Document Title: Main steam turbine datasheet Rev.: 01
Document No.: BU-05-VD-305-MA-DSH-3301-002 Page 1 of 12
Main Steam Turbine datasheet for 05-330-PKU-1
EQUIPMENT NAME: DRIVE PROPANE COMPRESSOR STEAMTURBINE
Code1 (Approved ) No comment and the document is released for Manufacturing
Code2 (Approved with comments) Vendor shall correct, revise and resubmit the document The document is released for manufacturing
Code3 (Commented) : Vendor shall correct / revise & resubmit document
Code4 Not Acceptable Quality (Rejected) Date: Dept: Signature:
HuangC HuangHA WuT Issued For Approval 2014-9-3001
HuangC HuangHA WuT Issued For Review 2014-4-200
AUTD APPD CHCD PRED Purpose of Issue StatusDate Rev.
Abusalehi-AText BoxGeneral Comments:
(1) All changes/modification with respect to previous revision should have revision mark (highlight) and SBW is responsible for any change/modification without revision mark.(2) Please manage to keep up to date, Condenser datasheet & Utility consumption list based on this datasheet.
Please see more comments on other pages...
Saki-MAccepted
Saki-MText Box20 Oct 2014MAM.S.CODE 2
duanweinaMain Steam turbine datasheet for 05-330-PKU-1
Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants Project
P.O. No.: 05-POR-MA-305-119
BUSHEHR PETROCHEMICAL COMPANY
Document Title: Main steam turbine datasheet Rev.: 01
Document No.: BU-05-VD-305-MA-DSH-3301-002 Page 2 of 12
Revision Index
Rev. 00 01 02 03 04 05 06 07 Rev. 00 01 02 03 04 05 06 07 Sheet Sheet
1 X X 2 X X 3 X X 4 X X 5 X X 6 X X 7 X X 8 X X 9 X X
10 X X 11 X X 12 X X 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1 PROPOSAL PURCHASE AS BUILT2 FOR SBW / BUSHER PETROCHEMICAL COMPANY UNIT
3 SITE BANDAR ASSALUYEH-IRAN SERIAL NUMBER
4 SERVICE PROPANE COMPRESSOR DRIVER NUMBER REQUIRED 1(ONE)
5 MANUFACTURER HANGZHOU STEAM TURBINE CO., LTD MODEL NK50/63 DRIVEN EQUIPMENT ITEM NO.
6 DRIVEN EQUIPMENT TYPE: COMPRESSOR GENERATOR OTHER7 NOTE: INFORMATION TO BE COMPLETED BY: PURCHASER MANUFACTURER PURCHASER OR MANUFACTURER8
9 OPERATING POINTS
10 AS APPLICABLE
11
12
13 COMP. NORMAL
14
14
16 TURBINE RATED
14
14
17 STEAM RATE, kg/kWh (3.45): RATED INDUCTION CONTROLLED UNCONTROLLED18 POTENTIAL MAXIMUM POWER (3.30) EXTRACTION CONTROLLED UNCONTROLLED19
20 INLET EXHAUST EXTRATION EXTRACTION EXTRACTION21 INDUCTION INDUCTION INDUCTION
22
23
24
25
26
27
28
29
30
31
32 LOCATION: (6.1.17) ELECTRICAL:
33 INDOOR HEATED UNDER ROOF OUTDOOR34 UNHEATED PARTIAL SIDES GRADE MEZZANINE VOLTS35 OTHER: PHASE
36 WINTERIZATION REQUIRED TROPICALIZATION REQUIRED HERTZ37 LOW TEMPERATURE CORROSIVE AGENTS kW AVAILABLE38 ELECTRICAL AREA CLASSIFICATION: (6.1.16) COOLING WATER:
39 CLASS GROUP DIVISION INLET TEMPERATURE (0C): MAX. RETURN (0C):
40 ZONE GROUP TEMP. RATING PRESSURE NORMAL (BAR): DESIGN (BarG/):41 SITE DATA: MINIMUM RETURN PRESSURE (BARG):
42 ELEVATION (m) BAROM. PRESS. (Bar) MAXIMUM ALLOWABLE PRESSURE DROP (BAR):43 WINTER TEMP. (0C) SUMMER TEMP. (0C) WATER SOURCE
44 REL. HUMIDITY (%) DESING WET BULB (0C) VELOCITY (m/s): MIN MAX
45 UNUSUAL CONDITIONS: DUST FUMES CLEANLINESS COEFFICIENT : 46 OTHER: UTILITY CONSUMPTION:
47 UTILITY CONDITIONS: (6.1.18) COOLING WATER (m3/h): INST. AIR (m3/h):
48 AUXILIARY STEAM: AUX. STEAM (kg/h): NORMAL MAXIMUM
49 INITIAL PRESSURE (BARa) AUX. DRIVERS (kW): ELECTRIC STEAM
50 INITIAL TEMPERATURE (0C) (TT) HEATER(S) (kW): OTHER
51 EXHAUST PRESSURE (BARG)
52 INSTRUMENT AIR ((BARa)
53 INSTRUMENT AIR DEW POINT (0C):
54 REMARKS:
55
NORMAL
MAXIMUM
NORMAL
330
80%
05-330-C-1
T3
5
SPECIAL-PURPOSE STEAM TURBINEDATA SHEET
SI UNITS
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
STEAM CONDITIONS
DOC TYPEUNIT
MINIMUM
MAXIMUM
1
ITEM CODE
C-1-T
32.2
2
SITE AND UTILITY DATA
50
DC1
50
INSTRUMENT/ CONTROL
JOB NO.
ALARM /SHUTDOWN
SR. NO.
002330
PRESSUREBARA
TEMP.0C (TT)
FLOWT/h
PRESSUREBARG
DSH
PAGE
3 OF 12
ENTHALPYkJ/kg
Busher Petrochemical Company
TEMP.0C (TT)
PRESSUREBARA
TEMP.0C (TT)
Thunder, and Lightning
IIB
MINIMUM
74~76
7.5
MAX NORM
270
4
MIN
147
PRESSUREBARA
TEMP.0C (TT)
33
400
43
24
APPLICABLE TO:
PERFORMANCE
SHAFT INLET INDUCTION / EXTRACTION EXHAUST
FLOWT/H
POWERkW
SPEEDRPM
60.98
67.36
41
41
0.99~1.1
48
2.5
400
COOLING TOWERS
CL-:
35
50ppm
8.5 / 85
45
3
5.5
DRIVERS HEATING
4.56
-40
8.5
160
8
2
110
410
430
75.46
0.126
39 0.11
0.11
4.39
FLOWT/H
Turbine Rated
67.36COMP. rated
75.46
NORMAL 60.98
NOR
2405.3
0.11 47.7 2403.1
0.116
47.7
48.8
410
410
4.47
75.46 41 410
41
16869 3980
13896
15335
3891
3980
67.36
60.98
12250 3844 55.11 41 410 2420.9
2421.30.126
0.11
50.4
COMP. rated
COMP. CDR40% TD
Saki-MRectangle
Abusalehi-ACallout(3) Based on MOM; 05-301 & 05-301-MOM-BUEI-SB-0001 dated 16 June 2014 item 24.1, relevant comment has been ignored so please keep previous figures.
Saki-MText Box(4) + Sandstorm
CLIENT :PROJECT TITLE :REQUISITION NO. : REV. :
1 APPLICABLE SPECIFICATIONS: NOISE SPECIFICATIONS:
2 ISO 10437 (API 612), SPECIAL PURPOSE STEAM TURBINES APPLICABLE TO MACHINE:
3 OTHER SEE SPECIFICATION:
4 APPLICABLE TO NEIGHBORHOOD:
5 VENDOR HAVING UNIT RESPONSIBILITY (3.48): SEE SPECIFICATION:
6 ACCOUSTICAL TREATMENT YES NO7 GOVERNING SPECIFICATION, IF DIFFERENT: TYPE
8
9
10 TURBINE TYPE BACKPRESSURE CONDENSING INDUCTION EXTRACTION OTHER11 SPEEDS: TORSIONAL CRITICAL SPEEDS (9.5):
12 MAXIMUM CONTINUOUS (rpm) TRIP (rpm) FIRST CRITICAL (rpm)
13 MAXIMUM ALLOWABLE (rpm) SECOND CRITICAL (rpm)
14 LATERAL CRITICAL SPEEDS (DAMPED) (9.2) (AS PER API 612) THIRD CRITICAL (rpm)
15 FIRST CRITICAL rpm MODE FOURTH CRITICAL (rpm)
16 SECOND CRITICAL rpm MODE LATERAL ANALYSIS REPORT REQUIRED
17 THIRD CRITICAL rpm MODE INDIVIDUAL BODY TRAIN18 FOURTH CRITICAL rpm MODE UNDAMPED STIFFNESS MAP REQUIRED (9.2.3.b)
19 VIBRATION (microns) (PEAK TO PEAK) TRAIN TORSIONAL ANALYSIS REPORT REQUIRED (9.5.1)
20 TRAIN TORSIONAL ANALYSIS PERFORMED BY
21 CASINGS, NOZZLES AND DIAPHRAGMS
22 MAWP (3.17) (7.1.3) HYDROTEST PRESSURE (16.3.2)
23 INLET SECTION (BARG) EXH. SECTION (BARG) HP CASING (BARG) MID CASING (BARG)
24 INDUCTION / EXTRACTION SECTION (BARG) EXHAUST CASING (BARG) OTHER (BARG)
25 OTHER (BARG) WELDED NOZZLE RING (7.3.1) NOZZLE RING % ADM
26 MAXIMUM ALLOWABLE TEMPERATURE (3.16) (3.21) DIAPHRAGM BLADE ATTACH: INTEGRALLY CAST27 INLET SECTION (0C) EXHAUST SECTION (0C) WELDED OTHER28 INDUCTION / EXTRACTION SECTION (0C)
29 MINIMUM DESIGN METAL TEMPERATURE (11.1.15) (0C) DIAPHRAGM AXIAL LOCATION: INDIVIDUALLY STACKED30 RELIEF VALVE SETTING INLET (BARG)
31 EXTRACTION (BAR) OTHER (BARG)
32 CASING CONNECTIONS
33
34 SIZE FACING POSITION FLANGED MATING MAX MINIMUM35 OR STUDDED FLANGE & GASKET STEAM FLOW STEAM FLOW
36 (7.2.3) BY VENDOR (kg/h) (kg/h)
37 INLET
38 EXHAUST
41
42 AUXILIARY SCREWED PIPE CONNECTION: TAPERED STRAIGHT MAIN CASING JOINT STUDS / NUTS DESIGNED FOR HYDRO TENSIONING (7.1.15.f)43 ALLOWABLE FORCES AND MOMENTS (2 times NEMA SM-23) note2 ROTATION: (VIEWED FROM INLET END)
44 CW CCW45
46
47 PARALLEL
48 TO SHAFT VIEW STEAM
49 VERTICAL
50 HORIZONTAL 900
51
52
53
54
55
note1:( M)=mechnical trip speed
note2: already provided and integrated by compressor vendor
BU-01_05-D-000-MA-SPF-102
General specification -"Special Purpose Steam Turbine"
05-330-C-1 PROPANE COMPRESSOR VENDOR
SPECIAL-PURPOSE STEAM TURBINEDATA SHEET
SI UNITS
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
PAGE
MOMENTFORCE MOMENT
COMPRESSOR VENDORS
FLANGED
FLANGED Y
68.25
ITEM CODE
DSH C-1-T 002 4 OF 12
IPS-G-SF-900
0
Busher Petrochemical Company
JOB NO.
25
EXHAUST EXTRACTION / INDUCTION
2
UNIT
0
DOC TYPE
45.5 0.7&FV
4597(M)note1
~3000
Y
430 120
1*10" RTJ/1500LB DOWN
CONSTRUCTIONAL FEATURES
SR. NO.
330
1
4179
2200*1106MM DOWN
CONNECTION
FORCEMOMENT
5
FORCE
Nm N Nm N NmN
INLET
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1 MATERIAL - CASING AND APPURTENANCES:
2 HIGH PRESSURE CASING DIAPHRAGM / BLADE CARRIERS
3 MID PRESSURE CASING DIAPHRAGM NOZZLES
4 EXHAUST CASING OTHER
5 STEAM CHEST Bearing Housing:
6 NOZZLE RING
7 STEAM CONTAMINANTS (11.1.6)
8 STEAM PATH COMPONENTS < HRC 22 (11.1.9)
9
10 ROTATING ELEMENTS (8)
11 SHAFT TYPE:
12 INTEGRAL WHEELS BUILT-UP (8.1.2) COMBINATION SHAFT ENDS: DIAMETER @ COUPLING (mm)13 DOUBLE EXTENDED STRAIGHT TAPER (mm/m)14 NUMBER OF STAGES BEARING SPAN (mm) KEYED SINGLE DOUBLE15 SHAFT MATERIAL HYDRAULIC FIT INTEGRAL FLANGE16 BLADES (BUCKETS): MAXIMUM TIP SPEED (m/s) FIELD BALANCING PROVISIONS REQUIRED (8.1.4)17 FINAL STAGE BLADE LENGTH (mm) MAX (mm) DESCRIPTION OF FIELD BALANCING PROVISIONS:18 REMARKS:
19 REMARKS:
20
21
22
23 WHEEL MATERIAL
24 BLADE MATERIAL
25 BLADE ROOT TYPE
26 CLOSURE PIECE TYPE
27 TIE WIRE MATERIAL
28 SHROUD MATERIAL
29 SHROUD ATTACH.
30 PITCH DIAMETER (mm)
31 BLADE HEIGHT (mm)
32 BLADE TYPE
33
34
35 SHAFT SEALS (10.5)
36
37 MAXIMUM SEAL PRESSURE (BARG) CASING END SEALS (10.5.1):
38 STEAM LEAKAGE (kg/h) TYPE: LABYRINTH OTHER39 AIR LEAKAGE (m3/h)(STD. COND.) MATERIAL: 1Cr18Ni9Ti(321)
40 SHAFT DIAMETER @ SEAL (mm)
41 STATIONARY LABYRINTH TYPE
42 ROTATING LABYRINTH TYPE INTERSTAGE SEALS (10.5.2):
43 MATERIAL TYPE: LABYRINTH44 OTHER45 MATERIAL: 1Cr18Ni9Ti(321)
46
47
48 REMARKS: note1:-77.6 means there is no steam leakage ,77.6 means seal steam consumption
49
50
51
52
53
54
55
Comparison sheet of turbine materials between HTC code and others have been
already supplied
Sealing strip
STAGE 1
REACTION
25
Foulenss-0.00020m2*W
1Cr18Ni9Ti(321)
1.08
1Cr18Ni9Ti(321)
Flute
INLET
JOB NO.
Gr D
28CrMoNiV49
UNIT
GS-C25
Busher Petrochemical Company0
STAGE
50
5 OF 12
11.5
1.08
-77.6 note1
EXHAUST
DOC TYPE
330
REACTION
STAGE 25STAGE 2~24 STAGESTAGE
N.AX22CrMoV12 1
C-1-T
INTEGRAL
T
N.A
DSH
STAGE
28CrMoNiV49
FORK
X20Cr13
X20Cr13
SPECIAL-PURPOSE STEAM TURBINEDATA SHEET
SI UNITS
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
0
INTEGRAL
X22CrMoV12 1
IMPULSE
Sealing strip
GS-22Mo4
GS-22Mo4
X22CrMoV12 1
002
GS-C25&GS-22Mo4
PAGEITEM CODE SR. NO.
1
X22CrMoV12 1
28CrMoNiV49
X22CrMoV12 1/X20Cr13
28CrMoNiV49
2735
Sealing strip
FORK
N.A
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1 BEARING AND BEARING HOUSINGS
2 RADIAL (10.1) THUST (10.2)
3 TYPE * NOTE 1
4 MANUFACTURER TYPE
5 LENGTH (mm) MANUFACTURER
6 SHAFT DIAMETER (mm) UNIT LOADING MAX. (N)
7 UNIT LOAD (ACT / ALLOW) (N) UNIT LOADING ULTIMATE (N)
8 BASE MATERIAL NUMBER OF PADS
9 BABBIT THICKNESS (mm) AREA (mm2)
10 NUMBER OF PADS PIVOT: CENTER/OFFSET (%)
11 LOAD: BETWEEN / ON PAD PAD BASE MATERIAL
12 PIVOT: CENTER / OFFSET (%)
13 LUBRICATION: FLOODED DIRECTED14 THRUST COLLOR: INTEGRAL REPLACEABLE15 BEARING TEMPERATURE DEVICES: VIBRATION DETECTORS:
16 THERMOCOUPLES TYPE TYPE MODEL17 SELECTION SWITCH AND INDICATOR BY: PURCHASEER MANUFACTURER MANUFACTURER18 RESISTANCE TEMPERATURE DETECTORS NUMBER AT EACH SHAFT BEARING TOTAL NUMBER
18 RESISTANCE MATERIAL (Ohm) MONITOR SUPPLIED BY20 SELECTION SWITCH AND INDICATOR BY: PURCHASEER MANUFACTURER LOCATION ENCLOSURE21 LOCATION - JOURNAL BEARING MANUFACTURER MODEL22 TOTAL LOCATION SCALE RANGE ALARM SET @ (microns)23 SCALE RANGE ALARM SET @ (0C) SHUT DOWN SET @ (microns) DELAY (s)24 SHUTDOWN SET @ (0C) DELAY (s) AXIAL POSITION DETECTORS:
25 LOCATION - THRUST BEARING TYPE MODEL26 ACTIVE SIDE MANUFACTURER NUMBER REQUIRED27 TOTAL LOCATION MONITOR SUPPLIED BY
28 INACTIVE SIDE LOCATION ENCLOSURE29 TOTAL LOCATION MANUFACTURER MODEL30 SCALE RANGE ALARM SET @ (0C) SCALE RANGE ALARM SET @ (microns)31 SHUTDOWN SET @ (0C) DELAY (s) SHUT DOWN SET @ (microns) DELAY (s)32 MONITOR SUPPLIED BY: COMP. VENDOR PROVISION FOR ACCELEROMETER MOUNTED ON BEARING HOUSINGS
33 LOCATION ENCLOSURE KEYPHASOR: STEAM TURBINE GEAR DRIVEN EQUIPMENT34 MANUFACTURER MODEL REMARKS:35
36
37 * NOTE 1: THE TURBING IS PRIOR TO APPLY THE TITLING PAD RADIAL
38 BEARING, BUT IF THE TITLING PAD BEARING CAN NOT PASS THE VIBRATION ANALYSIS, THE ELLIPTICAL BEARING WILL BE APPLIED.
39 LUBRICATION AND CONTROL OIL SYSTEM (15.5)
40 REFERENCE SPECIFICATIONS: OIL REQUIREMENTS:
41 FURNISHED BY TURBINE MANUFACTURER OTHERS / SBW NORMAL FLOW (m3/h)42 SEPARATE FOR TURBINE ONLY TRANSIENT FLOW (m3/h)43 COMMON WITH DRIVEN EQUIPMENT (15.5.2)(15.5.5): PRESSURE (BAR)44 TEMPERATURE (0C)
45 TURBINE MANUFACTURER TO SUPPLY: TOTAL HEAT REJECTED (kW)
46 CONTROL OIL ACCUMULATOR OIL TYPE (HC / SYNTHETIC)47 STAINLESS STEEL OIL SUPPLY HEADING PIPING VISCOSITY (cP @37.80C)48 OIL DRAIN HEADER PIPING FILTRATION (microns)49 STAINLESS STEEL CARBON STEEL50 SIGHT FLOW INDICATORS51 CONTROL OIL FILTERS SINGLE DUAL compressor vender 52 to supply
53
54
55
75
3300
INACTIVETILTING PAD TYPE
20
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
3 BENTLEY NEVADA
45
CCR
BENTLY NEVADA
NON-CONTACTING
3500
10
LUBE OIL
~12
~30
45
0.85
ISO VG46
0.25
800
INLET
20
Later
Kingsbury
EXHAUST
6 OF 12C-1-T
JOB NO. UNIT
0
DOC TYPESPECIAL-PURPOSE STEAM TURBINE
DATA SHEETSI UNITS
330 DSH
0
Busher Petrochemical Company
ITEM CODE SR. NO. PAGE
002
TILTING PAD TYPE
Kingsbury
TILTING PAD TYPEKingsbury
Later
NON-CONTACTING
1
Later
TILTING PAD TYPE
200
ACTIVE
Later
20
Later
6
Later
Later
6
3500
50
10
3300
Bearing Metal
BU-01_05-D-000-MA-SPF-101
2
CR
Kingsbury
5
250
20
5
105
Later
B.N
105
Later
560
RTD
Pt 100
BENTLEY NEVADA
2
SBW
4
Bearing Metal
0~200
2 per bearing Bearing Metal
SBW
115
3500
115
CCR
ISO VG46
CTRL OIL
~17
BENTLY NEVADA
2
0~200
Saki-MRectangle
Mottaghi-MCallout(4) Each RTD shall be dual Element Type.Please mention "Dual Element RTD"
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1
2 COUPLINGS AND GUARDS (15.1) SEE COMPRESSOR DATA SHEET
3 NOTE: SEE ROTATING ELEMENTS - SHAFT ENDS
4 SEE ATTACHED ISO 10441 DATA SHEET
5 COUPLING FURNISHED BY
6 MANUFACTURER TYPE MODEL
7 COUPLING GUARD FURNISHED BY
8 TYPE FULLY ENCLOSED SEMI OPEN OTHER9 COUPLING DETAILS VENDOR MOUNT HALF COUPLING (15.1.8)
10 MAXIMUM OUTER DIAMETER (mm) MASS SIMULATOR (15.1.6) IDLING ADAPTER REQUIRED (15.1.7)11 HUB MASS (kg) LUBRICATION REQUIREMENTS
12 SPACER LENGTH (mm) GREASE CONT. OIL LUBE NONE13 SPACER MASS (kg) QUANTITY PER HUB
14
15 MOUNTING PLATES (15.3)
16 BASEPLATES FURNISHED BY: SOLEPLATES FURNISHED BY:
17 UNDER TURBINE ONLY THICKNESS (mm)
18 OPEN NON-SKID DECKING (15.3.2.8) DRIP RIM SUBPLATES REQUIRED (15.3.2.7)19 LEVELING PADS (15.3.2.3) HOLD-DOWN BOLTS FURNISHED BY:
20 SINGLE SECTION MULTI SECTION EPOXY PRIMER VENDOR (15.3.1.7)21 COLUMN MOUNTING (15.3.2.2) SUBPLATES REQUIRED (15.3.2.7)22 LEVELING (CHOCK) BLOCKS REQUIRED SUPPLIED BY ANCHOR BOLTS FURNISHED BY (15.3.1.9):
23 GEAR UNIT (15.2)
24 FURNISHED BY: REFERENCE API 613 OTHER25 SEE ATTACHED GEAR DATA SHEETS
26 CONTROL AND INSTRUMENTATION (12)
27 INSTRUMENTS AND CONTROL PANELS SHALL BE API 614, PAGES
28 IN ACCORDANCE WITH THE FOLLOWING API 670, PAGES
29 ATTACHED DATA SHEETS: PURCHASER'S DATA SHEETS
30
31 PROTECTIVE DEVICES
32
33
34
35 MOUNTING LOCATION
36 SET RELIEF PRESSURE (BarG)
37 CAPACITY, STEAM (kg/h)
38 VALVE MANUFACTURER
39 VALVE TYPE
40 VALVE SIZE / RATING
41 FLANGE FACING (FF, RF)
42 FURNISHED BY
43 QUANTITY
44
45 REMARKS:
46
47
48
49
50
51
52
53
54
55
00 1
002
PAGE
ACCESSORIES
Busher Petrochemical Company
DOC TYPE
330 DSH 7 OF 12
ITEM CODE SR. NO.
C-1-T
JOB NO. UNIT
SBW
SPECIAL-PURPOSE STEAM TURBINEDATA SHEET
SI UNITS
NON-RETURN VALVE(S)(12.3.1.4)
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
THERMAL RELIEF VALVES(S)
(15.4.4)
Exhaust Piping
0.07
EXHAUST RELIEF VALVE(7.1.3) (15.4.1) (15.4.2)
EXTRACT. / INDUCT. RELIEF VALVE
(7.1.3) (15.4.1) (15.4.2)
VACUUM BREAKER(12.3.1.3)
condenser cooling water return line
100%
HTC
Water sealing spring type
150LB
RF
SBW
HTC
SBW
2
SBW
Flexible Diaphfragm later
SBW
SBW
Min. 457
RF
HTCHTC
2
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1 TRIP TRIP & THROTTLE VALVES (12.3.4.1) DUPLICATE TRIP/TRIP AND THROTTLE VALVES REQUIRED (12.3.4.2)2 LOCATION: MAIN INLET INDUCTION STRAINER: OPENING SIZE (mm/MESH)3 PROVIDED BY: VENDOR PURCHASER MATERIAL4 MANUFACTURER MODEL TEMPORARY START-UP STRAINER (MESH)
5 SIZE RATING FACING MATERIAL
6 SIZE RATING FACING STEM MATER HARDNESS (HRC)
7 SIZE RATING FACING SEAT MATERIAL HARDNESS (HRC)
8 CONSTRUCTION FEATURES: PACKING MATERIAL LEAK OFF (kg/h)
9 RESET: MANUAL HYDRAULIC SPRING SUPPORT OF VALVE REQUIRED10 TRIP: LOCAL (MANUAL) REMOTE BY VENDOR BY PURCHASER11 EXERCISER: LOCAL (MANUAL) REMOTE12 FULLY OIL OPERATED13 GOVERNOR - CONTROLLED VALVE(S):
14 LOCATION:
15
16 TRIP POSITION (OPEN/CLOSED)
17 NUMBER OF VALVES
18 CONNECTION SIZE
19 RATING
20 FACING (RT, RTJ, OTHER)
21 ACTION (CAM, BAR, OTHER)
22 STEM MATERIAL
23 STEM MATERIAL HARDNESS, HRC
24 SEAT MATERIAL
25 SEAT MATERIAL HARDNESS, HRC
26 PACKING MATERIAL
27 PACKING LEAKOFF, kg/h)
28
29
30
31
32 TURNING GEAR (15.8) MISCELLANEOUS
33 TURNING GEAR REQUIRED (15.8.1) START-UP ASSISTANCE (DAYS)
34 FURNISHED BY VENDOR'S REVIEW & COMMENTS ON PURCHASER'S
35 TYPE (15.8.5) SPEED (rpm) PIPING AND FOUNDATION DRAWINGS (6.1.9)
36 ENGAGEMENT (15.8.2) (15.8.3) (15.8.4): AUTO MANUAL VENDOR WITNESS INITIAL ALIGNMENT (6.1.9)37 MANUFACTURER MODEL "Y" TYPE STRAINER
38 MOUNTED BY WATER WASHING CONNECTIONS
39 DRIVER: REFERENCE SPECIFICATION STATIC CONDUCTING BRUSHES
40 DRIVEN BY: ELECTRIC MOTOR STEAM TURBINE SHUTDOWN ACTIVITIES EXHAUST VACUUM BREAKER (12.3.1.3)41 (15.8.5) HYD. / PNEUM. MOTOR OTHER:42 OPERATOR STATION (15.8.7) LOCAL REMOTE43 INSULATION AND JACKETING (15.7) SPECIAL TOOLS (15.9)
44 BLANKET OTHER COUPLING RING AND PLUG GAUGE BY COMP. VENDOR45 JACKETING HYDRAULIC MOUNTING / REMOVAL KIT BY COMP. VENDOR
46 CARBON STEEL STAINLESS STEEL OTHER47 EXTENT SPREADER BEAM(S) (15.9.3)
48 ON LOAN 49 PURCHASE50
51
52
53
54
55
21Cr12MoV(X22CrMoV121)
INDUCTION
HTC
330 002 8 OF 12
DOC TYPE ITEM CODE SR. NO. PAGE
00 1
Busher Petrochemical Company
C-1-TDSH
INDUCTIONEXTRACTION
HYDRAULIC
Graphite
BAR
21Cr12MoV
21CrMoV
NOTES
CLOSED
MAIN INLET
INDUCTIONEXTRACTION
LANTHANIDE MATERIAL COAT
4 OR 5
Other
Later
25person-day
Turbine Washing Facilities
1*10"
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
HTC HYDRAULIC
RF
JOB NO. UNIT
1Cr18Ni9Ti(361)
INLET INDCUT.
21CrMoV(21CrMoV5 7)
HTC
HTC
SPECIAL-PURPOSE STEAM TURBINEDATA SHEET
SI UNITS
1500LB
1.5
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1 GOVERNOR (12.2)
2 TYPE DIGITAL PROCESSOR BASED MANUFACTURER MODEL3 OTHER SUPPLIED BY4 SIMPLEX MULTI-CPU5 STEAM TURBINE TYPE
6 SINGLE VALVE SINGLE STAGE DOUBLE AUTOMATIC EXTRACTION
5 SINGLE VALVE MULTI STAGE SINGLE AUTOMATIC EXTRACTION/INDUCTION
8 MULTI VALVE MULTI STAGE DOUBLE AUTOMATIC EXTRACTION/INDUCTION
9 SINGLE AUTO EXTRACTION OTHER
10 DRIVEN EQUIPMENT TYPE
11 CENTRIFUGAL COMPRESSOR SYNCHROUS GENERATOR
12 AXIAL COMPRESSOR INDUCTION GENERATOR
13 CENTRIFUGAL PUMP OTHER
14 SERVICE REQUIREMENTS
15 MECHANICAL DRIVE GENERATOR DRIVE
16 SPEED CONTROL BY: DROOP CONTROL
17 PROCESS VARIABLE PRESSURE FLOW FREQUENCY CONTROL18 EXTRACTION PRESSURE FLOW LOAD CONTROL19 INDUCTION PRESSURE FLOW kW CONTROL20 TURBINE INLET PRESSURE FLOW kW IMPORT/EXPORT CONTROL21 TURBINE EXHAUST PRESSURE FLOW LOAD SHEDDING22 OTHER AUTOMATIC SYNCHRONIZATION
23 AUTOMATIC VOLTAGE REGULATION
24 TURBINE INLET PRESSURE LIMITING
25 INLET PRESSURE LIMITER
26 INPUT / OUTPUT REQUIREMENTS
27 DISCRETE INPUTS DISCRETE OUTPUTS
28 START OR RESET COMMON SHUTDOWN
29 NORMAL STOP COMMON ALARM
30 EMERGENCY TRIP OVERSPEED TRIP (rpm)
31 RAISE SPEED REMOTE SPEED SET POINT ENABLED
32 LOWER SPEED PRESSURE CONTROL ENABLED
33 ENABLE/DISABLE REMOTE SPEED SET POINT FLOW CONTROL ENABLED
34 RAMP TO MINIMUM CONTINUOUS EXTRACTION CONTROL ENABLED
35 OVERSPEED TEST ENABLE INDUCTION CONTROL ENABLED
36 ENABLE PRESSURE CONTROL SPEED PICKUP ALARM
37 ENABLE EXTRACTION CONTROL OTHER
38 REMOTE ALARM CLEAR / ACKNOWLEDGE
39 ENABLE AUTO SYNCHRONIZE
40 CASCADE RAISE / LOWER ANALOG OUTPUTS (4 mA TO 20 mA)
41 OTHER SPEED
42 ANALOG INPUTS (4 mA TO 20 mA) SPEED SET POINT
43 REMOTE SET POINT REMOTE SPEED SET POINT
44 PROCESS PRESSURE EXTRACTION PRESSURE
45 EXTRACTION PRESSURE FLOW EXTRACTION PRESSURE SET POINT46 kW IND. LOAD PRESSURE FLOW ACTUATOR POSITION47 kW IMPORT/EXPORT PROCESS PRESSURE
48 OTHER Inlet steam pressure kW
49 kW IMPORT/EXPORT
50
51
52
53
54
55
JOB NO. UNIT DOC TYPE SR. NO. PAGEITEM CODE
Busher Petrochemical Company
SPECIAL-PURPOSE STEAM TURBINEDATA SHEET
SI UNITS
002330 DSH C-1-T
00 1
9 OF 12
Note: This signal will be supplied by SBW
WOODWARD 505E
HTC
4513
Ready to start
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1 GOVERNOR INSTALLATION REQUIREMENTS
2 LOCATION LOCAL (AT TURBINE) MOUNTING FLUSH MOUNT IN PANEL SURFACE MOUNT3 REMOTE (CONTROL ROOM) VERTICAL RACK4 OTHER POWER SOURCE5 AREA CLASSIFICATION: Not Classified 400 V (A.C.) 6 CLASS GROUP DIVISION 110 V (A.C.) 7 ZONE GROUP TEMP. RATING 125 V (D.C.) 8 ENCLOSURE IP 65 24 V (D.C.) 9 NEMA 4
10 NEMA 4X 11 OTHER12 LOCAL GOVERNOR GAUGE BOARD REQUIRED NOT REQUIRED
13 LOCATION LOCAL ENCLOSURE IP 6514 REMOTE (CONTROL ROOM) NEMA 4 NEMA 4X15 OTHER OTHER16 AREA CLASSIFICATION:17 OUTPUTS FROM PANEL TO GOVERNOR CLASS GROUP DIVISION
18 START ZONE GROUP TEMP. RATING19 TRIP INPUTS TO PANEL FROM GOVERNOR20 RAISE COMMON ALARM TRIP21 LOWER TRIP LAMP22 OVER SPEED TEST REMOTE SETPOINT ENABLED LAMP23 RAMP TO MINIMUM CONTINUOUS SPEED SETPOINT METER24 REMOTE SET POINT ENABLE / DISABLE OTHER25 RESET26 OTHER27 MISCELLANEOUS GOVERNOR DETAILS
28 GOVERNOR ACTION ON LOSS OF REMOTE SIGNAL: LOCKS ON LAST VALUE
29 GOES TO MINIMUM CONTINUOUS
30 GOES TO MAXIMUM CONTINUOUS
31
32 EXTERNAL INTERFACE DEVICE TYPE: PRINTER FORMAT: GRAPHIC DISPLAY33 CRT TABULAR DATA34 MODEM TRENDING (REAL TIME)35 HISTORICAL ARCHIVING
36 DISTRIBUTIVE CONTROL SYSTEM MANUFACTURER MODEL37 DATA TRANSMISSION DATA LINK PROTOCOL38 DISCRETE I/O39 NETWORK TYPE40
41 GOVERNOR SPEED PICKUP SENSORS (12.2.6):
42 MANUFACTURER MODEL INSTALLATION: DUAL TRIPLE INSTALLED SPARE43 NUMBER OF TEETH IN SPEED SENSING SURFACE
44
45 ACTUATOR(S): SUPPLIED BY MANUFACTURER MODEL46 ACTUATOR TYPE HYDRAULIC PNEUMATIC SINGLE COIL MULTI COIL OTHER47
48 TURBINE MOUNTED ACCESSORIES
49 TACHOMETER MANUFACTURER MODEL NUMBER REQUIRED50 LOCATION(S)51
52
53
54
55
SINGLE
10Mechanical Data Sheet for Condensing Steam
Turbine(05-330-C-1-T)0 Busher Petrochemical Company
PAGE
330 DSH C-1-T 002
DOC TYPE SR. NO.ITEM CODEUNIT
10 OF 12SPECIAL-PURPOSE STEAM TURBINE
DATA SHEETSI UNITS
JOB NO.
HTC VOITH
AIRPAX MPU 60
DUAL
2 IIB T3
E360
2
LOCAL PANEL
AIRPAX
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1 OVERSPEED SHUTDOWN SYSTEM (12.3)
2 FURNISHED BY NUMBER OF SPEED PICKUPS
3 MANUFACTURER MODEL SOLENOID SHALL: DE-ENERGIZE TO TRIP4 ELECTRONIC SET POINT (rpm) ENERGIZE TO TRIP
5 OVERSPEED SHUTDOWN REQUIREMENTS CONTACTS SHALL BE: NORMALLY OPEN6 2 OUT OF 3 VOTING LOGIC (12.3.2.1) NORMALLY CLOSED
7 OTHER Vendor to provide extra one speed pickup sensor as spares VOLTAGE LEVEL:
8 (loose supply)
9
10 GLAND SEALING AND VACUUM SYSTEM (15.6)
11 SYSTEM PER: ANNEX G.1 ANNEX G.2 VACUUM SYSTEM FURNISHED BY12 OTHER SHIP LOOSE SKID MOUNTED13 AVAIL. HEADER PRESSURE (BAR) TEMP. (0C) OTHER
14 AVAILABLE SEAL STEAM SUPPLY PRESSURE (BARG) GLAND CONDENSER, SEE SPECIFICATION
15 AVAILABLE SEAL STEAM SUPPLY TEMPERATURE (0C) STEAM EJECTOR STEAM PRESSURE (BARG)16 SEAL STEAM PR. (BARA) FLOW (kg/h) STEAM FLOW (kg/h)17 SEALING STEAM RELIEF VALVE SET PRESSURE (BAR) VACUUM PUMP (15.6.2), SEE SPECIFICATION
18 FURNISHED BY CONDENSATE RECEIVER
19 FLOW ADJUSTING VALVES, TYPE LOOP SEAL HEIGHT (m)
20 FURNISHED BY
21
22 GENERAL MECHANICAL RUNNING TEST (16.3.3)
23 SHOP INSPECTION (16.1.5)
24 EXTENT: CONTRACT ROTOR 25 REFERENCE INSPECTION CHECKLIST (ANNEX. I) (16.1.7) SPARE ROTOR 26 TEST W/JOB COUPLING 27 INSPECTION AND MATERIAL TESTING TEST TAPE RECORD REQUIRED 28 TEST TAPE GIVEN TO PURCHASER 29 SPECIAL MATERIAL INSPECTION AND TESTING REQUIREMENTS (16.2.2) TEST W/JOB LUBE OIL CONSOLE 30 COMPONENT 31 TRIP & T & T
32 VALVE OPTIONAL TESTS (16.3.4)
33 STM CHEST
34 CASING PERFORMANCE (16.3.4.2) 35 PIPING COMPLETE UNIT (16.3.4.3) 36 ROTOR
37
38 HEAT STABILITY (16.2.2) AUXILIARY EQUIPMENT (16.3.4.4)
39 CLEANLINESS (16.2.3.3) TRIP/TRIP AND THROTTLE VALVE 40 HARDNESS (16.2.3.4) GLAND SEAL SYSTEM 41 HYDRO TESTS (16.3.2) GLAND VACUUM SYSTEM 42 BLADE SHAKER (STATIC) RELIEF VALVES 43 ROTOR BALANCE STANDARD (9.6.1) (9.6.2) 44 HIGH SPEED (9.6.3) CASING INTERNAL INSPECTION (16.3.4.5) 45 LOW SPEED PRIOR TO HIGH SPEED (9.6.6) COUPLING TO SHAFT FIT (16.3.4.8) 46 LOW SPEED RESIDUAL UNBALANCE CHECK (9.6.7) TURNING GEAR 47 FINAL SURFACE INSPECTION (16.4.3) OVERSPEED SHUTDOWN SYSTEM (16.3.4.6) 48 CRATING INSPECTION (16.4.1) GOVERNOR RESPONSE (16.3.4.10) 49 SPARE ROTOR FIT SOUND (16.3.4.11)
CASING JOINT LEAK TEST (16.3.2.3) SPARE PARTS TEST (16.3.4.7) 51 52 53 54
55
WIT
400(390~410)
R.T.
0 1
BU-01_05-D-000-MA-SPF-107 Para 3.3.2
1.08
U.T.
MAG PART OBSDYE PEN
4513
HTC
330 DSH C-1-T 002 11 OF 12
JOB NO.
OBS
OVER SPEED TRIP
WIT
OBS
Busher Petrochemical Company
PAGEUNIT DOC TYPE ITEM CODE SR. NO.
0
3
WOODWARD PROTECH GII
SPECIAL-PURPOSE STEAM TURBINEDATA SHEET
SI UNITS
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
40(38~42)
HTC
WIT
INSPECTION AND TESTING (16.2) (16.3)
HTC
40(38~42)
Saki-MRectangle
Saki-MCallout(5) Tests are required, please mark up.
CLIENT :PROJECT TITLE :
HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :
1
2 PAINTING WEIGHTS
3 MANUFACTURER'S STANDARD TURBINE (kg)
4 OTHER ROTOR (kg)
5 TURBINE UPPER HALF CASING (kg)
6 UNIT NAMEPLATE UNITS (6.2.6) U.S. CUSTOMARY SI MAXIMUM FOR MAINTENANCE (IDENTIFY) (kg)7 SHIPMENT (16.4.1) (16.4.3.j) TRIP/TRIP & THROTTLE VALVE (kg)
8 DOMESTIC EXPORT MISCELLANEOUS (kg)9 EXPORT BOXING REQUIRED OUTDOOR STORAGE OVER 12 MONTHS TOTAL SHIPPING MASS (kg)
10 WATERPROOF BOXING REQUIRED
11 SPARE ROTOR ASSEMBLY PACKAGED FOR:
12 HORIZONTAL STORAGE VERTICAL STORAGE (16.4.3.j)13 SPACE REQUIREMENTS: VENDOR DRAWING AND DATA REQUIREMENTS (17)
14 COMPLETE UNIT: L (mm) H (mm) ANNEXURE J
15 CONTROL PANEL: L (mm) H (mm) OTHER
16 OTHER: L (mm) H (mm)
17 OTHER: L (mm) H (mm)
18 REMARKS AND ADDITIONAL REQUIREMENTS:
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
PAGESR. NO.DOC TYPESPECIAL-PURPOSE STEAM TURBINE
DATA SHEETSI UNITS
JOB NO. UNIT
002DSH C-1-T
ITEM CODE
MISCELLANEOUS
Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)
00 1
BU-01-05-D-000-PI-SPF-009
330
Busher Petrochemical Company
~45000
12 OF 12
~4470
~15000
~15000
API 6th DATA SHEET R1