David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all...

Post on 11-Jun-2020

4 views 1 download

Transcript of David Philp BIM Task Group Industry Feedback Head of BIM Events... · Collaborative 3D BIM with all...

H.M. Government’s whole sector approach to implementation of digital, collaborative working

David PhilpBIM Task GroupHead of BIM

Open BIM / COBie Field TrailsIndustry Feedback

2

Construction Sector:a time of change

"Tempori Parendum"- Be prepared for your time

BIM, Procurement through computer readable data

Drop 2BLooking good!

Level 2 training industry towards good quality consistent data transactions

Built Environment enters aDigital Revolution

Government strategyCollaborative 3D BIM with all project and asset information, documentation and data being electronic

By 2016 a staged plan will be published with mandated milestones showing measurable progress at the end of each year.

Keep it simple; our hypothesis is:BIMGovernment as a client can derive significant improvements in cost, value and carbon performance through the use of open sharable asset information

What is COBie

“a common language”

9 | WWW.BENTLEY.COM

What is COBie?

Information Exchange to facilitate Digital transactions

10

COBie UK 2012

COBie is formal schema that helps organise information about new and existing facilities. It is general enough that it can be used to document both Buildings and Infrastructure assets. It is simple enough that it can be transmitted using a spread-sheet. It is means of sharing structured information

Purpose

COBie

PIM to AIM

13 | WWW.BENTLEY.COM

Data Procurement

Right amount of information at the right time

AIM (COBie is key)

Allows data transactions at all tiersWith simplicity!

BIM does not = correct information

16 | WWW.BENTLEY.COM

Answer ‘English Questions’

PAS 1192:2 – Data Tranactions

This is how we currentlypopulate the

CAFM systems

To help automate the process between Capex and Opex

Where's that Maintenance

manualfor the hand drier

And the page you want is probably

missing anyway

Better asset management

InteroperabilityLots of ways for the supply chain

to get there.One format many

routes

IFC

Manual input

Export tools

ProprietarySoftware

COBie: Reusability, Many client Use cases!

Data Hierarchy / Use Cases

StrategicSummary HMT

Portfolio Planning Depts

Asset Asset / Portfolio Depts

Full Atomic Detail

Asset & Systems Operations

Level of Detail Description Consumer

COST

IFC

COBie

Data

22

A key component of Level 2 BIM maturity

Level 2: process and deliverables

What a client needs to make decisions

The purposes that the information might be used for .The information (reports etc) to inform decisions and purposes

The data

The drawing content that conveys information

Hierarchy of Information and the Work Stages

WISDOM

KNOWLEDGE

INFORMATION

DATA

25 | WWW.BENTLEY.COM

PAS 1192/2Plain Language Questions

26 | WWW.BENTLEY.COM

How are the PLQ’s linked to data?

Energy Analysis Requirements Humidity RequirementEnergy Analysis Requirements Radiant Heating RequirementEnergy Analysis Requirements Air Circulation RequirementEnergy Analysis Requirements Ventilation RequirementEnergy Analysis Requirements Temperature Range RequirementEnergy Analysis Requirements Energy Performance BasisEnergy Analysis Requirements HVAC Performance Basis

PLQ’s at Stage 02

How are the PLQ’s answered?

What is the data?

27

BIM Level 2Practically applied

28 | WWW.BENTLEY.COM

29 | WWW.BENTLEY.COM

Thank You

Have a look at our web-sitewww.bimtaskgroup.org

Follow us on Twitter @BIMgcs

Questions?