Post on 13-Mar-2020
“OSI PI”
• What is it?
• Who else uses it?
• Why does UVM PPD want to use it?
Mike Pelletier Physical Plant DepartmentSenior Project Engineer All Hands Meeting 2015
UVM Energy Use PPD received funding for project implementation from
UVM Clean Energy Fund
Building Energy Tracking / Savings
Spring 2015
“OSI PI” – Project Goals
•Provide a platform for students to access the campus energy consumption and have the ability to create scenarios that reduce energy and greenhouse gas creation.
•Create the ability to combine data from multiple sources into one common repository to simplify use.
•Develop a data archive that can be accessed to provide before and after evidence of benefits.
•Create an opportunity for students to understand energy flows in a real world environment.
Campus Background
• Total # Buildings > 350
• Total Building Area ~ 5.0M SQ FT
• 2014 Annual Cost of Electricity = $8.3 Million
> 100 electric accounts with “smart meters”
• 2014 Annual cost of Heating = $3.8 Million > 100 gas meters
• Central Cooling & Heating Plants 3 separate control systems which do not “talk” to each other:
Delta V, Honeywell, and Johnson Controls
~ 100 boilers and ~ 50 cooling units
© C o p y r i g h t 2 0 1 2 O S I s o f t , L L C .
OSIsoft Company Fact Sheet
• Corporate – Founded 1980, Private
• Dr. J. P. Kennedy, Founder and CEO
• Employees – 1100+
• Engineering – 200 Cust. Support - 300
• Sales & Mkt – 220 Operations - 135
• Sales
• $ 300 MM (FYE 2013)
• 14.2 % CAGR – 10 years
• Geography
• Doing business in 110 + countries
• 26 offices in 16 countries.
• The business we are in…
• Enterprise Wide Infrastructure for streaming data & events
• Installed Base
• 4,000 + Active Customers
• 15,000 + Active System licenses (excluding OEM)
• 400,000,000 DataStreams
• Monitor 800 PI servers, 1800 Host computers & 8000 interfaces
6
OSIsoft’s Core Industries
• OSIsoft is ranked 1st in the power industry
• DTE Energy, PSE&G, Entergy, British Energy, Iberdrola
• 100% of the global Top 10 producers use the PI System
• BP, Shell, Chevron, ExxonMobil, Pemex, Total, Petrobras
• 40 of top 50 Chemical Companies rely on the PI System
• Dow Corning, Eastman Kodak, Cytec, Rhodia
• Nine of the Top 10 pharmaceuticals use the PI System
• Amgen, Bayer, PDL, Allergen, Johnson & Johnson, Roche
• The PI System is installed in the world's largest mining companies.
• Cemex, Cargill, BHP Billiton Yabulu, Codelco
• 400 sites from worldwide leaders use OSIsoft to manage their mills
• Abitibi, Cascades, Inc., International Paper, MeadWestvaco
• Innovative use of PI System to monitor complex IT environments
• Microsoft, Hewlett Packard, Thomson Reteurs, RBC
The software provides….Operational Intelligence
© C o p y r i g h t 2 0 1 2 O S I s o f t , L L C .
“OSI PI” – Many other campus users nationwide
Carnegie Mellon University, PA University of California at San Diego
University of California at Davis Harvard University
“OSI PI” – Many other campus users nationwide
The University of Iowa
“OSI PI” – Sample Dashboards from other campuses
“OSI PI” – Sample Dashboards from other campuses
CHW Valve Positions
Microsoft Campus in Redmond, WA
Operate CHW pumps based on CHW valve
positions at coils
“OSI PI” – Sample Dashboards from other campuses
The PI System Architecture
© C o p y r i g h t 2 0 1 2 O S I s o f t , L L C .
UVM Cloud at Tech Park
Chuck Norton’s
Office
Chuck Norton’s
Office
Proposed UVM PI System Architecture
15
Why does UVM want to use OSI PI? • The software works. It ’s proven technology.
• It is embedded in the Delta V controls in the Central Heating Plant
• It ’s cheaper than replacing all existing controls at UVM into one common platform
• Many configurable displays. limited only by our creativity
• We’ll GET THE FACTS to be able to make informed decisions for:
• What is the load
• Determining when to turn equipment on/off
• Optimize operations
• What is the cost of heating or cooling
• Managing the power demand kW $
• Diagnosing equipment
• Individual building operational costs
Davis Center: # 7 of Top 20 electricity users at UVM
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
$45,000
$50,000
10/18/2012 5/6/2013 11/22/2013 6/10/2014 12/27/2014 7/15/2015
Am
ou
nt
Bill
ed
Month Billed
Davis CenterTotal chg.'s
EEU Chg
Prev./Misc.
Franchise fee
Power factorchg.
Demand chg.
KWH chg.
Cust. chg.
$-
$5,000
$10,000
$15,000
$20,000
$25,000
$30,000
$35,000
$40,000
$45,000
$50,000
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
PER
CEN
T O
F B
ILL
MONTH BILLED
Davis Center
Cust. chg. KWH chg. Demand chg.
Power factor chg. Franchise fee Leased light
Prev./Misc. EEU Chg Total chg.'s$2,100
$15,345
OSI Pi Users – Sample Dashboards
Even more…. Dashboard Samples
Physical Plant Department
M.R. Pelletier 3/2015
Install Server, Software, and Port existing controls
Start with Central Plant then roll out to a Honeywell and a Johnson Building
Create conversion table for converting control names from “Martian language” to English
Collect electrical data – Shark meters; Power Logic; and BED Smart Meters
FUNDING FOR PROJECT
Clean Energy Fund $120,000
Physical Plant operating $40,000
Total Project Cost = $160,000
Physical Plant Department
M.R .Pelletier 3/2015
OSI PI Project Implementation
25
OSI PI Implementation: Where are we now?
• The PC’s are here
• “UVM Cloud” is available to load software
• Software is ready for download
• Network being configured
• Secret Decoder Ring (database) not yet developed
• BED Smart Electric Meters (need more technology to get it to work properly)
• Need to select 2 UVM buildings for beta testing: 1 Honeywell and 1 Johnson Controls building
Summary
• What is it - software
• Who else uses it - lots of people, other campuses nationwide
• Why does UVM want to use it – understand and reactappropriately