Beginning JAVA by E-Learning

Thanakit Sapmamoon 532115035

Noppasart Fongkham 532115041

Project AdvisorMr.Kittitouch Suteeca

Agenda

Project Overview Project Planning ISO29110 System Feature Software Demo Video Problem Comments and Suggestions from ShowPro

event

Project Overview

Beginning JAVA By E-Learning Convenience for user

- can use everywhere- learning via text and video- exercise for practice java skill

Project Overview (cont.)

Limitation Google Chrome is the most effectiveness browser. Require internet connection

Project Planning

Project Overall Status : 100%

Progress I6 URS (1,2,3,4,6,7)

Progress II2 URS (5,9)

Progress III3 URS (8,10,11)

Final Progress11 URS

ISO 29110

ISO29110 is the Software Life Cycle Profiles and Guidelines for enterprise,organization,department or project having up to 25 people.

Project Management activities: PM.1 Project Planning PM.2 Project Plan Execution PM.3 Project Assessment and Control PM.4 Project Closure

Software Implementation activities SI.1 Software Implementation Initiation SI.2 Software Requirements Analysis SI.3 Software Architectural and Detailed Design SI.4 Software Construction SI.5 Software Integration and Tests SI.6 Product Delivery

ISO 29110

Project Management Activity

PM.1 Project Planning

Identify project scope with project advisor Estimate time for each task Plan the schedule

PM.2 Project Plan Execution

Define the project repository as Dropbox Identify the software configuration item

PM.2 Project Plan Execution (cont.)

No. Work Item Repository Baseline Version

1. Proposal / BJE/Proposal 1.5

2. Project Management Plan / BJE /Project Plan 3.0

3. Software Requirement Specification / BJE /SRS 3.0

4. Software Design Document / BJE /SDD 3.0

5. Traceability Record / BJE/Traceability Record 3.0

6. Test Plan / BJE /Testing 3.0

7. Test Record / BJE / Testing 3.0

8. SourceCode / BJE / Software Source Code

1.0

9 Project Status Record / BJE / Etc 1.0

10 Self Assessment / BJE / Etc 1.0

Configuration Item Table

PM.3 Project Assessment and Control

Create Project Status Report for each progress report Progress I , Progress II and Progress III

PM.3 Project Assessment and Control (cont.)

Example of project status report

PM.4 Project Closure

Create Verification Record for recording the verification results Check by the checklist The checklist is from the tasks in the quality

planning in Project Plan

ISO 29110

Software Implementation

SI.1 Software Implementation Initiation

Identify Development Tools Hardware and Material Resource Responsibilities

SI.2 Software Requirement Analysis

Gathering the requirements from project advisors and team members

Analyze the requirements Establish Software Requirements Specification

(SRS) 11 URS and 25 SRS Including these diagrams :▪ 11 Use Case diagrams▪ 16 Activity diagrams

Example of SRS

Use Case Diagram for User and Visitor

Example of SRS (cont.)

Use Case Diagram for Admin

Example of SRS (cont.)

Example of AD-14 Admin add text file

SI.3 Software Architectural and Detailed design

Establish Software Design Document Including :▪ System Architecture▪ Class Diagram▪ Sequence Diagram▪ User Interface

Create Traceability Record

Example of SDD Example of SD-12 Admin add video

SI.4 Software Construction

Construction software follow SRS and SDD Perform unit testing

SI.5 Software Integration and Tests

Design the test cases and establish Test Plan 22 unit test cases, 18 system test cases

Perform the test cases Record the test results in the Test Record

SI.6 Product Delivery

Get acceptance by project advisor

System Feature

Registration System (done) Login & Logout System (done) Admin design assignment (done) Admin upload text and video for learning (done) User can learning (done) User can do assignment

Coding assignment (done) (Add to progress III) Drag and Drop assignment (done)

Score statistic page Can’t keeping score into database but can see source code

of coding assignment (fail)

Software Demo Video

Problems

Take a long time for develop part of coding assignment and checking assignment system

In part of learning , PDF file can show on firefox browser only

Comment and Suggestions from ShowPro event

Can upload text file for design assignment (just write in text file then upload and program will generate assignment)

Should have more type of assignment

Thank you for your kind attention

Q&A