Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications...

Post on 18-Jan-2018

224 views 0 download

description

Federal Aviation Administration DTAP Build 7.2 Schedule Update Build 7.2 Full Climb Via SID Compliance: -Compliance with full CVS Changes -CVS, CVS Except Maintain, Maintain ALT Selections -Longer WJHTC lab testing period expected due to CVS scale Build 7.2 Estimated Schedule: -June 11-12:B7.2 FAT at Thales -June 13:Install at FAATC -June 16 - July 3:Testing at FAATC -July 7-10:Install and SAT at MEM and EWR (Parallel installs)

Transcript of Federal Aviation Administration Data Communications Implementation Team (DCIT) Data Communications...

Federal AviationAdministrationData Communications

Implementation Team (DCIT)

Data CommunicationsImplementation Team (DCIT)

DCIT #31 PLENARYDCL Trials Update3/13/2014

Matt MakiDCL Trials Lead

Federal AviationAdministration

DTAP Build 7.1 Schedule Update• Build 7.1 Limited Climb Via SID Compliance:

- Interim Build with KEWR focus- UM169 CVS UL when MAINT ALT Set to NONE- National 7110.65 CVS ATC Implementation set for April 3- Trials will seek EWR/MEM CVS DTAP waiver thru May 15- EWR ATC FAT Input Planned

• Build 7.1 Estimated Schedule:- April 14-15: FAT at Thales- April 16: Install at FAATC- April 17-25: Testing at FAATC- April 28 - May1: Install and SAT at MEM and EWR (Parallel

installs)

Federal AviationAdministration

DTAP Build 7.2 Schedule Update

• Build 7.2 Full Climb Via SID Compliance:- Compliance with full 7110.65 CVS Changes- CVS, CVS Except Maintain, Maintain ALT Selections- Longer WJHTC lab testing period expected due to CVS scale

• Build 7.2 Estimated Schedule:- June 11-12: B7.2 FAT at Thales- June 13: Install at FAATC- June 16 - July 3: Testing at FAATC- July 7-10: Install and SAT at MEM and EWR (Parallel

installs)

Federal AviationAdministration

KEWR DCL Trials Status Update

• UAL, FDX MD11/B777 Daily Ops Ongoing:- Open OPR reports diminishing- UAL FRC DCL Filing Error Reductions- Resuming of UAL B767 ops expected next month+

• UPS Starts Daily MD11/B767 Ops March 15:- Approx. 24 Ops/week expected

• AFS-50/400/2P Approval letter to UK CAA pending:- BAW, SAS, DLH CAA Approval letters back to FAA pending- BAW approval expected first

Federal AviationAdministration

KEWR DCL Trials Status Update

• NetJets Trials Participation at KEWR:- NetJets confirmed interest in participating- Kick off Telcon set for March 19 with AOC and Pilot Reps- Bombardier Global Express 5000/6000 aircraft FANS equipped- Bombardier Challenger 350 FANS/VDL2 upgrades expected in

July- 1-2 DCL flights/week from KEWR expected

• March 1-4 ZNY 72 HR ERAM Testing Complete:- Test was successful- Next 72 HR ERAM run expected April 5-8

Federal AviationAdministration

Federal AviationAdministration

KMEM DCL Trials Update• DTAP Running Stable:

- Unplanned Recons minimized – 1 event since last DCIT- Server 1, 2 Re-starts On-going (Tues/Fri)- DTAP Processing 20-40 FDX DCL ops per push- Route Revisions remain minimal/none in #s

• MEM ATC confirms use of CVS phraseology:- Planned CVS waiver will include MEM