Construction Analysis during the Design Process Bauke de Vries Bauke de Vries.

Post on 01-Apr-2015

229 views 0 download

Tags:

Transcript of Construction Analysis during the Design Process Bauke de Vries Bauke de Vries.

Construction Analysis during the

Design Process

Construction Analysis during the

Design Process

www.ddss.arch.tue.nl

Bauke de Vries

www.ddss.arch.tue.nl

Bauke de Vries

www.ddss.arch.tue.nl

4D-CAD4D-CAD

•Linking building components with construction activities•Manual task of the construction planner•Dedicated systems: NavisWorks, 4D Suite, …•Advantages: Simulation, Visualization

www.ddss.arch.tue.nl

ChallengeChallenge

Automation of the planning process.

Advantages:

• Independency from the planner

• Quick first concept plan

www.ddss.arch.tue.nl

ImplementationImplementation

EquipmentLabour

Constr.Analysis

Comp.Rel. +Dur.

CADmodel

Formulas

CADProject

PlanningPlanningSchema

Design evaluation

www.ddss.arch.tue.nl

Construction algoritmsConstruction algoritms

Analysis by object name:

Walls are bearing floors, colums are bearing beams, etc.

www.ddss.arch.tue.nl

Construction algorithmsConstruction algorithms

Analysis by object elevation:

Object with a lower elevation is bearing an object with a higher elevation

www.ddss.arch.tue.nl

Construction algorithmsConstruction algorithms

Analysis by directed graph:

Each object is a node in a connection graph.

www.ddss.arch.tue.nl

Construction algorithmsConstruction algorithms

Analysis by object adjacency:

Each object is a node in a topological graph

A

C

B I

G

FD

JE

H K

L

M

N

- Objecten zonder voorganger

www.ddss.arch.tue.nl

Construction analysisConstruction analysis

Object of anlysis

www.ddss.arch.tue.nl

Construction analysisConstruction analysis

Move down

– Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie –– Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –

www.ddss.arch.tue.nl

Construction analysisConstruction analysis

The green objects have an intersection in the vertical direction with the red object

– Inleiding – Oriëntatie – Doelstelling van het onderzoek – De algoritmen – Implementatie –– Case Study – Reactie uit het bedrijfsleven – Conclusie en Aanbevelingen – Einde –

www.ddss.arch.tue.nl

Construction analysisConstruction analysis

The red object has in intersection with the green objects in the horizontal direction

www.ddss.arch.tue.nl

Construction analysisConstruction analysis

Example: Objects adjacent to floor

www.ddss.arch.tue.nl

Pilot studyPilot study

www.ddss.arch.tue.nl

Planning comparisonPlanning comparison

Real planning

Generatedplanning

www.ddss.arch.tue.nl

DifferencesDifferences

• Concurrency whenever possible

• Unlimited resources

• Construction method

www.ddss.arch.tue.nl

Complete processComplete process

www.ddss.arch.tue.nl

ExperiencesExperiences

• Model preperation through clash detection

• Generated planning 2 months longer than real planning over a a period of 1 ½ year

• Suitable for a quick first guess

• Further development of: Construction method, Humen resources, Material resources