December 2016

Presentation Slides

December 2016

Justin J Kringstad Geological Engineer

Director

North Dakota Pipeline Authority

Presentation Outline

• Understanding current and future oil production

– Activity

– Drilling economics

– Forecasts

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– Natural Gas Liquids

JJ Kringstad - North Dakota Pipeline Authority 2

North Dakota Drilling Activity

3 JJ Kringstad - North Dakota Pipeline Authority 3

Initial Production (IP) Year – 2016 YTD Non-Confidential

JJ Kringstad - North Dakota Pipeline Authority 4

Bakken IP Rates

Average BKN/TF Well Performance in Williams, McKenzie, Dunn, & Mountrail Counties (Minimum 1 bopd)

JJ Kringstad - North Dakota Pipeline Authority 5

Improving Well Performance

Average BKN/TF Well Performance in Williams, McKenzie, Dunn, & Mountrail Counties (Minimum 1 bopd)

JJ Kringstad - North Dakota Pipeline Authority 6

Improving Well Performance

A Quick Look at Bakken

Drilling Economics…

JJ Kringstad - North Dakota Pipeline Authority 7

North Dakota Oil Differential

8

8 8 JJ Kringstad - North Dakota Pipeline Authority

Based on EIA Data

Key Economic Assumptions

• $6-$8 Million Well Costs

• $45/BBL & $2.00/MCF Wellhead Pricing

• 1/6 Royalty

• Zero Flaring

• Assumed 10-20% IRR to drill (calculated after

production taxes and royalties)

• No Tax Incentives Included

• Production rate is 30-day average

• All Bakken/Three Forks wells drilled in 2008+

JJ Kringstad - North Dakota Pipeline Authority 9

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 10

Peak Month Minimum 400 BOPD

$45 Wellhead

6,616 Wells

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 11

Peak Month Minimum 500 BOPD

4,972 Wells

$45 Wellhead

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 12

Peak Month Minimum 600 BOPD

3,533 Wells

$45 Wellhead

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 13

Peak Month Minimum 700 BOPD

2,319 Wells

$45 Wellhead

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 14

Peak Month Minimum 800 BOPD

1,500 Wells

$45 Wellhead

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 15

Peak Month Minimum 900 BOPD

930 Wells

$45 Wellhead

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 16

Peak Month Minimum 1,000 BOPD

587 Wells

$45 Wellhead

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 17

Peak Month Minimum 1,200 BOPD

250 Wells

$45 Wellhead

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 18

Peak Month Minimum 1,500 BOPD

70 Wells

$45 Wellhead

JJ Kringstad - North Dakota Pipeline Authority 19

Summary of $45 Wellhead Oil

JJ Kringstad - North Dakota Pipeline Authority 20

Breakeven Summary

Forecasting Future Activity…

JJ Kringstad - North Dakota Pipeline Authority 21

US Crude Oil Storage (Excl. SPR)

22 JJ Kringstad - North Dakota Pipeline Authority 22

US Crude Oil Storage (Excl. SPR)

23 JJ Kringstad - North Dakota Pipeline Authority 23

North Dakota Forecast Activity Assumptions

24

24 JJ Kringstad - North Dakota Pipeline Authority 24

*Non-Confidential Bakken/Three Forks Production Only

Base Production Declines*

25 JJ Kringstad - North Dakota Pipeline Authority 25

NDPA ND Oil Production Forecast

26 JJ Kringstad - North Dakota Pipeline Authority 26

NDPA ND Oil Production Forecast

27 JJ Kringstad - North Dakota Pipeline Authority 27

North Dakota Oil Production Forecast

28

28 JJ Kringstad - North Dakota Pipeline Authority 28

Production forecast is for visual demonstration purposes only and should

not be considered accurate for any near or long term planning.

Presentation Outline

• Understanding current and future oil production

– Activity

– Drilling economics

– Forecasts

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– Natural Gas Liquids

JJ Kringstad - North Dakota Pipeline Authority 29

Estimated Williston Basin Oil Transportation

30

30 JJ Kringstad - North Dakota Pipeline Authority 30

September 2016

Estimated Williston Basin Oil Transportation

31

31 JJ Kringstad - North Dakota Pipeline Authority 31

32

Estimated ND Rail Export Volumes

JJ Kringstad - North Dakota Pipeline Authority 32

Rail Destinations Market Share (Sep. 2016)

33 JJ Kringstad - North Dakota Pipeline Authority 33

Data for Rail Destination Market Share Provided by the US Energy Information Administration

34

Major Rail Lines and Refineries

34

$45.11

$42.67

$41.81

$40.22

$44.21

EIA September 2016 Refiner Acquisition Cost

JJ Kringstad - North Dakota Pipeline Authority

Cushing $53.71

Brent $56.47 WTI + $2.76

Crude Oil Prices – Dec 12, 2016

35 JJ Kringstad - North Dakota Pipeline Authority

Pricing Data: Bloomberg

Williston Basin Truck Imports and Exports with Canada

36 JJ Kringstad - North Dakota Pipeline Authority 36

Data for truck imports/exports chart is provided by the US International Trade Commission

Williston Basin Oil Production & Export Capacity, BOPD

Production forecast is for visual demonstration purposes only and should

not be considered accurate for any near or long term planning.

37 37 JJ Kringstad - North Dakota Pipeline Authority

Evolution of Oil Gathering in ND

38 JJ Kringstad - North Dakota Pipeline Authority

Evolution of Oil Gathering in ND Statewide Totals

39 JJ Kringstad - North Dakota Pipeline Authority

Estimated Loaded Oil Truckloads Per Day

April 2015 Data 220 bbls/Truck

40 JJ Kringstad - North Dakota Pipeline Authority

Presentation Outline

• Understanding current and future oil production

– Activity

– Drilling economics

– Forecasts

• Williston Basin oil transportation dynamics

– Interstate oil movements

– Intrastate oil movements

• North Dakota natural gas production

– Flaring and gas capture

– Natural Gas Liquids

JJ Kringstad - North Dakota Pipeline Authority 41

Major Gas Pipeline and

Processing Infrastructure

WBI Transmission

Whiting

42 JJ Kringstad - North Dakota Pipeline Authority

Simple Terms Blue – Lack of pipelines Orange – Challenges on existing infrastructure

GREEN – % of gas captured and sold Blue – % flared from zero sales wells Orange – % flared from wells with at least one mcf sold.

Sep 2016 Data – Non-Confidential Wells Statewide

Solving the Flaring Challenge

43 JJ Kringstad - North Dakota Pipeline Authority

44 JJ Kringstad - North Dakota Pipeline Authority

Solving the Flaring Challenge

Capturing the 3% Faster Well Connections

45 45 JJ Kringstad - North Dakota Pipeline Authority

46 JJ Kringstad - North Dakota Pipeline Authority

Solving the Flaring Challenge

47 JJ Kringstad - North Dakota Pipeline Authority 47

Wellhead Gas Capture – Locations

48 JJ Kringstad - North Dakota Pipeline Authority 48

Wellhead Gas Capture – Intake Volume

49 JJ Kringstad - North Dakota Pipeline Authority 49

Wellhead Gas Capture – NGL Output

50 JJ Kringstad - North Dakota Pipeline Authority 50

Wellhead & Plant Gas Capture

51 JJ Kringstad - North Dakota Pipeline Authority 51

Wellhead & Plant Gas Capture

52 52 JJ Kringstad - North Dakota Pipeline Authority

Plant Natural Gas Liquids - (Aug. 2016)

NDPA ND Gas Production Forecast

53 JJ Kringstad - North Dakota Pipeline Authority 53

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: jjkringstad@ndpipelines.com

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

54 JJ Kringstad - North Dakota Pipeline Authority