (Conventional amp Renewable Sources) for Jan 2017 (BU) 1B
2 Generating Capacity Addition for Feb 2017 (MW) 2
3 List of Projects Commissioned in Feb 2017 3
4 All India Installed Capacity (MW) Region-wise as on 2822017 3
5 All India Installed Capacity (MW) Sector-wise as on 2822017 4
6 Transmission Lines Added during Feb 2017 (Ckms) 5
7 Transformation Capacity Addition during Feb 2017 (MVA) 6
8 Power Supply Position (Energy amp Peak) in Feb 2017 7
9 Peak Shortage of Power Supply (MW) in Different Regions 8-9
10 All India PLF Sector-wise for Feb 2017 10
11 T amp D and AT amp C Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 2822017
13 Average cost of Power amp Average Realisation
14 All India per capita consumption of Electricity (KWh)
15 All India Coal consumption for Power Generation (MT)
Section A - Highlights of Power Sector
11
1
Achievement
Feb-17
Thermal 79893 79455
Hydro 6600
Nuclear 2839
Bhutan Import 0070
All India 88964 -005
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1A
Electricity Generation During April 2015 to Feb 2016 amp April 2016 to Feb 2017 (BU)
6087
3543
Targets
857902 903694
34136
534
Change
wrt 2016
89011
01560032
92630
2999
Apr 15 - Feb16 Apr 16 - Feb 17
114391
33826
Change
092
5585 759
114330
45910577451011310
5191
-005
1 Electricity Generation for Feb 2017 (BU)
Feb-17Type
Achievement
Feb-16
7307
81624
89011
92630
87000
88000
89000
90000
91000
92000
93000
BU
Feb-16 Feb-17
10113101057745
0000
200000
400000
600000
800000
1000000
1200000
BU
Apr 15 - Feb16 Apr 16 - Feb 17
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-16 99345 5157 104502 86695 4553 91247 1459 1328 1453
May-16 99903 6863 106766 95402 5143 100545 472 3345 619
Jun-16 97326 8110 105436 89908 6090 95998 825 3317 983
Jul-16 94606 9544 104150 93142 8872 102013 157 758 209
Aug-16 95237 9634 104871 95122 7529 102651 012 2796 216
Sep-16 98072 8313 106385 95741 5485 101226 243 5155 510
Oct-16 99710 6272 105982 98631 4354 102985 109 4405 291
Nov-16 93569 5002 98571 85906 4141 90047 892 2079 947
Dec-16 95252 5445 100697 95123 4976 100099 014 943 060
Jan-17 95690 5789 101479 92129 4377 96506 387 3226 515
Total 968711 70129 1038840 740546 55519 786713 3081 2631 3205
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total
1B
33654
701291
2948697
572653
304122
955908
748511
21941
720206
All Figure in MU
Commulative for the period
4115991
57887 43765
Apr 2016 to Jan 2017
1056590
343703
5551832
742766
30153
54543
35551
194847
44934
21435077
Jan 2016
230845 105632
118755
36486
157554
Source-Wise All India
Generation from Renwables
Electricity Generation (Conventional amp Renewable Sources)
April-January 2017 vis-agrave-vis April- January 2016
Month
Generation
(April-January 2017)Generation (April- January 2016) Growth
Electricity Generation From Renewable (source wise)
April-January 2017 vis-agrave-vis April-January 2016
Jan 2017 Apr 2015 to Jan2016
For the Month of
2 Generating Capacity Addition for Feb 2017(MW)
Achievement Targets Achievement
Feb-16
Thermal 620 660 930 5000
Hydro 40 3985 224 46000
Nuclear 0 0 0
All India 660 10585 1154 7485
Apr 15 - Feb 16 Apr 16 - Feb 17 Change
Thermal 127456 809575 -36
Hydro 1436 1594 11
Nuclear 0 0 NA
All India 141816 96898 -32
2
Generating Capacity Addition during April 15 to Feb 16 amp April 16 to Feb 17 (MW)
Change wrt 2016TypeFeb-17
6600
11540
0
200
400
600
800
1000
1200
1400
1Feb-16 Feb-17
141816
96898
0
2000
4000
6000
8000
10000
12000
14000
16000
1Apr 15 - Feb 16 Apr 16 - Feb 17
(i) Thermal
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 4652450 578126 000 5230576 162000 1924678 1024698 8341952
Western 7271301 1120341 000 8391642 184000 744750 1686114 11006505
Southern 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
Eastern 2984787 10000 000 2994787 000 473812 89663 3558262
North-East 31000 177105 3600 211705 000 124200 28044 363949
Islands 000 000 4005 4005 000 000 1140 5145
ALL INDIA 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Note Captive Genaration is not included in the total RES as on 31122016 3
3 List of Projects Commissioned During Feb 2017
4 All India Installed Capacity (MW) Region-wise as on 28022017
Sembcorp Gayatri TPP U-2( 660) MW was Commisioned on 15022017
Nasik TPP PH-I (270) MW was Commisioned on 15022017
Teesta -III U-4 ( 200MW ) was Commisioned on 16022017
Chanju -I U-1 ( 12 MW ) was Commisioned on 17022017
Chanju-I U-2 ( 12 MW ) was Commisioned on 01022017
Thermal
21521489
578000
4441343 5001800
31542632
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 31542632
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Achievement
Feb-17
Thermal 79893 79455
Hydro 6600
Nuclear 2839
Bhutan Import 0070
All India 88964 -005
Type
Thermal
Hydro
Nuclear
Bhutan Import
All India
1A
Electricity Generation During April 2015 to Feb 2016 amp April 2016 to Feb 2017 (BU)
6087
3543
Targets
857902 903694
34136
534
Change
wrt 2016
89011
01560032
92630
2999
Apr 15 - Feb16 Apr 16 - Feb 17
114391
33826
Change
092
5585 759
114330
45910577451011310
5191
-005
1 Electricity Generation for Feb 2017 (BU)
Feb-17Type
Achievement
Feb-16
7307
81624
89011
92630
87000
88000
89000
90000
91000
92000
93000
BU
Feb-16 Feb-17
10113101057745
0000
200000
400000
600000
800000
1000000
1200000
BU
Apr 15 - Feb16 Apr 16 - Feb 17
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-16 99345 5157 104502 86695 4553 91247 1459 1328 1453
May-16 99903 6863 106766 95402 5143 100545 472 3345 619
Jun-16 97326 8110 105436 89908 6090 95998 825 3317 983
Jul-16 94606 9544 104150 93142 8872 102013 157 758 209
Aug-16 95237 9634 104871 95122 7529 102651 012 2796 216
Sep-16 98072 8313 106385 95741 5485 101226 243 5155 510
Oct-16 99710 6272 105982 98631 4354 102985 109 4405 291
Nov-16 93569 5002 98571 85906 4141 90047 892 2079 947
Dec-16 95252 5445 100697 95123 4976 100099 014 943 060
Jan-17 95690 5789 101479 92129 4377 96506 387 3226 515
Total 968711 70129 1038840 740546 55519 786713 3081 2631 3205
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total
1B
33654
701291
2948697
572653
304122
955908
748511
21941
720206
All Figure in MU
Commulative for the period
4115991
57887 43765
Apr 2016 to Jan 2017
1056590
343703
5551832
742766
30153
54543
35551
194847
44934
21435077
Jan 2016
230845 105632
118755
36486
157554
Source-Wise All India
Generation from Renwables
Electricity Generation (Conventional amp Renewable Sources)
April-January 2017 vis-agrave-vis April- January 2016
Month
Generation
(April-January 2017)Generation (April- January 2016) Growth
Electricity Generation From Renewable (source wise)
April-January 2017 vis-agrave-vis April-January 2016
Jan 2017 Apr 2015 to Jan2016
For the Month of
2 Generating Capacity Addition for Feb 2017(MW)
Achievement Targets Achievement
Feb-16
Thermal 620 660 930 5000
Hydro 40 3985 224 46000
Nuclear 0 0 0
All India 660 10585 1154 7485
Apr 15 - Feb 16 Apr 16 - Feb 17 Change
Thermal 127456 809575 -36
Hydro 1436 1594 11
Nuclear 0 0 NA
All India 141816 96898 -32
2
Generating Capacity Addition during April 15 to Feb 16 amp April 16 to Feb 17 (MW)
Change wrt 2016TypeFeb-17
6600
11540
0
200
400
600
800
1000
1200
1400
1Feb-16 Feb-17
141816
96898
0
2000
4000
6000
8000
10000
12000
14000
16000
1Apr 15 - Feb 16 Apr 16 - Feb 17
(i) Thermal
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 4652450 578126 000 5230576 162000 1924678 1024698 8341952
Western 7271301 1120341 000 8391642 184000 744750 1686114 11006505
Southern 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
Eastern 2984787 10000 000 2994787 000 473812 89663 3558262
North-East 31000 177105 3600 211705 000 124200 28044 363949
Islands 000 000 4005 4005 000 000 1140 5145
ALL INDIA 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Note Captive Genaration is not included in the total RES as on 31122016 3
3 List of Projects Commissioned During Feb 2017
4 All India Installed Capacity (MW) Region-wise as on 28022017
Sembcorp Gayatri TPP U-2( 660) MW was Commisioned on 15022017
Nasik TPP PH-I (270) MW was Commisioned on 15022017
Teesta -III U-4 ( 200MW ) was Commisioned on 16022017
Chanju -I U-1 ( 12 MW ) was Commisioned on 17022017
Chanju-I U-2 ( 12 MW ) was Commisioned on 01022017
Thermal
21521489
578000
4441343 5001800
31542632
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 31542632
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Generation from
Conventional Sources
Generation
from
Renewable
Sources
Total
Generation
from
Conventional
Sources
Generation from
Renewable
Sources
Total
Growth in
Conventional
Generation
Growth in
Renewable
Generation
Growth in
Total
Generation
(MU) (MU) (MU) (MU) (MU) (MU) () () ()
Apr-16 99345 5157 104502 86695 4553 91247 1459 1328 1453
May-16 99903 6863 106766 95402 5143 100545 472 3345 619
Jun-16 97326 8110 105436 89908 6090 95998 825 3317 983
Jul-16 94606 9544 104150 93142 8872 102013 157 758 209
Aug-16 95237 9634 104871 95122 7529 102651 012 2796 216
Sep-16 98072 8313 106385 95741 5485 101226 243 5155 510
Oct-16 99710 6272 105982 98631 4354 102985 109 4405 291
Nov-16 93569 5002 98571 85906 4141 90047 892 2079 947
Dec-16 95252 5445 100697 95123 4976 100099 014 943 060
Jan-17 95690 5789 101479 92129 4377 96506 387 3226 515
Total 968711 70129 1038840 740546 55519 786713 3081 2631 3205
Wind
Solar
Biomass
Bagasse
Small Hydro
Others
Total
1B
33654
701291
2948697
572653
304122
955908
748511
21941
720206
All Figure in MU
Commulative for the period
4115991
57887 43765
Apr 2016 to Jan 2017
1056590
343703
5551832
742766
30153
54543
35551
194847
44934
21435077
Jan 2016
230845 105632
118755
36486
157554
Source-Wise All India
Generation from Renwables
Electricity Generation (Conventional amp Renewable Sources)
April-January 2017 vis-agrave-vis April- January 2016
Month
Generation
(April-January 2017)Generation (April- January 2016) Growth
Electricity Generation From Renewable (source wise)
April-January 2017 vis-agrave-vis April-January 2016
Jan 2017 Apr 2015 to Jan2016
For the Month of
2 Generating Capacity Addition for Feb 2017(MW)
Achievement Targets Achievement
Feb-16
Thermal 620 660 930 5000
Hydro 40 3985 224 46000
Nuclear 0 0 0
All India 660 10585 1154 7485
Apr 15 - Feb 16 Apr 16 - Feb 17 Change
Thermal 127456 809575 -36
Hydro 1436 1594 11
Nuclear 0 0 NA
All India 141816 96898 -32
2
Generating Capacity Addition during April 15 to Feb 16 amp April 16 to Feb 17 (MW)
Change wrt 2016TypeFeb-17
6600
11540
0
200
400
600
800
1000
1200
1400
1Feb-16 Feb-17
141816
96898
0
2000
4000
6000
8000
10000
12000
14000
16000
1Apr 15 - Feb 16 Apr 16 - Feb 17
(i) Thermal
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 4652450 578126 000 5230576 162000 1924678 1024698 8341952
Western 7271301 1120341 000 8391642 184000 744750 1686114 11006505
Southern 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
Eastern 2984787 10000 000 2994787 000 473812 89663 3558262
North-East 31000 177105 3600 211705 000 124200 28044 363949
Islands 000 000 4005 4005 000 000 1140 5145
ALL INDIA 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Note Captive Genaration is not included in the total RES as on 31122016 3
3 List of Projects Commissioned During Feb 2017
4 All India Installed Capacity (MW) Region-wise as on 28022017
Sembcorp Gayatri TPP U-2( 660) MW was Commisioned on 15022017
Nasik TPP PH-I (270) MW was Commisioned on 15022017
Teesta -III U-4 ( 200MW ) was Commisioned on 16022017
Chanju -I U-1 ( 12 MW ) was Commisioned on 17022017
Chanju-I U-2 ( 12 MW ) was Commisioned on 01022017
Thermal
21521489
578000
4441343 5001800
31542632
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 31542632
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
2 Generating Capacity Addition for Feb 2017(MW)
Achievement Targets Achievement
Feb-16
Thermal 620 660 930 5000
Hydro 40 3985 224 46000
Nuclear 0 0 0
All India 660 10585 1154 7485
Apr 15 - Feb 16 Apr 16 - Feb 17 Change
Thermal 127456 809575 -36
Hydro 1436 1594 11
Nuclear 0 0 NA
All India 141816 96898 -32
2
Generating Capacity Addition during April 15 to Feb 16 amp April 16 to Feb 17 (MW)
Change wrt 2016TypeFeb-17
6600
11540
0
200
400
600
800
1000
1200
1400
1Feb-16 Feb-17
141816
96898
0
2000
4000
6000
8000
10000
12000
14000
16000
1Apr 15 - Feb 16 Apr 16 - Feb 17
(i) Thermal
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 4652450 578126 000 5230576 162000 1924678 1024698 8341952
Western 7271301 1120341 000 8391642 184000 744750 1686114 11006505
Southern 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
Eastern 2984787 10000 000 2994787 000 473812 89663 3558262
North-East 31000 177105 3600 211705 000 124200 28044 363949
Islands 000 000 4005 4005 000 000 1140 5145
ALL INDIA 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Note Captive Genaration is not included in the total RES as on 31122016 3
3 List of Projects Commissioned During Feb 2017
4 All India Installed Capacity (MW) Region-wise as on 28022017
Sembcorp Gayatri TPP U-2( 660) MW was Commisioned on 15022017
Nasik TPP PH-I (270) MW was Commisioned on 15022017
Teesta -III U-4 ( 200MW ) was Commisioned on 16022017
Chanju -I U-1 ( 12 MW ) was Commisioned on 17022017
Chanju-I U-2 ( 12 MW ) was Commisioned on 01022017
Thermal
21521489
578000
4441343 5001800
31542632
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 31542632
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(i) Thermal
(ii) Hydro
(iii) Nuclear
NIL
Nuclear Hydro RES Grand TotalRegion Coal Gas Diesel Total
Northern 4652450 578126 000 5230576 162000 1924678 1024698 8341952
Western 7271301 1120341 000 8391642 184000 744750 1686114 11006505
Southern 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
Eastern 2984787 10000 000 2994787 000 473812 89663 3558262
North-East 31000 177105 3600 211705 000 124200 28044 363949
Islands 000 000 4005 4005 000 000 1140 5145
ALL INDIA 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Note Captive Genaration is not included in the total RES as on 31122016 3
3 List of Projects Commissioned During Feb 2017
4 All India Installed Capacity (MW) Region-wise as on 28022017
Sembcorp Gayatri TPP U-2( 660) MW was Commisioned on 15022017
Nasik TPP PH-I (270) MW was Commisioned on 15022017
Teesta -III U-4 ( 200MW ) was Commisioned on 16022017
Chanju -I U-1 ( 12 MW ) was Commisioned on 17022017
Chanju-I U-2 ( 12 MW ) was Commisioned on 01022017
Thermal
21521489
578000
4441343 5001800
31542632
40726
000
5000000
10000000
15000000
20000000
25000000
30000000
35000000
Thermal Nuclear Hydro RES Total Captive
Thermal Nuclear Hydro RES Total Captive
Total = 31542632
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Sector
Coal Gas Diesel Total
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
All India 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
State 10319228
Private 13538178
Central 7685226
RES
RES as on 31122016
5 All India Installed Capacity (MW) Sector-wise as on 28022017
4
Grand TotalTHERMAL
Nuclear Hydro
State 10319228 33
Private 13538178 43
Central 7685226 24
All India Installed Capacity(MW) as on 28-02-2017 (Sector-Wise)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 500 KV HVDC
+- 800 KV HVDC
765 KV
400 KV
220 KV
All India
5
25721
0
Apr 15 - Feb 16
5705
10012
5292
23583
10059
3506 2574
6 Transmission Lines Added during Feb 2017 (Ckms)
6727
769
1507
417
1176
5429
Transmission Lines Added during Apr 15 to Feb 16 amp Apr 16 to Feb17 (Ckms)
Feb-17
0
Feb-16
0
Apr 16 - Feb 17
0
0
759
0
738
0 0
1176
1507
0
200
400
600
800
1000
1200
1400
1600
Feb-17
ckm
s
Feb-16 Feb-17
25721
23583
9000
11000
13000
15000
17000
19000
21000
23000
25000
27000
ckm
s
Apr 15 - Feb 16 Apr 16 - Feb 17
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
Voltage Level
+- 800 KV HVDC
+- 500 KV HVDC
765 KV
400 KV
220 KV
All India
6
1507
738
769
7 Transformation Capacity Addition During Feb 2017 (MVA)
0
0
815
1300
0 0
11785
17171
0
Feb-16 Feb-17
April 15 to Feb 16 April 16 to Jan17
2115
0
0
1500 2574
All India Transformation Capacity Addition during Apr 15 to Feb 16 amp Apr
16 to Feb 17 (MVA)
23583
0
5705
10012
5292
43956
13500
2115
1507
0
500
1000
1500
2000
2500
MV
A
Transformation Capacity Addition during Feb 2017
Feb-16 Feb-17
43956
23583
0
74520
1
MV
A
April 15 to Feb 16 April 16 to Jan17
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Feb16 Feb 17 Feb 16 Feb17 Jan16 Jan 17
Northern 25122 24600 23933 24222 -47 -15
Western 28611 27355 28604 27352 00 00
Southern 24707 24610 24495 24609 -09 00
Eastern 9544 9224 9443 9214 -11 -01
North Eastern 1111 1089 1087 1071 -22 -16
All India 89095 86879 87562 86468 -17 -05
Feb 16 Feb 17 Feb 16 Feb 17 Jan16 Jan 17
Northern 42794 43262 41195 42723 -37 -12
Western 45110 47962 45071 47789 -01 -04
Southern 37990 41275 37370 41155 -16 -03
Eastern 17239 17174 17061 17029 -10 -08
North Eastern 2401 2243 2328 2234 -30 -04
All India 142924 149130 140408 148169 -18 -06
7
RegionPower (MW)
8 Power Supply Position (Energy amp Peak) in Feb 2017
Peak Demand Peak Met
Requirement Availability
Energy (MU)Region Deficit ()
Deficit ()
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Chandigarh Delhi Haryana HP JampK Punjab Rajasthan UP UtrakhandFeb 16 0 4 0 0 363 0 0 905 0
Feb 17 0 0 0 0 524 0 205 0 0
Chattisgarh Gujarat MP Maharashtra Daman amp Diu Dadar Nagar Haveli Goa
Feb 16 369 9 6 21 0 0 0
Feb 17 8 5 12 76 0 0 0
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Feb 16 7 3 601 4 19 0 0
Feb 17 0 0 14 13 61 20 0
8
9 Peak Shortage of Power Supply (MW) in Different Regions
0 0 0 0
52
4
0
20
5
0 00 4 0 0
36
3
0 0
90
5
0
0
400
800
1200
Chandi
garh
Delh
i
Hary
an
a
HP
Jamp
K
Punja
b
Raja
sth
an U
P
Utr
akh
and
MW
Northern States (MW) Feb 17 Feb 16
8 5 12
76
0 0 0
369
9 6 21
0 0 0
0
100
200
300
400
Ch
attis
garh
Guja
rat
MP
Maha
rashtr
a
Da
ma
n amp
Diu
Da
dar
Naga
rH
ave
li Goa
MW
Western States (MW) Feb 17 Feb 16
0 0 14 1361 20 07 3
601
4 19 0 00
100
200
300
400
500
600
700
AP Telengana Karnataka Kerala Tamil Nadu Puducherry Lakshyadeep
Southern State (MW)Feb 17 Feb 16
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Bihar DVC Jharkhand Odisha West Bengal Sikkim AampN Island
Feb 16 35 93 27 0 29 0 8
Feb 17 150 0 0 0 0 0 8
Arunachal Assam Manipur Meghalaya Mizoram Nagaland Tripura
Feb 16 4 6 1 0 2 1 0
Feb 17 4 2 0 0 2 1 0
9
150
0 0 0 0 0 8
35
93
27
0
29
0 8
0
50
100
150
200
Bih
ar
DV
C
Jh
ark
ha
nd
Od
ish
a
We
st
Ben
ga
l
Sik
kim
Aamp
N I
sla
nd
MW
Eastern States (MW)Feb 17 Feb 16
4
2
0 0
2
1
0
4
1
0
2
1
0
0
2
4
6
8
Aru
na
ch
al
Assa
m
Ma
nip
ur
Me
gh
ala
ya
Miz
ora
m
Na
ga
lan
d
Tri
pura
MW
North-Eastern States (MW)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Sector Feb 16 Feb 17
Central 7463 7446
State 5799 5413
Private 6520 5935
ALL INDIA 6521 6183
Month 2015-16 2016-17
April 6205 6783
May 6416 6224June 5943 6087
July 5836 5400
August 5810 5203
September 6418 5813
October 6686 6009
November 6075 6074
December 6175 6046
January 6320 6037
February 6495 6183
March 6389
For Coal and Lignite based Power Plants
10
PLF
All India PLF Month-wise
10 All India PLF Sector-wise for Feb 2017
74
63
57
99
65
20
65
21
744
6
541
3
593
5
618
3
00010002000300040005000600070008000
Central State Private ALL INDIA
P
LF
Sector-Wise Plant Load Factor for Jan 2016 and Jan 2017
Feb 16 Feb 17
62
05
64
16
59
43
58
36
58
10
64
18
66
86
60
75
61
75
63
20
64
95
63
89
67
83
62
24
60
87
54
00
52
03
58
13
60
09
60
74
60
46
60
37
61
83
0
20
40
60
80
April
May
Jun
e
July
Augu
st
Septe
mber
Octo
ber
Nove
mb
er
Dece
mb
er
Jan
uary
Febru
ary
Marc
hAll India PLF Month-wise
2015-16 2016-17
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
2010-11 2011-12 2012-13 2013-15 2014-15
TampD Losses 2397 2365 2304 2146 2277(P)
ATampC Losses 2635 2663 2548 2258 2462(P)
Note As per PFC for utilities selling directly to consumers P Provisional
Total Number of Villages
597464
Pump sets Energised
as on 31-03-2016
20434180
Note From the year 2004-05 onwards Definition of Village Electrification-
A village would be declared Electrified if
Without
Subsidy
Gap ACS-
ARR(
Without
Subsidy)
Paiseunit
Gap ACS-
ARR (on
subsidy
booked
basis)
paiseunit
Gap ACS-
ARR (on
subsidyrece
ived basis)
paiseunit
2013-14 400 118 76 77
2014-15 412 108 58 60
Source- PFC Reports on the performance of State Power Utilities
2014-15 1010
2015-16 1075
(Gross Generation+Net Import) Mid Year Population Provisional
2013-14 4894
2014-15 5304
2015-16 5459
Actual
11
15 All India Coal consumption for Power Generation (MT)
520
14 All India per capita consumption of Electricity ( KWh)
Average Revenue Realization(paiseunit)
20648398
Pump sets Energised as on 31- 01-17
Average cost of supply(ACS) (paiseunit)
i) Basic Infrastructure such as Distribution Transformer and Distribution lines are provided in the inhabited
locality as well as Dalit Basti hemlet where it exists (For electrification through Non-Conventional Energy
Sources a Distribution Transformer mat not be necessary)
Figures are based on the data available in DDUGJY website
11 T amp D and ATampC Losses ()
12 All India Village Electrification amp Pumpsets Energised as on 3112017
Villiages Electrified (Nos) as on 31117
9875590898
Villages electrified
518
Year
ii) Electricity is provided to Public places like Schools Panchayat Office Health Centre Dispensaries
Community Centres etc and
iv) Mandatory Certification from Gram Panchayat regarding the completion of village electrification should be
obtained
13 Average cost of Power amp Average Realisation
iii) The number of households electrified should be at least 10 of the total number of households in the village
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is
provisional in nature as Indicated in all the reports The data in the report prior to October 2015 was
Updated every month based on the information received from statesdistribution utilities as and when
reported but the data for all the states for a particular month was generally not made available
simultaneously to reflect the countrywide picture for a particular month Number of total villages and
number of electrified villages have also been adjusted for changes observed from Census 2011 data As
such each monthly report of Village electrification of CEA is independent of the earlier published reports
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Capacity Addition Targets and Achievements in 12th Plan 12
2 Capacity Addition Targets amp Achievements during Feb 2017 and April 2016 to Feb 2017 13
3 Installed Capacity in various Regions including their shares 14-19
Section B - Capacity Addition
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(i) Targets
(MW)
TypeSector Central State Private Total
Thermal 1487800 1392200 4354000 7234000
Hydro 600400 160800 328500 1089700
Nuclear 530000 000 000 530000
Total 2618200 1553000 4682500 8853700
(ii)
(MW)
TypeSector Central State Private Total
Thermal 1346360 2115135 5366050 8827545
Hydro 258402 221100 61900 541402
Nuclear 100000 000 000 100000
Total 1704762 2336235 5427950 9468947
Acievement 6511 15043 11592 10695
1 Capacity Addtion Targets and Achievements in the 12th Plan
12
Achievement of Capacity Addition during the Current Plan upto Feb 2017
Achievements upto Feb 2017 during the 12th Plan
723
400
0
108
970
0
53
000
0
882
754
5
54
140
2
10
000
0
000
1000000
2000000
3000000
4000000
5000000
6000000
7000000
8000000
9000000
Thermal Hydro Nuclear
12th Plan Target 88537 MW Achieved so far 9468947 MW
Target Achievement
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(MW)
Deviation
Target Achievement Target Achievement (+) (-)
Central 27305 0 0 2705 8255 -18795
State 3910 0 0 850 2752 1902
Pvt 6800 660 930 3390 4698 1308
Total 134405 660 930 6945 82755 13305
Central 490 150 0 300 80 -220
State 395 200 200 850 1490 640
Pvt 829 485 24 169 24 -145
Total 1714 3985 224 1319 1594 275
Nuclear Central 1500 0 0 0 0 0
Central 47205 150 0 3005 9055 -20995
State 4305 200 200 1700 4242 2542
Pvt 7629 7085 954 3559 4722 1163
Total 166545 10585 1154 8264 98695 16055
13
Target
2016-17
Hydro
All India
Capacity Addition TargetsAchievements during the Month of Feb 2017
Thermal
2 Capacity Addition Targets Achievements During Feb 2017 amp April 2016 to Feb 2017
Feb-17 April 16 - Feb 17Schemes Sector
69
45
13
19
0
82
64
82
76
15
94
0
98
70
0
2000
4000
6000
8000
10000
12000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during 2016-17 Target
Achievement
66
0
39
85
0
10
58
5
93
0
22
4
0
11
54
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
10000
Thermal Hydro Nuclear Total
MW
Targets and Achievement during Feb 2017 Target
Achievement
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Coal Gas Diesel Total
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Sub Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Sub Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Sub Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Sub Total 2984787 10000 000 2994787 000 473812 89663 3558262
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Sub Total 31000 177105 3600 211705 000 124200 28044 363949
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Sub Total 000 000 4005 4005 000 000 1140 5145
State 6397550 725795 36393 7159738 000 2961800 197690 10319228
Private 7314238 1058060 47370 8419668 000 314400 4804110 13538178
Central 5193000 749083 000 5942083 578000 1165143 000 7685226
Total 18904788 2532938 83763 21521489 578000 4441343 5001800 31542632
Figures at decimal may not tally due to rounding off
Note -
(As per latest information available with MNRE)
Break up of RES all India as on 31122016 is given below (in MW)
433386 2870044 901269 5001800
1 SGPL TPP U-2 (660 MW) has been added to the Private sector of Andhra Pradesh
2 NASIK (P) TPS U-2 (270 MW) has been added to the Private sector of Maharashtra
6 TEESTA-III HPS U-4(200 MW) has been added to the State sector of Sikkim
Sikkim 360 MW
Punjab 340 MW
Haryana 200 MW
UP 200 MW
Rajasthan 100 MW
14
3 CHANJU-I HPS U-1amp2 (2x12 MW) have been added to the Private sector of Himachal Pradesh
4 DPL TPS U-34amp5 (707575 MW) have been retired from the State sector of West Bengal
5 TROMBAY TPS U-4 (150 MW) has been retired from the Private sector of Maharashtra
7 TEESTA-III HPS (1200MW) tie-up of power is as under
Southern
Region
Eastern Region
North Eastern
Region
Total
Capacity
Islands
ALL INDIA
Abbreviation-SHP=Small Hydro Project (le 25 MW) BP=Biomass Power UampI=Urban amp Industrial Waste Power RES=Renewable Energy Sources
1RES include SHP BP UampI Solar and Wind Energy Installed capacity in respect of RES (MNRE) as on 31122016
BM PowerCogen Waste to Energy
785694 11408
Small
Hydro PowerWind Power
Nuclear Hydro
Bio-PowerSolar Power
Northern
Region
Western Region
RES
(MNRE)
ALL INDIA INSTALLED CAPACITY (IN MW) OF POWER STATIONS
(As on 28022017)
(UTILITIES)
RegionOwnership
Sector
Modewise breakup
Grand TotalThermal
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Coal Gas Diesel Total
State 13500 180040 000 193540 000 000 000 193540
Private 44550 10800 000 55350 000 000 5478 60828
Central 442137 20761 000 462898 12208 76264 000 551370
Sub-Total 500187 211601 000 711788 12208 76264 5478 805738
State 272000 15000 000 287000 000 108451 5930 401381
Private 216550 000 000 216550 000 000 16387 232937
Central 120203 53529 000 173732 10916 61013 000 245661
Sub-Total 608753 68529 000 677282 10916 169464 22317 879979
State 000 000 000 000 000 52960 25661 78621
Private 000 000 000 000 000 177200 54253 231453
Central 15202 6188 000 21390 3408 128894 000 153692
Sub-Total 15202 6188 000 21390 3408 359054 79914 463766
State 000 17500 000 17500 000 123000 10803 151303
Private 000 000 000 000 000 000 5100 5100
Central 32932 12914 000 45846 7700 104435 000 157981
Sub-Total 32932 30414 000 63346 7700 227435 15903 314384
State 263000 15000 000 278000 000 257023 12780 547803
Private 501400 000 000 501400 000 000 65978 567378
Central 66088 26392 000 92480 20804 92165 000 205449
Sub-Total 830488 41392 000 871880 20804 349188 78758 1320630
State 519000 60380 000 579380 000 108796 2385 690561
Private 319600 000 000 319600 000 000 565361 884961
Central 101472 22123 000 123595 57300 74153 000 255048
Sub-Total 940072 82503 000 1022575 57300 182949 567746 1830570
State 592300 000 000 592300 000 72410 2510 667220
Private 700600 000 000 700600 000 000 217737 918337
Central 290995 54997 000 345992 33572 166065 000 545629
Sub-Total 1583895 54997 000 1638892 33572 238475 220247 2131186
State 000 000 000 000 000 125215 6287 131502
Private 9900 45000 000 54900 000 73000 26428 154328
Central 30050 6935 000 36985 2228 46924 000 86137
Sub-Total 39950 51935 000 91885 2228 245139 32715 371967
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 1620 1620
Central 3254 1532 000 4786 884 6274 000 11944
Sub-Total 3254 1532 000 4786 884 6274 1620 13564
97719 29035 000 126754 12980 70436 000 210170
State 1659800 287920 000 1947720 000 847855 66356 2861931
Private 1792600 55800 000 1848400 000 250200 958342 3056942
Central 1200050 234406 000 1434456 162000 826623 000 2423079
Grand Total 4652450 578126 000 5230576 162000 1924678 1024698 8341952
15
Ownership
Sector
Modewise breakup
Chandigarh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTHERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
(As on 28022017)
State Grand Total
Uttar
Pradesh
Uttrakhnad
NuclearHydro
(Renewable)
ThermalRES (MNRE)
Delhi
Haryana
Himachal
Pradesh
Jammu amp
Kashmir
Punjab
Rajasthan
Central - Unallocated
Total (Northern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(As on 28022017)
Coal Gas Diesel Total
State 000 000 000 000 000 000 005 005
Private 000 4800 000 4800 000 000 005 4805
Central 33860 000 000 33860 2580 000 000 36440
Sub-Total 33860 4800 000 38660 2580 000 010 41250
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 400 400
Central 4338 420 000 4758 738 000 000 5496
Sub-Total 4338 420 000 4758 738 000 400 5896
State 498000 232182 000 730182 000 77200 800 808182
Private 864200 406000 000 1270200 000 000 567397 1837597
Central 288862 42427 000 331289 55932 000 000 387221
Sub-Total 1651062 680609 000 2331671 55932 77200 568197 3033000
State 408000 000 000 408000 000 170366 8396 586762
Private 538900 000 000 538900 000 000 322758 861658
Central 249005 25718 000 274723 27324 152000 000 454047
Sub-Total 1195905 25718 000 1221623 27324 322366 331154 1902467
State 328000 000 000 328000 000 12000 1105 341105
Private 1094800 000 000 1094800 000 000 42864 1137664
Central 157454 000 000 157454 4752 000 000 162206
Sub-Total 1580254 000 000 1580254 4752 12000 43969 1640975
State 1058000 67200 000 1125200 000 288484 20813 1434497
Private 1191600 56800 000 1248400 000 44700 721511 2014611
Central 371226 262393 000 633619 69014 000 000 702633
Sub-Total 2620826 386393 000 3007219 69014 333184 742324 4151741
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 060 060
Central 5422 2710 000 8132 846 000 000 8978
Sub-Total 5422 2710 000 8132 846 000 060 9038
179635 19691 000 199326 22814 000 000 222140
State 2292000 299382 000 2591382 000 548050 31119 3170551
Private 3689500 467600 000 4157100 000 44700 1654995 5856795
Central 1289801 353359 000 1643160 184000 152000 000 1979160
Grand Total 7271301 1120341 000 8391642 184000 744750 1686114 11006505
16
Thermal
Maharashtra
Nuclear
Dadra amp Nagar
Naveli
Central - Unallocated
Total (Western
Region)
Goa
Daman amp Diu
Gujarat
Madhya
Pradesh
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
WESTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalHydro
(Renewable)RES (MNRE)
Chhattisgarh
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(As on 28022017)
Coal Gas Diesel Total
State 308591 23540 000 332131 000 180887 8950 521968
Private 431000 307411 1697 740108 000 000 366099 1106207
Central 154030 000 000 154030 12716 000 000 166746
Sub-Total 893621 330951 1697 1226269 12716 180887 375049 1794922
State 540659 000 000 540659 000 224566 000 765225
Private 27000 157089 1983 186072 000 000 123021 309093
Central 179988 000 000 179988 14862 000 000 194850
Sub-Total 747647 157089 1983 906719 14862 224566 123021 1269168
State 422000 000 12792 434792 000 359980 15533 810305
Private 206000 000 2520 208520 000 000 594921 803441
Central 202846 000 000 202846 47586 000 000 250432
Sub-Total 830846 000 15312 846158 47586 359980 610454 1864178
State 000 000 15996 15996 000 188150 14502 218648
Private 000 17400 000 17400 000 000 11936 29336
Central 107369 35958 000 143327 22860 000 000 166187
Sub-Total 107369 53358 15996 176723 22860 188150 26438 414171
State 466000 52408 000 518408 000 220320 12270 750998
Private 295000 50310 41170 386480 000 000 1024907 1411387
Central 425510 000 000 425510 98650 000 000 524160
Sub-Total 1186510 102718 41170 1330398 98650 220320 1037177 2686545
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 000 000
Central 10017 000 000 10017 000 000 000 10017
Sub-Total 10017 000 000 10017 000 000 000 10017
State 000 3250 000 3250 000 000 000 3250
Private 000 000 000 000 000 000 003 003
Central 24932 000 000 24932 5278 000 000 30210
Sub-Total 24932 3250 000 28182 5278 000 003 33463
164308 000 000 164308 30048 000 000 194356
State 1737250 79198 28788 1845236 000 1173903 51255 3070394
Private 959000 532210 47370 1538580 000 000 2120887 3659467
Central 1269000 35958 000 1304958 232000 000 000 1536958
Grand Total 3965250 647366 76158 4688774 232000 1173903 2172142 8266819
17
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
SOUTHERN REGION
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Andhra Pradesh
Telangana
State Ownership
Sector
Total (Southern
Region)
Karnataka
Kerala
Tamil Nadu
NLC
Puducherry
Central - Unallocated
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(As on 28022017)
Coal Gas Diesel Total
State 21000 000 000 21000 000 000 7070 28070
Private 000 000 000 000 000 000 18841 18841
Central 253124 000 000 253124 000 12943 000 266067
Sub-Total 274124 000 000 274124 000 12943 25911 312978
State 87500 000 000 87500 000 13000 405 100905
Private 90000 000 000 90000 000 000 1751 91751
Central 31493 000 000 31493 000 7093 000 38586
Sub-Total 208993 000 000 208993 000 20093 2156 231242
State 552000 10000 000 562000 000 98600 9195 669795
Private 178138 000 000 178138 000 000 32962 211100
Central 92245 000 000 92245 000 43130 000 135375
Sub-Total 822383 10000 000 832383 000 141730 42157 1016270
State 000 000 000 000 000 000 000 000
Private 105000 000 000 105000 000 000 000 105000
Central 695066 000 000 695066 000 19326 000 714392
Sub-Total 800066 000 000 800066 000 19326 000 819392
State 42000 000 000 42000 000 206192 630 248822
Private 500000 000 000 500000 000 000 13597 513597
Central 168304 000 000 168304 000 10501 000 178805
Sub-Total 710304 000 000 710304 000 216693 14227 941224
State 000 000 000 000 000 36000 5211 41211
Private 000 000 000 000 000 19500 001 19501
Central 9210 000 000 9210 000 7527 000 16737
Sub-Total 9210 000 000 9210 000 63027 5212 77449
159707 000 000 159707 000 000 000 159707
State 702500 10000 000 712500 000 353792 22511 1088803
Private 873138 000 000 873138 000 19500 67152 959790
Central 1409149 000 000 1409149 000 100520 000 1509669
Grand Total 2984787 10000 000 2994787 000 473812 89663 3558262
18
RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
EASTERN REGION
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)
Bihar
Jharkhand
West Bengal
DVC
Odisha
Sikkim
Central - Unallocated
Total (Eastern
Region)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(As on 28022017)
Coal Gas Diesel Total
State 6000 32345 000 38345 000 10000 3001 51346
Private 000 2450 000 2450 000 000 1528 3978
Central 12700 43560 000 56260 000 32972 000 89232
Sub-Total 18700 78355 000 97055 000 42972 4529 144556
State 000 000 000 000 000 000 10461 10461
Private 000 000 000 000 000 000 027 027
Central 1235 4683 000 5918 000 9757 000 15675
Sub-Total 1235 4683 000 5918 000 9757 10488 26163
State 000 000 000 000 000 28200 3103 31303
Private 000 000 000 000 000 000 001 001
Central 1770 10979 000 12749 000 7458 000 20207
Sub-Total 1770 10979 000 12749 000 35658 3104 51511
State 000 16950 000 16950 000 000 1601 18551
Private 000 000 000 000 000 000 502 502
Central 1870 33896 000 35766 000 6237 000 42003
Sub-Total 1870 50846 000 52716 000 6237 2103 61056
State 000 000 3600 3600 000 000 545 4145
Private 000 000 000 000 000 000 001 001
Central 1570 7161 000 8731 000 8098 000 16829
Sub-Total 1570 7161 3600 12331 000 8098 546 20975
State 000 000 000 000 000 000 3067 3067
Private 000 000 000 000 000 000 050 050
Central 1070 4891 000 5961 000 5332 000 11293
Sub-Total 1070 4891 000 5961 000 5332 3117 14410
State 000 000 000 000 000 000 4147 4147
Private 000 000 000 000 000 000 010 010
Central 1035 4054 000 5089 000 3431 000 8520
Sub-Total 1035 4054 000 5089 000 3431 4157 12677
3750 16136 000 19886 000 12715 000 32601
State 6000 49295 3600 58895 000 38200 25925 123020
Private 000 2450 000 2450 000 000 2119 4569
Central 25000 125360 000 150360 000 86000 000 236360
Grand Total 31000 177105 3600 211705 000 124200 28044 363949
(As on 28022017)
Coal Gas Diesel Total
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 540 540
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 4005 4005 000 000 1065 5070
State 000 000 000 000 000 000 000 000
Private 000 000 000 000 000 000 075 075
Central 000 000 000 000 000 000 000 000
Sub-Total 000 000 000 000 000 000 075 075
State 000 000 4005 4005 000 000 525 4530
Private 000 000 000 000 000 000 615 615
Central 000 000 000 000 000 000 000 000
Grand Total 000 000 4005 4005 000 000 1140 5145
19
Andaman amp
Nicobar
lakshadweep
Total (Islands)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
State Ownership
Sector
Modewise breakup
Grand TotalThermal
NuclearHydro
(Renewable)RES (MNRE)
Mizoram
Central - Unallocated
Total (North-
Eastern Region)
INCLUDING ALLOCATED SHARES IN JOINT amp CENTRAL SECTOR UTILITIES
Arunachal
Pradesh
Meghalaya
Tripura
Manipur
Nagaland
Ownership
Sector
Modewise breakup
Grand TotalThermalNuclear
Hydro
(Renewable)RES (MNRE)
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
NORTH-EASTERN REGION
Assam
INSTALLED CAPACITY (IN MW) OF POWER UTILITIES IN THE STATESUTS LOCATED IN
ISLANDS
State
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1Programme and Achievements of Transmission Lines in Feb 2017 and during April
2016 to Feb 2017
2 List of Transmission Lines CommissionedReady for commissioning during Feb 2017
Section C - Transmission Lines
20
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Programme
2016-17 Programme Achievement Programme Achievement
Central Sector 2597 0 0 2597 2574
State Sector 0 0 0 0 0
Total 2597 0 0 2597 2574
Central Sector 0 0 0 0 0
JVPrivate Sector 0 0 0 0 0
Total 0 0 0 0 0
Central Sector 3123 0 0 3123 4041
State Sector 750 0 0 750 337
JVPrivate Sector 1313 0 0 1133 1327
Total 5186 0 0 5006 5705
Central Sector 3953 0 34 3695 3377
State Sector 5799 284 45 5797 3464
JVPrivate Sector 762 0 659 942 3171
Total 10514 284 738 10434 10012
Central Sector 78 0 0 0 28
State Sector 5009 162 709 4479 5184
JVPrivate Sector 0 0 60 0 80
Total 5087 162 769 4479 5292
Grand Total 23384 446 1507 22516 23583
Voltage Level
(kV)
Name of the
Transmission LineType
400LILO of One Ckt Parbati Pooling Station - Amritsar at
JalandharDC
400 Ajmer - Deedwana SC
400 Bikaner - Deedwana SC
400 Hindaun - Alwar SC
400 JP Nigri TPP - Satna (PG) DC
220 Sujangarh - Deedwana DC
400 Koradi II to Koradi -III line (cktII) DC
400 LILO of Jeerat - KTPS 400 kV SC at N Chanditala DC+SC
230 Kamudhi ss - Tiruchuliss (Muthuramlingapuram) - Ckt-I DC
220 Bechraji - Maruti Suzuki line DC
220 Chandrayanagutta - 220KV Imlibun GIS (UG Cable) DC
220 HSR Layout - Nimhans SS (UG Cable) UG Cable
220 Harsh Vihar - Patparganj line (UG cable link) DC
220Interconnection of one ckt of GSEG - Kosamba line with
Essar - Ichhapore lineDC
220 Karad - Koyna (Loc 8 - 144) line SC on DC
220 LILO on one ckt of Nelamangala - Anchepalya line at Magadi DC
220 LILO of (Ckt-II) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of (Ckt-I) of Miryalaguda - Khammam at Suryapet SS DC
220 LILO of Bakreswar - Gokarna at Sadaipur DC
220 LILO of Ghanapur - Malkaram at Moulali DC
220LILO of Wanaparthy - Ragimanagadda at Singotam X Road
SSDC
220 LILO of one Ckt of Chilakallu - Narkatpally at Suryapet SS DC
220 LILO of one ckt of Ramgarh GTPS - Dechu at Amarasagar DC
220 Mitha - Becharji DC
220 RSS (Ramagundam TPS)- Nirmal line (2nd Ckt Stringing) DC
TSTRANSCO 24
RVPNL 33
GETCO 59
TSTRANSCO 9
TSTRANSCO 10
TSTRANSCO 140
TSTRANSCO 48
TSTRANSCO 42
WBSETCL 13
GETCO 1
MSETCL 44
KPTCL 31
TSTRANSCO 10
KPTCL 11
DTL 29
WBSETCL 7
TANTRANSCO 69
GETCO 2
JAL 322
APL 60
STATE Sector
MSETCL 38
PVT Sector
APL 111
APL 129
APL 97
(Figs in ckms)
Voltage Level
Sector
400 kV
220kV
1 Programme and Achievementsof Transmission Lines in Feb 2017 and during April 2016 to Feb 2017
+- 800 kV HVDC
+- 500 kV HVDC
765 kV
Apr 16 to Feb17
CENTRAL Sector
PGCIL
As on 28-FEB-2017
Executing Agency Line Length (CKM)
Feb 17
Transmission Works (220 kV and above) for Transmission Lines CommissionedReady for commissioning During
FEB-17
34
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1Programme and Achievements of Sub-Stations in Feb 2017 and during Apr 2016 to
Feb 2017
2 List of Sub Stations commissionedready for commisssioning during Feb 2017
Section D - Sub Stations
21
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Programme
2016-17 Programme Achievement Achievement
Central Sector 1500 0 0 1500
State Sector 0 0 0 0
JVPrivate Sector 0 0 0 0
Total 1500 0 0 1500
Central Sector 10500 0 0 13500
State Sector 1500 0 1500 4500
JVPrivate Sector 2000 0 0 2500
Total 14000 0 1500 20500
Central Sector 9890 3500 500 10435
State Sector 13015 630 1000 10925
JVPrivate Sector 2000 0 1260 3260
Total 24905 4130 2760 24620
Central Sector 0 0 0 0
State Sector 4783 260 2500 14925
JVPrivate Sector 0 0 0 0
Total 4783 260 2500 14925
Grand Total 45188 4390 6760 61545
220 kV
0
4783
0
4783
43373
14000
400 kV
9575
11515
2000
23090
0
1500
765 kV
10500
1500
2000
1 Programme amp Achievement of sub- stations in Feb 2017 and during April 2016 to Feb 2017
(Fig in MVA)
Voltage Level
Sector
Feb-17 Apr 16 - Jan 17
Programme
plusmn 800 kV HVDC
1500
0
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Name of
Sub-StationType
Extn at
Hyderabad Ss400220
Alwar SS 400220
Deedwana SS 400220132
400 KV Gonda
Ss220132
Agra (UP) SS
(ICT-II) 765400
Gr Noida (Aug)
(500-315)400220
Kamavarapukota
ss (ICT-1)400220
Kosamba (ICT
addition)400220
Tiruchuli (Near
Muthuramalingap230110
Amberi SS 220132
Badaun (Aug)
ICT-II (200-150)220132
Botad (Aug) 220132
Chilakalaguda
GIS (Osmania 220132
Dohna Bareily
(Aug) ICT -I (160 220132
Name of
Sub-StationType
Gondal (Aug) 220132
Haldarwa (Aug) 22066
Himmatpura Ss
(Trf 220132
Imlibun (GIS) 220132
Khanpur (Aug) 22066
Kheralu (Aug) 22066
Magadi SS 22066
Panandhro
(KLTPS) (Aug)22066
Preet Vihar GIS
(ICT-I)22033
Ranasan (Aug) 220132
Sawaimadhopur
Ss (Aug) (160-220132
Shamli (Aug) ICT
-II (200-160)220132
Singotam X
Roads Ss22033
Sircilla Ss
(Karimnagar 220132
Sultanpur (Aug)
ICT-I (200-160)220132
Wagra (Aug) 22066
As on 28-FEB-2017
Transmission Works (220 kV and above) for Sub-Stations CommissionedReady for commissioning During FEB-17
PVT Sector
220 UPPTCL 50
220
400 APTRANSCO 315
400 GETCO 500
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
220
Page 1 of 2
GETCO 50
220 GETCO 50
220 TSTRANSCO 320
220 GETCO 100
Voltage Level
(kV)Executing Agency
Capacity Added
(MWMVA)
CENTRAL Sector
400 PGCIL 500
630
400 APL 630
220 SEUPPTCL 200
400 APL
STATE Sector
765 UPPTCL 1500
400 UPPTCL 185
230 TANTRANSCO 100
220 RVPNL 160
GETCO 150
220 TSTRANSCO 160
220 UPPTCL 60
220 GETCO 100
220 PSTCL 60
220 GETCO 60
220 KPTCL 200
220 DTL 100
220 GETCO 50
220 RVPNL 60
220 UPPTCL 40
220 TSTRANSCO 40
220 TSTRANSCO 300
21
220 UPPTCL 40
220 GETCO 50
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Electricity Generation (MU) Targets and Achievements for 2016-17 22
Section E - Electricity Generation
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Programme Achievement Ach Programme Achievement Ach
Central Sector 33063200 2658700 2672160 10051 30140400 30620251 10159
State Sector 31669700 2625400 2358510 8983 28810700 27260042 9462
PvtIPP Sector 33185900 2734700 2775294 10148 30265900 30761300 10164
PvtUTL Sector 1981200 143600 139559 9719 1805500 1727771 9569
Total 99900000 8162400 7945523 9734 91022500 90369364 9928
Central Sector 5340000 247600 272775 11017 4998700 5485318 10973
State Sector 6775100 447900 352963 7880 6255000 4678312 7479
PvtIPP Sector 1139900 25700 24389 9490 1105800 1135660 10270
PvtUTL Sector 145000 9500 9955 10479 133000 133718 10054
Total 75870190 730700 660082 38866 12492500 11433008 9152
Central Sector 4000000 354300 283921 8014 3642700 3413644 9371
Total 4000000 354300 283921 8014 3642700 3413644 9371
Bhutan Import 500000 15600 6981 4475 485900 558515 11494
Central Sector 42403200 3260600 3228856 9903 38781800 39519213 10190
State Sector 38444800 3073300 2711473 8823 35065700 31938354 9108
Pvt Sector 36452000 2913500 2949197 10123 33310200 33758449 10135
Total 117800000 9263000 8896507 9604 107643600 105774531 9826
Provisional based on actual-cum-Assesment
Figs in MU
Cummulative
Achievement
Cummulative
Achievement
Jan-17 Jan-16 Upto Jan-17 Upto Jan-16
5789 4377 70129 55518
22
Feb 17
1 Electricity Generation (MU) Targets and Achievememts for 2016-17
All India Energy Generation During April 2016 to Feb 2017 (MU)
Target (2016-
17)
April 16 to Feb 17Sector
Hydro
Thermal
Nuclear
Renewable Energy Generation
Achievement
910225
124925
36427
1076436
903694
114330
34136
1057745
0
200000
400000
600000
800000
1000000
1200000
Thermal Hydro Nuclear Total
Programme
Achievement
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Power Supply Position (Provisional) for Feb 2017 and April 2017 to Feb 2017 23
2 Peak Demand and Peak Met (Provisional) for Feb 2017 and April 2016 to Feb 2017 24
3 Power Supply Position (Revised) for Jan 2016 25
4 Peak Demand and Peak Met (Revised) for Jan 2016 26
5 Notified Power cuts Restrictions on Industries during Feb 2017 27
6 Power Supply to Agricultural Sector during Feb 2017 28
Section F - Power supply position
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 93 93 0 00 1541 1541 0 00
)द+ल Delhi 1710 1709 -1 00 28862 28831 -31 -01
ह1रयाणा Haryana 3253 3253 0 00 45324 45324 0 00
)हमाचल 6दश Himachal Pradesh 701 699 -2 -03 8087 8037 -50 -06
जltम कमीर Jammu amp Kashmir 1469 1188 -281 -191 15929 12887 -3042 -191
पजाब Punjab 2915 2915 0 00 49659 49659 0 00
राजDथान Rajasthan 5689 5663 -26 -05 62282 61862 -420 -07उरउरउरउर 6दश Uttar Pradesh 7786 7724 -62 -08 98619 96816 -1803 -18उराखडउराखडउराखडउराखड Uttarakhand 985 979 -6 -06 12013 11937 -76 -06उरीउरीउरीउरी Northern Region 24600 24222 -378 -15 322317 316897 -5420 -17छीसगढ़ Chhattisgarh 1681 1681 0 00 21193 21140 -53 -03
गजरात Gujarat 8055 8055 0 00 94366 94365 -1 00
मLय 6दश Madhya Pradesh 5607 5607 0 00 60520 60519 -1 00
महाराNO Maharashtra 11012 11009 -3 00 126561 126503 -58 00
दमन और )दउ Daman amp Diu 194 194 0 00 2190 2190 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli499 499 0 00 5544 5544 0 00
गोवा Goa 308 308 0 00 3971 3969 -2 -01
पिचमी Western Region 27355 27352 -3 00 314343 314232 -111 00
आUV 6दश Andhra Pradesh 4451 4451 0 00 49283 49242 -41 -01
तलगाना Telangana 4752 4752 0 00 47601 47591 -10 00
कनाटक Karnataka 5866 5866 0 00 60472 60117 -355 -06
करल Kerala 1870 1869 -1 -01 22018 21984 -34 -02
तमल नाड Tamil Nadu 7496 7496 0 00 95036 95017 -19 00
पडचर Puducherry 175 175 0 00 2316 2313 -3 -01
लY-ीप Lakshadweep 4 4 0 0 44 44 0 0
दणी Southern Region 24610 24609 -1 00 276729 276265 -464 -02
_बहार Bihar 1754 1744 -10 -06 23616 23150 -466 -20
दामोदर घाट 13नगम DVC 1514 1514 0 00 17043 16909 -134 -08
झारखeड Jharkhand 611 610 0 00 7274 7223 -51 -07
ओgडशा Odisha 1919 1919 0 00 24343 24341 -2 00
पिचम बगाल West Bengal 3379 3379 0 00 44342 44214 -128 -03
सिlकम Sikkim 47 47 0 00 436 436 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 220 165 -55 -250
पव Eastern Region 9224 9214 -10 -01 117057 116277 -780 -07
अoणाचल 6दश Arunachal Pradesh 58 57 -1 -14 660 646 -14 -21
असम Assam 625 611 -14 -23 8387 8088 -299 -36
मpणपर Manipur 60 59 -1 -15 693 670 -23 -33
मघालय Meghalaya 159 159 0 00 1565 1565 0 00
मज़ोरम Mizoram 42 42 -1 -15 466 455 -11 -24
नागालsड Nagaland 49 48 -1 -16 687 675 -12 -17
_tपरा Tripura 96 95 -1 -06 1423 1403 -20 -14उरउरउरउर-पव North-Eastern Region 1089 1071 -18 -16 13879 13493 -386 -28
सपण+ भारत All India 86879 86468 -410 -05 1044325 1037163 -7162 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 23
ऊजा प13त म कमी ऊजा प13त म कमी
Energy not Supplied Energy not Supplied
(Page 1 of 2)
ऊजा+ 5व6यत आपत+ िथत =रपोट+ (पवा+वलोकन) Energy Power Supply Position Report (Provisional)
राHयState
फ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 189 189 0 00 361 361 0 00
)द+ल Delhi 3882 3882 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6556 6556 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1479 1479 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2622 2098 -524 -200 2675 2140 -535 -200
पजाब Punjab 6723 6723 0 00 11408 11408 0 00
राजDथान Rajasthan 10527 10322 -205 -19 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14133 14133 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 1973 1973 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 43262 42723 -539 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3397 3389 -8 -02 3875 3851 -25 -06
गजरात Gujarat 13306 13301 -5 00 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 10915 10904 -12 -01 11512 11501 -11 -01
महाराNO Maharashtra 21281 21204 -76 -04 21281 21204 -76 -04
दमन और )दउ Daman amp Diu 281 281 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli671 671 0 00 784 784 0 00
गोवा Goa 515 515 0 00 531 531 0 00
पिचमी Western Region 47962 47789 -173 -04 47962 47844 -119 -02
आUV 6दश Andhra Pradesh 7501 7501 0 00 7969 7965 -4 -01
तलगाना Telangana 8927 8927 0 00 8927 8927 0 00
कनाटक Karnataka 10257 10242 -14 -01 10257 10242 -14 -01
करल Kerala 3702 3688 -13 -04 4132 3996 -135 -33
तमल नाड Tamil Nadu 13701 13640 -61 -04 14823 14823 0 00
पडचर Puducherry 364 344 -20 -55 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 41275 41155 -120 -03 42052 41610 -442 -11
_बहार Bihar 3619 3469 -150 -41 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2508 2508 0 00 2721 2721 0 00
झारखeड Jharkhand 1035 1035 0 00 1498 1498 0 00
ओgडशा Odisha 3345 3345 0 00 4012 4012 0 00
पिचम बगाल West Bengal 7177 7177 0 00 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17174 17029 -145 -08 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 139 135 -4 -29 148 140 -8 -54
असम Assam 1398 1396 -2 -01 1673 1633 -40 -24
मpणपर Manipur 163 162 -1 -06 163 163 0 -02
मघालय Meghalaya 300 300 0 00 331 331 0 00
मज़ोरम Mizoram 95 93 -2 -21 98 98 0 00
नागालsड Nagaland 148 147 -1 -07 148 147 -1 -07
_tपरा Tripura 223 223 0 00 284 284 0 00उरउरउरउर-पव North-Eastern Region 2243 2234 -9 -04 2487 2475 -12 -05
सपण+ भारत All India 149136 148169 -968 -06 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability 24
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (पवा+वलोकन) Peak Power Supply Position Report (Provisional)
आकड़ मगा वाट नट Figures in MW net
राHयStateफ़रवर 2017 February2017 अल2016 - फ़रवर2017 April2016 to February2017
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
आकड़ मलयन य13नट नट Figures in MU net
ऊजा आवयकता ऊजा उपलधता ऊजा आवयकता ऊजा उपलधता
णाल System Energy Requirement Energy Supplied Energy Requirement Energy Supplied
Region ( MU ) ( MU ) ( MU ) ( ) ( MU ) ( MU ) ( MU ) ( )
चडीगढ़ Chandigarh 113 113 0 00 1448 1448 0 00
)द+ल Delhi 1938 1937 -1 -01 27152 27122 -30 -01
ह1रयाणा Haryana 3449 3449 0 00 42071 42071 0 00
)हमाचल 6दश Himachal Pradesh 779 764 -15 -19 7386 7338 -48 -06
जltम कमीर Jammu amp Kashmir 1599 1284 -315 -197 14460 11699 -2761 -191
पजाब Punjab 3013 3013 0 00 46744 46744 0 00
राजDथान Rajasthan 6110 6062 -48 -08 56593 56199 -394 -07उरउरउरउर 6दश Uttar Pradesh 8747 8673 -74 -08 90833 89092 -1741 -19उराखडउराखडउराखडउराखड Uttarakhand 1098 1077 -21 -19 11028 10958 -70 -06उरीउरीउरीउरी Northern Region 26846 26373 -474 -18 297717 292675 -5042 -17छीसगढ़ Chhattisgarh 1939 1939 0 00 19512 19459 -53 -03
गजरात Gujarat 8496 8495 0 00 86311 86310 -1 00
मLय 6दश Madhya Pradesh 6295 6295 0 00 54913 54912 -1 00
महाराNO Maharashtra 10963 10953 -10 -01 115549 115494 -55 00
दमन और )दउ Daman amp Diu 195 195 0 00 1996 1996 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli501 501 0 00 5045 5045 0 00
गोवा Goa 319 319 0 00 3663 3661 -2 -01
पिचमी Western Region 28707 28697 -10 00 286988 286880 -108 00
आUV 6दश Andhra Pradesh 4447 4447 0 00 44832 44791 -41 -01
तलगाना Telangana 4783 4783 0 00 42849 42839 -10 00
कनाटक Karnataka 5961 5961 0 00 54606 54251 -355 -07
करल Kerala 2014 2014 0 00 20148 20115 -33 -02
तमल नाड Tamil Nadu 8136 8136 0 00 87540 87521 -19 00
पडचर Puducherry 189 189 0 00 2141 2138 -3 -01
लY-ीप Lakshadweep 4 4 0 0 40 40 0 0
दणी Southern Region 25531 25531 0 00 252119 251656 -463 -02
_बहार Bihar 2019 1967 -51 -25 21862 21406 -456 -21
दामोदर घाट 13नगम DVC 1698 1647 -52 -30 15529 15395 -134 -09
झारखeड Jharkhand 692 679 -13 -19 6663 6613 -50 -08
ओgडशा Odisha 2209 2209 0 00 22424 22422 -2 00
पिचम बगाल West Bengal 3495 3486 -9 -03 40963 40835 -128 -03
सिlकम Sikkim 44 44 0 00 389 389 0 00
अडमान-13नकोबार Andaman- Nicobar 20 15 -5 -25 200 150 -50 -250
पव Eastern Region 10158 10033 -125 -12 107833 107063 -770 -07
अoणाचल 6दश Arunachal Pradesh 68 67 -1 -17 602 589 -13 -22
असम Assam 693 684 -9 -13 7762 7477 -285 -37
मpणपर Manipur 76 75 -1 -16 633 611 -22 -35
मघालय Meghalaya 151 151 0 00 1406 1406 0 00
मज़ोरम Mizoram 50 49 -1 -21 424 413 -11 -26
नागालsड Nagaland 66 66 -1 -14 638 627 -11 -17
_tपरा Tripura 184 183 0 -02 1327 1308 -19 -14उरउरउरउर-पव North-Eastern Region 1289 1275 -14 -11 12790 12422 -368 -29
सपण+ भारत All India 92531 91908 -623 -07 957446 950695 -6751 -07
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
250
(Page 1 of 2)
राHयState
ऊजा+ 5व6यत आपत + िथत =रपोट+ (सशोTधत) Energy Power Supply Position Report (Revised)
Energy not Supplied Energy not Supplied
जनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
ऊजा प13त म कमी ऊजा प13त म कमी
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
अuधकतम माग अuधकतम उपलिध अuधकतम माग अuधकतम उपलिध
णाल System Peak Demand Peak Met Peak Demand Peak Met
Region ( MW ) ( MW ) ( MW ) ( ) ( MW ) ( MW ) ( MW ) ( )
चडीगढ़ Chandigarh 246 246 0 00 361 361 0 00
)द+ल Delhi 4168 4168 0 00 6342 6261 -81 -13
ह1रयाणा Haryana 6815 6815 0 00 9262 9262 0 00
)हमाचल 6दश Himachal Pradesh 1492 1492 0 00 1492 1492 0 00
जltम कमीर Jammu amp Kashmir 2675 2140 -535 -200 2675 2140 -535 -200
पजाब Punjab 5954 5954 0 00 11408 11408 0 00
राजDथान Rajasthan 10348 10348 0 00 10613 10348 -265 -25उरउरउरउर 6दश Uttar Pradesh 14344 14344 0 00 17183 15501 -1682 -98उराखडउराखडउराखडउराखड Uttarakhand 2037 2037 0 00 2037 2037 0 00उरीउरीउरीउरी Northern Region 44985 44447 -538 -12 53372 52612 -760 -14छीसगढ़ Chhattisgarh 3308 3110 -197 -60 3875 3851 -25 -06
गजरात Gujarat 13188 13174 -14 -01 14724 14708 -16 -01
मLय 6दश Madhya Pradesh 11353 11353 0 00 11512 11501 -11 -01
महाराNO Maharashtra 20315 20300 -15 -01 20499 20462 -37 -02
दमन और )दउ Daman amp Diu 312 312 0 00 327 327 0 00
दादर व नगर हवल Dadra amp Nagar
Haveli743 743 0 00 784 784 0 00
गोवा Goa 482 432 -50 -104 531 531 0 00
पिचमी Western Region 47881 47844 -37 -01 47881 47844 -37 -01
आUV 6दश Andhra Pradesh 7372 7367 -5 -01 7969 7965 -4 -01
तलगाना Telangana 8407 8391 -16 -02 8407 8391 -16 -02
कनाटक Karnataka 9577 9530 -47 -05 10061 9871 -191 -19
करल Kerala 3594 3594 0 00 4132 3996 -135 -33
तमल नाड Tamil Nadu 13705 13685 -20 -01 14823 14823 0 00
पडचर Puducherry 329 329 0 00 371 368 -3 -07
लY-ीप Lakshadweep 8 8 0 0 8 8 0 0
दणी Southern Region 40808 40744 -64 -02 42052 41610 -442 -11
_बहार Bihar 3810 3701 -109 -29 3883 3759 -125 -32
दामोदर घाट 13नगम DVC 2721 2721 0 00 2721 2721 0 00
झारखeड Jharkhand 1211 1211 0 00 1498 1498 0 00
ओgडशा Odisha 3720 3720 0 00 4012 4012 0 00
पिचम बगाल West Bengal 6630 6604 -26 -04 7931 7886 -45 -06
सिlकम Sikkim 91 91 0 00 112 112 0 00
अडमान-13नकोबार Andaman- Nicobar 40 32 -8 -20 40 32 -8 -20
पव Eastern Region 17569 17438 -130 -07 18790 18596 -194 -10
अoणाचल 6दश Arunachal Pradesh 122 120 -2 -17 148 140 -8 -54
असम Assam 1466 1464 -1 -01 1673 1633 -40 -24
मpणपर Manipur 163 163 0 -02 163 163 0 -02
मघालय Meghalaya 331 331 0 00 331 331 0 00
मज़ोरम Mizoram 98 98 0 00 98 98 0 00
नागालsड Nagaland 122 121 -1 -08 130 130 0 00
_tपरा Tripura 224 223 -1 -05 284 284 0 00उरउरउरउर-पव North-Eastern Region 2330 2320 -10 -04 2487 2475 -12 -05
सपण+ भारत All India 148245 147094 -1151 -08 159542 156934 -2608 -16
Lakshadweep and Andaman amp Nicobar Islands are stand- alone systems power supply position of thesedoes not form part of regional requirement and availability
26
माग कv प13त म कमी माग कv प13त म कमी
Demand not Met Demand not Met
अTधकतम 5व6यत आपत + िथत =रपोट+ (सशोTधत) Peak Power Supply Position Report (Revised)
आकड़ मगा वाट नट Figures in MW net
राHयStateजनवर 2017 January2017 अल2016 - जनवर2017 April2016 to January2017
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
राHय State Region ऊजा+माग कटौती EnergyDemand Cutउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi No Notified Cuts
ह1रयाणा Haryana No Notified Cuts
)हमाचल 6दश Himachal Pradesh No Notified Cuts
जltम कमीर Jammu amp Kashmir
प जाब Punjab No Notified Cuts
राजDथान Rajasthan No Notified Cutsउरउरउरउर 6दश Uttar Pradesh No Notified Cutsउराखडउराखडउराखडउराखड Uttarakhand No Notified Cuts
पिचमी Western Regionछीसगढ़ Chhattisgarh No Notified Cuts
गजरात Gujarat No Notified Cuts
मLय 6दश Madhya Pradesh No Notified Cuts
महाराNO Maharashtra No Notified Cuts
गोवा Goa No Notified Cuts
दणी Southern Region
आUV 6दश Andhra Pradesh No Notified Cuts
तलगाना Telangana No Notified Cuts
कनाटक Karnataka No Notified Cuts
करल Kerala No Notified Cuts
तमल नाड Tamil Nadu No Notified Cuts
पडचर Puducherry No Notified Cuts
पव Eastern Region
_बहार Bihar No Notified Cuts
झारखeड Jharkhand No Notified Cuts
ओgडशा Odisha No Notified Cuts
पिचम बगाल West Bengal No Notified Cuts
27
फ़रवर 2017 म इडaज पर 5व6यत कटौती का 5ववरण Notified Power CutsRestrictions on Industries during February2017
Data not received
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorHPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sectorराHय State Region औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म औसत िवत आपत13 घट म Average Hours of SupplyAverage Hours of SupplyAverage Hours of SupplyAverage Hours of Supplyउरीउरीउरीउरी Northern Region
चडीगढ़ Chandigarh
)द+ल Delhi There is no agricultural load in Delhi
ह1रयाणा Haryana 0925 hrsday
)हमाचल 6दश Himachal Pradesh HPSEBL has only 2 agriculture consumers and uninterrupted power is being supplied to agriculture sector
जltम कमीर Jammu amp Kashmir
प जाब Punjab 501 hrsday
राजDथान Rajasthan 0645 hrsday उरउरउरउर 6दश Uttar Pradesh 1850 hrsday उराखडउराखडउराखडउराखड Uttarakhand 2313 hrsday
पिचमी Western Regionछीसगढ़ Chhattisgarh 18 hrsday
गजरात Gujarat 8 hrsday
मLय 6दश Madhya Pradesh Three-Phase Supply(Irrigation)- 0951hrs day Three-Phase (Mixed) Supply - 2315 hrs day
महाराNO Maharashtra 09 hrsday
गोवा Goa No restriction
दणी Southern Region
आUV 6दश Andhra Pradesh 07 hrsday
तलगाना Telangana 09 hrsday
कनाटक Karnataka 6 hrsday
करल Kerala No Restrictions
तमल नाड Tamil Nadu 9 hrsday (6 hrs during day time and 3 hrs during night time)
पडचर Puducherry No Restrictions
पव Eastern Region
_बहार Bihar About 18 hrs
झारखeड Jharkhand About 20 hrs
ओgडशा Odisha 24 hrs
पिचम बगाल West Bengal About 23 hrs
28
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Growth of Installed Capacity since 6th Plan 29
2 Growth of Transmission Sector since 6th Plan 30
3 All India Yearly Coal consumption for Power Generation (Utilities)
4 All India Annual Per Capita Consumption of Electricity since -2006
5 Average cost of power supply amp Average realisation (Paisakwh)
6 Growth of Rural Electrification amp Pump Sets Energisation
7 Status of Hydro Schemes Cleared by the CEA in Feb 2017
Section G - Growth of Power Sector
31
32
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
(In MW)
Coal Gas Diesel Total
End of 6th Plan 2631083 54150 17737 2702970 1095 1446002 0 4258472
End of 7th Plan 4123748 234300 16509 4374557 1565 1830763 1814 6363634
End of 8th Plan 5415448 656190 2939 6101028 2225 2165808 90201 8579537
End of 9th Plan 6213088 1116310 113483 7442881 2720 2626876 162839 10504596
End of 10th Plan 7112138 1369171 120175 8601484 3900 3465377 77606 13232921
End of 11th Plan 11202238 1838105 119975 13160318 4780 389904 2450345 19987703
End of Feb 2017 18904788 2532938 837633 21521489 5780 4441343 5001800 31542632
Captive Generation Capacity in Industries having demand of 1 MW and above grid interactive (as on 31-03-16) = 48279 MW
Provisional
Coal Gas Diesel Nuclear Hydro Res Total
18904788 2532938 837633 578000 444134 50018 22925174
29
All India Generating Installed Capacity ( MW ) (As on 28022017 )
1 Growth of Installed Capacity Since 6th Plan
Plan YearThermal
Nuclear Hydro RES (MNRE) Total
Total Installed Capacity 31542632 MW
Coal Gas Diesel Nuclear Hydro Res
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Transmission
System Type
Voltage
(KV) levelUnit
Ach At
the end
of 6th
Plan
Ach At
the end
of 7th
Plan
Ach At the
end of 8th
Plan (as
on
3131997)
Ach At the
end of 9th
Plan (as
on
3132002)
Ach as on
31032007
(End of 10th
Plan)
Ach as
on
31032012
(End of
11th Plan)
Ach as on
2822017
Target
31032017
(End of 12th
Plan)
765 ckm 0 0 0 1160 2184 5250 29950 32250
400 ckm 6029 19824 36142 49378 75722 106819 157142 144819
220 ckm 46005 59631 79600 96993 114629 135980 162530 170980
Total ckm 52034 79455 115742 147531 192535 248049 349622 348049
HVDC ckm 0 0 1634 4738 5872 9432 15512 16872
Total
(AC+HVDC)ckm 52034 79455 117376 152269 198407 257481 365134 364921
765 MVA 0 0 0 0 0 25000 161500 174000
400 MVA 9330 21580 40865 60380 92942 151027 234087 196027
220 MVA 37291 53742 84177 116363 156497 223774 308407 299774
Total AC MVA 46621 75322 125042 176743 249439 399801 703994 669801
HVDC MW 0 0 0 5200 8200 9750 16500 22500
AC+HVDC 46621 75322 125042 181943 257639 409551 720494 692301
Inter-regional
transmission
Capacity
MW 14050 27750 67850 65550
30
2 Growth of Transmission Sector Since 6th Plan
AC
Transmission
lines
AC Substations
Transformation
Capacity
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
2004-05 27800
2005-06 28100
2006-07 30200
2007-08 33000
2008-09 35500
2009-10 36700
2010-11 38700
2011-12 41756
2012-13 45460
2013-14 48940
2014-15 53040
2015-16 5459
Actual
Year
2005-06
2006-07
2007-08
2008-09
2009-10
2010-11
2011-12
2012-13
2013-14 957
2014-15 1010
2015-16
2004-05 254 209 7568
2005-06 260 221 7636
2006-07 276 227 7423
2007-08 293 239 7727
2008-09 340 263 8713
2009-10 355 268 8870
2010-11 398 303 11975
2011-12 455 330 13514
2012-13 501 376 14867
2013-14 518 175
2014-15 520
Source- PFC Reports on the performance of State Power Utilities 31
6719
7171
3 All India yearly Coal Consumption for Power Generation (Utilities)
YEARCoal Consumption
Million Tonnes
4 All India Annual per Capita consumption of Electricity Since 2006
Per Capita Consumption ( kWh)
6314
(GrossGen+ Net Import) Mid-year population Actual
5 Average cost of power supply amp average realization ( paiseKWH )
Yearcost of supply
(paiseunit)
Realization(paiseunit)
Including AgricultureOnly
Agriculture
1075
7335
7786
91441
8188
88363
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Sl
NoExecuting Agency
Installed
Capacity (MW)Cost (Rs crore)
Date of
Clearance
32
Cummulative as on 3112017
86293726
46708
18423975
499150557976840909
010411 to 310312
412667
No of villages electrified is reduced due to revision of data by states as per new definition of villiage electrification
since 2004-05
65291374575 296361511th Plan
Cumu upto End of 11th Plan
590898 20648398
557439
15455554
2314176
322968331020397343611750
2005-062006-07 22594
2003-042004-05
65109527813884
297594
010408 to 310309010409 to 310310010410 to 310311
10th Plan
3207
482864
12632
1576036
44517
Villages Electricfied (Nos)
2001-02
284064367244
1218
27801997-981998-991999-002000-01
316074
010407 to 310308
6 Growth Of Rural Electrification amp Pumpsets Energisation
Plan Year
9th Plan2002-03
134092626
4111
Pump Sets Energised
Disclaimer The data included in monthly Progress reports of Village electrification published by CEA is provisional in nature as
Indicated in all the reports The data in the report prior to October 2015 was Updated every month based on the information received
from statesdistribution utilities as and when reported but the data for all the states for a particular month was generally not made
available simultaneously to reflect the countrywide picture for a particular month Number of total villages and number of electrified
villages have also be en adjusted for changes observed from Census 2011 data As such each monthly report of Village electrification of CEA is
independent of the earlier published reports
Kwar HEP Jammu Kashmir by Ms Chenab Valley Power Projects Pvt Ltd( 540 MW) 494924 crores 23022017
7 Status of Hydro Schemes Cleared by the CEA in Feb2017
Name of Scheme
2093
5743
9769
Cumu upto End of 10th Plan
311060
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
SN Contents Page
1 Rate of sale of power for the year 2014-2015 33-41
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
Name of UtilityPower Station UTILITY
Energy Source-
CoalGas
NapthaLSHS
DieselHydro
Net Gen
(Mkwh)
Rate of Sale
of Power as
approved by
CERCSERC
(PaiseKwh) NORTHERN REGION
CENTRAL SECTOR
BHAKRA (RB+LB)+GANGUWAL+KOTLA Ω BBMB HYDRO-HYDRO 611718 3307
DEHAR H P S Ω
BBMB HYDRO-HYDRO 311179 6355
PONG H P S Ω BBMB HYDRO-HYDRO 131548 2362
BAIRA SIUL HPS NHPC LTD HYDRO-HYDRO 79700 17560
CHAMERA- I HPS NHPC LTD HYDRO-HYDRO 255200 20080
CHAMERA- II HPS NHPC LTD HYDRO-HYDRO 149900 27400
CHAMERA- III HPS NHPC LTD HYDRO-HYDRO 102100 42460
PARBATI - III HPS NHPC LTD HYDRO-HYDRO 66100 63520
DHAULI GANGA HPS NHPC LTD HYDRO-HYDRO 74400 29060
CHUTAK NHPC LTD HYDRO-HYDRO 3300 68320
DULHASTI HPS NHPC LTD HYDRO-HYDRO 217600 61580
SALAL HPS NHPC LTD HYDRO-HYDRO 349200 10100
TANAKPUR HPS NHPC LTD HYDRO-HYDRO 44700 22980
URI HPS -I NHPC LTD HYDRO-HYDRO 307700 16100
URI HPS - II NHPC LTD HYDRO-HYDRO 118800 35060
NIMMO-BAZGO NHPC LTD HYDRO-HYDRO 7600 63320
SEWA - II NHPC LTD HYDRO-HYDRO 57400 43280
ANTA CCPP NTPC LTD THERMAL-GASN 161200 39000
AURAIYA CCPP NTPC LTD THERMAL-GASN 160700 49800
BADARPUR TPS NTPC LTD THERMAL-COAL 293600 53700
DADRI COAL- I (NCTPP) NTPC LTD THERMAL-COAL 546100 47500
DADRI COAL - II (NCTPP) NTPC LTD THERMAL-COAL 600500 52100
DADRI CCPP NTPC LTD THERMAL-GASHSD 243200 49200
FARIDABAD CCPP NTPC LTD THERMAL-GASN 152700 36700
RIHAND STPS I NTPC LTD THERMAL-COAL 646500 24500
RIHAND STPS II NTPC LTD THERMAL-COAL 692800 26200
RIHAND STPS III NTPC LTD THERMAL-COAL 639100 29900
SINGRAULI STPS NTPC LTD THERMAL-COAL 1343100 17700
TANDA TPS NTPC LTD THERMAL-COAL 279000 44700
UNCHAHAR TPS I NTPC LTD THERMAL-COAL 278700 36700
UNCHAHAR TPS II NTPC LTD THERMAL-COAL 268100 36400
UNCHAHAR TPS III NTPC LTD THERMAL-COAL 145600 41200
NARORA APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 253262 24856
RAJASTHAN APS 2345 amp 6 NPCIL NUCLEAR-NUCLEAR 695001 34339
NJHPS SJVNL HYDRO-HYDRO 678149 28740
RAMPUR HPS SJVNL HYDRO-HYDRO 124490 31080
TEHRI HPP THDC HYDRO-HYDRO 296713 58700
KOTESHWAR HEP THDC HYDRO-HYDRO 118626 52000
NEYVELI BARSINGSAR NEYVELI LIGNITE CORP LTD THERMAL-LIG 125579 41967
STATE SECTOR
PANIPAT TPS - I (Unit 1 to 4) HPGCL THERMAL-COAL 40655 60300
PANIPAT TPS - II (Unit 5) HPGCL THERMAL-COAL 45458 44500
PANIPAT TPS - II (Unit 6) HPGCL THERMAL-COAL 59433 47200
PANIPAT TPS - II (Unit 7) HPGCL THERMAL-COAL 119478 45300
PANIPAT TPS - II (Unit 8) HPGCL THERMAL-COAL 127156 45200
DCRTPP (UNIT 1 TO 2) Y NAGAR HPGCL THERMAL-COAL 320641 41400
RGTPP (UNIT 1TO 2) KHEDAR HISSAR HPGCL THERMAL-COAL 538592 44500
WYC HYDEL STATION HPGCL HYDRO-HYDRO 17689 7600
GIRI POWER HOUSE HPSEB HYDRO-HYDRO 21309 12600
ANDHRA POWER HOUSE HPSEB HYDRO-HYDRO 7178 15200
BHABA POWER HOUSESANJAY P HOUSE HPSEB HYDRO-HYDRO 52119 9300
GHANVI POWER HOUSE HPSEB HYDRO-HYDRO 8578 22500
33
RATE OF SALE OF POWER FOR THE YEAR 2014-2015
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
BASSI POWER HOUSE HPSEB HYDRO-HYDRO 30702 10800
BINWA POWER HOUSE HPSEB HYDRO-HYDRO 2804 24300
GAJ POWER HOUSE HPSEB HYDRO-HYDRO 5006 37600
BANER POWER HOUSE HPSEB HYDRO-HYDRO 4604 22800
HOLI POWER HOUSE HPSEB HYDRO-HYDRO 769 22500
THIROT POWER HOUSE HPSEB HYDRO-HYDRO 804 22500
KHAULI POWER HOUSE HPSEB HYDRO-HYDRO 5115 22500
LARJI POWER HOUSE HPSEB HYDRO-HYDRO 63965 38100
NOGLI POWER HOUSE HPSEB HYDRO-HYDRO 615 38900
CHABA POWER HOUSE HPSEB HYDRO-HYDRO 779 29100
RUKTI POWER HOUSE HPSEB HYDRO-HYDRO 018 16800
SAL-II POWER HOUSE HPSEB HYDRO-HYDRO 540 22500
KILLAR HPSEB HYDRO-HYDRO 047 38200
BHABA AUGUMENTATION POWER HOUSE HPSEB HYDRO-HYDRO 154 22500
BHURI SINGH HPSEB HYDRO-HYDRO 126 24500
GAS TURBINE POWER STATION IPGCL THERMAL-GAS 90426 40040
RAJGHAT POWER HOUSE IPGCL THERMAL-COAL 35761 49470
PPS-I PPCL THERMAL-GAS 179925 31500
PPS-III PPCL THERMAL-GAS 215657 40500
LOWER JHELUM JampKPDD HYDRO-HYDRO 57712 5400
UPPER SINDH -I SUMBAL KANGAN JampKPDD HYDRO-HYDRO 7255 6300
UPPER SINDH -II KANGAN JampKPDD HYDRO-HYDRO 29094 8500
GANDHARBAL JampKPDD HYDRO-HYDRO 1572 4500
BAGLLIHAR HEP JampKPDD HYDRO-HYDRO 291310 29100
KARNAH MPH JampKPDD HYDRO-HYDRO 627 29900
CHENANI I JampKPDD HYDRO-HYDRO 4393 7400
CHENANI II JampKPDD HYDRO-HYDRO 402 9600
CHENANI III UDHAMPUR JampKPDD HYDRO-HYDRO 148 14100
IQBAL MHP KARGIL JampKPDD HYDRO-HYDRO 482 18200
HUNDER MHP JampKPDD HYDRO-HYDRO 085 25800
SUMOOR JampKPDD HYDRO-HYDRO 009 34300
BAZGO MHP JampKPDD HYDRO-HYDRO 013 32800
IGO MERCELLONG JampKPDD HYDRO-HYDRO 130 42900
PAHALGAM MHP JampKPDD HYDRO-HYDRO 650 46700
MARPACHOO JampKPDD HYDRO-HYDRO 073 44600
HAFTAL JampKPDD HYDRO-HYDRO 133 43200
BADERWAH POWER HOUSE JampKPDD HYDRO-HYDRO 180 12000
SANJAK JampKPDD HYDRO-HYDRO 061 41000
GNDTPLANT BATHINDA PUNJAB STATE POWER COR LTD THERMAL-COAL 145289 51000
GGSSTPLANT ROOP NAGAR PUNJAB STATE POWER COR LTD THERMAL-COAL 734046 51000
GHTPLANT LEHRA MOHABAT PUNJAB STATE POWER COR LTD THERMAL-COAL 611743 51000
SHANAN POWER HOUSE JOGINDER NGR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 35122 51000
UBDCPATHANKOT MALIKPUR PUNJAB STATE POWER COR LTD HYDRO-HYDRO 36163 51000
ASHP ANANDPUR SAHIB PUNJAB STATE POWER COR LTD HYDRO-HYDRO 73439 51000
MUKERIAN HYDEL TALWARA PUNJAB STATE POWER COR LTD HYDRO-HYDRO 124674 51000
RANJIT SAGAR Dam(RSD) SHAPUR KANDI PUNJAB STATE POWER COR LTD HYDRO-HYDRO 157060 51000
KOTA THERMAL POWER STATION RRVUNL THERMAL-COAL 801025 33715
SURATGARH THERMAL POWER STATION RRVUNL THERMAL-COAL 915221 39308
CHHABRA TPS RRVUNL THERMAL-COAL 408854 34195
RAMGARH GAS THERMAL POWER PROJECT RRVUNL THERMAL-GAS 137918 39169
DHOLPUR COMBINED CYCLE POWER PROJECT RRVUNL THERMAL-GAS 82911 37437
MAHI HYDEL POWER STATION RRVUNL HYDRO-HYDRO 15853 13755
MINI MICRO HYDEL (MMH) POWER STATION RRVUNL HYDRO-HYDRO 675 37997
GIRAL LIGNITE TPP -II RRVUNL THERMAL-LIG 19153 28677
KALISINDH TPP RRVUNL THERMAL-LIG 105763 42967
KHARA HEP UPJVNL HYDRO-HYDRO 36106 7200
MATATILLA HEP UPJVNL HYDRO-HYDRO 8024 6500
OBRA HEP UPJVNL HYDRO-HYDRO 22835 6300
RIHAND UPJVNL HYDRO-HYDRO 57211 5500
34
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
UGC PS(NIRGAJINI CHITORA SALAWA BHOLA) UPJVNL HYDRO-HYDRO 2149 21300
EYC UPJVNL HYDRO-HYDRO 684 22500
SHEETLA UPJVNL HYDRO-HYDRO 194 27300
ANPARA A TPS UPRVUNL THERMAL-COAL 387596 18586
ANPARA B TPS UPRVUNL THERMAL-COAL 579492 23461
HARDUAGANJ TPS UPRVUNL THERMAL-COAL 10019 54697
HARDUAGANJ EXTN TPS UPRVUNL THERMAL-COAL 316904 43434
OBRA A TPS UPRVUNL THERMAL-COAL 41632 28640
OBRA B TPS UPRVUNL THERMAL-COAL 276642 23911
PANKI TPS UPRVUNL THERMAL-COAL 85253 44469
PARICHHA TPS UPRVUNL THERMAL-COAL 28902 39411
PARICHHA EXTNTPS UPRVUNL THERMAL-COAL 219602 36628
PARICHHA EXTN ST 2 TPS UPRVUNL THERMAL-COAL 316949 44596
CHIBRO (YAMUNA) HPS UTTARAKHAND JVNL HYDRO-HYDRO 86096 6230
CHILLA HPS UTTARAKHAND JVNL HYDRO-HYDRO 78391 6970
DHAKRANI HPS UTTARAKHAND JVNL HYDRO-HYDRO 13424 7160
DHALIPUR HPS UTTARAKHAND JVNL HYDRO-HYDRO 22836 8880
KHATIMA HPS UTTARAKHAND JVNL HYDRO-HYDRO 4088 6690
KHODRI HPS UTTARAKHAND JVNL HYDRO-HYDRO 39810 7730
KULHAL HPS UTTARAKHAND JVNL HYDRO-HYDRO 15233 6670
TILOTH HPS UTTARAKHAND JVNL HYDRO-HYDRO 37033 12820
MANERI BHALI - II HPS UTTARAKHAND JVNL HYDRO-HYDRO 88252 14960
RAMGANGA HPS UTTARAKHAND JVNL HYDRO-HYDRO 26356 8890
PRIVATE SECTOR
INDIRA GANDHI STPP(IGSTPP) ARAVALI POWER CO PVT THERMAL-COAL 658748 56756
MAHATMA GANDHI THERMAL POWER PLANT JHAJJAR POWER LTD THERMAL-COAL 613551 40380
BASPA-II HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 124240 27000
VISHNU PRAYAG HEP J P POWER VENTURES HYDRO-HYDRO 181375 24700
KARCHAM WANGTOO HEPHIMACHAL BASPA POWER COM
LDTHYDRO-HYDRO 421411 34000
MALANA HEP MALANA PCL HYDRO-HYDRO 24558 35334
MALANA STAGE- II HPS EVEREST PPL HYDRO-HYDRO 20624 40160
ALLAIN DUHANGAN HEP AD HYDRO POWER LTD HYDRO-HYDRO 57791 39932
RENUSAGAR DIVISION(CAPTIVE) ₭ HINDALCO IND LTD THERMAL-COAL 612958 000
RAJ WESTPOWER LTD RAJASTHAN JSW ENERGY LTD THERMAL-LIG 655600 41181
RITHALA COMBI CYCLE POWER PLANT TATA POWER DDL THERMAL-GAS 030
ROJA THERMAL POWER STATION ROJA POWER SCL THERMAL-COAL 784700 55300
KHAMBERKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 49632 70900
BARKHERA BAJAJ ENERGY PVT LTD THERMAL-COAL 52986 70000
MAQSOODAPUR BAJAJ ENERGY PVT LTD THERMAL-COAL 49795 70700
UTRAULA BAJAJ ENERGY PVT LTD THERMAL-COAL 50904 71200
KUNDARKHI BAJAJ ENERGY PVT LTD THERMAL-COAL 50550 69800
KAWAI TPPRAJASTHAN ADANI POWER LTD THERMAL-COAL 740056 33700
WESTERN REGION
CENTRAL SECTOR
INDIRA SAGAR HPS NHDC LTD HYDRO-HYDRO 254272 24386
OMKARESHWAR HPS NHDC LTD HYDRO-HYDRO 112055 39727
GANDHAR CCPP NTPC LTD THERMAL-GAS 79200 35000
KAWAS CCPP NTPC LTD THERMAL-GASN 156200 33000
KORBA I amp II NTPC LTD THERMAL-COAL 1511200 15800
KORBA III NTPC LTD THERMAL-COAL 369500 26200
SIPAT STPS I NTPC LTD THERMAL-COAL 1358400 27900
SIPAT STPS II NTPC LTD THERMAL-COAL 701900 26700
VINDHYACHAL STPS I NTPC LTD THERMAL-COAL 768600 23100
VINDHYACHAL STPS II NTPC LTD THERMAL-COAL 650600 22100
VINDHYACHAL STPS III NTPC LTD THERMAL-COAL 674200 26700
VINDHYACHAL STPS IV NTPC LTD THERMAL-COAL 666000 29600
MOUDA I NTPC LTD THERMAL-COAL 209600 52700
KAKRAPARA 1 amp 2 NPCIL NUCLEAR-NUCLEAR 314952 23731
TARAPUR 1 amp 2 NPCIL NUCLEAR-NUCLEAR 185827 9679
BHILAI EXPANSION POWER PLANT NTPC SAIL PCPL THERMAL-COAL 296272 21497
35
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
TARAPUR 3 amp 4 NPCIL NUCLEAR-NUCLEAR 746310 28511
STATE SECTOR
GSEG-HAZIRA GUJARAT S ENEGEN LTD THERMAL-GAS 20321
AKRIMOTA THERMAL POWER STATION GUJARAT MINERAL DCL THERMAL-LIG 135876 20600
KORBA TPS EAST CSPGCL THERMAL-COAL 191206 23570
DSP TPS KORBA EAST CSPGCL THERMAL-COAL 345348 24440
KORBA-WEST EXTENSION TPS CSPGCL THERMAL-COAL 334767 26500
HASDEO TPS KORBA WEST CSPGCL THERMAL-COAL 554364 17630
GANGREL HPS CSPGCL HYDRO-HYDRO 4708 36580
BANGO HEP CSPGCL HYDRO-HYDRO 26035 10150
MINI HYDEL POWER KORBA WEST CSPGCL HYDRO-HYDRO 88310 40610
SIKASAR HEP CSPGCL HYDRO-HYDRO 845 26490
DHUVARAN CCPP-1 GSECL THERMAL-GAS 3227 257700
DHUVARAN CCPP-2 GSECL THERMAL-GAS 13138 103400
GANDHI NAGAR TPS 1-4 GSECL THERMAL-COAL 182500 54200
GANDHI NAGAR TPS 5 GSECL THERMAL-COAL 156506 39200
KUTCH LIG TPS 1-3 GSECL THERMAL-LIG 125350 29200
KUTCH LIG TPS 4 GSECL THERMAL-LIG 37862 40500
SIKKA TPS GSECL THERMAL-COAL 93978 54200
UKAI 1-5 GSECL THERMAL-COAL 403139 40700
UKAI TPS 6 GSECL THERMAL-COAL 267219 42500
WANAKBORI TPS 1-6 GSECL THERMAL-COAL 602017 41200
WANAKBORI TPS 7 GSECL THERMAL-COAL 141438 39400
KADANA HPS GSECL HYDRO-HYDRO 21565 27600
UKAI HPS GSECL HYDRO-HYDRO 70873 3300
UGBPS II GSECL THERMAL-GAS 13352 321000
TONS HYDRO POWER STATION MPPGCL HYDRO-HYDRO 107800 14100
BANSAGAR-II MPPGCL HYDRO-HYDRO 9800 10000
BANSAGAR- III MPPGCL HYDRO-HYDRO 10800 11900
JHINNA HPS MPPGCL HYDRO-HYDRO 9800 14700
RANI AVANTI BAI-BARGI HPS MPPGCL HYDRO-HYDRO 48800 3800
GANDHI SAGAR HPS MPPGCL HYDRO-HYDRO 13600 4300
SANJAY GANDHI HPS MPPGCL HYDRO-HYDRO 3200 18300
MADHIKHERA HPS MPPGCL HYDRO-HYDRO 9700 32000
PENCH HPS MPPGCL HYDRO-HYDRO 25900 8600
RAJGHAT HPS MPPGCL HYDRO-HYDRO 4100 16700
AMARKANTAK PH II MPPGCL THERMAL-COAL 43500 25200
AMARKANTAK PH III MPPGCL THERMAL-COAL 145300 30000
SANJAY GANDHI TPHSGTPS PH-I MPPGCL THERMAL-COAL 158700 41400
SANJAY GANDHI TPHSGTPS PH-II MPPGCL THERMAL-COAL 161300 41400
SANJAY GANDHI TPHSGTPS PH-III MPPGCL THERMAL-COAL 303000 42300
SATPURA TPH STPS PH II MPPGCL THERMAL-COAL 159000 30600
SATPURA TPH STPS PH III MPPGCL THERMAL-COAL 205400 30600
SATPURA TPH STPS PH IV MPPGCL THERMAL-COAL 188900 40500
BHUSAWAL TPS MSPGCL THERMAL-COAL 93598 31900
BHUSAWAL 4 TPS MSPGCL THERMAL-COAL 241877 35200
BHUSAWAL 5 TPS MSPGCL THERMAL-COAL 249655 34800
CHANDRAPUR(MAHARASHTRA) STPS MSPGCL THERMAL-COAL 1138231 23000
KHAPERKHEDA MSPGCL THERMAL-COAL 457529 28900
KHAPERKHEDA 5 MSPGCL THERMAL-COAL 293421 40100
KORADI TPS MSPGCL THERMAL-COAL 202257 40500
NASIK TPS MSPGCL THERMAL-COAL 373003 43000
PARLI TPS MSPGCL THERMAL-COAL 132458 33700
PARLI 6 amp 7 TPS MSPGCL THERMAL-COAL 274197 38300
PARAS MSPGCL THERMAL-COAL 259660 33200
URAN CCPP MSPGCL THERMAL-GAS 337627 27300
KOYANA(POPHALI) MSPGCL HYDRO-HYDRO 311476 2800
VAITARANA MSPGCL HYDRO-HYDRO 34749 8500
YELDARI MSPGCL HYDRO-HYDRO 5501 3600
BHATGHAR MSPGCL HYDRO-HYDRO 11293 5200
PANSHET MSPGCL HYDRO-HYDRO 10962 3800
36
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
BHIRA MSPGCL HYDRO-HYDRO 9301 5700
TILLARI MSPGCL HYDRO-HYDRO 16761 4700
SSP-RIVER BED POWER HOUSE SSNPHP HYDRO-HYDRO 229776 20500
SSP-CENTRAL HEAD POWER HOUSE SSNPHP HYDRO-HYDRO 61167 20500
PRIVATE SECTOR
BINA TPP J P POWER VENTURES THERMAL-COAL 156264 48200
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 764365 28400
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 790424 23500
MUNDRA TPP GUJARAT ADANI POWER LTD THERMAL-COAL 1250782 32400
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 707487 25500
TIRODA TPP MAHARASHTRA ADANI POWER LTD THERMAL-COAL 843613 33500
AMRAVATI TPP RATTANINDIA POWER LTD THERMAL-COAL 211401 30500
ABHIJEET MADC NAGPUR ENERGY PVT ABHIJEET MADC NAGPUR THERMAL-COAL 602 29200
SAI WPCL-Unit-1 SAI WARDHA POWER LTD THERMAL-COAL 4954
SAI WPCL-Unit-3 SAI WARDHA POWER LTD THERMAL-COAL 61081
SAI WPCL-Unit-4 SAI WARDHA POWER LTD THERMAL-COAL 38547
SABARMATI THERMAL POWER STAN SABARMATI TORRENT POWER LTD THERMAL-COAL 272004 44841
ESSAR POWER GUJARAT(EPGL) ESSAR POWER GUJARAT LTD THERMAL-COAL 622400 27100
GEPL-VEDANTA LTD POWER PLANT-I VEDANTA LTD THERMAL-GAS 15982 24000
SSL-VEDANTA LTD POWER PLANT-II VEDANTA LTD THERMAL-GAS 16818 24000
GPPC CCPP GSPC PIPAVAV THERMAL-GAS 221 72700
PONTEMOL DIV -VII CURCHOREM GOA SPONGE amp POWER THERMAL-COAL 6403900 24000
165 MW POWER PLANT (STATION- II) GUJARAT INDUSTRIES PCL THERMAL-GAS 3785 206252
145 MW POWER PLANT (STATION- I) GUJARAT INDUSTRIES PCL THERMAL-GAS 66450 55252
SURAT LIG POWER PLANT (SLPL STATION -I) GUJARAT INDUSTRIES PCL THERMAL-LIG 124670 21220
SURAT LIG POWER PPANT (SSPP STATION -II) GUJARAT INDUSTRIES PCL THERMAL-LIG 163009 29894
PAGUTHAN CCPP CLP INDIA PVT LTD THERMAL-GASN 29059 195200
MUNDRA UMPP COASTAL GUJARAT POWER LTD THERMAL-IMP COAL 2450200 23520
LANCO AMARKANTAK TPP PATHADIH LANCO AMARKAN PLTD THERMAL-COAL 204600 33300
O P JINDAL STPPS-I JINDAL POWER LTD TAMNAR THERMAL-COAL 736840 33400
O P JINDAL STPPS-II JINDAL POWER LTD TAMNAR THERMAL-COAL 231840 32100
RINFRA-GOA RELIANCE INFRAS LTD THERMAL-N 000
DAHANU TPS RELIANCE INFRAS LTD THERMAL-COAL 364226 37600
TROMBAY UNIT 5 TATA POWER COM LTD THERMAL-COAL 312800 43100
TROMBAY UNIT 6 TATA POWER COM LTD THERMAL-GAS 77000 165000
TROMBAY UNIT 7 TATA POWER COM LTD THERMAL-GAS 111900 39500
TROMBAY UNIT 8 TATA POWER COM LTD THERMAL-IMP COAL 66900 68600
BHIRA TATA POWER COM LTD HYDRO-HYDRO 83700 17800
BHIVPURI TATA POWER COM LTD HYDRO-HYDRO 33000 23900
KHOPOLI TATA POWER COM LTD HYDRO-HYDRO 27600 38600
JSW ENERGY LTD THERMAL-IMP COAL 200600 29200
JSW ENERGY LTD THERMAL-IMP COAL 493600 38500
CGPL MUNDRA TATA POWER COM LTD THERMAL-COAL 2450200 23500
SOTHERN REGION
CENTRAL SECTOR
NEYVELI TPS I NEYVELI LIGNITE CORP LTD THERMAL-LIG 319295 36394
NEYVELI TPS- I EXPN NEYVELI LIGNITE CORP LTD THERMAL-LIG 310727 34172
NEYVELI TPS-II NEYVELI LIGNITE CORP LTD THERMAL-LIG 1006306 29960
R GANDHI (KAYAMKULAM) NTPC LTD THERMAL-N 169400 130200
RAMAGUNDEM STPS I amp II NTPC LTD THERMAL-COAL 1547200 30400
RAMAGUNDEM STPS III NTPC LTD THERMAL-COAL 375300 34700
SIMHADRI I NTPC LTD THERMAL-COAL 727700 36000
SIMHADRI II NTPC LTD THERMAL-COAL 691900 42300
KAIGA 123 amp 4 NPCIL NUCLEAR-NUCLEAR 585991 30196
MADRAS APS 1 amp 2 NPCIL NUCLEAR-NUCLEAR 236300 20539
STATE SECTOR
APGAS POWER CORPORN LTD(VIJJESWARAM - I) ANDHRA PRADESH GPCL THERMAL-GAS 1910 38161
APGAS POWER CORPORN LTD(VIJJESWARAM -II) ANDHRA PRADESH GPCL THERMAL-GAS 4481 34440
Dr NTTPS (VIJAYAWADA TPS) APGENCO THERMAL-COAL 814914 39820
Dr NTTPS - IV (VIJAYAWADA TPS - 4) APGENCO THERMAL-COAL 343303 39820
RAYALASEEMA THERMAL POWER PROJECT-I APGENCO THERMAL-COAL 241635 39820
37
SBU 3 JSW ENERGY LTD
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
RAYALASEEMA THERMAL POWER PROJECT-II APGENCO THERMAL-COAL 272408 39820
RAYALASEEMA THERMAL POWER PROJECT-III APGENCO THERMAL-COAL 127833 39820
SRISAILAM (SRBHES) APGENCO HYDRO-HYDRO 114104 39820
UPPER SILERU APGENCO HYDRO-HYDRO 51368 39820
LOWER SILERU APGENCO HYDRO-HYDRO 127020 39820
DONKARAI APGENCO HYDRO-HYDRO 13616 39820
PENNA AHOBILAM (PABRHES)) APGENCO HYDRO-HYDRO 1250 39820
CHETTIPETA APGENCO HYDRO-HYDRO 287 39820
NAGARJUNA SAGAR RCPH APGENCO HYDRO-HYDRO 18448 39820
MUCHKUND APGENCO HYDRO-HYDRO 29528 39820
TUNGABHADRA HES amp HAMPI PH (AP Share) APGENCO HYDRO-HYDRO 14779 39820
KOTHAGUDEM ABC STATIONS TSPGENCO THERMAL-COAL 329086 35400
KOTHAGUDEM THERMAL POWER STATION (KTPS-V) TSPGENCO THERMAL-COAL 253031 28700
KOTHAGUDEM THERMAL POWER STATION (KTPS-VI) TSPGENCO THERMAL-COAL 307391 48900
RAMAGUNDEM THERMAL POWER STATION B TSPGENCO THERMAL-COAL 10303 53500
KAKATHIYA TPP (KTPP) TSPGENCO THERMAL-COAL 319482 40500
SRISAILAM LEBT BANK HES(SLBHES) yen TSPGENCO HYDRO-HYDRO 172355
NAGARJUNASAGAR yen TSPGENCO HYDRO-HYDRO 105284
PRIYADARSHINI JURALA yen TSPGENCO HYDRO-HYDRO 22133
POCHAMPAD yen TSPGENCO HYDRO-HYDRO 617
SINGUR yen TSPGENCO HYDRO-HYDRO 335
NIZAMSAGAR yen TSPGENCO HYDRO-HYDRO 422
PEDDAPALLI MINI HYDELS yen TSPGENCO HYDRO-HYDRO 003
PALAIR MINI HYDRO yen TSPGENCO HYDRO-HYDRO 080
BELLARY TPS KPCL THERMAL-COAL 542900 40236
RAICHUR TPS KPCL THERMAL-COAL 998303 38406
ALMATTI DPH HPS KPCL HYDRO-HYDRO 46891 15107
BHADRA HPS KPCL HYDRO-HYDRO 4885 30121
GERUSUPPA HPS KPCL HYDRO-HYDRO 53988 16900
GHAT PRABHA HPS KPCL HYDRO-HYDRO 6411 15445
MGHE JOGFALLS HPS KPCL HYDRO-HYDRO 33692 4407
KADRA HPS KPCL HYDRO-HYDRO 39182 23066
NAGJHARI KPCL HYDRO-HYDRO 317678 4514
SUPA HPS KPCL HYDRO-HYDRO 44403 4514
KODASALLI HPS KPCL HYDRO-HYDRO 37418 17220
LIGANAMAKKI HPS KPCL HYDRO-HYDRO 24955 2769
MUNIRABAD HPS KPCL HYDRO-HYDRO 10434 5356
SHARAVATHY HPS KPCL HYDRO-HYDRO 514747 2769
SIVASAMUNDRUM HPS KPCL HYDRO-HYDRO 21714 8470
VARAHI (UG) HPS KPCL HYDRO-HYDRO 110152 11343
MANI DAM POWER HOUSE KPCL HYDRO-HYDRO 2752 7734
SHIMSHAPURA KPCL HYDRO-HYDRO 8324 8470
IDAMALAYAR HPS KSEB HYDRO-HYDRO 37257 52800
IDUKKI HPS KSEB HYDRO-HYDRO 249200 52800
KAKKAD HPS KSEB HYDRO-HYDRO 19293 52800
KALLADA HPS KSEB HYDRO-HYDRO 6899 52800
KUTTIADI + KES+ KAES KSEB HYDRO-HYDRO 73832 52800
KUTTIADI TAIL RACE KSEB HYDRO-HYDRO 792 52800
LOWER PERIYAR HPS KSEB HYDRO-HYDRO 57750 52800
MALANKARA HPS KSEB HYDRO-HYDRO 3415 52800
MADUPETTY KSEB HYDRO-HYDRO 357 52800
MALAMPUZHA KSEB HYDRO-HYDRO 519 52800
CHEMBUKADAVU ST I amp II KSEB HYDRO-HYDRO 1095 52800
URUMI ST I amp II KSEB HYDRO-HYDRO 1298 52800
LOWER MEENMUTTY KSEB HYDRO-HYDRO 474 52800
NERIAMANGLAM amp NES KSEB HYDRO-HYDRO 34630 52800
PALLIVASAL HPS KSEB HYDRO-HYDRO 21169 52800
PANNIAR HPS KSEB HYDRO-HYDRO 15495 52800
PORINGALKUTHU KSEB HYDRO-HYDRO 15103 52800
PORINGALKUTHU LBE KSEB HYDRO-HYDRO 10745 52800
PEPPARA KSEB HYDRO-HYDRO 513 52800
38
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
POOZHITHODE KSEB HYDRO-HYDRO 1133 52800
PEECHI KSEB HYDRO-HYDRO 192 52800
RANI-PERUNADU KSEB HYDRO-HYDRO 735 52800
SABARIGIRI HPS KSEB HYDRO-HYDRO 122484 52800
SENGULAM HPS KSEB HYDRO-HYDRO 15135 52800
SHOLAYAR HPS KSEB HYDRO-HYDRO 23793 52800
VILANGAD KSEB HYDRO-HYDRO 045 52800
BRAHMAPURAM DG(BDPP) KSEB THERMAL-DIESEL 853 52800
KOZHIKODE DG (KDPP) KSEB THERMAL-DIESEL 19927 52800
MINICOY Ω LAKSHADEEP THERMAL-DIESEL 760
KAVARATTI Ω LAKSHADEEP THERMAL-DIESEL 1022
AMINI Ω LAKSHADEEP THERMAL-DIESEL 483
ANDROTT Ω LAKSHADEEP THERMAL-DIESEL 699
KALPENI Ω LAKSHADEEP THERMAL-DIESEL 342
AGATTI Ω LAKSHADEEP THERMAL-DIESEL 550
KADMAT Ω LAKSHADEEP THERMAL-DIESEL 410
KILTAN Ω LAKSHADEEP THERMAL-DIESEL 262
CHETLET Ω LAKSHADEEP THERMAL-DIESEL 151
BITRA Ω LAKSHADEEP THERMAL-DIESEL 023
BANGARAM Ω LAKSHADEEP THERMAL-DIESEL 006
KARAIKAL CCGPP PUDDUCHERRY PCL THERMAL-GAS 9504 41700
ENNORE (ETPS) TN GEN amp DIS CORP LTD THERMAL-COAL 48514 52312
METTUR (MTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 569740 52312
METTUR (MTPS-II) TN GEN amp DIS CORP LTD THERMAL-COAL 280237 52312
NORTH CHENNAI (NCTPS-I) TN GEN amp DIS CORP LTD THERMAL-COAL 386443 52312
NORTH CHENNAI (NCTPS -II) TN GEN amp DIS CORP LTD THERMAL-COAL 518708 52312
TUTICORIN (TTPS) TN GEN amp DIS CORP LTD THERMAL-COAL 704333 52312
KOVILKALAPPAL TN GEN amp DIS CORP LTD THERMAL-GAS 37268 52312
VALUTHUR TN GEN amp DIS CORP LTD THERMAL-GAS 101307 52312
KUTTALAM TN GEN amp DIS CORP LTD THERMAL-GAS 45255 52312
PYKARA TN GEN amp DIS CORP LTD HYDRO-HYDRO 3845 52312
PYKARA MINI MICRO TN GEN amp DIS CORP LTD HYDRO-HYDRO 723 52312
MOYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 14419 52312
MARAVAKANDY TN GEN amp DIS CORP LTD HYDRO-HYDRO 054 52312
KUNDAH-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 25729 52312
KUNDAH-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 65290 52312
KUNDAH-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 38815 52312
KUNDAH-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 15661 52312
KUNDAH-V TN GEN amp DIS CORP LTD HYDRO-HYDRO 9321 52312
KUNDAH-VI (PARSON VALLEY) TN GEN amp DIS CORP LTD HYDRO-HYDRO 3466 52312
METTUR DAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 10674 52312
METTUR TUNNEL TN GEN amp DIS CORP LTD HYDRO-HYDRO 33519 52312
BARRIAGE-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 6826 52312
BARRIAGE-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6949 52312
BARRIAGE-III TN GEN amp DIS CORP LTD HYDRO-HYDRO 6929 52312
BARRIAGE-IV TN GEN amp DIS CORP LTD HYDRO-HYDRO 5591 52312
BHAVANI SAGAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3140 52312
POONACHI TN GEN amp DIS CORP LTD HYDRO-HYDRO 323 52312
SATHANOOR TN GEN amp DIS CORP LTD HYDRO-HYDRO 099 52312
MUKURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 183 52312
THIRUMURTHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 172 52312
PERIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 51572 52312
VAIGAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 3266 52312
SURULIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 10292 52312
PAPANASAM TN GEN amp DIS CORP LTD HYDRO-HYDRO 11737 52312
SERVALAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 3854 52312
SARKARPATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 13414 52312
ALIYAR TN GEN amp DIS CORP LTD HYDRO-HYDRO 15384 52312
KADAMPARAI TN GEN amp DIS CORP LTD HYDRO-HYDRO 49913 52312
SHOLAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 19597 52312
SHOLAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6485 52312
39
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
KODAYAR-I TN GEN amp DIS CORP LTD HYDRO-HYDRO 13560 52312
KODAYAR-II TN GEN amp DIS CORP LTD HYDRO-HYDRO 6568 52312
ALIYAR MINI TN GEN amp DIS CORP LTD HYDRO-HYDRO 623 52312
PYKARA ULTIMATE TN GEN amp DIS CORP LTD HYDRO-HYDRO 36583 52312
AMARAVATHY TN GEN amp DIS CORP LTD HYDRO-HYDRO 610 52312
BHAVANI RBC TN GEN amp DIS CORP LTD HYDRO-HYDRO 1890 52312
BHAVANI KATTALAI (BKB) TN GEN amp DIS CORP LTD HYDRO-HYDRO 19349 52312
PRIVATE SECTOR
LANCO TANJORE POWER COMPANY LTD LANCO TANJORE PCL THERMAL-GAS 56035 36989
BSES KERALA POWER LTD BSES KERALA THERMAL-N 14556 128458
GMR BARGE MOUNTED CCP PLANT GMR ENERGY GMR BMCC POWER PLANT THERMAL-GAS 000
JEGURUPADU CCPP PH-I GVK INDUSTRIS LIMITED THERMAL-GAS 57312 50700
SBU 1 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 207400 49700
SBU 2 JSW ENERGY LTD VIJAYANAGAR JSW ENERGY LTD THERMAL-IMP COAL 473500 50900
LANCO KONDAPALLI POWER LTD PH-I LANCO KONDAPALLI POWER LTD THERMAL-GASN 55900
SIMHAPURI ENERGY LTD PH-I SIMHAPURI ENERGY LTD THERMAL-COAL 287800 53400
MADURAI POWER MADURAI POWER CORP THERMAL-LSHS 24363 137200
PPN POWER PPN POWER POWER THERMAL-GAS 117100
SAMALPATTI POWER PLANT SAMALPATTI PCPL THERMAL-LSHS 22996
UDUPI POWER CORPORATION LTD UDUPI POWER CORPN LTD THERMAL-COAL 602100 46800
SPECTRUM POWER GENERATION LTD SPECTRUM PG LTD THERMAL-GASN 52670 60500
TAQA NEYVELI POWER COM PVT LTD TAQA NEYVELI THERMAL-LIG 166000 44100
VALLUR THERMAL POWER PLANT NTECL THERMAL-COAL 534061 44355
GMR VEMAGIRI POWER GENERATION LTD GMR VEMAGIRI PGL THERMAL-GAS 000
EASTERN REGION
CENTRAL SECTOR
MTPS STAGE - I KANTI BIJLEE UTPADAN N LTD THERMAL-COAL 76625 56180
BOKARO `B` TPS DVC THERMAL-COAL 143887
CHANDRAPURA(DVC) TPS DVC THERMAL-COAL 448806
DURGAPUR TPS DVC THERMAL-COAL 115376
DURGAPUR STEEL TPS DVC THERMAL-COAL 363340
MEJIA TPS DVC THERMAL-COAL 1063279
KODERMA TPS DVC THERMAL-COAL 167999
MAITHON HPS DVC HYDRO-HYDRO 13688
PANCHET HPS DVC HYDRO-HYDRO 12794
TILLAYA HPS DVC HYDRO-HYDRO 946
RANGIT HPS NHPC LTD HYDRO-HYDRO 32800 29040
TEESTA V HPS NHPC LTD HYDRO-HYDRO 258700 23380
TLDP -III NHPC LTD HYDRO-HYDRO 39400 61940
FARAKKA STPS I amp II NTPC LTD THERMAL-COAL 947600 37400
FARAKKA STPS III NTPC LTD THERMAL-COAL 299100 45700
KAHALGAON TPS I NTPC LTD THERMAL-COAL 542200 35200
KAHALGAON TPS II NTPC LTD THERMAL-COAL 904900 36000
BARH-II NTPC LTD THERMAL-COAL 123400 56400
TALCHER TPS NTPC LTD THERMAL-COAL 338200 24600
TALCHER KANIHA I NTPC LTD THERMAL-COAL 692900 22600
TALCHER KANIHA II NTPC LTD THERMAL-COAL 1528600 22400
STATE SECTOR
ECG HEP V Nagar BIHAR STATE HEPCL HYDRO-HYDRO 1152 24900
SONE EAST CANAL HPS Barun BIHAR STATE HEPCL HYDRO-HYDRO 242 24900
SONE WEST CANAL HPS Dehri BIHAR STATE HEPCL HYDRO-HYDRO 953 24900
KATAIYA BIHAR STATE HEPCL HYDRO-HYDRO 709 24900
PATRATU TPS JHARKHAND UUNL THERMAL-COAL 65940 56587
SIKIDIRI Ω HYDEL(SUBERNREKHA) JHARKHAND BVNL HYDRO-HYDRO 3371 64560
BALIMELA HPS ODISHA HPCL HYDRO-HYDRO 124093 8822
HIRAKUD HEP ODISHA HPCL HYDRO-HYDRO 56449 12764
40
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)
CHIPLIMA HEP ODISHA HPCL HYDRO-HYDRO 27711 4807
RENGALI HPS ODISHA HPCL HYDRO-HYDRO 71010 10809
UPPER INDRAVATI HPS ODISHA HPCL HYDRO-HYDRO 259723 8042
UPPER KOLAB HPS ODISHA HPCL HYDRO-HYDRO 70270 4984
IB VALLEY TPS ODISHA PGCL THERMAL-COAL 249855 21152
J P H Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 099 34100
RIMBI - I Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 003 34100
MEYONGCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 440 34100
RIMBI - II Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 001 34100
KALEZ Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 059 34100
RABOMCHU Ω
GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 074 34100
D P H (GANGTOK DG) Ω
GOVT OF SIKKIM EPDEPTT THERMAL-DIESEL 005 34100
TENUGHAT THERMAL POWER STATION TENUGHAT VIDYUT NIGAM LTD THERMAL-COAL 211042 32959
DURGAPUR PROJECTS LIMITED DPL THERMAL-COAL 140872 47296
KOLAGHAT THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 719913 30905
BAKRESHWAR THERMAL POWER PLANT WEST BENGAL PDCL THERMAL-COAL 801105 31786
BANDEL THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 109472 32617
SANTHALDIH THERMAL POWER STATION WEST BENGAL PDCL THERMAL-COAL 344420 35196
SAGARDIGHI THERMAL POWER PROJECT WEST BENGAL PDCL THERMAL-COAL 410429 32155
JALDHAKA H E P WEST BENGAL SEDCL HYDRO-HYDRO 10830
RAMAM H E P WEST BENGAL SEDCL HYDRO-HYDRO 23640
TEESTA CANAL FALLS WEST BENGAL SEDCL HYDRO-HYDRO 14051
PURULIA PUMPED STORAGE PROJECT WEST BENGAL SEDCL HYDRO-HYDRO 139133
MINI MICRO WEST BENGAL SEDCL HYDRO-HYDRO 2376
PRIVATE SECTOR
LACHUNG HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 375 30000
MANGLAY HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 384 30000
RONGLI HEP GOVT OF SIKKIM EPDEPTT HYDRO-HYDRO 509 40000
CHUZACHEN HEP GATI INFRA PVT LTD HYDRO-HYDRO 42437 37399
CALCUTTA ELECTRIC SCL CALCUTTA ELECTRIC SCL THERMAL-COAL 787400 69700
DISHERGARH POWER STATION INDIA POWER CORPN THERMAL-COAL 3442 58900
ADHUNIK POWER amp NATURAL RESOURCES LTD ADHUNIK POWER amp NATURAL
RESOURCES LTD THERMAL-COAL 221239 49200
HIRAKUD POWER HINDALCO IND LTD THERMAL-COAL 289404 27500
JOJOBERA UNIT 1 TATA POWER COM LTD THERMAL-COAL 39300 48000
JOJOBERA UNIT 2 TATA POWER COM LTD THERMAL-COAL 75700 38100
JOJOBERA UNIT 3 TATA POWER COM LTD THERMAL-COAL 78200 38600
JOJOBERA UNIT 4 TATA POWER COM LTD THERMAL-COAL 76100 38800
MAITHON UNIT 1 TATA POWER COM LTD THERMAL-COAL 631200 33500
MAITHON UNIT 2 TATA POWER COM LTD THERMAL-COAL 320500 37600
HALDIA UNIT 1 TATA POWER COM LTD THERMAL-WHR 30800 28200
HALDIA UNIT 2 TATA POWER COM LTD THERMAL-WHR 29100 28200
HALDIA UNIT 3 TATA POWER COM LTD THERMAL-WHR 22300 28200
NORTH EASTERN REGION
CENTRAL SECTOR
LOKTAK HPS NHPC LTD HYDRO-HYDRO 37200 32700
AGARTALA GT NEEPCO THERMAL-GAS 62870 41540
ASSAM GAS BASED P PRO NEEPCO THERMAL-GAS 174108 37440
DOYANG HPS NEEPCO HYDRO-HYDRO 16527 46690
KOPILI + KOPILI II +KHANDONG NEEPCO HYDRO-HYDRO 71733 12020
RANGANADI HPS NEEPCO HYDRO-HYDRO 110951 29100
STATE SECTOR
KARBI LANGPI HPS ASSAM POWER GENCO HYDRO-HYDRO 36515 15318
LAKWA TPS ASSAM POWER GENCO THERMAL-GAS 85530 39669
NAMRUP TPS ASSAM POWER GENCO THERMAL-GAS 55760 39569
LIKIMRO HEP GOVT OF NAGALAND HYDRO-HYDRO 10400 44800
UMIAM ST I MEGHALAYA ENE COR LTD HYDRO-HYDRO 9040 11600
UMIAM ST II MEGHALAYA ENE COR LTD HYDRO-HYDRO 4600 16400
UMIAM ST III MEGHALAYA ENE COR LTD HYDRO-HYDRO 11310 16200
UMIAM ST IV MEGHALAYA ENE COR LTD HYDRO-HYDRO 16264 10800
UMTRU MEGHALAYA ENE COR LTD HYDRO-HYDRO 1526 10800
SONAPANI MEGHALAYA ENE COR LTD HYDRO-HYDRO 575 13600
MLHEP MEGHALAYA ENE COR LTD HYDRO-HYDRO 42999 28300
SERLUI-A MIZORAM POWER ELECT HYDRO-HYDRO 002 37700
KHAWIVA MIZORAM POWER ELECT HYDRO-HYDRO 102 37700
TUIPUI MIZORAM POWER ELECT HYDRO-HYDRO 054 37700
MAICHARM -I MIZORAM POWER ELECT HYDRO-HYDRO 307 37700
TEIREI MIZORAM POWER ELECT HYDRO-HYDRO 009 37700
KAU TLABUNG MIZORAM POWER ELECT HYDRO-HYDRO 269 37700
SERLUI -B MIZORAM POWER ELECT HYDRO-HYDRO 2628 37700
LENGPUI DG SET(AIRPORT) MIZORAM POWER ELECT THERMAL-DIESEL 002 37700
BARAMURA GT TRIPURA SECL THERMAL-GAS 30312 52784
ROKHIA GT TRIPURA SECL THERMAL-GAS 41623 52784
GUMTI HPS TRIPURA SECL HYDRO-HYDRO 3011 52784
Note
ColouredFaint Data for 2014-15 not yet received
Punjab State Power Corporation Ltd not given Rate of Sale of Power hence Rate of Sale of Power taken from 2013-14 data
WBSED Ltd not given Rate of Sale of Power for the year 2014-15
₭ RenusagarPower Division Total Energy is supplied to Hindalco dedicated transmission lines therefore Rate of Sale of power not given
yen TSPGENCO Unit Cost of Generation amp Fixed Charges are not applicable due to low generation than targeted
41
LIG Lignite MMH Mini Micro Hydel N Naptha Not given by concerned utility WHR Waste Heat Recovery amp WR Washery Rejects
Ω COD = ROSP(Concerned Utilities not given ROSOP)