Post on 07-Apr-2018
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 1/10
CCA Proposals
Group 6(Phi l ippines)
cen e u ao ea
Daria Mathew (Facilitator)
Isidra D. Penaranda
Edgardo C. Manda
Lasaro P. Salvacion
Enrico R. Corvera
Theresa Audrey Esteban
Narensh Nair
The views expressed in this paper/presentation are the views of the author and do not necessarily reflect the views
or policies of the Asian Development Bank (ADB), or its Board of Governors, or the governments they represent.ADB does not guarantee the accuracy of the data included in this paper and accepts no responsibility for anyconsequence of their use. Terminology used may not necessarily be consistent with ADB official terms.
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 2/10
.Project Proponent: Department of Environment and National Resources,
Philippines
Project Title: Establishment of the Philippines Centre on Climate
Change (PCCC)
Project Objectives
General Objective: To institutionalize and establish the PKCCC
Specific Objective: 1.To formulate organizational standard management for
2.To identify mission statement/vision/goals of PCCC
3.To identify local , regional, and international institutional
and donor agency
4. To establish networkin mechanisms in order to broaden
the base for sharing information capacity building and
identify technology gaps for further R & D
5. To establish link with NAHRIM and the Philippines
knowled e centre on Climate Chan e
6. To institutionalize PCCC throughPresidential/Legislation action
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 3/10
Project Partners: -State Universities and College
-Philippines Atmospheric, Geophysical and Astronomical
Services Administrative-National mapping and resource information authority
-National Hydraulic Research Centre
-
-Bureau of Fisheries and Aquatic Resources
-Department of Science and Technology
-Department of Education
-NAHRIM
-ADB
Project Activities: 1.) Scoping study to identify key players and framework of the
pro ec
2.) Consultative meetings and workshops
3.) Signing of Memorandum of Agreement (MoA) for the
partners agencies
4.) Drafting of framework plan for PCCC institutionalization
5.) Issuance of Presidential/Legislative action through Republic
act/Presidential Executive order
.
government of the Philippine counterpart
7.) Development/Establishment of PCCC
8.) Man power recruitment and installation of facilities
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 4/10
Regional
Knowledge
Center onNARBO
ClimateChange
NAHRIM KHubPhilippine
KnowledgeCenter on
Regional
Knowledge
Climate
Change
Center on
Climate
Change
ADB Team
Regional
Knowledge
Center on
ClimateChange
oca
KC
on CC
Local
Local
KC
KCon CC LocalKC
on CC
on
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 5/10
Project Outputs: 1. Signed MoA2. Framework Plan
3. Presidential Executive Order or Republic Act
-
.
5. Establishment and Operationalization of PCCC
including the setting up of facilities and man powerrequirement
Project Indicative
Budget:
Grand Total = USD 10 million (2 Years)
CY 2009 = USD 100,000-= ,
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 6/10
roposa o.Project Proponent: Department of Environment and Natural Resources
(DENR)
Project Title: Capacity Building for Agusan River Basin Organization
(ARBO)
Pro ect Ob ectives 1. To identif ke la ers in the Basin
2. To equip local government units (LGUs) and RBOs
knowledge regarding climate change
3. To identify roles and functions of LGUs and RBOs
Project Partners: 1) ADB
2) NAHRIM
4) LGUs
5) Academe
6) NGO
7) Local Communities
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 7/10
a n ro ec c v es: onsu a on an en ca on o ey p ayers n
the ARB
2) Conduct Training Needs Assessment
3) Conduct seminar, trainin /worksho s for
LGUs/RBOs and community on climate change
4) Determine role and function of LGUs5) Determine role and function of ARBO
Main Project Outputs: 1. Technical Capability of the RBO and Secretariat
which will enhance awareness/capacities of LGUs and
2. Institutional setup for RBO established with delineated
functions/responsibilities
Project Indicative Grand Total = USD 200,000 (2 years)Budget: CY 2009 = USD 100,000
CY 2010 = USD 100,000
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 8/10
roposa o.Project
Proponent:
Laguna Lake Development Authority (LLDA)
Project Title: Design and Develop Hydrologic Monitoring System (Network)
Project
Objectives
1. Physical Installation of Hydrologic Devices in strategic areas
around the lake
2. To develop a Decision Support System (DSS) for well
informed decision
Project -National Hydraulic Research Centrear ners: - n vers y o e pp nes
-Japan Water Agency
-NAHRIM
Activities:
. , ,2. Awareness raising/Capacity Building of concerned staff
8/6/2019 CCA Proposal Group6
http://slidepdf.com/reader/full/cca-proposal-group6 9/10
a n ro ec u pu s: . c en c a a or me y ec s on ma ng process
for climate change mitigation and adaptation
2. Telemetric/Hydrologic Model to simulate
h drolo ic/h dro- eolo ic and climate chan e
related information
3. Enhanced technical capacities4. Monitoring Network established
Project Indicative Budget: Grand Total = USD 2.5 million (2 Years)
CY 2009 = USD 1 million
CY 2010 = USD 1.5 million