CONFERENCE OF BEE EMPANNELLED CFL INVESTORS /
MANUFACTURERS FOR IMPLEMENTATION OF
A
CLEAN DEVELOPMENT MECHANISM
CDM SSC-PoA
Registered under Kyoto Protocol with UNFCCC by
BUREAU OF ENERGY EFFICIENCY MINISTRY OF POWER, GOI
Under the BLY scheme quality long-life CFLs would be distributed by SSC-CPA implementer(s) to grid-connected residential households in exchange of an incandescent lamp (ICL) @ INR 15.
Once the CFLs have reached their end of life or any CFLs which have failed prematurely during the project period, the SSC-CPA implementer(s) would arrange for the collection and disposal of CFLs as per applicable environmental norms.
To bridge the cost differential between the market price of the CFLs and the price at which they are distributed to households, the Clean Development Mechanism (CDM) is harnessed. The SSC-CPA implementer(s) would cover the project cost through sale of GHG emission reductions (CERs) achieved in their respective CPA areas.
BEE will co-ordinate the Small-Scale Programme of Activities (SSC-PoA) with UNFCCC.
BEE will support the project implementer(s) in implementing the CDM Programme Activities (CPAs) in India through Electricity Distribution Companies (DISCOMs)
ROLE OF BUREAU OF ENERGY EFFICIENCY
• DISCOM identifies BEE empanelled Investor for implementation of BLY in their territory
• Enters into Bi-partite Agreement with Investor
• Enters into Tri-partite Agreement with Investor and BEE
• Provides all the necessary support including the database of the targeted consumers
ROLE OF DISCOM
ROLE OF INVESTOR
•Investor identifies long-life IS 15111 certified CFL Supplier
• Develops project as per BLY scheme templates
•Generate CFL use awareness amongst the households
• Distributes the CFLs to the targeted consumers in the project area
Role ofUttar Pradesh Power Corporation Ltd.
Uttar Pradesh Power Corporation Ltd. through its DISCOMs intends to promote Energy Efficiency in lighting system of residential households consumers based on the scheme parameters laid down by the Bureau of Energy Efficiency under the CDM based CFL Lighting Scheme Bachat Lamp Yojana.
Model Bid Documents have been prepared based on EOI Templete of BEE for selection of investors / project developers .
DISCOMs PARTICIPATING IN
DAKSHINANCHAL VIDYUT VITRAN NIGAM LTD.
Number of consumers
Zones
Agra Aligarh Kanpur Jhansi Banda
18 Lakh
DVVNL TENDER NOTICE
PASCHIMANCHAL VIDYUT VITRAN NIGAM LTD.
Number of consumers
Zones
2O Lakh
PVVNL TENDER NOTICE
Meeru
t
Saharanpu
r
Moradab
ad
Noida Ghaziaba
d
SCOPE OF BLY OPPORTUNITY
•The number of CPA documents to be developed in DISCOM is to be decided by the CPA-implementer at the time of document development.
• The Investor will provide new CFLs to household, in case CFLs become non functional during the Warrantee Period. Warrantee Period is one year from the completion date of CFL distribution to households as accepted by BEE for start date of CER crediting for a CPA under PoA.
SCOPE OF BLY OPPORTUNITY
ICL CFL
40W 8-10 Watt
60W 11-15 Watt
100W 18-20 Watt
• The range of CFL Watt should be as given in the table :-
•The CFLs should be capable of with standing very wide Voltage swings i.e. 110 volts to 280 volts. •The CFLs to be distributed should carry the manufacturer’s logo, BLY logo and logo of DISCOM.
SCOPE OF BLY OPPORTUNITYThe project completion period shall be
CER crediting Period which will be calculated as follows :-
1 Rated life of lamps in hours (Minimum) as per IS 15111
6000 hr.
2 Uses of CFL per day as per CDM small scale methodology AMS-II. J
3.5 hr.
3 CER crediting period =6000/(3.5*365)
4.7 years.
EVALUATION CRITERION FOR SELECTION OF PROJECT
DEVELOPER
The bid shall be awarded to the firm which will share the maximum percentage of CERs with DISCOM.
EXPECTED TIMELINES
Deliverable Planned Date(s)Submit bi-lateral agreement with DISCOM
Within one month of winning the bid
Submit bank guarantee of requisite Within one month of winning the bidSign Tri-partite agreement with DISCOM and BEE
Within two month of winning the bid
Secure finance Within four months of winning the bid
Secure supply agreement of CFLs with manufacturer
Within four months of winning the bid
CPA submission for inclusion to BEE Within six months of winning the bidDelivery of CFLs (beginning date) Within eight months of winning the
bidDistribution of CFLs (beginning date) Within ten months of winning the
bidDistribution of CFLs (end date) Within Twelve months of bid date
NON-PERFORMANCE PENALTY
“The CPA implementer is required to submit a Performance Bank Guarantee (from a nationalized / scheduled commercial bank of Rs. 50 Lacs (INR) on winning the bid•Either within one month of registration of PoA with the CDM executive board
OR•Within one month of winning the bid ( whichever is earlier )”
This Bank Guarantee shall be invoked by the DISCOM in the event the CPA implementers withdraw or are unable to implement the CPA as agreed to the timelines after following due procedure given in the relevant agreements. The Bank Guarantee is returnable as per the following. •50% after the expiry of warrantee period. •50% after the Project Completion.