Post on 13-Apr-2017
www.paawan-energy.com
PAAWAN ENERGY
MNRE, NSIC & MSME CHANNEL PARTNER
FEASIBILITY STUDIES PROCUREMENT & SUPPLY
SITE SURVEY & RESEARCH LEGAL ASSURANCE
VENDOR SELECTION ENGINEERING, PROCUREMENT & CONSTRUCTION
www.paawan-energy.com
EPC SERVICES-SOLAR PV PROJECTS Our engineering, procurement, and construction (EPC) team provides bankable, innovative, and
reliable solar energy solutions to customers around the world. Offering “turnkey” working systems
due to the set structures Paawan has in place, we are able to provide a complete spectrum of
services for projects from viability studies to commissioning.
Paawan is capable of managing a project through financing, engineering, procurement, construction
and beyond, Paawan’s team of experienced experts can provide:
• Viability Studies
• Financing
• Permitting
• Project Development
• Engineering
• Construction
EPC BENEFITS
Security: Ensure performance security to protect the interests of investors
Experience: In-depth experience in typical and complex installations
Bankability: Provide a bankability contract to our project company satisfying lender
requirements
www.paawan-energy.com
EXECUTION SERVICES
Drawings & Documents
Civil work
DC Electrical work (Pre-Inverter)
AC Electrical work (post-Inverter)
Drawings & Documents Layout, SLD etc.
Civil Work
Land Development
Access roads
To facilitate Drainage system
Access module mounting structure
To construct PCU room
DC Electrical Work (Pre-Inverter)
Plot Plan Layout
Module Interconnection by series and parallel combination
String combiner boxes
Cable sizing
Supply to Inverter
SCADA System
AC Electrical Work (Post-Inverter)
Transformer rating LT
and HT Panels
Conductor sizing
www.paawan-energy.com
ADVISORY & CONSULTANCY SERVICES
To provide expertise for business development through Govt. policies, schemes,
incentives etc.
Site survey & Research
Feasibility study
System Design & Engineering
To prepare BOQ, Quotation, Proposals etc
To prepare Layout, SLD & Engineering drawings
Drawings-PV Array, PCU, Switch yard, Civil, Mechanical, structural
Get approval from authority & SERC for design
To facilitate Bid Management/PPAs based projects
To deliver the Detailed Project Report & Pre-feasibility Report
To suggest competitive vendors as per requirement
Framework for planning & strategy for Erection & commissioning
www.paawan-energy.com
PAAWAN TEAM
Mr. Asgar Ali
Head-I&C; Experience: 30Years
Qualification: B.E (EC)
Implemented approx. 50MW solar projects
Expertise in Project Management, Erection & commissioning, Installation, Operation & Maintenance
Mr. Jitendra Pathak (Sr. Project Manager)
Experience: 6Years
Qualification: B.tech (Electrical Engineering)
Implemented approx. 20MW solar projects
Expertise in Erection & commissioning, O&M
Mr. Chetan Kumar (Sr. Project Manager)
Experience: 6Years
Qualification: PGD (Renewables-MGICC);
B.tech (Mechanical Engg)
Implemented approx. 10MW solar projects
Expertise in Design & Engineering, Consultancy, Erection & commissioning, O&M, Training
Mr. Akshay Deep (Project Engineer)
Experience: 5Years
Qualification: M.tech (Renewable-TERI);
B.tech (Mechanical Engg)
Implemented approx. 10MW solar projects
Expertise in Design & Engineering, Project Management, Procurement, Installation & commissioning
Mr. Harvendra kumar (Project Engineer)
Experience: 5Years
Qualification: B.tech (EC-UPTU)
Implemented approx. 10MW solar projects
Expertise in Project Management, Installation & commissioning
Mr. Raj Bahadur (Technician)
Experience: 10years
Qualification: ITI
Implemented approx. 20MW solar projects
Expertise in Installation & commissioning
www.paawan-energy.com
Mr. Rajesh kumar (Technician)
Experience: 10years
Qualification: ITI
Implemented approx. 20MW solar projects
Expertise in Installation & commissioning
Mr. Omveer Singh (Supervisor & Technician)
Experience: 8years
Qualification: ITI
Implemented approx. 10MW solar projects
Expertise in Installation & commissioning
Mr. Ravi Yadav (Technician)
Experience: 5years
Qualification: ITI
Implemented approx. 10MW solar projects
Expertise in Installation & commissioning
Mr. Indresh Kumar (Site Engineer)
Experience: 3years
Qualification: B.tech (EC-UPTU)
Implemented approx. 5MW solar projects
Expertise in Installation & commissioning, O&M
Mr. Surjeet Kumar (Site Engineer)
Experience: 3years
Qualification: B.tech (EC-UPTU)
Implemented approx. 5MW solar projects
Expertise in Installation & commissioning, O&M
Mr. Rahul Yadav (Site Engineer)
Experience: 3years
Qualification: B.tech (EE-UPTU)
Implemented approx. 5MW solar projects
Expertise in Installation & commissioning, O&M
www.paawan-energy.com
Details of the Projects-EPC/Installation & commissioning
S.No. Name of the
client/customer
Project Description Total Capacity
1. The Energy Resource
Institute (TERI), IHC, New
Delhi
Setting up of Solar Micro grid Project
under LaBL Programme
10kWp
2. Gyandeep sr. sec school
shikohabad
Setting up solar power project of 5kWp;
Module-5kWp; Inverter-192V 10kVA,
Battery-12V 150Ah * 16nos.
5kWp
3. M/s Unify Disposable, Delhi Setting up of solar power plant-1kWp;
Module-250Wp * 4nos; Inverter-1kVA;
Battery-2nos. -12V 150Ah
1kWp
4. M/s Su-Kam Power Systems
Ltd, New delhi
50 kWp (3 No`s) SPV power Plant at IANA
Assam Riffles Camp and Shivalic Public
School 100 kWp (5 No`s) SPV Power Plant
at ASEB Ghuwati and Assam Riffles
102 kWp Spv power plant at Su Kam
Office
252kWp
5. M/s Larsen & Toubro Ltd
95 kWp SPV Power Plant at CSTI Pilkua Hapur Uttar Pradesh 125 kWP roof top project CM house PATNA Bihar
5 MWp SPV Power Plant at Village
Ghator Phalodi District Jodhpur Rajasthan
3.18 MWp SPV Power Plant at site
Village Dhurser Pokhran District. Jaislmer
Rajasthan
Roof-top-220kW
Grid-connected
capacity: 8.18MW
6. Reliance Industries Ltd.
1MW Solar Power Plant for the first time in India in solar lighting section in March 2010 at Kidwai Nagar Thayag Raj Stadium for Common Wealth Games 2010 New Delhi.
Roof top Grid-
connected-1MW
7. Lanco Solar Energy Pvt Ltd- 120 Kwp SPV Power Plant at National Institute of solar energy, Gurgoan
Roof top Off-grid-
www.paawan-energy.com
120kW
8. Punjl loyd Pvt Ltd, New
delhi
50kWP SPV Power Plant at site PAU Ludhiana.
Roof top off-grid-
50kW
9. Ritika Systems Pvt Ltd,
Noida
30 No`s of 2.8 kWp SPV power plant at site Various District in Haryana and 5X10 Kwp SPV Power Plant at Site Tiloniya Rajasthan
Roof top off-grid
134kWp
10. M/s Tata B P Solar India
Ltd, New delhi
67.2kWP solar power plant in .Ian.2008 at NBCC plaza site Saket, New Delhi
Roof top off-grid
67.2kWp
11. M/s Vikram Solar Pvt Ltd,
Kolkata
I&C-2MW (Grid-connected); DC & AC Electrical work at Baap, Rajasthan
Grid-connected
capacity: 2MW
EXECUTION PLAN-Engineering, Procurement & Construction
Solar Project Execution Plan Activity Expected Time Period
Project Zero date 1 week
Land rights and free access to land
Allocation of PV Modules and tie-up with OEM
Allocation of inverters and tie-up with OEM
In-principle fund tie-up
NoC from Village panchyat and application for land conversion
Land demarkation
Soil investigation and soil test report
Pre-execution activity 1 week
Land contour survey
Boundary demarkation with Govt surveyor
Layout drawing with area grading & drainage
Application to Getco for connectivity and finalise their s/s
www.paawan-energy.com
Creation of open store area for module Finalisation of module mounting structure design for MB modules
Finalisation of painting / GI for mounting structure
Procurement of Components 2-3weeks
Civil Contractor Finalization
Mounting structural for modules
AC package
DC cables
Connectors
Fastners / hardwares for mounting structure
SCB
Installers
SCADA
Earthing and lighting protection of PV yard
Illumination package
Engineering 2-3weeks (Execute parallel with Procurement)
Approval of Layout
Foundation design for module mounting structure
Fianlisation of 33/66 kV S/S, main control room along with DISCOM
Approval of SLD / Plan - section of 66 kV s/s
Foundation plan & design of 66 kV S/S
Approval of SY. MOM for Structure, Inverter & transformer
Foundation design of structure, inverter & transformer
Mounting structure design approval
DC Engg fianlisation
Finalisation of internal roads, drains, fencing, crossings etc
Freezing of engg (supply code) for inverters
www.paawan-energy.com
Approval of engg drawing for Switchgear/cable/C&R panel/CT/PT/LA/Breaker
Supply of equipments at site 2-3weeks
Mounting structure
PV modules
Inverters
Transformers
Switchgear/C&R panel/CT/PT/LA/Breaker
DC cables
Connectors
Fastners / hardwares for mounting structure
SCB
SCADA
Switch yard structures
Civil / Construction 2week
Mobilisation of civil contractor at site
Fencing
Release of civil foundation drawings for
Internal roads, drains
66 kV s/s design drawing
HT control room
LT control room
Transformers
Foundation of PV modules
HT control room (one no)
LT control room
S/S equipment and tower, cable trench
www.paawan-energy.com
Transformer
Internal roads, drains
Erection of DC system 4-5weeks
Mobilisation of installers at site
Module structure
Module erection
Laying / termination of DC cable
Erection of inverters/VCB/LT panel
Testing of arrays
Erection of AC system 4weeks
Mobilisation of AC package contractor at site
Switch Yard structures
Switch Yard Equipment
Transformer
HT board
C&R panel
Testing of Electrical system 4-5days
Availability of DISCOM line 10-12days
Approval of CEI/DISCOM 1-2week
Charging of 33/66 kVA substation 1-2days
Charging of 11 kVA Switchboard 1-2days
Charging of inverter & Transformer 1-2days
Testing/commissioning of inverters 1-2days
Power injection into grid 1-2days
CoD (Commercial operation Date) 1day
Submission of as-built drawing 2days
Handover with identified punch points 2days
www.paawan-energy.com
EPC COSTING
S. No. Capacity Range Amount INR
(Crore/MW) 01 1-10MW 6crore
02 10-50W 5.5crore
Power Purchase Agreement-Solar Projects