4D-CAD4D-CAD
•Linking building components with construction activities•Manual task of the construction planner•Dedicated systems: NavisWorks, 4D Suite, …•Advantages: Simulation, Visualization
www.ddss.arch.tue.nl
ChallengeChallenge
Automation of the planning process.
Advantages:
• Independency from the planner
• Quick first concept plan
www.ddss.arch.tue.nl
ImplementationImplementation
EquipmentLabour
Constr.Analysis
Comp.Rel. +Dur.
CADmodel
Formulas
CADProject
PlanningPlanningSchema
Design evaluation
www.ddss.arch.tue.nl
Construction algoritmsConstruction algoritms
Analysis by object name:
Walls are bearing floors, colums are bearing beams, etc.
www.ddss.arch.tue.nl
Construction algorithmsConstruction algorithms
Analysis by object elevation:
Object with a lower elevation is bearing an object with a higher elevation
www.ddss.arch.tue.nl
Construction algorithmsConstruction algorithms
Analysis by directed graph:
Each object is a node in a connection graph.
www.ddss.arch.tue.nl
Construction algorithmsConstruction algorithms
Analysis by object adjacency:
Each object is a node in a topological graph
A
C
B I
G
FD
JE
H K
L
M
N
- Objecten zonder voorganger
www.ddss.arch.tue.nl
Construction analysisConstruction analysis
Object of anlysis
www.ddss.arch.tue.nl
Construction analysisConstruction analysis
Move down
– Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie –– Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –
www.ddss.arch.tue.nl
Construction analysisConstruction analysis
The green objects have an intersection in the vertical direction with the red object
– Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie –– Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –
www.ddss.arch.tue.nl
Construction analysisConstruction analysis
The red object has in intersection with the green objects in the horizontal direction
www.ddss.arch.tue.nl
Construction analysisConstruction analysis
Example: Objects adjacent to floor
www.ddss.arch.tue.nl
Pilot studyPilot study
www.ddss.arch.tue.nl
Planning comparisonPlanning comparison
Real planning
Generatedplanning
www.ddss.arch.tue.nl
DifferencesDifferences
• Concurrency whenever possible
• Unlimited resources
• Construction method
www.ddss.arch.tue.nl
Complete processComplete process
www.ddss.arch.tue.nl
ExperiencesExperiences
• Model preperation through clash detection
• Generated planning 2 months longer than real planning over a a period of 1 ½ year
• Suitable for a quick first guess
• Further development of: Construction method, Humen resources, Material resources