BU-05-VD-305-MA-DSH-3301-002,01

12
Gas Sweetening, Sulphur Recovery, C 2 Recovery, Fractionation and Inter Connection Pipeline Between Plants Project P.O. No.: 05-POR-MA-305-119 BUSHEHR PETROCHEMICAL COMPANY Document Title: Main steam turbine datasheet Rev.: 01 Document No.: BU-05-VD-305-MA-DSH-3301-002 Page 1 of 12 Main Steam Turbine datasheet for 05-330-PKU-1 EQUIPMENT NAME: DRIVE PROPANE COMPRESSOR STEAMTURBINE Code1 (Approved ) No comment and the document is released for Manufacturing Code2 (Approved with comments) Vendor shall correct, revise and resubmit the document The document is released for manufacturing Code3 (Commented) : Vendor shall correct / revise & resubmit document Code4 Not Acceptable Quality (Rejected) Date: Dept: Signature: HuangC HuangHA WuT Issued For Approval 2014-9-30 01 HuangC HuangHA WuT Issued For Review 2014-4-2 00 AUT’D APP’D CHC’D PRE’D Purpose of Issue Status Date Rev.

description

data sheet

Transcript of BU-05-VD-305-MA-DSH-3301-002,01

  • Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants Project

    P.O. No.: 05-POR-MA-305-119

    BUSHEHR PETROCHEMICAL COMPANY

    Document Title: Main steam turbine datasheet Rev.: 01

    Document No.: BU-05-VD-305-MA-DSH-3301-002 Page 1 of 12

    Main Steam Turbine datasheet for 05-330-PKU-1

    EQUIPMENT NAME: DRIVE PROPANE COMPRESSOR STEAMTURBINE

    Code1 (Approved ) No comment and the document is released for Manufacturing

    Code2 (Approved with comments) Vendor shall correct, revise and resubmit the document The document is released for manufacturing

    Code3 (Commented) : Vendor shall correct / revise & resubmit document

    Code4 Not Acceptable Quality (Rejected) Date: Dept: Signature:

    HuangC HuangHA WuT Issued For Approval 2014-9-3001

    HuangC HuangHA WuT Issued For Review 2014-4-200

    AUTD APPD CHCD PRED Purpose of Issue StatusDate Rev.

    Abusalehi-AText BoxGeneral Comments:

    (1) All changes/modification with respect to previous revision should have revision mark (highlight) and SBW is responsible for any change/modification without revision mark.(2) Please manage to keep up to date, Condenser datasheet & Utility consumption list based on this datasheet.

    Please see more comments on other pages...

    Saki-MAccepted

    Saki-MText Box20 Oct 2014MAM.S.CODE 2

    duanweinaMain Steam turbine datasheet for 05-330-PKU-1

  • Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants Project

    P.O. No.: 05-POR-MA-305-119

    BUSHEHR PETROCHEMICAL COMPANY

    Document Title: Main steam turbine datasheet Rev.: 01

    Document No.: BU-05-VD-305-MA-DSH-3301-002 Page 2 of 12

    Revision Index

    Rev. 00 01 02 03 04 05 06 07 Rev. 00 01 02 03 04 05 06 07 Sheet Sheet

    1 X X 2 X X 3 X X 4 X X 5 X X 6 X X 7 X X 8 X X 9 X X

    10 X X 11 X X 12 X X 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1 PROPOSAL PURCHASE AS BUILT2 FOR SBW / BUSHER PETROCHEMICAL COMPANY UNIT

    3 SITE BANDAR ASSALUYEH-IRAN SERIAL NUMBER

    4 SERVICE PROPANE COMPRESSOR DRIVER NUMBER REQUIRED 1(ONE)

    5 MANUFACTURER HANGZHOU STEAM TURBINE CO., LTD MODEL NK50/63 DRIVEN EQUIPMENT ITEM NO.

    6 DRIVEN EQUIPMENT TYPE: COMPRESSOR GENERATOR OTHER7 NOTE: INFORMATION TO BE COMPLETED BY: PURCHASER MANUFACTURER PURCHASER OR MANUFACTURER8

    9 OPERATING POINTS

    10 AS APPLICABLE

    11

    12

    13 COMP. NORMAL

    14

    14

    16 TURBINE RATED

    14

    14

    17 STEAM RATE, kg/kWh (3.45): RATED INDUCTION CONTROLLED UNCONTROLLED18 POTENTIAL MAXIMUM POWER (3.30) EXTRACTION CONTROLLED UNCONTROLLED19

    20 INLET EXHAUST EXTRATION EXTRACTION EXTRACTION21 INDUCTION INDUCTION INDUCTION

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32 LOCATION: (6.1.17) ELECTRICAL:

    33 INDOOR HEATED UNDER ROOF OUTDOOR34 UNHEATED PARTIAL SIDES GRADE MEZZANINE VOLTS35 OTHER: PHASE

    36 WINTERIZATION REQUIRED TROPICALIZATION REQUIRED HERTZ37 LOW TEMPERATURE CORROSIVE AGENTS kW AVAILABLE38 ELECTRICAL AREA CLASSIFICATION: (6.1.16) COOLING WATER:

    39 CLASS GROUP DIVISION INLET TEMPERATURE (0C): MAX. RETURN (0C):

    40 ZONE GROUP TEMP. RATING PRESSURE NORMAL (BAR): DESIGN (BarG/):41 SITE DATA: MINIMUM RETURN PRESSURE (BARG):

    42 ELEVATION (m) BAROM. PRESS. (Bar) MAXIMUM ALLOWABLE PRESSURE DROP (BAR):43 WINTER TEMP. (0C) SUMMER TEMP. (0C) WATER SOURCE

    44 REL. HUMIDITY (%) DESING WET BULB (0C) VELOCITY (m/s): MIN MAX

    45 UNUSUAL CONDITIONS: DUST FUMES CLEANLINESS COEFFICIENT : 46 OTHER: UTILITY CONSUMPTION:

    47 UTILITY CONDITIONS: (6.1.18) COOLING WATER (m3/h): INST. AIR (m3/h):

    48 AUXILIARY STEAM: AUX. STEAM (kg/h): NORMAL MAXIMUM

    49 INITIAL PRESSURE (BARa) AUX. DRIVERS (kW): ELECTRIC STEAM

    50 INITIAL TEMPERATURE (0C) (TT) HEATER(S) (kW): OTHER

    51 EXHAUST PRESSURE (BARG)

    52 INSTRUMENT AIR ((BARa)

    53 INSTRUMENT AIR DEW POINT (0C):

    54 REMARKS:

    55

    NORMAL

    MAXIMUM

    NORMAL

    330

    80%

    05-330-C-1

    T3

    5

    SPECIAL-PURPOSE STEAM TURBINEDATA SHEET

    SI UNITS

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    STEAM CONDITIONS

    DOC TYPEUNIT

    MINIMUM

    MAXIMUM

    1

    ITEM CODE

    C-1-T

    32.2

    2

    SITE AND UTILITY DATA

    50

    DC1

    50

    INSTRUMENT/ CONTROL

    JOB NO.

    ALARM /SHUTDOWN

    SR. NO.

    002330

    PRESSUREBARA

    TEMP.0C (TT)

    FLOWT/h

    PRESSUREBARG

    DSH

    PAGE

    3 OF 12

    ENTHALPYkJ/kg

    Busher Petrochemical Company

    TEMP.0C (TT)

    PRESSUREBARA

    TEMP.0C (TT)

    Thunder, and Lightning

    IIB

    MINIMUM

    74~76

    7.5

    MAX NORM

    270

    4

    MIN

    147

    PRESSUREBARA

    TEMP.0C (TT)

    33

    400

    43

    24

    APPLICABLE TO:

    PERFORMANCE

    SHAFT INLET INDUCTION / EXTRACTION EXHAUST

    FLOWT/H

    POWERkW

    SPEEDRPM

    60.98

    67.36

    41

    41

    0.99~1.1

    48

    2.5

    400

    COOLING TOWERS

    CL-:

    35

    50ppm

    8.5 / 85

    45

    3

    5.5

    DRIVERS HEATING

    4.56

    -40

    8.5

    160

    8

    2

    110

    410

    430

    75.46

    0.126

    39 0.11

    0.11

    4.39

    FLOWT/H

    Turbine Rated

    67.36COMP. rated

    75.46

    NORMAL 60.98

    NOR

    2405.3

    0.11 47.7 2403.1

    0.116

    47.7

    48.8

    410

    410

    4.47

    75.46 41 410

    41

    16869 3980

    13896

    15335

    3891

    3980

    67.36

    60.98

    12250 3844 55.11 41 410 2420.9

    2421.30.126

    0.11

    50.4

    COMP. rated

    COMP. CDR40% TD

    Saki-MRectangle

    Abusalehi-ACallout(3) Based on MOM; 05-301 & 05-301-MOM-BUEI-SB-0001 dated 16 June 2014 item 24.1, relevant comment has been ignored so please keep previous figures.

    Saki-MText Box(4) + Sandstorm

  • CLIENT :PROJECT TITLE :REQUISITION NO. : REV. :

    1 APPLICABLE SPECIFICATIONS: NOISE SPECIFICATIONS:

    2 ISO 10437 (API 612), SPECIAL PURPOSE STEAM TURBINES APPLICABLE TO MACHINE:

    3 OTHER SEE SPECIFICATION:

    4 APPLICABLE TO NEIGHBORHOOD:

    5 VENDOR HAVING UNIT RESPONSIBILITY (3.48): SEE SPECIFICATION:

    6 ACCOUSTICAL TREATMENT YES NO7 GOVERNING SPECIFICATION, IF DIFFERENT: TYPE

    8

    9

    10 TURBINE TYPE BACKPRESSURE CONDENSING INDUCTION EXTRACTION OTHER11 SPEEDS: TORSIONAL CRITICAL SPEEDS (9.5):

    12 MAXIMUM CONTINUOUS (rpm) TRIP (rpm) FIRST CRITICAL (rpm)

    13 MAXIMUM ALLOWABLE (rpm) SECOND CRITICAL (rpm)

    14 LATERAL CRITICAL SPEEDS (DAMPED) (9.2) (AS PER API 612) THIRD CRITICAL (rpm)

    15 FIRST CRITICAL rpm MODE FOURTH CRITICAL (rpm)

    16 SECOND CRITICAL rpm MODE LATERAL ANALYSIS REPORT REQUIRED

    17 THIRD CRITICAL rpm MODE INDIVIDUAL BODY TRAIN18 FOURTH CRITICAL rpm MODE UNDAMPED STIFFNESS MAP REQUIRED (9.2.3.b)

    19 VIBRATION (microns) (PEAK TO PEAK) TRAIN TORSIONAL ANALYSIS REPORT REQUIRED (9.5.1)

    20 TRAIN TORSIONAL ANALYSIS PERFORMED BY

    21 CASINGS, NOZZLES AND DIAPHRAGMS

    22 MAWP (3.17) (7.1.3) HYDROTEST PRESSURE (16.3.2)

    23 INLET SECTION (BARG) EXH. SECTION (BARG) HP CASING (BARG) MID CASING (BARG)

    24 INDUCTION / EXTRACTION SECTION (BARG) EXHAUST CASING (BARG) OTHER (BARG)

    25 OTHER (BARG) WELDED NOZZLE RING (7.3.1) NOZZLE RING % ADM

    26 MAXIMUM ALLOWABLE TEMPERATURE (3.16) (3.21) DIAPHRAGM BLADE ATTACH: INTEGRALLY CAST27 INLET SECTION (0C) EXHAUST SECTION (0C) WELDED OTHER28 INDUCTION / EXTRACTION SECTION (0C)

    29 MINIMUM DESIGN METAL TEMPERATURE (11.1.15) (0C) DIAPHRAGM AXIAL LOCATION: INDIVIDUALLY STACKED30 RELIEF VALVE SETTING INLET (BARG)

    31 EXTRACTION (BAR) OTHER (BARG)

    32 CASING CONNECTIONS

    33

    34 SIZE FACING POSITION FLANGED MATING MAX MINIMUM35 OR STUDDED FLANGE & GASKET STEAM FLOW STEAM FLOW

    36 (7.2.3) BY VENDOR (kg/h) (kg/h)

    37 INLET

    38 EXHAUST

    41

    42 AUXILIARY SCREWED PIPE CONNECTION: TAPERED STRAIGHT MAIN CASING JOINT STUDS / NUTS DESIGNED FOR HYDRO TENSIONING (7.1.15.f)43 ALLOWABLE FORCES AND MOMENTS (2 times NEMA SM-23) note2 ROTATION: (VIEWED FROM INLET END)

    44 CW CCW45

    46

    47 PARALLEL

    48 TO SHAFT VIEW STEAM

    49 VERTICAL

    50 HORIZONTAL 900

    51

    52

    53

    54

    55

    note1:( M)=mechnical trip speed

    note2: already provided and integrated by compressor vendor

    BU-01_05-D-000-MA-SPF-102

    General specification -"Special Purpose Steam Turbine"

    05-330-C-1 PROPANE COMPRESSOR VENDOR

    SPECIAL-PURPOSE STEAM TURBINEDATA SHEET

    SI UNITS

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    PAGE

    MOMENTFORCE MOMENT

    COMPRESSOR VENDORS

    FLANGED

    FLANGED Y

    68.25

    ITEM CODE

    DSH C-1-T 002 4 OF 12

    IPS-G-SF-900

    0

    Busher Petrochemical Company

    JOB NO.

    25

    EXHAUST EXTRACTION / INDUCTION

    2

    UNIT

    0

    DOC TYPE

    45.5 0.7&FV

    4597(M)note1

    ~3000

    Y

    430 120

    1*10" RTJ/1500LB DOWN

    CONSTRUCTIONAL FEATURES

    SR. NO.

    330

    1

    4179

    2200*1106MM DOWN

    CONNECTION

    FORCEMOMENT

    5

    FORCE

    Nm N Nm N NmN

    INLET

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1 MATERIAL - CASING AND APPURTENANCES:

    2 HIGH PRESSURE CASING DIAPHRAGM / BLADE CARRIERS

    3 MID PRESSURE CASING DIAPHRAGM NOZZLES

    4 EXHAUST CASING OTHER

    5 STEAM CHEST Bearing Housing:

    6 NOZZLE RING

    7 STEAM CONTAMINANTS (11.1.6)

    8 STEAM PATH COMPONENTS < HRC 22 (11.1.9)

    9

    10 ROTATING ELEMENTS (8)

    11 SHAFT TYPE:

    12 INTEGRAL WHEELS BUILT-UP (8.1.2) COMBINATION SHAFT ENDS: DIAMETER @ COUPLING (mm)13 DOUBLE EXTENDED STRAIGHT TAPER (mm/m)14 NUMBER OF STAGES BEARING SPAN (mm) KEYED SINGLE DOUBLE15 SHAFT MATERIAL HYDRAULIC FIT INTEGRAL FLANGE16 BLADES (BUCKETS): MAXIMUM TIP SPEED (m/s) FIELD BALANCING PROVISIONS REQUIRED (8.1.4)17 FINAL STAGE BLADE LENGTH (mm) MAX (mm) DESCRIPTION OF FIELD BALANCING PROVISIONS:18 REMARKS:

    19 REMARKS:

    20

    21

    22

    23 WHEEL MATERIAL

    24 BLADE MATERIAL

    25 BLADE ROOT TYPE

    26 CLOSURE PIECE TYPE

    27 TIE WIRE MATERIAL

    28 SHROUD MATERIAL

    29 SHROUD ATTACH.

    30 PITCH DIAMETER (mm)

    31 BLADE HEIGHT (mm)

    32 BLADE TYPE

    33

    34

    35 SHAFT SEALS (10.5)

    36

    37 MAXIMUM SEAL PRESSURE (BARG) CASING END SEALS (10.5.1):

    38 STEAM LEAKAGE (kg/h) TYPE: LABYRINTH OTHER39 AIR LEAKAGE (m3/h)(STD. COND.) MATERIAL: 1Cr18Ni9Ti(321)

    40 SHAFT DIAMETER @ SEAL (mm)

    41 STATIONARY LABYRINTH TYPE

    42 ROTATING LABYRINTH TYPE INTERSTAGE SEALS (10.5.2):

    43 MATERIAL TYPE: LABYRINTH44 OTHER45 MATERIAL: 1Cr18Ni9Ti(321)

    46

    47

    48 REMARKS: note1:-77.6 means there is no steam leakage ,77.6 means seal steam consumption

    49

    50

    51

    52

    53

    54

    55

    Comparison sheet of turbine materials between HTC code and others have been

    already supplied

    Sealing strip

    STAGE 1

    REACTION

    25

    Foulenss-0.00020m2*W

    1Cr18Ni9Ti(321)

    1.08

    1Cr18Ni9Ti(321)

    Flute

    INLET

    JOB NO.

    Gr D

    28CrMoNiV49

    UNIT

    GS-C25

    Busher Petrochemical Company0

    STAGE

    50

    5 OF 12

    11.5

    1.08

    -77.6 note1

    EXHAUST

    DOC TYPE

    330

    REACTION

    STAGE 25STAGE 2~24 STAGESTAGE

    N.AX22CrMoV12 1

    C-1-T

    INTEGRAL

    T

    N.A

    DSH

    STAGE

    28CrMoNiV49

    FORK

    X20Cr13

    X20Cr13

    SPECIAL-PURPOSE STEAM TURBINEDATA SHEET

    SI UNITS

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    0

    INTEGRAL

    X22CrMoV12 1

    IMPULSE

    Sealing strip

    GS-22Mo4

    GS-22Mo4

    X22CrMoV12 1

    002

    GS-C25&GS-22Mo4

    PAGEITEM CODE SR. NO.

    1

    X22CrMoV12 1

    28CrMoNiV49

    X22CrMoV12 1/X20Cr13

    28CrMoNiV49

    2735

    Sealing strip

    FORK

    N.A

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1 BEARING AND BEARING HOUSINGS

    2 RADIAL (10.1) THUST (10.2)

    3 TYPE * NOTE 1

    4 MANUFACTURER TYPE

    5 LENGTH (mm) MANUFACTURER

    6 SHAFT DIAMETER (mm) UNIT LOADING MAX. (N)

    7 UNIT LOAD (ACT / ALLOW) (N) UNIT LOADING ULTIMATE (N)

    8 BASE MATERIAL NUMBER OF PADS

    9 BABBIT THICKNESS (mm) AREA (mm2)

    10 NUMBER OF PADS PIVOT: CENTER/OFFSET (%)

    11 LOAD: BETWEEN / ON PAD PAD BASE MATERIAL

    12 PIVOT: CENTER / OFFSET (%)

    13 LUBRICATION: FLOODED DIRECTED14 THRUST COLLOR: INTEGRAL REPLACEABLE15 BEARING TEMPERATURE DEVICES: VIBRATION DETECTORS:

    16 THERMOCOUPLES TYPE TYPE MODEL17 SELECTION SWITCH AND INDICATOR BY: PURCHASEER MANUFACTURER MANUFACTURER18 RESISTANCE TEMPERATURE DETECTORS NUMBER AT EACH SHAFT BEARING TOTAL NUMBER

    18 RESISTANCE MATERIAL (Ohm) MONITOR SUPPLIED BY20 SELECTION SWITCH AND INDICATOR BY: PURCHASEER MANUFACTURER LOCATION ENCLOSURE21 LOCATION - JOURNAL BEARING MANUFACTURER MODEL22 TOTAL LOCATION SCALE RANGE ALARM SET @ (microns)23 SCALE RANGE ALARM SET @ (0C) SHUT DOWN SET @ (microns) DELAY (s)24 SHUTDOWN SET @ (0C) DELAY (s) AXIAL POSITION DETECTORS:

    25 LOCATION - THRUST BEARING TYPE MODEL26 ACTIVE SIDE MANUFACTURER NUMBER REQUIRED27 TOTAL LOCATION MONITOR SUPPLIED BY

    28 INACTIVE SIDE LOCATION ENCLOSURE29 TOTAL LOCATION MANUFACTURER MODEL30 SCALE RANGE ALARM SET @ (0C) SCALE RANGE ALARM SET @ (microns)31 SHUTDOWN SET @ (0C) DELAY (s) SHUT DOWN SET @ (microns) DELAY (s)32 MONITOR SUPPLIED BY: COMP. VENDOR PROVISION FOR ACCELEROMETER MOUNTED ON BEARING HOUSINGS

    33 LOCATION ENCLOSURE KEYPHASOR: STEAM TURBINE GEAR DRIVEN EQUIPMENT34 MANUFACTURER MODEL REMARKS:35

    36

    37 * NOTE 1: THE TURBING IS PRIOR TO APPLY THE TITLING PAD RADIAL

    38 BEARING, BUT IF THE TITLING PAD BEARING CAN NOT PASS THE VIBRATION ANALYSIS, THE ELLIPTICAL BEARING WILL BE APPLIED.

    39 LUBRICATION AND CONTROL OIL SYSTEM (15.5)

    40 REFERENCE SPECIFICATIONS: OIL REQUIREMENTS:

    41 FURNISHED BY TURBINE MANUFACTURER OTHERS / SBW NORMAL FLOW (m3/h)42 SEPARATE FOR TURBINE ONLY TRANSIENT FLOW (m3/h)43 COMMON WITH DRIVEN EQUIPMENT (15.5.2)(15.5.5): PRESSURE (BAR)44 TEMPERATURE (0C)

    45 TURBINE MANUFACTURER TO SUPPLY: TOTAL HEAT REJECTED (kW)

    46 CONTROL OIL ACCUMULATOR OIL TYPE (HC / SYNTHETIC)47 STAINLESS STEEL OIL SUPPLY HEADING PIPING VISCOSITY (cP @37.80C)48 OIL DRAIN HEADER PIPING FILTRATION (microns)49 STAINLESS STEEL CARBON STEEL50 SIGHT FLOW INDICATORS51 CONTROL OIL FILTERS SINGLE DUAL compressor vender 52 to supply

    53

    54

    55

    75

    3300

    INACTIVETILTING PAD TYPE

    20

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    3 BENTLEY NEVADA

    45

    CCR

    BENTLY NEVADA

    NON-CONTACTING

    3500

    10

    LUBE OIL

    ~12

    ~30

    45

    0.85

    ISO VG46

    0.25

    800

    INLET

    20

    Later

    Kingsbury

    EXHAUST

    6 OF 12C-1-T

    JOB NO. UNIT

    0

    DOC TYPESPECIAL-PURPOSE STEAM TURBINE

    DATA SHEETSI UNITS

    330 DSH

    0

    Busher Petrochemical Company

    ITEM CODE SR. NO. PAGE

    002

    TILTING PAD TYPE

    Kingsbury

    TILTING PAD TYPEKingsbury

    Later

    NON-CONTACTING

    1

    Later

    TILTING PAD TYPE

    200

    ACTIVE

    Later

    20

    Later

    6

    Later

    Later

    6

    3500

    50

    10

    3300

    Bearing Metal

    BU-01_05-D-000-MA-SPF-101

    2

    CR

    Kingsbury

    5

    250

    20

    5

    105

    Later

    B.N

    105

    Later

    560

    RTD

    Pt 100

    BENTLEY NEVADA

    2

    SBW

    4

    Bearing Metal

    0~200

    2 per bearing Bearing Metal

    SBW

    115

    3500

    115

    CCR

    ISO VG46

    CTRL OIL

    ~17

    BENTLY NEVADA

    2

    0~200

    Saki-MRectangle

    Mottaghi-MCallout(4) Each RTD shall be dual Element Type.Please mention "Dual Element RTD"

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1

    2 COUPLINGS AND GUARDS (15.1) SEE COMPRESSOR DATA SHEET

    3 NOTE: SEE ROTATING ELEMENTS - SHAFT ENDS

    4 SEE ATTACHED ISO 10441 DATA SHEET

    5 COUPLING FURNISHED BY

    6 MANUFACTURER TYPE MODEL

    7 COUPLING GUARD FURNISHED BY

    8 TYPE FULLY ENCLOSED SEMI OPEN OTHER9 COUPLING DETAILS VENDOR MOUNT HALF COUPLING (15.1.8)

    10 MAXIMUM OUTER DIAMETER (mm) MASS SIMULATOR (15.1.6) IDLING ADAPTER REQUIRED (15.1.7)11 HUB MASS (kg) LUBRICATION REQUIREMENTS

    12 SPACER LENGTH (mm) GREASE CONT. OIL LUBE NONE13 SPACER MASS (kg) QUANTITY PER HUB

    14

    15 MOUNTING PLATES (15.3)

    16 BASEPLATES FURNISHED BY: SOLEPLATES FURNISHED BY:

    17 UNDER TURBINE ONLY THICKNESS (mm)

    18 OPEN NON-SKID DECKING (15.3.2.8) DRIP RIM SUBPLATES REQUIRED (15.3.2.7)19 LEVELING PADS (15.3.2.3) HOLD-DOWN BOLTS FURNISHED BY:

    20 SINGLE SECTION MULTI SECTION EPOXY PRIMER VENDOR (15.3.1.7)21 COLUMN MOUNTING (15.3.2.2) SUBPLATES REQUIRED (15.3.2.7)22 LEVELING (CHOCK) BLOCKS REQUIRED SUPPLIED BY ANCHOR BOLTS FURNISHED BY (15.3.1.9):

    23 GEAR UNIT (15.2)

    24 FURNISHED BY: REFERENCE API 613 OTHER25 SEE ATTACHED GEAR DATA SHEETS

    26 CONTROL AND INSTRUMENTATION (12)

    27 INSTRUMENTS AND CONTROL PANELS SHALL BE API 614, PAGES

    28 IN ACCORDANCE WITH THE FOLLOWING API 670, PAGES

    29 ATTACHED DATA SHEETS: PURCHASER'S DATA SHEETS

    30

    31 PROTECTIVE DEVICES

    32

    33

    34

    35 MOUNTING LOCATION

    36 SET RELIEF PRESSURE (BarG)

    37 CAPACITY, STEAM (kg/h)

    38 VALVE MANUFACTURER

    39 VALVE TYPE

    40 VALVE SIZE / RATING

    41 FLANGE FACING (FF, RF)

    42 FURNISHED BY

    43 QUANTITY

    44

    45 REMARKS:

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    00 1

    002

    PAGE

    ACCESSORIES

    Busher Petrochemical Company

    DOC TYPE

    330 DSH 7 OF 12

    ITEM CODE SR. NO.

    C-1-T

    JOB NO. UNIT

    SBW

    SPECIAL-PURPOSE STEAM TURBINEDATA SHEET

    SI UNITS

    NON-RETURN VALVE(S)(12.3.1.4)

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    THERMAL RELIEF VALVES(S)

    (15.4.4)

    Exhaust Piping

    0.07

    EXHAUST RELIEF VALVE(7.1.3) (15.4.1) (15.4.2)

    EXTRACT. / INDUCT. RELIEF VALVE

    (7.1.3) (15.4.1) (15.4.2)

    VACUUM BREAKER(12.3.1.3)

    condenser cooling water return line

    100%

    HTC

    Water sealing spring type

    150LB

    RF

    SBW

    HTC

    SBW

    2

    SBW

    Flexible Diaphfragm later

    SBW

    SBW

    Min. 457

    RF

    HTCHTC

    2

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1 TRIP TRIP & THROTTLE VALVES (12.3.4.1) DUPLICATE TRIP/TRIP AND THROTTLE VALVES REQUIRED (12.3.4.2)2 LOCATION: MAIN INLET INDUCTION STRAINER: OPENING SIZE (mm/MESH)3 PROVIDED BY: VENDOR PURCHASER MATERIAL4 MANUFACTURER MODEL TEMPORARY START-UP STRAINER (MESH)

    5 SIZE RATING FACING MATERIAL

    6 SIZE RATING FACING STEM MATER HARDNESS (HRC)

    7 SIZE RATING FACING SEAT MATERIAL HARDNESS (HRC)

    8 CONSTRUCTION FEATURES: PACKING MATERIAL LEAK OFF (kg/h)

    9 RESET: MANUAL HYDRAULIC SPRING SUPPORT OF VALVE REQUIRED10 TRIP: LOCAL (MANUAL) REMOTE BY VENDOR BY PURCHASER11 EXERCISER: LOCAL (MANUAL) REMOTE12 FULLY OIL OPERATED13 GOVERNOR - CONTROLLED VALVE(S):

    14 LOCATION:

    15

    16 TRIP POSITION (OPEN/CLOSED)

    17 NUMBER OF VALVES

    18 CONNECTION SIZE

    19 RATING

    20 FACING (RT, RTJ, OTHER)

    21 ACTION (CAM, BAR, OTHER)

    22 STEM MATERIAL

    23 STEM MATERIAL HARDNESS, HRC

    24 SEAT MATERIAL

    25 SEAT MATERIAL HARDNESS, HRC

    26 PACKING MATERIAL

    27 PACKING LEAKOFF, kg/h)

    28

    29

    30

    31

    32 TURNING GEAR (15.8) MISCELLANEOUS

    33 TURNING GEAR REQUIRED (15.8.1) START-UP ASSISTANCE (DAYS)

    34 FURNISHED BY VENDOR'S REVIEW & COMMENTS ON PURCHASER'S

    35 TYPE (15.8.5) SPEED (rpm) PIPING AND FOUNDATION DRAWINGS (6.1.9)

    36 ENGAGEMENT (15.8.2) (15.8.3) (15.8.4): AUTO MANUAL VENDOR WITNESS INITIAL ALIGNMENT (6.1.9)37 MANUFACTURER MODEL "Y" TYPE STRAINER

    38 MOUNTED BY WATER WASHING CONNECTIONS

    39 DRIVER: REFERENCE SPECIFICATION STATIC CONDUCTING BRUSHES

    40 DRIVEN BY: ELECTRIC MOTOR STEAM TURBINE SHUTDOWN ACTIVITIES EXHAUST VACUUM BREAKER (12.3.1.3)41 (15.8.5) HYD. / PNEUM. MOTOR OTHER:42 OPERATOR STATION (15.8.7) LOCAL REMOTE43 INSULATION AND JACKETING (15.7) SPECIAL TOOLS (15.9)

    44 BLANKET OTHER COUPLING RING AND PLUG GAUGE BY COMP. VENDOR45 JACKETING HYDRAULIC MOUNTING / REMOVAL KIT BY COMP. VENDOR

    46 CARBON STEEL STAINLESS STEEL OTHER47 EXTENT SPREADER BEAM(S) (15.9.3)

    48 ON LOAN 49 PURCHASE50

    51

    52

    53

    54

    55

    21Cr12MoV(X22CrMoV121)

    INDUCTION

    HTC

    330 002 8 OF 12

    DOC TYPE ITEM CODE SR. NO. PAGE

    00 1

    Busher Petrochemical Company

    C-1-TDSH

    INDUCTIONEXTRACTION

    HYDRAULIC

    Graphite

    BAR

    21Cr12MoV

    21CrMoV

    NOTES

    CLOSED

    MAIN INLET

    INDUCTIONEXTRACTION

    LANTHANIDE MATERIAL COAT

    4 OR 5

    Other

    Later

    25person-day

    Turbine Washing Facilities

    1*10"

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    HTC HYDRAULIC

    RF

    JOB NO. UNIT

    1Cr18Ni9Ti(361)

    INLET INDCUT.

    21CrMoV(21CrMoV5 7)

    HTC

    HTC

    SPECIAL-PURPOSE STEAM TURBINEDATA SHEET

    SI UNITS

    1500LB

    1.5

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1 GOVERNOR (12.2)

    2 TYPE DIGITAL PROCESSOR BASED MANUFACTURER MODEL3 OTHER SUPPLIED BY4 SIMPLEX MULTI-CPU5 STEAM TURBINE TYPE

    6 SINGLE VALVE SINGLE STAGE DOUBLE AUTOMATIC EXTRACTION

    5 SINGLE VALVE MULTI STAGE SINGLE AUTOMATIC EXTRACTION/INDUCTION

    8 MULTI VALVE MULTI STAGE DOUBLE AUTOMATIC EXTRACTION/INDUCTION

    9 SINGLE AUTO EXTRACTION OTHER

    10 DRIVEN EQUIPMENT TYPE

    11 CENTRIFUGAL COMPRESSOR SYNCHROUS GENERATOR

    12 AXIAL COMPRESSOR INDUCTION GENERATOR

    13 CENTRIFUGAL PUMP OTHER

    14 SERVICE REQUIREMENTS

    15 MECHANICAL DRIVE GENERATOR DRIVE

    16 SPEED CONTROL BY: DROOP CONTROL

    17 PROCESS VARIABLE PRESSURE FLOW FREQUENCY CONTROL18 EXTRACTION PRESSURE FLOW LOAD CONTROL19 INDUCTION PRESSURE FLOW kW CONTROL20 TURBINE INLET PRESSURE FLOW kW IMPORT/EXPORT CONTROL21 TURBINE EXHAUST PRESSURE FLOW LOAD SHEDDING22 OTHER AUTOMATIC SYNCHRONIZATION

    23 AUTOMATIC VOLTAGE REGULATION

    24 TURBINE INLET PRESSURE LIMITING

    25 INLET PRESSURE LIMITER

    26 INPUT / OUTPUT REQUIREMENTS

    27 DISCRETE INPUTS DISCRETE OUTPUTS

    28 START OR RESET COMMON SHUTDOWN

    29 NORMAL STOP COMMON ALARM

    30 EMERGENCY TRIP OVERSPEED TRIP (rpm)

    31 RAISE SPEED REMOTE SPEED SET POINT ENABLED

    32 LOWER SPEED PRESSURE CONTROL ENABLED

    33 ENABLE/DISABLE REMOTE SPEED SET POINT FLOW CONTROL ENABLED

    34 RAMP TO MINIMUM CONTINUOUS EXTRACTION CONTROL ENABLED

    35 OVERSPEED TEST ENABLE INDUCTION CONTROL ENABLED

    36 ENABLE PRESSURE CONTROL SPEED PICKUP ALARM

    37 ENABLE EXTRACTION CONTROL OTHER

    38 REMOTE ALARM CLEAR / ACKNOWLEDGE

    39 ENABLE AUTO SYNCHRONIZE

    40 CASCADE RAISE / LOWER ANALOG OUTPUTS (4 mA TO 20 mA)

    41 OTHER SPEED

    42 ANALOG INPUTS (4 mA TO 20 mA) SPEED SET POINT

    43 REMOTE SET POINT REMOTE SPEED SET POINT

    44 PROCESS PRESSURE EXTRACTION PRESSURE

    45 EXTRACTION PRESSURE FLOW EXTRACTION PRESSURE SET POINT46 kW IND. LOAD PRESSURE FLOW ACTUATOR POSITION47 kW IMPORT/EXPORT PROCESS PRESSURE

    48 OTHER Inlet steam pressure kW

    49 kW IMPORT/EXPORT

    50

    51

    52

    53

    54

    55

    JOB NO. UNIT DOC TYPE SR. NO. PAGEITEM CODE

    Busher Petrochemical Company

    SPECIAL-PURPOSE STEAM TURBINEDATA SHEET

    SI UNITS

    002330 DSH C-1-T

    00 1

    9 OF 12

    Note: This signal will be supplied by SBW

    WOODWARD 505E

    HTC

    4513

    Ready to start

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1 GOVERNOR INSTALLATION REQUIREMENTS

    2 LOCATION LOCAL (AT TURBINE) MOUNTING FLUSH MOUNT IN PANEL SURFACE MOUNT3 REMOTE (CONTROL ROOM) VERTICAL RACK4 OTHER POWER SOURCE5 AREA CLASSIFICATION: Not Classified 400 V (A.C.) 6 CLASS GROUP DIVISION 110 V (A.C.) 7 ZONE GROUP TEMP. RATING 125 V (D.C.) 8 ENCLOSURE IP 65 24 V (D.C.) 9 NEMA 4

    10 NEMA 4X 11 OTHER12 LOCAL GOVERNOR GAUGE BOARD REQUIRED NOT REQUIRED

    13 LOCATION LOCAL ENCLOSURE IP 6514 REMOTE (CONTROL ROOM) NEMA 4 NEMA 4X15 OTHER OTHER16 AREA CLASSIFICATION:17 OUTPUTS FROM PANEL TO GOVERNOR CLASS GROUP DIVISION

    18 START ZONE GROUP TEMP. RATING19 TRIP INPUTS TO PANEL FROM GOVERNOR20 RAISE COMMON ALARM TRIP21 LOWER TRIP LAMP22 OVER SPEED TEST REMOTE SETPOINT ENABLED LAMP23 RAMP TO MINIMUM CONTINUOUS SPEED SETPOINT METER24 REMOTE SET POINT ENABLE / DISABLE OTHER25 RESET26 OTHER27 MISCELLANEOUS GOVERNOR DETAILS

    28 GOVERNOR ACTION ON LOSS OF REMOTE SIGNAL: LOCKS ON LAST VALUE

    29 GOES TO MINIMUM CONTINUOUS

    30 GOES TO MAXIMUM CONTINUOUS

    31

    32 EXTERNAL INTERFACE DEVICE TYPE: PRINTER FORMAT: GRAPHIC DISPLAY33 CRT TABULAR DATA34 MODEM TRENDING (REAL TIME)35 HISTORICAL ARCHIVING

    36 DISTRIBUTIVE CONTROL SYSTEM MANUFACTURER MODEL37 DATA TRANSMISSION DATA LINK PROTOCOL38 DISCRETE I/O39 NETWORK TYPE40

    41 GOVERNOR SPEED PICKUP SENSORS (12.2.6):

    42 MANUFACTURER MODEL INSTALLATION: DUAL TRIPLE INSTALLED SPARE43 NUMBER OF TEETH IN SPEED SENSING SURFACE

    44

    45 ACTUATOR(S): SUPPLIED BY MANUFACTURER MODEL46 ACTUATOR TYPE HYDRAULIC PNEUMATIC SINGLE COIL MULTI COIL OTHER47

    48 TURBINE MOUNTED ACCESSORIES

    49 TACHOMETER MANUFACTURER MODEL NUMBER REQUIRED50 LOCATION(S)51

    52

    53

    54

    55

    SINGLE

    10Mechanical Data Sheet for Condensing Steam

    Turbine(05-330-C-1-T)0 Busher Petrochemical Company

    PAGE

    330 DSH C-1-T 002

    DOC TYPE SR. NO.ITEM CODEUNIT

    10 OF 12SPECIAL-PURPOSE STEAM TURBINE

    DATA SHEETSI UNITS

    JOB NO.

    HTC VOITH

    AIRPAX MPU 60

    DUAL

    2 IIB T3

    E360

    2

    LOCAL PANEL

    AIRPAX

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1 OVERSPEED SHUTDOWN SYSTEM (12.3)

    2 FURNISHED BY NUMBER OF SPEED PICKUPS

    3 MANUFACTURER MODEL SOLENOID SHALL: DE-ENERGIZE TO TRIP4 ELECTRONIC SET POINT (rpm) ENERGIZE TO TRIP

    5 OVERSPEED SHUTDOWN REQUIREMENTS CONTACTS SHALL BE: NORMALLY OPEN6 2 OUT OF 3 VOTING LOGIC (12.3.2.1) NORMALLY CLOSED

    7 OTHER Vendor to provide extra one speed pickup sensor as spares VOLTAGE LEVEL:

    8 (loose supply)

    9

    10 GLAND SEALING AND VACUUM SYSTEM (15.6)

    11 SYSTEM PER: ANNEX G.1 ANNEX G.2 VACUUM SYSTEM FURNISHED BY12 OTHER SHIP LOOSE SKID MOUNTED13 AVAIL. HEADER PRESSURE (BAR) TEMP. (0C) OTHER

    14 AVAILABLE SEAL STEAM SUPPLY PRESSURE (BARG) GLAND CONDENSER, SEE SPECIFICATION

    15 AVAILABLE SEAL STEAM SUPPLY TEMPERATURE (0C) STEAM EJECTOR STEAM PRESSURE (BARG)16 SEAL STEAM PR. (BARA) FLOW (kg/h) STEAM FLOW (kg/h)17 SEALING STEAM RELIEF VALVE SET PRESSURE (BAR) VACUUM PUMP (15.6.2), SEE SPECIFICATION

    18 FURNISHED BY CONDENSATE RECEIVER

    19 FLOW ADJUSTING VALVES, TYPE LOOP SEAL HEIGHT (m)

    20 FURNISHED BY

    21

    22 GENERAL MECHANICAL RUNNING TEST (16.3.3)

    23 SHOP INSPECTION (16.1.5)

    24 EXTENT: CONTRACT ROTOR 25 REFERENCE INSPECTION CHECKLIST (ANNEX. I) (16.1.7) SPARE ROTOR 26 TEST W/JOB COUPLING 27 INSPECTION AND MATERIAL TESTING TEST TAPE RECORD REQUIRED 28 TEST TAPE GIVEN TO PURCHASER 29 SPECIAL MATERIAL INSPECTION AND TESTING REQUIREMENTS (16.2.2) TEST W/JOB LUBE OIL CONSOLE 30 COMPONENT 31 TRIP & T & T

    32 VALVE OPTIONAL TESTS (16.3.4)

    33 STM CHEST

    34 CASING PERFORMANCE (16.3.4.2) 35 PIPING COMPLETE UNIT (16.3.4.3) 36 ROTOR

    37

    38 HEAT STABILITY (16.2.2) AUXILIARY EQUIPMENT (16.3.4.4)

    39 CLEANLINESS (16.2.3.3) TRIP/TRIP AND THROTTLE VALVE 40 HARDNESS (16.2.3.4) GLAND SEAL SYSTEM 41 HYDRO TESTS (16.3.2) GLAND VACUUM SYSTEM 42 BLADE SHAKER (STATIC) RELIEF VALVES 43 ROTOR BALANCE STANDARD (9.6.1) (9.6.2) 44 HIGH SPEED (9.6.3) CASING INTERNAL INSPECTION (16.3.4.5) 45 LOW SPEED PRIOR TO HIGH SPEED (9.6.6) COUPLING TO SHAFT FIT (16.3.4.8) 46 LOW SPEED RESIDUAL UNBALANCE CHECK (9.6.7) TURNING GEAR 47 FINAL SURFACE INSPECTION (16.4.3) OVERSPEED SHUTDOWN SYSTEM (16.3.4.6) 48 CRATING INSPECTION (16.4.1) GOVERNOR RESPONSE (16.3.4.10) 49 SPARE ROTOR FIT SOUND (16.3.4.11)

    CASING JOINT LEAK TEST (16.3.2.3) SPARE PARTS TEST (16.3.4.7) 51 52 53 54

    55

    WIT

    400(390~410)

    R.T.

    0 1

    BU-01_05-D-000-MA-SPF-107 Para 3.3.2

    1.08

    U.T.

    MAG PART OBSDYE PEN

    4513

    HTC

    330 DSH C-1-T 002 11 OF 12

    JOB NO.

    OBS

    OVER SPEED TRIP

    WIT

    OBS

    Busher Petrochemical Company

    PAGEUNIT DOC TYPE ITEM CODE SR. NO.

    0

    3

    WOODWARD PROTECH GII

    SPECIAL-PURPOSE STEAM TURBINEDATA SHEET

    SI UNITS

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    40(38~42)

    HTC

    WIT

    INSPECTION AND TESTING (16.2) (16.3)

    HTC

    40(38~42)

    Saki-MRectangle

    Saki-MCallout(5) Tests are required, please mark up.

  • CLIENT :PROJECT TITLE :

    HANGZHOU STEAM TURBINE CO., LTD REQUISITION NO. : REV. :

    1

    2 PAINTING WEIGHTS

    3 MANUFACTURER'S STANDARD TURBINE (kg)

    4 OTHER ROTOR (kg)

    5 TURBINE UPPER HALF CASING (kg)

    6 UNIT NAMEPLATE UNITS (6.2.6) U.S. CUSTOMARY SI MAXIMUM FOR MAINTENANCE (IDENTIFY) (kg)7 SHIPMENT (16.4.1) (16.4.3.j) TRIP/TRIP & THROTTLE VALVE (kg)

    8 DOMESTIC EXPORT MISCELLANEOUS (kg)9 EXPORT BOXING REQUIRED OUTDOOR STORAGE OVER 12 MONTHS TOTAL SHIPPING MASS (kg)

    10 WATERPROOF BOXING REQUIRED

    11 SPARE ROTOR ASSEMBLY PACKAGED FOR:

    12 HORIZONTAL STORAGE VERTICAL STORAGE (16.4.3.j)13 SPACE REQUIREMENTS: VENDOR DRAWING AND DATA REQUIREMENTS (17)

    14 COMPLETE UNIT: L (mm) H (mm) ANNEXURE J

    15 CONTROL PANEL: L (mm) H (mm) OTHER

    16 OTHER: L (mm) H (mm)

    17 OTHER: L (mm) H (mm)

    18 REMARKS AND ADDITIONAL REQUIREMENTS:

    19

    20

    21

    22

    23

    24

    25

    26

    27

    28

    29

    30

    31

    32

    33

    34

    35

    36

    37

    38

    39

    40

    41

    42

    43

    44

    45

    46

    47

    48

    49

    50

    51

    52

    53

    54

    55

    PAGESR. NO.DOC TYPESPECIAL-PURPOSE STEAM TURBINE

    DATA SHEETSI UNITS

    JOB NO. UNIT

    002DSH C-1-T

    ITEM CODE

    MISCELLANEOUS

    Mechanical Data Sheet for Condensing SteamTurbine(05-330-C-1-T)

    00 1

    BU-01-05-D-000-PI-SPF-009

    330

    Busher Petrochemical Company

    ~45000

    12 OF 12

    ~4470

    ~15000

    ~15000

    API 6th DATA SHEET R1