AFRH-W
Sheridan Building Exterior AlterationsFinal Design Review Submission
Submitted by: Armed Forces Retirement Home
Submitted to: National Capital Planning Commission
June 30, 2011
AFRH-W
Sheridan Building Exterior AlterationsFinal Design Review Submission
Submitted by: Armed Forces Retirement Home
Submitted to: National Capital Planning Commission
June 30, 2011
CONTENTS:
I. Project ReportII. Documentation of Existing ConditionsIII. Documentation of NEPA ComplianceIV. Documentation of Section 106 ComplianceV. Drawings, and Plans (also see separate enclosure)VI. Materials Specifications
Armed Forces Retirement Home - Washington Sheridan Building – Exterior Alterations for Assisted Living NCPC Final Design Review Submission June 30, 2011 I. PROJECT REPORT
a. Name and telephone number of agency project manager
Justin Seffens Armed Forces Retirement Home Chief of Campus Operations 3700 North Capitol Street, NW Washington, DC 20010 202-541-7549
b. Narrative description of the project including existing conditions to be affected and a
summary of the basic design concept on which the physical form of the proposal is based. AFRH proposes to construct a new glass and steel elevator tower and to expand existing window openings on the Sheridan Building (Building 17). These alterations will accommodate the relocation of Assisted Living residents from the LaGarde Building (Building 56) to the Sheridan Building as part of the Home’s ongoing efforts to consolidate operations in the north end of the campus. After the relocation, Assisted Living residents and services will be housed on the second and third floors of the south tower of the Sheridan Building. Constructed in 1960, the Sheridan Building dates from outside the period of significance of the AFRH-W Historic District (1842-1951) and is identified as a non-contributing resource. ELEVATOR TOWER Scope A new elevator tower at the Sheridan Building will accommodate two elevator shafts to provide access to all floors of the building, including the basement. AFRH has designed the new tower to be outside the existing building footprint because of the difficulty and cost of altering the original reinforced concrete floor structure. Instead, the tower will project from a recessed bay at the southwest corner of the Sheridan Building, adjacent to the south building entrance. The tower will extend approximately 6’ above the height of the existing roof parapet and continue a full story below grade to the level of the existing subterranean tunnel between the Sheridan and Scott buildings. The tower will be constructed of a steel frame with a glass curtain wall enclosure, and the elevator cabs will feature transparent glass walls. The curtain wall will have aluminum silicone glazed mullions along the vertical joints and will be fitted with aluminum mullions along the horizontal joints, corresponding to the floor lines of the existing building. The curtain wall glass will be Viracon 1” VE1-2m Insulating Silkscreen Glass in Medium Gray Viraspan. The Silkscreen will have a ½” fret stripe. The machine room for the elevators will be located below grade and accessed from the basement to minimize the height of the tower. The tower will have a flat roof and flush cornice to be in keeping with the character of the roofline of the existing building. AFRH will also construct a new entry pavilion at the existing south entrance to the building to be consistent in design and material with the new elevator tower. The new entry pavilion will also be constructed of a glass curtain wall with aluminum mullions and will project approximately 13 ft from the face of the building. The fascia and soffits of the pavilion’s projecting metal roof will be wrapped in aluminum panels. An aluminum-wrapped column will support the pavilion roof at the southwest corner.
Purpose • Consolidate operations on the north end of campus. • Reduce travel distances for residents and staff. • Improve food service. • Improve efficiency of back-of-house services. • Accommodate emergency equipment.
Need • AFRH is consolidating the Home’s operations in the north end of the campus to decrease
operating costs for the agency. The new elevator tower is part of the relocation of Assisted Living residents and services to the north end, and thus important to the overall consolidation effort.
• AFRH seeks to minimize travel distance for food service and to avoid moving food through common areas. The existing elevators would require dining staff to travel through the central activity spaces and the primary corridors of the Sheridan Building to access Assisted Living residents in the south tower of the building. The new elevators, however, will allow staff to move directly to Assisted Living from the service tunnel between the New Commons Building and the Sheridan Building. This will make food service more efficient and cost effective for AFRH-W.
• Transporting bulk food a shorter distance between the kitchen and Assisted Living floors will contribute to a higher quality of food because appropriate hot and cold temperatures can be maintained during transit.
• The elevators will serve all floors of the Sheridan Building and will thus provide additional convenience and mobility to all residents traveling between the Sheridan Building and the New Commons Building.
• The new elevators will improve safety and comfort for residents and staff by minimizing the travel distance between the new Assisted Living community and the wellness clinic in the New Commons Building.
• Elevators that are used to transport Assisted Living residents on stretchers must allow enough space for additional medical equipment and for larger than typical patients and medics, per building code requirements. The existing elevators in the Sheridan building can accommodate a stretcher on a diagonal only and do not meet this requirement. The new elevators will meet existing code.
• Maximizing the residents’ efficient and safe utilization of their living environment, promoting their access to supportive services, and enhancing the quality of food service are all important components of person-centered care, a key focus of the agency’s CARF accreditation. Enhancing the residents’ ability to safely and more easily move throughout the Sheridan Building will meet the goals for environmental and communications accessibility stated in CARF Quality Standards.
EXPANDED WINDOW OPENINGS Scope The exterior of the Sheridan Building will be altered to accommodate the new Assisted Living functions on the interior of the building. The existing masonry panels outside the corner rooms on the second and third floors at the south end of the Sheridan Building will be removed, and four existing punched openings will be expanded to accommodate larger windows. The openings will be fitted with Viracon 1” VRE1-46 #2 Radiant Low-e Insulating Laminated Glass. Purpose
• Consolidate operations on north end of campus. • Provide natural light and views to new Assisted Living day rooms.
Need • AFRH is consolidating the Home’s operations in the north end of the campus to decrease
operating costs for the agency. Design changes to accommodate the relocation of Assisted Living residents to the Sheridan Building is important to the overall consolidation effort.
• Providing more modern, light-filled spaces will be an attraction to potential AFRH-W residents and their families.
• Assisted Living residents may have limited mobility and may not be able to fully enjoy the amenities and common areas that the agency provides on other parts of the campus. Increasing the visibility of the campus from day rooms and activity rooms is an important part of providing a
comfortable, appealing, and calming setting for Assisted Living residents, while also providing a sense of connection between these residents and the activities taking place outside the building.
In accordance with the review process outlined in the 2008 AFRH-W Programmatic Agreement, AFRH has completed an Undertaking Review Request (URR) for this project. DCHPO has signed the request in concurrence with the agency’s finding of no adverse effect, contingent up on the design meeting the height described in this scope of work. No additional Section 106 review is required for this project.
c. Total area of the site and allocation of land to proposed uses.
1,380 square feet (area/limit of work on first floor, including interior work) d. Area of building(s) and site coverage. 7,750 square feet (total area of proposed work)
e. Existing assigned employment and projected assigned employment over a 20-year
period, in five-year increments.
Assisted Living employees currently working in the LaGarde Building will relocate to the new Assisted Living community in the Sheridan Building once construction is complete. The new elevator tower and expanded window openings will not result in a net change of full-time employees at AFRH-W
f. Description of the relationship of the project to the agency’s master plan, where
applicable, including rationale for any deviations. The proposed addition to and modification of the Sheridan Building is consistent with the NCPC-approved AFRH-W Master Plan (August 2008). The project is located in the North-Northeast Sub-zone of the AFRH Zone, and complies with all design guidelines relevant to this location. The project location is indicated in yellow on the Master Plan map. The proposed elevator tower is an appropriate architectural feature of the Sheridan Building (an institutional building) and is consistent with the design guidelines for this sub-zone. The window enlargements are in keeping with the allowable solid/void ratios for institutional buildings in this area of campus.
g. Status of coordination with affected local and state governments and the
Metropolitan Washington Council of Governments for projects not previously coordinated through an installation master plan.
N/A. The proposed project is not new development, but rather an improvement to an existing building. This project is consistent with the NCPC-approved Final AFRH-W Master Plan (August 2008). h. Status of community participation, including summary of community views.
The scope of the project is consistent with the NCPC-approved AFRH-W Master Plan and does not require a Master Plan Amendment. Therefore, no public participation is required for Section 106 compliance for this project, pursuant to the AFRH-W Programmatic Agreement (2008). Further, this project falls under an existing AFRH CATEX, and no public participation is required for NEPA compliance. i. Schedule for construction and occupancy. Construction will begin in November 2011. Construction should take approximately 1 year. The new elevator tower and expanded window openings should be in place and in service by November 2012. j. Total estimated cost of project and funding status.
The total project cost is approximately $1,900,000. Funding has been approved by the AFRH Chief Operating Officer, Chief Financial Officer, and the Capital Funding Committee. k. A transportation management program for any project that will increase the
employment level on a work site to 500 or more employees (including existing and proposed employees).
The new elevator tower and expanded window openings will not result in a net change of full-time employees or a change in land use at AFRH-W. There will be no permanent impact on traffic patterns or volume as a result of this project, and a transportation management program is not required.
Armed Forces Retirement Home - Washington Eagle Gate Renovation Project Final Design Review Submission June 30, 2011 II. EXISTING CONDITIONS
FIGURE 1: Proposed project location
PROJECT LOCATION
FIGURE 2: Location of proposed new elevator tower and entry pavilion (view of southwest corner of the Sheridan Building, looking northeast) EHT Traceries, May 2011
FIGURE 3: Location of proposed new elevator tower and entry pavilion (view of southwest corner of the Sheridan Building, looking east) EHT Traceries, May 2011
FIGURE 4: Location of proposed expanded window openings (view of south elevation of the Sheridan Building, looking northeast) EHT Traceries, May 2011
FIGURE 5: Location of proposed new entry pavilion (detail of south building entrance, looking east) EHT Traceries, May 2011
FIGURE 6: Location of proposed new entry pavilion (detail of south building entrance, looking northeast) EHT Traceries, May 2011
FIGURE 7: Location of proposed new elevator tower (detail of southeast corner of the Sheridan Building) EHT Traceries, May 2011
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 1/11
DC SHPOUNDERTAKING REVIEW REQUEST (URR)
DATE: May 20, 2011 PROPOSED START DATE: September 2011
RESOURCE(S) TO BE AFFECTED: RLS: Sheridan Building (Building 17) Non-Contributing
BRIEF DESCRIPTION OF PROPOSED ACTION:
AFRH proposes to construct a new glass and steel elevator tower and to expand existing window openings on the Sheridan Building. These alterations will accommodate the relocation of Assisted Living residents from the LaGarde Building to the Sheridan Building as part of the Home’s efforts to consolidate operations in the north end of the campus. Assisted Living will be located on the second and third floors of the south tower of the building. Constructed in 1960, the Sheridan Building dates from outside the period of significance of the AFRH-W Historic District and is identified as a non-contributing resource.
ELEVATOR TOWER
Scope The new tower will accommodate two elevator shafts that will provide access to all floors of the Sheridan Building, including the basement. The tower cannot be accommodated within the footprint of the building because of the difficulty and cost of altering the building’s floor structure. Instead, the tower will project from a recessed bay at the southwest corner of the building, adjacent to the south entrance. The tower will extend approximately 5’6” above the height of the existing roof parapet and will extend a full story below grade, at the level of the existing subterranean tunnel between the Sheridan and Scott buildings. A new entry pavilion will be constructed adjacent to the tower and will be consistent in character with the new elevator tower.
The tower will be constructed of a steel frame with glass enclosure, and the elevator cabs will be glass. The machine room will be located in the basement.
Purpose: The elevators will be used by all residents living in the south tower of the Sheridan Building to minimize the travel distance between the Sheridan Building and the New Commons Building. The elevators will be used for food service between the kitchen facilities in the New Commons Building and the relocated Assisted Living residents in the Sheridan Building. The elevators will assist in moving supplies and other back-of-house services between the New Commons Building and the two Assisted Living floors by connecting to the new service tunnel between the two buildings.The elevators will be used by AFRH-W staff to transport Assisted Living residents in the Sheridan Building to the wellness clinic, administrative and business offices, and activity spaces in the New Commons Building, including the dining room, library, computer room, meditation chapel, swimming pool, fitness center, and therapy room.The elevators will be used in emergency situations to accommodate stretchers.
Need: Relocating Assisted Living residents from the LaGarde Building to the Sheridan Building is the primary component of consolidating the Home’s operations in the north end of the campus and is crucial to decreasing operating costs for the agency. The new elevator tower will accommodate this relocation.
GOVERNMENT OF THE DISTRICT OF COLUMBIA STATE HISTORIC PRESERVATION OFFICE
1100 4th Street, S.W., Suite E650, Washington, D.C. 20024 Phone: 202-442-7600 Fax: 202-442-7638
DC STATE HISTORIC PRESERVATION OFFICEFEDERAL AGENCY SECTION 106 REVIEW FORM
TO: Justin Seffens, Federal Preservation Officer ADDRESS: Armed Forces Retirement Home-Washington, 3700 North Capitol Street, NW
PROJECT NAME/DESCRIPTION: Sheridan Building exterior alterations (URR #15)
PROJECT ADDRESS/LOCATION DESCRIPTION: Sheridan Building (Building 17)
DC SHPO PROJECT NUMBER: 11-275
The DC State Historic Preservation Office (DC SHPO) has reviewed the above-referenced federal undertaking(s) in accordance with Section 106 of the National Historic Preservation Act and has determined that:
Alternate two, with the lower elevator, will be constructed; the final design will be reviewed by the U.S. Commission of Fine Arts and the National Capital Planning Commission.
BY: DATE: June 8, 2011 Timothy Dennee, Architectural Historian
This project will have no effect on historic properties. No further DC SHPO review or comment will be necessary.
There are no historic properties that will be affected by this project. No further DC SHPO review or comment will be necessary.
This project will have no adverse effect on historic properties. No further DC SHPO review or comment will be necessary.
This project will have no adverse effect on historic properties conditioned upon fulfillment of the measures stipulated below.
Other Comments / Additional Comments (see below):
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 2/11
AFRH food services seek to minimize travel distance and avoid moving food through common areas. Theexisting elevators would require dining staff to travel through the central activity spaces and the primary corridors of the Sheridan Building to access Assisted Living residents. The new elevators, however, will allow staff to move directly to Assisted Living from the service tunnel between the New Commons Building and the Sheridan Building. This will make food service more efficient and cost effective for AFRH-W.Transporting bulk food a shorter distance between the kitchen and Assisted Living floors will contribute to a higher quality of food because appropriate hot and cold temperatures can be maintained during transit. The new elevators will provide additional convenience and mobility to all residents traveling from the New Commons Building to the Sheridan Building, as the elevators will serve all floors of Sheridan. The new elevators will improve safety and comfort for residents and staff by minimizing the travel distance for transporting Assisted Living residents to the wellness clinic in the New Commons Building. The elevators will minimize travel distance to the New Commons Building for all Independent Living residents in the southern towers of the Sheridan Building, which is important for many residents who have decreased mobility.Elevators that are used to transport Assisted Living residents on stretchers must allow enough space for additional medical equipment and for larger than typical patients and medics, per building code requirements. The existing elevators in the Sheridan building can accommodate a stretcher on a diagonal, but they do not provide enough additional space. The new elevators will meet existing code. Maximizing the residents’ efficient and safe utilization of their living environment, promoting their access to supportive services, and enhancing the quality of food service are all important components of person-centered care, a key focus of the agency’s CARF accreditation. Enhancing the residents’ ability to safely and more easily move throughout the Sheridan Building will meet the goals for environmental and communications accessibility stated in CARF Quality Standards.
EXPANDED WINDOW OPENINGS Scope The exterior of the Sheridan Building will be altered to accommodate the new Assisted Living functions on the interior of the building. The existing masonry panels outside the corner rooms on the second and third floors at the south end of the Sheridan Building will be removed, and four existing punched openings will be expanded to accommodate floor-to-ceiling glass.
Purpose: The expanded openings correspond to new day rooms on the interior of the building. The increased glazing will dramatically improve visibility from the day rooms to the exterior.
Need: Relocating Assisted Living residents from the LaGarde Building to the Sheridan Building is the primary component of consolidating the Home’s operations in the north end of the campus and is crucial to decreasing operating costs for the agency. Design changes for new day rooms for Assisted Living residents will accommodate this relocation.Providing more modern, light-filled spaces will be an attraction to potential AFRH-W residents and their families. Assisted Living residents may have limited mobility and may not be able to fully enjoy the amenities and common areas that the agency provides on other parts of the campus. Increasing the visibility of the campus from day rooms and activity rooms is an important part of providing a comfortable, appealing, and calming setting for Assisted Living residents, while also providing a sense of connection between these residents and the activities taking place outside the building.
IS ANY DEMOLITION OR REMOVAL OF BUILDING OR LANDSCAPE MATERIAL ANTICIPATED?
Yes. The proposed scope includes removal of existing building material from a non-contributing building.
IS THERE AN ADVERSE EFFECT ON RESOURCE(S)?No.
IF YES, EXPLAIN:N/A
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 3/11
ATTACHMENTS:
MAP SHOWING APE, INDICATING LOCATION OF AFFECTED RESOURCES
COMPREHENSIVE PHOTOS OF APECOMPREHENSIVE PHOTOS OF AFFECTED RESOURCE(S)AFRH-W RI/CRM DATA SHEET FOR AFFECTED RESOURCE(S)ARCHITECTURAL DRAWINGS, SUFFICIENT TO INDICATE DESIGN OF PROPOSED WORK
ADDITIONAL INFORMATION:n/a
INTERNAL AFRH-W INFO:
NAME OF PROJECT PROPOSER REQUESTING PERMISSION TO PROCEED:
Justin Seffens (Chief of Campus Operations and Federal Preservation Officer, AFRH-W)
TELEPHONE: 202-730-3508E-MAIL: justin.seffens@afrh.gov
WHO WILL OVERSEE THE ACTION? Justin Seffens (Chief of Campus Operations, AFRH-W)
CONTRACTOR(S) EXPECTED TO CARRY OUT THE ACTION:
Hensel Phelps
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 5/11
Figure 1: Location Map for Sheridan Building (Building 17)
ProjectLocation
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 6/11
Figures 2 and 3: View of recessed bay at southwest corner of the Sheridan Building, location of the proposed elevator tower
Figure 4: Detail of recessed bay at southwest corner of the Sheridan Building, location of the proposed elevator tower
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 7/11
Figure 5: View of southwest corner of the Sheridan Building, location of proposed expanded window openings on the second and third stories
Figure 6: Detail of existing entry at southwest corner of the Sheridan Building
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 8/11
Figure 7: Context view of proposed new elevator tower on the Sheridan Building
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 9/11
Figure 8: Context view of proposed alterations to window openings on south elevation of the Sheridan Building
Figure 9: Detail view of proposed alterations to window openings on 2nd and 3rd stories of the south elevation of the Sheridan Building
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 10/11
URR #15 – Sheridan Building Exterior Alterations May 20, 2011 Page 11/11
UP
18.6
5A
10.6
1A
10.2
EXIS
TIN
G P
EDES
TRIA
N T
UN
NEL
PHAS
E I
BASE
/ALT
ERN
ATE
1 (A
LL G
RO
UN
D L
EVEL
IMPR
OVE
MEN
TSIN
CLU
DIN
G E
LEVA
TOR
PIT
)
BASE
ON
LYR
EFER
TO
SH
EET
A10.
3 FO
REL
EVAT
OR
MAC
HIN
E R
OO
MAL
TER
NAT
E
1
A10
.8
2A
10.2
BASE
SEC
TIO
N
ALTE
RN
ATE
ISE
CTI
ON
BASE
/ALT
ERN
ATE
1G
RAD
ED T
ERR
AIN
AN
DR
ETAI
NIN
G W
ALL
BASE
BASE
BASE
REF
ER T
O S
HEE
T A1
0.3
FOR
ELE
VATO
R M
ACH
INE
RO
OM
ALT
ERN
ATES
ELEV
ATO
R AL
TERN
ATES
BASE
- PR
OVI
DE
TUN
NEL
CO
NN
ECTI
ON
FR
OM
SC
OTT
BU
ILD
ING
TO
SH
ERID
AN B
UIL
DIN
G,
INC
LUD
ING
ALL
DEM
OLI
TIO
N A
ND
IM
PRO
VEM
ENTS
WO
RK
AT L
EVEL
S G
RO
UN
DTH
RO
UG
H R
OO
F IN
CLU
DIN
G IN
STAL
LATI
ON
O
F N
EW E
LEVA
TOR
S, C
UR
TAIN
WAL
L SY
STEM
, EN
TRY
VEST
IBU
LE, S
LAB
ADD
ITIO
NAN
D S
TRU
CTU
RAL
REI
NFO
RC
EMEN
TS, A
ND
FI
NIS
HES
.
ALT
ERN
ATE
I -
PRO
VID
E AL
L W
OR
K IN
CLU
DIN
G D
EMO
LITI
ON
AND
NEW
IMPR
OVE
MEN
TS O
NLY
AT
GR
OU
ND
FLO
OR
. PR
OVI
DE
TEM
POR
ARY
CAP
AS
PER
1/
A10.
2. E
XCLU
DE
ALL
WO
RK
FRO
M L
EVEL
S1
THR
U 7
, EXC
LUD
E AL
L EL
EVAT
OR
EQ
UIP
MEN
T AT
GR
OU
ND
FLO
OR
.
ALTE
RNAT
E LE
GEN
D
BASE
/ALT
ERN
ATE
1 W
OR
K AN
DIM
PRO
VEM
ENTS
BASE
WO
RK
AND
IMPR
OVE
MEN
TS
EXIS
TIN
G S
HER
IDAN
CO
NST
RU
CTI
ON
TO
REM
AIN
AN
D B
E PR
OTE
CTE
D D
UR
ING
WO
RK
N
GEN
ERAL
SER
VIC
ES A
DM
INIS
TRAT
ION
301
7TH
& D
STR
EETS
, SW
RO
OM
200
2W
ASH
ING
TON
, DC
204
07
ARM
ED F
OR
CES
RET
IREM
ENT
HO
ME
3700
NO
RTH
CAP
ITO
L ST
REE
T N
WW
ASH
ING
TON
, DC
200
11
CERTIFICATIONS KEY PLAN REVISION NOTES GRAPHIC SCALE CONTRACTORS BUILDING PROJECT DRAWING
MAR
KD
ATE
DES
CR
IPTI
ON
A/E
CO
N. N
O.
A/E
TASK
NO
.
CO
NS.
CO
NTR
.
CO
NS.
WO
RK
PRIM
E A/
E
SUB
A/E
CO
NST
R. C
ON
.
NAM
E
STR
EET
CIT
Y/ST
./ZIP
BUIL
DIN
G N
O.
OTH
ERBU
ILD
ING
NO
s.
FAC
ILIT
Y C
OD
E
PRO
JEC
TTI
TLE
PRO
JEC
TD
ESC
RIP
TIO
N
PRO
JEC
T N
O.
GSA
PM
SUBM
ISSI
ON
SUB
DAT
E
DR
AWIN
G T
ITLE
FILE
NAM
E
FLO
OR
NO
.
DR
AWN
BY
CH
ECKE
D B
Y
DR
AWIN
G N
O.
DIS
CIP
LIN
ESH
EET
TYPE
SEQ
UEN
CE
SHEE
TO
FPR
OPE
RTY
OF
THE
UN
ITED
STA
TES
GO
VER
NM
ENT
- FO
R O
FFIC
IAL
USE
ON
LY.
D
o no
t rem
ove
this
not
ice.
P
rope
rly d
estro
y do
cum
ents
whe
n no
long
er n
eede
d.
DAT
E D
RAF
TED
:
SCO
TT B
UIL
DIN
G
SCO
TT R
OAD
NW
WAS
HIN
GTO
N, D
C 2
0011
SHEE
T SI
ZE: 3
0 X
42
RIC
K H
AMIL
TON
SCO
TT B
UIL
DIN
G R
EPLA
CEM
ENT
Tel D
ata
Engi
neer
Pow
erho
use
Des
ign
Arc
hite
cts
and
Engi
neer
s Lt
d.
412.
287.
7333
412-
287-
7334
Cos
t Con
sulta
ntR
ider
Lev
ett B
uckn
all
617.
737.
9339
617.
737.
0540
101
C:\U
sers
\mpa
gane
tti\D
ocum
ents
\AFR
HC
once
pt_C
entra
l_m
paga
netti
.rvt
As
indi
cate
d
Jaco
bs E
ngin
eerin
g, In
c.57
1.72
1.12
01C
onst
ruct
ion
Man
ager
571.
721.
1271
Amm
an W
hitn
ey20
2.33
1.74
90St
ruct
ural
Eng
inee
r20
2.33
1.10
29
Bur
o H
appo
ld C
onsu
lting
Engi
neer
s
MEP
/FP/
Tel D
ata
Engi
neer
617.
419.
2284
A. M
orto
n Th
omas
and
Ass
ocia
tes,
Inc.
301.
881.
0814
Civ
il En
gine
er80
0.88
1.25
45
Geo
conc
epts
Eng
inee
ring,
Inc.
703.
726.
8032
Geo
tech
nica
l Eng
inee
r70
3.72
6.80
30
Froe
hlin
g &
Rob
erts
on, I
nc91
9.58
2.03
04En
viro
nmen
tal E
ngin
eer
919.
828.
3441
Poly
soni
cs C
orpo
ratio
n54
0.34
1.09
09A
cous
tical
Con
sulta
nt54
0.34
1.49
88
mcl
a20
2.29
8.80
79Li
ghtin
g C
onsu
ltant
202.
298.
8062
Lee
and
Asso
ciat
es20
2.46
6.42
32La
ndsc
ape
Arc
hite
ct20
2.46
6.66
66
Hop
kins
Foo
d Se
rvic
eSp
ecia
lists
, Inc
.30
1.32
0.92
02Fo
od S
ervi
ce C
onsu
ltant
301.
320.
9200
A10.
1
Aut
hor
Che
cker
02/1
5/11
ELEV
ATO
R P
HAS
ING
Febr
uary
28,
201
1
BRID
GIN
G D
OC
UM
ENT
AFR
H -
New
Com
mon
s an
dH
ealth
care
Cen
ter
2900
3.00
1/8
" = 1
'-0"
1PH
ASIN
G P
LAN
- G
RO
UN
D F
LOO
R
1/8
" = 1
'-0"
2PH
ASIN
G P
LAN
- FI
RST
FLO
OR
1/8
" = 1
'-0"
3PH
ASIN
G P
LAN
- SE
CO
ND
FLO
OR
1/8
" = 1
'-0"
4
PHAS
ING
PLA
N -
ELEV
ATO
R R
OO
FLE
VEL
90
Sher
idan
Gro
und
Floo
r-1
' - 0
"
Sher
idan
Firs
t Flo
or13
' - 0
"
Sher
idan
Sec
ond
Floo
r27
' - 0
"
She
ridan
Ele
vato
r Pit
-8' -
0"
TEM
POR
ARY
CO
NC
RET
E SL
AB
NEW
WAL
KWAY
CO
NTI
NU
OU
S W
ATER
PRO
OFI
NG
OVE
RR
EMO
VABL
E C
ON
CR
ETE
SLAB
NEW
REM
OVA
BLE
CO
NC
RET
EM
ETAL
DEC
K SL
AB
8" x
8" S
TEEL
BEA
MS
AT 4
' ON
CEN
TER
INFI
LL E
LEVA
TOR
DO
OR
OPE
NIN
GS
WIT
H 6
x8x1
6C
ON
CR
ETE
BLO
CKS
EXIS
TIN
G E
NTR
Y
EXIS
TIN
G C
ANO
PY
EXIS
TIN
G F
OU
ND
ATIO
N W
ALL
EXIS
TIN
GPI
LE C
AP
PRO
VID
EBO
ND
BR
EAKE
R
PRO
VID
E KE
Y, W
ATER
STO
P AN
DEP
OXY
AN
CH
OR
ED D
OW
ELS
AT 2
4" O
N C
ENTE
R
PRO
VID
E KE
Y, W
ATER
STO
P AN
DEP
OXY
AN
CH
OR
ED D
OW
ELS
AT 2
4" O
N C
ENTE
R
PRO
VID
E EX
PAN
SIO
N B
OLT
EDA
NG
LES
BETW
EEN
TH
E BE
AMS
FOR
MET
AL D
ECK
SUPP
OR
T
EXIS
TIN
G P
EDES
TRIA
N T
UN
NEL
Sher
idan
Thi
rd F
loor
37' -
6"
She
ridan
Six
th F
loor
69' -
0"
She
ridan
Sev
enth
Flo
or79
' - 6
"
Sher
idan
T.O
. Cop
ing
93' -
0 1
/4"
Elev
ator
Roo
f Lev
el98
' - 6
"
8' - 6"
10' - 0"
8' - 3"8' - 0" TYP.
V.I.F.
8' - 0" TYP.
V.I.F.
8' - 0" TYP.
V.I.F. 10' - 0"
NEW
WAL
KWAY
CO
NC
RET
E PI
T W
ALLS
BEYO
ND
EXIS
TIN
G F
OU
ND
ATIO
N W
ALL
EXIS
TIN
GPI
LE C
AP
PRO
VID
EBO
ND
BR
EAKE
R
PRO
VID
E KE
Y, W
ATER
STO
P AN
DEP
OXY
AN
CH
OR
ED D
OW
ELS
AT 2
4" O
N C
ENTE
R
PRO
VID
E KE
Y, W
ATER
STO
P AN
DEP
OXY
AN
CH
OR
ED D
OW
ELS
AT 2
4" O
N C
ENTE
R
EXIS
TIN
G P
EDES
TRIA
N T
UN
NEL
HO
IST
BEAM
AS
PER
MFR
'SR
ECO
MM
END
ATIO
N
VIR
ACO
N 1
" VE1
-2M
INSU
LATI
NG
HS/
HS
SILK
SCR
EEN
ALU
MIN
UM
SIL
ICO
NE
GLA
ZED
CU
RTA
INW
ALL
MU
LLIO
N (V
ERTI
CAL
S)
6" S
IGH
TLIN
E AL
UM
INU
MC
UR
TAIN
WAL
L M
ULL
ION
(HO
RIZ
ON
TALS
)
CO
NTI
NU
OU
S W
ATER
PRO
OFI
NG
NEW
SLA
B PO
RTI
ON
EXIS
TIN
G B
EAM
. CU
T TO
P PO
RTI
ON
AND
REI
NFO
RC
E ST
RU
CTU
RE.
PRO
VID
E EX
PAN
SIO
N J
OIN
T TY
P.AB
OVE
GR
ADE
NEW
GW
B C
EILI
NG
TYP
.
4
A10
.8Si
m
5
A10
.8Si
m
5
A10
.8Si
m
4
A10
.8Si
m
EXIS
TIN
G C
EILI
NG
TO R
EMAI
N
EXIS
TIN
G C
EILI
NG
TO R
EMAI
N
EXIS
TIN
G C
EILI
NG
TO R
EMAI
N
EXIS
TIN
G C
EILI
NG
TO R
EMAI
N
NEW
AC
TC
EILI
NG
NEW
AC
TC
EILI
NG
NEW
GW
B C
EILI
NG
NEW
GW
B C
EILI
NG
NEW
GW
B C
EILI
NG
NEW
GW
B C
EILI
NG
NEW
GW
B C
EILI
NG
NEW
GW
B C
EILI
NG
INSU
LATE
D M
ETAL
PAN
EL
VEN
T LO
UVE
RS
AS P
ERM
FR'S
REC
OM
MEN
DAT
ION
NEW
ELE
VATO
RD
OO
RS
TYP.
N
GEN
ERAL
SER
VIC
ES A
DM
INIS
TRAT
ION
301
7TH
& D
STR
EETS
, SW
RO
OM
200
2W
ASH
ING
TON
, DC
204
07
ARM
ED F
OR
CES
RET
IREM
ENT
HO
ME
3700
NO
RTH
CAP
ITO
L ST
REE
T N
WW
ASH
ING
TON
, DC
200
11
CERTIFICATIONS KEY PLAN REVISION NOTES GRAPHIC SCALE CONTRACTORS BUILDING PROJECT DRAWING
MAR
KD
ATE
DES
CR
IPTI
ON
A/E
CO
N. N
O.
A/E
TASK
NO
.
CO
NS.
CO
NTR
.
CO
NS.
WO
RK
PRIM
E A/
E
SUB
A/E
CO
NST
R. C
ON
.
NAM
E
STR
EET
CIT
Y/ST
./ZIP
BUIL
DIN
G N
O.
OTH
ERBU
ILD
ING
NO
s.
FAC
ILIT
Y C
OD
E
PRO
JEC
TTI
TLE
PRO
JEC
TD
ESC
RIP
TIO
N
PRO
JEC
T N
O.
GSA
PM
SUBM
ISSI
ON
SUB
DAT
E
DR
AWIN
G T
ITLE
FILE
NAM
E
FLO
OR
NO
.
DR
AWN
BY
CH
ECKE
D B
Y
DR
AWIN
G N
O.
DIS
CIP
LIN
ESH
EET
TYPE
SEQ
UEN
CE
SHEE
TO
FPR
OPE
RTY
OF
THE
UN
ITED
STA
TES
GO
VER
NM
ENT
- FO
R O
FFIC
IAL
USE
ON
LY.
D
o no
t rem
ove
this
not
ice.
P
rope
rly d
estro
y do
cum
ents
whe
n no
long
er n
eede
d.
DAT
E D
RAF
TED
:
SCO
TT B
UIL
DIN
G
SCO
TT R
OAD
NW
WAS
HIN
GTO
N, D
C 2
0011
SHEE
T SI
ZE: 3
0 X
42
RIC
K H
AMIL
TON
SCO
TT B
UIL
DIN
G R
EPLA
CEM
ENT
Tel D
ata
Engi
neer
Pow
erho
use
Des
ign
Arc
hite
cts
and
Engi
neer
s Lt
d.
412.
287.
7333
412-
287-
7334
Cos
t Con
sulta
ntR
ider
Lev
ett B
uckn
all
617.
737.
9339
617.
737.
0540
101
C:\U
sers
\mpa
gane
tti\D
ocum
ents
\AFR
HC
once
pt_C
entra
l_m
paga
netti
.rvt
1/4
" = 1
'-0"
Jaco
bs E
ngin
eerin
g, In
c.57
1.72
1.12
01C
onst
ruct
ion
Man
ager
571.
721.
1271
Amm
an W
hitn
ey20
2.33
1.74
90St
ruct
ural
Eng
inee
r20
2.33
1.10
29
Bur
o H
appo
ld C
onsu
lting
Engi
neer
s
MEP
/FP/
Tel D
ata
Engi
neer
617.
419.
2284
A. M
orto
n Th
omas
and
Ass
ocia
tes,
Inc.
301.
881.
0814
Civ
il En
gine
er80
0.88
1.25
45
Geo
conc
epts
Eng
inee
ring,
Inc.
703.
726.
8032
Geo
tech
nica
l Eng
inee
r70
3.72
6.80
30
Froe
hlin
g &
Rob
erts
on, I
nc91
9.58
2.03
04En
viro
nmen
tal E
ngin
eer
919.
828.
3441
Poly
soni
cs C
orpo
ratio
n54
0.34
1.09
09A
cous
tical
Con
sulta
nt54
0.34
1.49
88
mcl
a20
2.29
8.80
79Li
ghtin
g C
onsu
ltant
202.
298.
8062
Lee
and
Asso
ciat
es20
2.46
6.42
32La
ndsc
ape
Arc
hite
ct20
2.46
6.66
66
Hop
kins
Foo
d Se
rvic
eSp
ecia
lists
, Inc
.30
1.32
0.92
02Fo
od S
ervi
ce C
onsu
ltant
301.
320.
9200
A10.
2
Aut
hor
Che
cker
02/1
7/11
ELEV
ATO
R P
HAS
ING
DET
AILS
Febr
uary
28,
201
1
BRID
GIN
G D
OC
UM
ENT
AFR
H -
New
Com
mon
s an
dH
ealth
care
Cen
ter
2900
3.00
1/4
" = 1
'-0"
1SE
CTI
ON
- EL
EVAT
OR
ALT
ERN
ATE
1 1
/4" =
1'-0
"2
SEC
TIO
N -
ELEV
ATO
R B
ASE
1/4
" = 1
'-0"
3SE
CTI
ON
- EL
EVAT
OR
BAS
E LO
BBY
91
LIM
IT O
F W
OR
K
EXIS
TIN
G U
TILI
TY C
HAS
EA
ND
PIP
ES T
O B
ED
EMO
LISH
ED
CU
T PO
RTI
ON
OF
EXIS
TIN
G P
EDES
TRIA
NTU
NN
EL T
O M
ATC
H N
EW C
ON
STR
UC
TIO
N
PRO
TEC
T ST
RU
CTU
RE
DU
RIN
G D
EMO
LITI
ON
TYP
.
EXIS
TIN
GBU
ILD
ING
JO
INT
(LIM
IT O
F FL
OO
RFI
NIS
H D
EMO
)
DEM
OLI
SH C
EILI
NG
AN
DFL
OO
R F
INIS
H T
HR
OU
GH
OU
T
LIM
IT O
F FL
OO
R F
INIS
HD
EMO
REM
OVE
SO
ILAS
PER
CIV
IL D
RAW
ING
S
AREA
OF
WO
RK
CU
T TO
P PO
RTI
ON
OF
BEAM
EXTE
ND
ING
OVE
R S
LAB.
PR
OTE
CT
AND
BR
ACE
REM
AIN
ING
PO
RTI
ON
OF
BEAM
EXIS
TIN
GBU
ILD
ING
JO
INT
(LIM
IT O
F FL
OO
RFI
NIS
H D
EMO
)
DEM
OLI
SH C
EILI
NG
AND
FLO
OR
FIN
ISH
TH
RO
UG
HO
UT
EXIS
TIN
G P
IPES
TO
BE
DEM
OLI
SHEDLIM
IT O
F FL
OO
RFI
NIS
H D
EMO
A10
.34
AREA
OF
WO
RK
CU
T TO
P PO
RTI
ON
OF
BEAM
EXTE
ND
ING
OVE
R S
LAB.
PR
OTE
CT
AND
BR
ACE
REM
AIN
ING
PO
RTI
ON
OF
BEAM
EXIS
TIN
GBU
ILD
ING
JO
INT
DEM
O F
LOO
RFI
NIS
H
LIM
IT O
F FL
OO
RFI
NIS
H D
EMO
LITI
ON
A10
.34
DEM
OLI
TIO
N LE
GEN
D: EX
ISTI
NG
DO
OR
& F
RAM
E TO
REM
AIN
EXIS
TIN
G W
IND
OW
& F
RAM
E TO
REM
AIN
GEN
ERAL
DEM
OLI
TIO
N NO
TES:
1. D
UR
ING
DEM
OLI
TIO
N, P
RO
TEC
T AL
L A
REA
S, S
YSTE
MS
FIN
ISH
ES A
ND
OTH
ERIT
EMS
TO R
EMAI
N.
2.D
EMO
LITI
ON
PLA
NS
ARE
PRO
VID
ED T
O D
IAG
RAM
AR
EAS
OF
DEM
OLI
TIO
N A
ND
AR
EN
OT
TO B
E C
ON
SID
ERED
A R
ECO
RD
OF
EXIS
TIN
G C
ON
DIT
ION
S.
3. C
OO
RD
INAT
E EX
TEN
T O
F D
EMO
LITI
ON
WIT
H N
EW C
ON
STR
UC
TIO
N W
OR
K.
4. D
EMO
LISH
ALL
FLO
OR
FIN
ISH
ES W
ITH
IN W
OR
K AR
EA.
5. R
EMO
VE C
EILI
NG
S W
ITH
IN W
OR
K AR
EA O
F G
RO
UN
D F
LOO
R A
ND
FIR
ST F
LOO
R, I
NC
LUD
ING
ALL
LIG
HT
FIXT
UR
ES A
ND
MEC
HAN
ICAL
DIF
FUSE
RS
PER
NAR
RAT
IVE.
6. R
EIN
FOR
CE
ALL
CU
T BE
AMS
AS P
ER S
TRU
CTU
RAL
REQ
UIR
EMEN
TS.
7. P
RO
TEC
T A
LL E
XIST
ING
TO
REM
AIN
TH
RO
UG
HO
UT,
INC
LUD
ING
MEC
HAN
ICAL
DU
CTW
OR
KAN
D E
QU
IPM
ENT
WIT
HIN
DEM
OLI
SHED
CEI
LIN
G A
REA
.
EXIS
TIN
G T
O R
EMAI
N
EXIS
TIN
G T
O B
E D
EMO
LISH
ED
EXIS
TIN
G D
OO
R &
FR
AME
TO B
E D
EMO
LISH
EDEX
ISTI
NG
WIN
DO
W &
FR
AME
TO B
E D
EMO
LISH
ED
EXIS
TIN
G C
EILI
NG
, IN
CLU
DIN
G L
IGH
T FI
XTU
RES
DIF
FUSE
RS
AND
OTH
ER C
OM
PON
ENTS
TO
BE
DEM
OLI
SHED
Leve
l 215
' - 0
"Sh
erid
an F
irst F
loor
13' -
0"
Sher
idan
Sec
ond
Floo
r27
' - 0
"
Sher
idan
Thi
rd F
loor
37' -
6"
Sher
idan
Fou
rth F
loor
48' -
0"
Sher
idan
Fift
h Fl
oor
58' -
6"
She
ridan
Six
th F
loor
69' -
0"
She
ridan
Sev
enth
Flo
or79
' - 6
"
Sher
idan
T.O
. Cop
ing
93' -
0 1
/4"
EXIS
TIN
G C
ANO
PYTO
BE
DEM
OLI
SHED
POR
TIO
NS
OF
FAC
HAD
ETO
BE
DEM
OLI
SHED
ENTR
Y SY
STEM
TO B
E D
EMO
LISH
ED
N
GEN
ERAL
SER
VIC
ES A
DM
INIS
TRAT
ION
301
7TH
& D
STR
EETS
, SW
RO
OM
200
2W
ASH
ING
TON
, DC
204
07
ARM
ED F
OR
CES
RET
IREM
ENT
HO
ME
3700
NO
RTH
CAP
ITO
L ST
REE
T N
WW
ASH
ING
TON
, DC
200
11
CERTIFICATIONS KEY PLAN REVISION NOTES GRAPHIC SCALE CONTRACTORS BUILDING PROJECT DRAWING
MAR
KD
ATE
DES
CR
IPTI
ON
A/E
CO
N. N
O.
A/E
TASK
NO
.
CO
NS.
CO
NTR
.
CO
NS.
WO
RK
PRIM
E A/
E
SUB
A/E
CO
NST
R. C
ON
.
NAM
E
STR
EET
CIT
Y/ST
./ZIP
BUIL
DIN
G N
O.
OTH
ERBU
ILD
ING
NO
s.
FAC
ILIT
Y C
OD
E
PRO
JEC
TTI
TLE
PRO
JEC
TD
ESC
RIP
TIO
N
PRO
JEC
T N
O.
GSA
PM
SUBM
ISSI
ON
SUB
DAT
E
DR
AWIN
G T
ITLE
FILE
NAM
E
FLO
OR
NO
.
DR
AWN
BY
CH
ECKE
D B
Y
DR
AWIN
G N
O.
DIS
CIP
LIN
ESH
EET
TYPE
SEQ
UEN
CE
SHEE
TO
FPR
OPE
RTY
OF
THE
UN
ITED
STA
TES
GO
VER
NM
ENT
- FO
R O
FFIC
IAL
USE
ON
LY.
D
o no
t rem
ove
this
not
ice.
P
rope
rly d
estro
y do
cum
ents
whe
n no
long
er n
eede
d.
DAT
E D
RAF
TED
:
SCO
TT B
UIL
DIN
G
SCO
TT R
OAD
NW
WAS
HIN
GTO
N, D
C 2
0011
SHEE
T SI
ZE: 3
0 X
42
RIC
K H
AMIL
TON
SCO
TT B
UIL
DIN
G R
EPLA
CEM
ENT
Tel D
ata
Engi
neer
Pow
erho
use
Des
ign
Arc
hite
cts
and
Engi
neer
s Lt
d.
412.
287.
7333
412-
287-
7334
Cos
t Con
sulta
ntR
ider
Lev
ett B
uckn
all
617.
737.
9339
617.
737.
0540
101
C:\U
sers
\mpa
gane
tti\D
ocum
ents
\AFR
HC
once
pt_C
entra
l_m
paga
netti
.rvt
1/8
" = 1
'-0"
Jaco
bs E
ngin
eerin
g, In
c.57
1.72
1.12
01C
onst
ruct
ion
Man
ager
571.
721.
1271
Amm
an W
hitn
ey20
2.33
1.74
90St
ruct
ural
Eng
inee
r20
2.33
1.10
29
Bur
o H
appo
ld C
onsu
lting
Engi
neer
s
MEP
/FP/
Tel D
ata
Engi
neer
617.
419.
2284
A. M
orto
n Th
omas
and
Ass
ocia
tes,
Inc.
301.
881.
0814
Civ
il En
gine
er80
0.88
1.25
45
Geo
conc
epts
Eng
inee
ring,
Inc.
703.
726.
8032
Geo
tech
nica
l Eng
inee
r70
3.72
6.80
30
Froe
hlin
g &
Rob
erts
on, I
nc91
9.58
2.03
04En
viro
nmen
tal E
ngin
eer
919.
828.
3441
Poly
soni
cs C
orpo
ratio
n54
0.34
1.09
09A
cous
tical
Con
sulta
nt54
0.34
1.49
88
mcl
a20
2.29
8.80
79Li
ghtin
g C
onsu
ltant
202.
298.
8062
Lee
and
Asso
ciat
es20
2.46
6.42
32La
ndsc
ape
Arc
hite
ct20
2.46
6.66
66
Hop
kins
Foo
d Se
rvic
eSp
ecia
lists
, Inc
.30
1.32
0.92
02Fo
od S
ervi
ce C
onsu
ltant
301.
320.
9200
A10.
3
Aut
hor
Che
cker
02/0
1/11
SHER
IDAN
DEM
OLI
TIO
N F
LOO
R P
LAN
S
Febr
uary
28,
201
1
BRID
GIN
G D
OC
UM
ENT
AFR
H -
New
Com
mon
s an
dH
ealth
care
Cen
ter
2900
3.00
1/8
" = 1
'-0"
1S
herid
an G
roun
d Fl
oor D
emol
ition
Pla
n
1/8
" = 1
'-0"
2S
herid
an F
irst F
loor
Dem
oliti
on P
lan
1/8
" = 1
'-0"
3S
herid
an T
ypic
al F
loor
s 2
- 7 D
emol
ition
Pla
n
92
1/8
" = 1
'-0"
4EL
EVAT
ION
- W
EST
DEM
OLI
TIO
N
UP
18.6
1A
10.6
2A
10.6
A10
.7
1
A10
.7
3
3A
10.6
4A
10.6
5A
10.6
ALT
. 2
ALT
. 2
PRO
TEC
T N
ON
-WO
RK
AREA
DU
RIN
G C
ON
STR
UC
TIO
N
EXIS
TIN
G P
EDES
TRIA
N T
UN
NEL
EXIS
TIN
G U
TILI
TY T
UN
NEL
LOW
ER G
RAD
E
RET
AIN
ING
WAL
LSA
ND
BLA
STED
CO
NC
RET
E
EDG
E O
F TU
NN
ELBE
LOW
ATM
MAC
HIN
EAT
M D
ESK
GW
B, P
T-2
S.S.
HAN
DR
AIL,
TYP
.
HO
RIZ
ON
TAL
SLID
ING
FIR
E D
OO
RG
WB,
PT-
1 TY
P.SW
-2 T
YP.
PFT5
PFT5
PFT5
PFT5
PFT5
PFT5
PFT5
PFT5
PFT6
PFT6
PFT6
PFT6
PFT6
PFT6
PFT6
1
A10
.8
PFT6
CPT
CO
NN
ECTI
ON
BET
WEE
NEX
ISTI
NG
AN
D N
EWFL
OO
RS
PFT5
MAC
HINE
ROO
MSH
03
MAC
HINE
ROO
MSH
04
SER
VIC
EEL
EVAT
OR
VEST
IBUL
ESH
02
NEW
PEDE
STRI
ANTU
NNEL
SH01
A10
.82
EXIS
TIN
G B
UIL
DIN
GJO
INT
A10
.83
ELEV
ATO
RSH
AFT
SH05
2A
10.2
3A
10.2
CPT
-6TH
RO
UG
HO
UT
A10
.7
1
A10
.72A10
.7
3
AREA
OF
WO
RK
PRO
TEC
T N
ON
-WO
RK
AREA
DU
RIN
G C
ON
STR
UC
TIO
N NEW
PLA
NTE
R
PTD
ALU
MIN
UM
CLA
D C
OLU
MN
CU
RTA
INW
ALL
ELEV
ATO
REN
CLO
SUR
E
NEW
ELE
VATO
RS,
REF
ERTO
ELE
VATO
R A
LTER
NAT
ES
NEW
EN
TRY
VEST
IBU
LEC
UR
TAIN
WAL
L SY
STEM
NEW
CU
RTA
INW
ALL
ENTR
YVE
STIB
ULE
SH11
CO
NN
ECTI
ON
BET
WEE
NEX
ISTI
NG
AN
D N
EWFL
OO
RS
EXIS
TIN
G B
UIL
DIN
GJO
INT
2A
10.2
3A
10.2
8A
10.7
A10
.77
4
5
6C
PT-6
THR
OU
GH
OU
T
A10
.7
1
A10
.72A10
.7
3
MAC
HIN
E R
OO
MAL
TER
NAT
E 3
MAC
HIN
E R
OO
MAL
TER
NAT
E 1
EXIS
TIN
G B
UIL
DIN
GJO
INT
2A
10.2
3A
10.2
EXIS
TIN
G C
OLU
MN
SBE
LOW
ELEV
ATO
R/M
.R.
RO
OF
TO D
RAI
N T
OEX
ISTI
NG
SH
ERID
ANR
OO
F
A10
.7
1
A10
.72A10
.7
3
PHAS
E II
AREA
OF
WO
RK
PRO
TEC
T N
ON
-WO
RK
AREA
DU
RIN
G C
ON
STR
UC
TIO
N
CU
RTA
INW
ALL
ELEV
ATO
REN
CLO
SUR
E
NEW
ELE
VATO
RS,
REF
ERTO
ELE
VATO
R A
LTER
NAT
ES
NEW
GW
B W
ALL,
TO M
ATC
H E
XIST
ING
CO
NN
ECTI
ON
BET
WEE
NEX
ISTI
NG
AN
D N
EWFL
OO
RS
EXIS
TIN
G B
UIL
DIN
GJO
INT
2A
10.2
3A
10.2
8A
10.7
CPT
-6TH
RO
UG
HO
UT
EXTE
NT
OF
NEW
CAR
PET
ELEV
ATO
R N
OTE
S
BASE
- PR
OVI
DE
MAC
HIN
E R
OO
M-L
ESS
ELEV
ATO
RS
PER
BR
IDG
ING
DO
CU
MEN
T M
ANU
AL.
ALTE
RN
ATE
1 -
PRO
VID
E TR
ACTI
ON
ELE
VATO
RS
WIT
H
MAC
HIN
E R
OO
M T
O B
E LO
CAT
ED O
VER
EL
EVAT
OR
SH
AFT.
SH
AFT
HEI
GH
T TO
BE
MO
DIF
IED
TO
AC
CO
MO
DAT
E M
.R.
REQ
UIR
EMEN
TS. S
EE 3
/A10
.4
ALTE
RN
ATE
2 -
PRO
VID
E TR
ACTI
ON
ELE
VATO
RS
WIT
H
MAC
HIN
E R
OO
MS
TO B
E LO
CAT
ED W
ITH
IN
SHER
IDAN
BU
ILD
ING
GR
OU
ND
FLO
OR
.
LOC
ATIO
N T
BD B
Y O
WN
ER. S
EE 1
/A10
.4
ALTE
RN
ATE
3 -
PRO
VID
E EL
EVAT
OR
S W
ITH
MAC
HIN
E
RO
OM
S TO
BE
LOC
ATED
ON
SH
ERID
AN
BU
ILD
ING
RO
OF
ADJA
CEN
T TO
SH
AFT.
AT
TAC
H M
ACH
INE
RO
OM
STR
UC
TUR
E TO
EX
ISTI
NG
CO
LUM
NS
MAR
KED
ON
PLA
N. S
EE3/
A10.
4
N
GEN
ERAL
SER
VIC
ES A
DM
INIS
TRAT
ION
301
7TH
& D
STR
EETS
, SW
RO
OM
200
2W
ASH
ING
TON
, DC
204
07
ARM
ED F
OR
CES
RET
IREM
ENT
HO
ME
3700
NO
RTH
CAP
ITO
L ST
REE
T N
WW
ASH
ING
TON
, DC
200
11
CERTIFICATIONS KEY PLAN REVISION NOTES GRAPHIC SCALE CONTRACTORS BUILDING PROJECT DRAWING
MAR
KD
ATE
DES
CR
IPTI
ON
A/E
CO
N. N
O.
A/E
TASK
NO
.
CO
NS.
CO
NTR
.
CO
NS.
WO
RK
PRIM
E A/
E
SUB
A/E
CO
NST
R. C
ON
.
NAM
E
STR
EET
CIT
Y/ST
./ZIP
BUIL
DIN
G N
O.
OTH
ERBU
ILD
ING
NO
s.
FAC
ILIT
Y C
OD
E
PRO
JEC
TTI
TLE
PRO
JEC
TD
ESC
RIP
TIO
N
PRO
JEC
T N
O.
GSA
PM
SUBM
ISSI
ON
SUB
DAT
E
DR
AWIN
G T
ITLE
FILE
NAM
E
FLO
OR
NO
.
DR
AWN
BY
CH
ECKE
D B
Y
DR
AWIN
G N
O.
DIS
CIP
LIN
ESH
EET
TYPE
SEQ
UEN
CE
SHEE
TO
FPR
OPE
RTY
OF
THE
UN
ITED
STA
TES
GO
VER
NM
ENT
- FO
R O
FFIC
IAL
USE
ON
LY.
D
o no
t rem
ove
this
not
ice.
P
rope
rly d
estro
y do
cum
ents
whe
n no
long
er n
eede
d.
DAT
E D
RAF
TED
:
SCO
TT B
UIL
DIN
G
SCO
TT R
OAD
NW
WAS
HIN
GTO
N, D
C 2
0011
SHEE
T SI
ZE: 3
0 X
42
RIC
K H
AMIL
TON
SCO
TT B
UIL
DIN
G R
EPLA
CEM
ENT
Tel D
ata
Engi
neer
Pow
erho
use
Des
ign
Arc
hite
cts
and
Engi
neer
s Lt
d.
412.
287.
7333
412-
287-
7334
Cos
t Con
sulta
ntR
ider
Lev
ett B
uckn
all
617.
737.
9339
617.
737.
0540
101
C:\U
sers
\mpa
gane
tti\D
ocum
ents
\AFR
HC
once
pt_C
entra
l_m
paga
netti
.rvt
As
indi
cate
d
Jaco
bs E
ngin
eerin
g, In
c.57
1.72
1.12
01C
onst
ruct
ion
Man
ager
571.
721.
1271
Amm
an W
hitn
ey20
2.33
1.74
90St
ruct
ural
Eng
inee
r20
2.33
1.10
29
Bur
o H
appo
ld C
onsu
lting
Engi
neer
s
MEP
/FP/
Tel D
ata
Engi
neer
617.
419.
2284
A. M
orto
n Th
omas
and
Ass
ocia
tes,
Inc.
301.
881.
0814
Civ
il En
gine
er80
0.88
1.25
45
Geo
conc
epts
Eng
inee
ring,
Inc.
703.
726.
8032
Geo
tech
nica
l Eng
inee
r70
3.72
6.80
30
Froe
hlin
g &
Rob
erts
on, I
nc91
9.58
2.03
04En
viro
nmen
tal E
ngin
eer
919.
828.
3441
Poly
soni
cs C
orpo
ratio
n54
0.34
1.09
09A
cous
tical
Con
sulta
nt54
0.34
1.49
88
mcl
a20
2.29
8.80
79Li
ghtin
g C
onsu
ltant
202.
298.
8062
Lee
and
Asso
ciat
es20
2.46
6.42
32La
ndsc
ape
Arc
hite
ct20
2.46
6.66
66
Hop
kins
Foo
d Se
rvic
eSp
ecia
lists
, Inc
.30
1.32
0.92
02Fo
od S
ervi
ce C
onsu
ltant
301.
320.
9200
A10.
4
Aut
hor
Che
cker
02/0
1/11
SHER
IDAN
FLO
OR
PLA
NS
Febr
uary
28,
201
1
BRID
GIN
G D
OC
UM
ENT
AFR
H -
New
Com
mon
s an
dH
ealth
care
Cen
ter
2900
3.00
1/8
" = 1
'-0"
1S
herid
an G
roun
d Fl
oor
1/8
" = 1
'-0"
3El
evat
or R
oof L
evel
1/8
" = 1
'-0"
4S
herid
an T
ypic
al F
loor
s 2
- 7 P
lan
93
18.6
9' -
6" G
WB
8' -
6" G
WB
8' -
10" A
CT
9' -
2" A
CT
9' -
2" G
WB
8' -
10" G
WB
8' -
6" G
WB
8' -
6" G
WB
10' -
0" A
CT8'
- 3"
GW
B
10' -
0" A
CT
8' -
0" G
WB
9' -
0" E
XIST
ING
N
GEN
ERAL
SER
VIC
ES A
DM
INIS
TRAT
ION
301
7TH
& D
STR
EETS
, SW
RO
OM
200
2W
ASH
ING
TON
, DC
204
07
ARM
ED F
OR
CES
RET
IREM
ENT
HO
ME
3700
NO
RTH
CAP
ITO
L ST
REE
T N
WW
ASH
ING
TON
, DC
200
11
CERTIFICATIONS KEY PLAN REVISION NOTES GRAPHIC SCALE CONTRACTORS BUILDING PROJECT DRAWING
MAR
KD
ATE
DES
CR
IPTI
ON
A/E
CO
N. N
O.
A/E
TASK
NO
.
CO
NS.
CO
NTR
.
CO
NS.
WO
RK
PRIM
E A/
E
SUB
A/E
CO
NST
R. C
ON
.
NAM
E
STR
EET
CIT
Y/ST
./ZIP
BUIL
DIN
G N
O.
OTH
ERBU
ILD
ING
NO
s.
FAC
ILIT
Y C
OD
E
PRO
JEC
TTI
TLE
PRO
JEC
TD
ESC
RIP
TIO
N
PRO
JEC
T N
O.
GSA
PM
SUBM
ISSI
ON
SUB
DAT
E
DR
AWIN
G T
ITLE
FILE
NAM
E
FLO
OR
NO
.
DR
AWN
BY
CH
ECKE
D B
Y
DR
AWIN
G N
O.
DIS
CIP
LIN
ESH
EET
TYPE
SEQ
UEN
CE
SHEE
TO
FPR
OPE
RTY
OF
THE
UN
ITED
STA
TES
GO
VER
NM
ENT
- FO
R O
FFIC
IAL
USE
ON
LY.
D
o no
t rem
ove
this
not
ice.
P
rope
rly d
estro
y do
cum
ents
whe
n no
long
er n
eede
d.
DAT
E D
RAF
TED
:
SCO
TT B
UIL
DIN
G
SCO
TT R
OAD
NW
WAS
HIN
GTO
N, D
C 2
0011
SHEE
T SI
ZE: 3
0 X
42
RIC
K H
AMIL
TON
SCO
TT B
UIL
DIN
G R
EPLA
CEM
ENT
Tel D
ata
Engi
neer
Pow
erho
use
Des
ign
Arc
hite
cts
and
Engi
neer
s Lt
d.
412.
287.
7333
412-
287-
7334
Cos
t Con
sulta
ntR
ider
Lev
ett B
uckn
all
617.
737.
9339
617.
737.
0540
101
C:\U
sers
\mpa
gane
tti\D
ocum
ents
\AFR
HC
once
pt_C
entra
l_m
paga
netti
.rvt
1/8
" = 1
'-0"
Jaco
bs E
ngin
eerin
g, In
c.57
1.72
1.12
01C
onst
ruct
ion
Man
ager
571.
721.
1271
Amm
an W
hitn
ey20
2.33
1.74
90St
ruct
ural
Eng
inee
r20
2.33
1.10
29
Bur
o H
appo
ld C
onsu
lting
Engi
neer
s
MEP
/FP/
Tel D
ata
Engi
neer
617.
419.
2284
A. M
orto
n Th
omas
and
Ass
ocia
tes,
Inc.
301.
881.
0814
Civ
il En
gine
er80
0.88
1.25
45
Geo
conc
epts
Eng
inee
ring,
Inc.
703.
726.
8032
Geo
tech
nica
l Eng
inee
r70
3.72
6.80
30
Froe
hlin
g &
Rob
erts
on, I
nc91
9.58
2.03
04En
viro
nmen
tal E
ngin
eer
919.
828.
3441
Poly
soni
cs C
orpo
ratio
n54
0.34
1.09
09A
cous
tical
Con
sulta
nt54
0.34
1.49
88
mcl
a20
2.29
8.80
79Li
ghtin
g C
onsu
ltant
202.
298.
8062
Lee
and
Asso
ciat
es20
2.46
6.42
32La
ndsc
ape
Arc
hite
ct20
2.46
6.66
66
Hop
kins
Foo
d Se
rvic
eSp
ecia
lists
, Inc
.30
1.32
0.92
02Fo
od S
ervi
ce C
onsu
ltant
301.
320.
9200
A10.
5
Aut
hor
Che
cker
02/0
1/11
SHER
IDAN
REF
LEC
TED
CEI
LIN
G P
LAN
S
Febr
uary
28,
201
1
BRID
GIN
G D
OC
UM
ENT
AFR
H -
New
Com
mon
s an
dH
ealth
care
Cen
ter
2900
3.00
1/8
" = 1
'-0"
1S
herid
an G
roun
d Fl
oor
1/8
" = 1
'-0"
2S
herid
an F
irst F
loor
1/8
" = 1
'-0"
3S
herid
an T
ypic
al F
loor
s 2
- 7 P
lan
94
Sher
idan
Gro
und
Floo
r-1
' - 0
"
Sher
idan
Firs
t Flo
or13
' - 0
"
Sher
idan
Sec
ond
Floo
r27
' - 0
"
Sher
idan
Thi
rd F
loor
37' -
6"
Sher
idan
Fou
rth F
loor
48' -
0"
Sher
idan
Fift
h Fl
oor
58' -
6"
She
ridan
Six
th F
loor
69' -
0"
She
ridan
Sev
enth
Flo
or79
' - 6
"
Sher
idan
T.O
. Cop
ing
93' -
0 1
/4"
Elev
ator
Roo
f Lev
el98
' - 6
"
MAC
HIN
E R
OO
MAL
TER
NAT
E 1
VIR
ACO
N 1
" VE1
-2M
INSU
LATI
NG
HS/
HS
SILK
SCR
EEN
ALU
MIN
UM
SIL
ICO
NE
GLA
ZED
CU
RTA
INW
ALL
MU
LLIO
N (V
ERTI
CAL
S)
6" S
IGH
TLIN
E AL
UM
INU
MC
UR
TAIN
WAL
L M
ULL
ION
(HO
RIZ
ON
TALS
)
NEW
GR
ADED
TER
RAI
NR
EFER
TO
CIV
IL
4
A10
.8Si
m
5
A10
.8Si
m
6
A10
.8Si
m
MAC
HIN
E R
OO
MAL
TER
NAT
E 1
VIR
ACO
N 1
" VE1
-2M
INSU
LATI
NG
HS/
HS
SILK
SCR
EEN
ALU
MIN
UM
SIL
ICO
NE
GLA
ZED
CU
RTA
INW
ALL
MU
LLIO
N (V
ERTI
CAL
S)
6" S
IGH
TLIN
E AL
UM
INU
MC
UR
TAIN
WAL
L M
ULL
ION
(HO
RIZ
ON
TALS
)
NEW
VES
TIBU
LEC
ANO
PY
ALU
MIN
UM
CO
LUM
NC
OVE
R
4
A10
.8Si
m
4
A10
.8Si
m
6
A10
.8Si
m
MAC
HIN
E R
OO
MAL
TER
NAT
E 1
VIR
ACO
N 1
" VE1
-2M
INSU
LATI
NG
HS/
HS
SILK
SCR
EEN
ALU
MIN
UM
SIL
ICO
NE
GLA
ZED
CU
RTA
INW
ALL
MU
LLIO
N (V
ERTI
CAL
S)
6" S
IGH
TLIN
E AL
UM
INU
MC
UR
TAIN
WAL
L M
ULL
ION
(HO
RIZ
ON
TALS
)
NEW
VES
TIBU
LE C
ANO
PY
4
A10
.8Si
m
5
A10
.8Si
m
6
A10
.8Si
m
Sher
idan
Firs
t Flo
or13
' - 0
"
Sher
idan
Sec
ond
Floo
r27
' - 0
"
ALU
MIN
UM
CO
LUM
N C
OVE
R
VEST
IBU
LE R
OO
F
CU
RTA
INW
ALL
ENC
LOSU
RE
WAL
K O
FF M
ATEN
TRY
SYST
EM
N
GEN
ERAL
SER
VIC
ES A
DM
INIS
TRAT
ION
301
7TH
& D
STR
EETS
, SW
RO
OM
200
2W
ASH
ING
TON
, DC
204
07
ARM
ED F
OR
CES
RET
IREM
ENT
HO
ME
3700
NO
RTH
CAP
ITO
L ST
REE
T N
WW
ASH
ING
TON
, DC
200
11
CERTIFICATIONS KEY PLAN REVISION NOTES GRAPHIC SCALE CONTRACTORS BUILDING PROJECT DRAWING
MAR
KD
ATE
DES
CR
IPTI
ON
A/E
CO
N. N
O.
A/E
TASK
NO
.
CO
NS.
CO
NTR
.
CO
NS.
WO
RK
PRIM
E A/
E
SUB
A/E
CO
NST
R. C
ON
.
NAM
E
STR
EET
CIT
Y/ST
./ZIP
BUIL
DIN
G N
O.
OTH
ERBU
ILD
ING
NO
s.
FAC
ILIT
Y C
OD
E
PRO
JEC
TTI
TLE
PRO
JEC
TD
ESC
RIP
TIO
N
PRO
JEC
T N
O.
GSA
PM
SUBM
ISSI
ON
SUB
DAT
E
DR
AWIN
G T
ITLE
FILE
NAM
E
FLO
OR
NO
.
DR
AWN
BY
CH
ECKE
D B
Y
DR
AWIN
G N
O.
DIS
CIP
LIN
ESH
EET
TYPE
SEQ
UEN
CE
SHEE
TO
FPR
OPE
RTY
OF
THE
UN
ITED
STA
TES
GO
VER
NM
ENT
- FO
R O
FFIC
IAL
USE
ON
LY.
D
o no
t rem
ove
this
not
ice.
P
rope
rly d
estro
y do
cum
ents
whe
n no
long
er n
eede
d.
DAT
E D
RAF
TED
:
SCO
TT B
UIL
DIN
G
SCO
TT R
OAD
NW
WAS
HIN
GTO
N, D
C 2
0011
SHEE
T SI
ZE: 3
0 X
42
RIC
K H
AMIL
TON
SCO
TT B
UIL
DIN
G R
EPLA
CEM
ENT
Tel D
ata
Engi
neer
Pow
erho
use
Des
ign
Arc
hite
cts
and
Engi
neer
s Lt
d.
412.
287.
7333
412-
287-
7334
Cos
t Con
sulta
ntR
ider
Lev
ett B
uckn
all
617.
737.
9339
617.
737.
0540
101
C:\U
sers
\mpa
gane
tti\D
ocum
ents
\AFR
HC
once
pt_C
entra
l_m
paga
netti
.rvt
As
indi
cate
d
Jaco
bs E
ngin
eerin
g, In
c.57
1.72
1.12
01C
onst
ruct
ion
Man
ager
571.
721.
1271
Amm
an W
hitn
ey20
2.33
1.74
90St
ruct
ural
Eng
inee
r20
2.33
1.10
29
Bur
o H
appo
ld C
onsu
lting
Engi
neer
s
MEP
/FP/
Tel D
ata
Engi
neer
617.
419.
2284
A. M
orto
n Th
omas
and
Ass
ocia
tes,
Inc.
301.
881.
0814
Civ
il En
gine
er80
0.88
1.25
45
Geo
conc
epts
Eng
inee
ring,
Inc.
703.
726.
8032
Geo
tech
nica
l Eng
inee
r70
3.72
6.80
30
Froe
hlin
g &
Rob
erts
on, I
nc91
9.58
2.03
04En
viro
nmen
tal E
ngin
eer
919.
828.
3441
Poly
soni
cs C
orpo
ratio
n54
0.34
1.09
09A
cous
tical
Con
sulta
nt54
0.34
1.49
88
mcl
a20
2.29
8.80
79Li
ghtin
g C
onsu
ltant
202.
298.
8062
Lee
and
Asso
ciat
es20
2.46
6.42
32La
ndsc
ape
Arc
hite
ct20
2.46
6.66
66
Hop
kins
Foo
d Se
rvic
eSp
ecia
lists
, Inc
.30
1.32
0.92
02Fo
od S
ervi
ce C
onsu
ltant
301.
320.
9200
A10.
7
Aut
hor
Che
cker
02/0
1/11
SHER
IDAN
ELE
VATI
ON
S
Febr
uary
28,
201
1
BRID
GIN
G D
OC
UM
ENT
AFR
H -
New
Com
mon
s an
dH
ealth
care
Cen
ter
2900
3.00
1/8
" = 1
'-0"
1S
herid
an -
Sou
th E
leva
tion
1/8
" = 1
'-0"
2S
herid
an -
Wes
t Ele
vatio
n 1
/8" =
1'-0
"3
She
ridan
- N
orth
Ele
vatio
n
96
1/4
" = 1
'-0"
4SH
ERID
AN F
IRST
FLO
OR
- 1
1/4
" = 1
'-0"
5SH
ERID
AN F
IRST
FLO
OR
- 2
1/4
" = 1
'-0"
6SH
ERID
AN F
IRST
FLO
OR
- 3
1/4
" = 1
'-0"
7SH
ERID
AN F
IRST
FLO
OR
- 4
1/4
" = 1
'-0"
8SE
CTI
ON
- SH
ERID
AN N
EW V
ESTI
BULE
5'-
53/
4"7'
-11
"
RO
OF
90'-
7"
B HGE FD.6
E.4
F.2
G.4
LIM
IT O
F W
ORK
EXIS
TING
UTI
LITY
CHA
SE A
NDPI
PES
TO B
E DE
MOL
ISHE
D
CUT
PORT
ION
OF E
XIST
ING
PED
ESTR
IAN
TUNN
EL T
O M
ATCH
NEW
CON
STRU
CTIO
N
PROT
ECT
STRU
CTUR
EDU
RING
DEM
OLIT
ION
TYP.
EXIS
TING
BUIL
DING
JOIN
T(L
IMIT
OF
FLO
ORFI
NISH
DEM
O)
DEM
OLIS
H CE
ILIN
G AN
DFL
OOR
FINI
SH T
HROU
GHOU
T
LIM
IT O
F FL
OOR
FINI
SHDE
MO
REM
OVE
SOIL
AS P
ER C
IVIL
DRA
WIN
GS
D
C
A11
.03
2
AREA
OF
WOR
K
CUT
TOP
PORT
ION
OF B
EAM
EXTE
NDIN
G O
VER
SLAB
. PRO
TECT
AND
BRAC
E RE
MAI
NING
PO
RTIO
NOF
BEA
M
EXIS
TING
BUIL
DING
JOIN
T(L
IMIT
OF
FLO
ORFI
NISH
DEM
O) DE
MOL
ISH
CEIL
ING
AND
FLOO
RFI
NISH
THR
OUGH
OUT
EXIS
TING
PIP
ES T
O BE
DEM
OLIS
HEDLI
MIT
OF
FLOO
RFI
NISH
DEM
O
D1.
014
AREA
OF
WOR
K
CUT
TOP
PORT
ION
OF B
EAM
EXTE
NDIN
G O
VER
SLAB
. PRO
TECT
AND
BRAC
E RE
MAI
NING
PO
RTIO
NOF
BEA
M
EXIS
TING
BUIL
DING
JOIN
T
DEM
O FL
OOR
FINI
SH
LIM
IT O
F FL
OOR
FINI
SH D
EMOL
ITIO
N
D1.
014
DEMO
LITI
ON L
EGEN
D:
EXIS
TING
DOO
R &
FRAM
E TO
REM
AIN
EXIS
TING
WIN
DOW
& F
RAM
E TO
REM
AIN
GENE
RAL
DEMO
LITI
ON N
OTES
:
1. D
URIN
G DE
MOL
ITIO
N, P
ROTE
CT A
LL A
REAS
, SYS
TEM
S FI
NISH
ES A
ND O
THER
ITEM
S TO
REM
AIN.
2.DE
MOL
ITIO
N PL
ANS
ARE
PROV
IDED
TO
DIAG
RAM
ARE
AS O
F DE
MOL
ITIO
N AN
D AR
ENO
T TO
BE
CONS
IDER
ED A
REC
ORD
OF E
XIST
ING
COND
ITIO
NS.
3. C
OORD
INAT
E EX
TENT
OF
DEM
OLIT
ION
WIT
H NE
W C
ONST
RUCT
ION
WOR
K.
4. D
EMOL
ISH
ALL
FLOO
R FI
NISH
ES W
ITHI
N W
ORK
AREA
.
5. R
EMOV
E CE
ILIN
GS W
ITHI
N W
ORK
AREA
OF
GROU
ND F
LOOR
AND
FIR
ST F
LOOR
, INC
LUDI
NGAL
L LI
GHT
FIXT
URES
AND
MEC
HANI
CAL
DIFF
USER
S PE
R N
ARRA
TIVE
.
6. R
EINF
ORCE
ALL
CUT
BEA
MS
AS P
ER S
TRUC
TURA
L RE
QUIR
EMEN
TS.
7. P
ROTE
CT A
LL E
XIST
ING
TO
REM
AIN
THRO
UGHO
UT, I
NCLU
DING
MEC
HANI
CAL
DUCT
WO
RK A
ND E
QUI
PMEN
T W
ITHI
NDE
MOL
ISHE
D CE
ILIN
G AR
EA. EX
ISTI
NG T
O RE
MAI
N
EXIS
TING
TO
BE D
EMOL
ISHE
D
EXIS
TING
DOO
R &
FRAM
E TO
BE
DEM
OLI
SHED
EXIS
TING
WIN
DOW
& F
RAM
E TO
BE
DEM
OLI
SHED
EXIS
TING
CEI
LING
, INC
LUDI
NG L
IGHT
FIX
TURE
SDI
FFUS
ERS
AND
OTHE
R CO
MPO
NENT
S TO
BE
DEM
OLIS
HED
LEVE
L - M
AIN
EL. 1
5' - 0
"
SHER
IDAN
FIR
ST F
LOO
REL
. 13'
- 0"
SHER
IDAN
SEC
OND
FLOO
REL
. 27'
- 0"
SHER
IDAN
THI
RD F
LOOR
EL. 3
7' - 6
"
SHER
IDAN
FOU
RTH
FLOO
REL
. 48'
- 0"
SHER
IDAN
FIF
TH F
LOOR
EL. 5
8' - 6
"
SHER
IDAN
SIX
TH F
LOO
REL
. 69'
- 0"
SHER
IDAN
SEV
ENTH
FLO
OREL
. 79'
- 6"
SHER
IDAN
T.O
. COP
ING
EL. 9
3' - 0
1/4
"
EXIS
TING
CAN
OPY
TO B
E DE
MOL
ISHE
D
PORT
IONS
OF
FACH
ADE
TO B
E DE
MOL
ISHE
D
ENTR
Y SY
STEM
TO B
E DE
MOL
ISHE
D
TOP
OF P
ARAP
ETEL
. 62'
- 6"
ATL
AN
TA -
WA
SH
ING
TON
- N
EW
YO
RK
- N
EW
PO
RT
BE
AC
H
OO
PE
RC
CA
RR
Y
©625 N
orth
Was
hingto
n Stre
etSu
ite 20
0Al
exan
dria,
VA
2231
4(7
03) 5
19-6
152
www.
coop
ercarr
y.com
SCO
PE D
OCUM
ENTS
The
Cons
tructi
on D
ocum
ents
have
not
bee
n co
mple
ted
ther
efor
e th
is dr
awing
may
be
incom
plete
or n
ot co
ordin
ated
. Th
e do
cum
ents
issue
d ind
icate
the
gene
ral s
cope
of
the
Proje
ct. T
he C
ontra
ctor i
s res
pons
ible
for c
omple
te a
nd c
oord
inate
d pr
icing
and
Wor
k, an
d sh
all in
clude
all i
tem
s nec
essa
ry fo
r the
pro
per e
xecu
tion
and
com
pletio
nof
the
Proje
ct, w
heth
er in
dicat
ed o
r not
. Al
l com
pone
nts o
f the
Pro
ject s
hall c
omply
with
any
and
all r
equir
emen
ts of
nat
ional,
stat
e, a
nd lo
cal c
odes
. Th
e Co
ntra
ctor s
hall
infor
m th
e Ow
ner a
nd A
rchit
ect o
f any
om
ission
s, inc
onsis
tenc
ies o
r erro
rs in
the
infor
mat
ion p
rovid
ed.
If no
not
ice is
give
n an
d an
y om
ission
s, inc
onsis
tenc
ies o
rer
rors
are
disc
over
ed, t
he A
rchit
ect's
dec
ision
s on
item
s of W
ork i
nclud
ed in
the
scop
e sh
all b
e bin
ding
on th
e Co
ntra
ctor,
when
cons
isten
t with
the
gene
ral s
cope
and
quali
ty of
the
Proje
ct.
Prin
cipa
l-in-
Cha
rge
Pro
ject
Man
ager
Pro
ject
Arc
hite
ct
Sta
ff A
rchi
tect
Pro
ject
No.
Dat
e
Dra
win
g N
o.
NOT
ISSU
ED F
OR
CONS
TRUC
TION
1
A
23
45
67
89
1011
1213
1415
1617
18
12
34
56
78
910
1112
1314
1516
1718
BCDEFGHJKLMNP
ABCDEFGHJKLMNP
Copy
right
Coo
per C
arry
201
1
GS
A P
roje
ct N
umbe
r
GS
A C
ontr
act N
umbe
r
GS-1
1-P1
0-M
KC-0
026
GS-1
1-P0
9-M
KC-0
022
PRO
PERT
Y OF
UNI
TED
STAT
ES G
OVE
RNM
ENT
FOR
OFF
ICAL
USE
ONL
YDo
not
rem
ove
this
notic
ePr
oper
ly de
stroy
doc
umen
ts wh
en n
o lon
ger n
eede
d
E:\2010\20100044\d-7 drawings\revit\users\20100044_2011_hawkinse.rvt6/28/20112:31:19PM
D1.
01
06/0
1/11
2010
0044
DANA
PO
MER
OY
STEV
E SM
ITH
KENN
ETH
BROW
N
Auth
orSHER
IDAN
DEM
OLIT
ION
FLOO
R PL
ANS
SCOT
T PR
OJEC
T
Scot
t Buil
ding
3700
N. C
apito
l St.,
NW
Was
hingt
on, D
.C. 2
0011
♦Ar
med
For
ces R
etire
men
t Hom
e
PROJECTNUMBER:20100044PROJECTNAME:SCOTTPROJECTSHEETNUMBER:D1.01-SHERIDANDEMOLITIONFLOORPLANS
SCAL
E: 1
/8" =
1'-0
"D1
.01
A4.6
11Sh
erida
n Gr
ound
Floo
r Dem
olitio
n Pl
an
SCAL
E: 1
/8" =
1'-0
"D1
.01
A4.6
12Sh
erida
n Fi
rst F
loor D
emoli
tion
Plan
SCAL
E: 1
/8" =
1'-0
"D1
.01
A11.
033
Sher
idan
Typic
al Fl
oors
2 -
7 De
moli
tion
Plan
92
SCAL
E: 1
/8" =
1'-0
"D1
.01
A2.0
2A4
ELEV
ATIO
N - W
EST
DEM
OLIT
ION
ISSU
ANCE
SNo
.Dr
awing
Issu
e Des
cripti
onDa
te1
FINA
L CON
CEPT
SUB
MISS
ION
04.11
.2011
2DE
SIGN
DEV
ELOP
MENT
SUB
MISS
ION
06.01
.2011
0'4'
8'16
'32
'
UP
3
A4.6
14
A4.6
1
A11
.03
1
ALT.
2
PRO
TECT
NO
N-W
ORK
ARE
ADU
RING
CON
STRU
CTIO
N
EXIS
TING
PEDE
STRI
ANTU
NNEL
EXIS
TING
UTIL
ITY
TUNN
EL
LOW
ER G
RADE
RETA
ININ
G W
ALL
SAND
BLA
STED
CON
CRET
E
EDGE
OF
TUNN
ELBE
LOW
ATM
MAC
HINE
ATM
DES
K
GWB,
PT-
2
S.S.
HAN
DRAI
L, T
YP.
HORI
ZONT
AL S
LIDI
NGFI
RE D
OOR
GWB,
PT-
1 TY
P.SW
-2 T
YP.
PFT5
PFT5
PFT5
PFT5
PFT5
PFT5
PFT5
PFT5
PFT6
PFT6
PFT6
PFT6
PFT6
PFT6
PFT6
PFT6
CPT
CONN
ECTI
ON B
ETW
EEN
EXIS
TING
AND
NEW
FLOO
RS
PFT5
STOR
AGE
SH03
MACH
INE
ROOM
SH04
SERV
ICE
ELEV
ATOR
VEST
IBUL
ESH
02
NEW
PEDE
STRI
ANTU
NNEL
SH01
EXIS
TING
BUI
LDIN
GJO
INT
ELEV
ATOR
SHAF
TSH
05
1
A11.
04CP
T-6
THRO
UGHO
UT
2
A4.5
2
GLAS
S CU
RTAI
N W
ALL
A11
.03
1
A11
.03
2
A11
.03
3
1
A11.
04 6
A11.
03
AREA
OF
WOR
K /
RENO
VATI
ON
PRO
TECT
NO
N-W
ORK
ARE
ADU
RING
CON
STRU
CTIO
N
EXISTINGFLOORNEWFLOOR
EXIS
TING
BUI
LDIN
GJO
INT
LINEOFNEWCARPET
12'-
3"1'
- 6"
12' -
3"
4'- 0
"2'
- 6"
5'- 9
"
CURT
AINW
ALL
ELEV
ATOR
ENC
LOSU
RE
NEW
ELE
VATO
RS
TPO
ROOF
MEM
BRAN
E
PREF
INIS
HED
ALUM
INUM
A11
.03
1
A11
.03
2
A11
.03
3EX
ISTI
NG B
UILD
ING
JOIN
T
1
A11.
04
EXIS
TING
CO
LUM
NSBE
LOW
ELEV
ATOR
/M.R
.RO
OF
TO D
RAIN
TO
EXIS
TING
SHE
RIDA
NRO
OF
A11
.03
1
A11
.03
2
1
A11.
04
EXIS
TING
BUI
LDIN
G JO
INT
CONN
ECTI
ON
BETW
EEN
EXIS
TING
AND
NEW
FLO
ORS
CPT-
6 TH
ROUG
HOUT
NEW
GW
B W
AL T
OM
ATCH
EXI
STIN
G
PHAS
E II
AREA
OF
WOR
K
CURT
AINW
ALL
ELEV
ATOR
ENC
LOSU
RE
NEW
ELE
VATO
RSEX
TENT
OF
NEW
CAR
PET
PROT
ECT
NOT-
WOR
K AR
EADU
RING
CON
STRU
CTIO
N
A11
.03
1
A11
.03
2
A11
.03
3
AREA
OF
WOR
K
PROT
ECT
NON-
WOR
K AR
EADU
RING
CON
STRU
CTIO
N
NEW
PLA
NTER
PTD
ALUM
INUM
CLAD
COL
UMN
CURT
AINW
ALL
ELEV
ATOR
ENCL
OSU
RE
NEW
ELE
VATO
RS, R
EFER
TO E
LEVA
TOR
ALTE
RNAT
ES
NEW
ENT
RY V
ESTI
BULE
CURT
AINW
ALL
SYST
EM
NEW
CUR
TAIN
WAL
L
ENTR
YVE
STIB
ULE
SH11
CONN
ECTI
ON
BETW
EEN
EXIS
TING
AND
NEW
FLOO
RS
EXIS
TING
BUI
LDIN
GJO
INT
1
A11.
04
6
A11.
03
CPT-
6TH
ROUG
HOUT
17' -
61/
2"
13' -
27/
8"
8'- 6
1/ 2"
16'-11/2"20'-4"3'-91/2"
ATL
AN
TA -
WA
SH
ING
TON
- N
EW
YO
RK
- N
EW
PO
RT
BE
AC
H
OO
PE
RC
CA
RR
Y
©625 N
orth
Was
hingto
n Stre
etSu
ite 20
0Al
exan
dria,
VA
2231
4(7
03) 5
19-6
152
www.
coop
ercarr
y.com
SCO
PE D
OCUM
ENTS
The
Cons
tructi
on D
ocum
ents
have
not
bee
n co
mple
ted
ther
efor
e th
is dr
awing
may
be
incom
plete
or n
ot co
ordin
ated
. Th
e do
cum
ents
issue
d ind
icate
the
gene
ral s
cope
of
the
Proje
ct. T
he C
ontra
ctor i
s res
pons
ible
for c
omple
te a
nd c
oord
inate
d pr
icing
and
Wor
k, an
d sh
all in
clude
all i
tem
s nec
essa
ry fo
r the
pro
per e
xecu
tion
and
com
pletio
nof
the
Proje
ct, w
heth
er in
dicat
ed o
r not
. Al
l com
pone
nts o
f the
Pro
ject s
hall c
omply
with
any
and
all r
equir
emen
ts of
nat
ional,
stat
e, a
nd lo
cal c
odes
. Th
e Co
ntra
ctor s
hall
infor
m th
e Ow
ner a
nd A
rchit
ect o
f any
om
ission
s, inc
onsis
tenc
ies o
r erro
rs in
the
infor
mat
ion p
rovid
ed.
If no
not
ice is
give
n an
d an
y om
ission
s, inc
onsis
tenc
ies o
rer
rors
are
disc
over
ed, t
he A
rchit
ect's
dec
ision
s on
item
s of W
ork i
nclud
ed in
the
scop
e sh
all b
e bin
ding
on th
e Co
ntra
ctor,
when
cons
isten
t with
the
gene
ral s
cope
and
quali
ty of
the
Proje
ct.
Prin
cipa
l-in-
Cha
rge
Pro
ject
Man
ager
Pro
ject
Arc
hite
ct
Sta
ff A
rchi
tect
Pro
ject
No.
Dat
e
Dra
win
g N
o.
NOT
ISSU
ED F
OR
CONS
TRUC
TION
1
A
23
45
67
89
1011
1213
1415
1617
18
12
34
56
78
910
1112
1314
1516
1718
BCDEFGHJKLMNP
ABCDEFGHJKLMNP
Copy
right
Coo
per C
arry
201
1
GS
A P
roje
ct N
umbe
r
GS
A C
ontr
act N
umbe
r
GS-1
1-P1
0-M
KC-0
026
GS-1
1-P0
9-M
KC-0
022
PRO
PERT
Y OF
UNI
TED
STAT
ES G
OVE
RNM
ENT
FOR
OFF
ICAL
USE
ONL
YDo
not
rem
ove
this
notic
ePr
oper
ly de
stroy
doc
umen
ts wh
en n
o lon
ger n
eede
d
E:\2010\20100044\d-7 drawings\revit\users\20100044_2011_hawkinse.rvt6/28/20112:31:09PM
A11
.01
06/0
1/11
2010
0044
Desig
ner
Appr
over
Chec
ker
Auth
or
SHER
IDAN
ELE
VATO
R - F
LOOR
PLAN
S
SCOT
T PR
OJEC
T
Scot
t Buil
ding
3700
N. C
apito
l St.,
NW
Was
hingt
on, D
.C. 2
0011
♦Ar
med
For
ces R
etire
men
t Hom
e
PROJECTNUMBER:20100044PROJECTNAME:SCOTTPROJECTSHEETNUMBER:A11.01-SHERIDANELEVATOR-FLOORPLANS
SCAL
E: 1
/8" =
1'-0
"A1
1.01
A4.6
11SH
ERID
AN G
ROUN
D FL
OOR
SCAL
E: 1
/8" =
1'-0
"A1
1.01
A11.
033
ENLA
RGED
FLO
OR P
LAN
- SHE
RIDA
N LE
VELS
2 -
3
ISSU
ANCE
SNo
.Dr
awing
Issu
e Des
cripti
onDa
te
SCAL
E: 1
/8" =
1'-0
"A1
1.01
A11.
035
ENLA
RGED
FLO
OR P
LAN
- ELE
VATO
R RO
OFSC
ALE:
1/8
" = 1
'-0"
A11.
01A1
1.034
ENLA
RGED
FLO
OR P
LAN
- SHE
RIDA
N LE
VELS
4 -
7
SCAL
E: 1
/8" =
1'-0
"A1
1.01
A4.6
12EN
LARG
ED F
LOOR
PLA
NS -
SHER
IDAN
FIR
ST F
LOOR
0'4'
8'16
'32
'
0'4'
8'16
'32
'0'
4'8'
16'
32'
0'4'
8'16
'32
'
0'4'
8'16
'32
'
3
A4.6
14
A4.6
1
1
A11.
04
6
A11.
03
2
A4.5
2
10' -
10
1/2"
GWB
9' - 2
"A
1
8' - 6
"GW
B
9' - 6
"GW
B
6' - 8
"GW
B
9' - 2
"8'
- 10"
8' - 6
"8'
- 10"
A 1
8' - 6
"GW
B
10' -
10
1/2"
GWB
10' -
0"
ACT1
GLAS
S CU
RTAI
NWAL
L
1
A11.
04
6
A11.
03
10' -
10
1/2"
GWB
8' - 3
"GW
B
10' -
0"
ACT1
13' -
0"
1
A11.
04
8' - 0
"GW
B
1
A11.
04
8' - 0
"GW
BA
TLA
NTA
- W
AS
HIN
GTO
N -
NE
W Y
OR
K -
NE
WP
OR
T B
EA
CH
OO
PE
RC
CA
RR
Y
©625 N
orth
Was
hingto
n Stre
etSu
ite 20
0Al
exan
dria,
VA
2231
4(7
03) 5
19-6
152
www.
coop
ercarr
y.com
SCO
PE D
OCUM
ENTS
The
Cons
tructi
on D
ocum
ents
have
not
bee
n co
mple
ted
ther
efor
e th
is dr
awing
may
be
incom
plete
or n
ot co
ordin
ated
. Th
e do
cum
ents
issue
d ind
icate
the
gene
ral s
cope
of
the
Proje
ct. T
he C
ontra
ctor i
s res
pons
ible
for c
omple
te a
nd c
oord
inate
d pr
icing
and
Wor
k, an
d sh
all in
clude
all i
tem
s nec
essa
ry fo
r the
pro
per e
xecu
tion
and
com
pletio
nof
the
Proje
ct, w
heth
er in
dicat
ed o
r not
. Al
l com
pone
nts o
f the
Pro
ject s
hall c
omply
with
any
and
all r
equir
emen
ts of
nat
ional,
stat
e, a
nd lo
cal c
odes
. Th
e Co
ntra
ctor s
hall
infor
m th
e Ow
ner a
nd A
rchit
ect o
f any
om
ission
s, inc
onsis
tenc
ies o
r erro
rs in
the
infor
mat
ion p
rovid
ed.
If no
not
ice is
give
n an
d an
y om
ission
s, inc
onsis
tenc
ies o
rer
rors
are
disc
over
ed, t
he A
rchit
ect's
dec
ision
s on
item
s of W
ork i
nclud
ed in
the
scop
e sh
all b
e bin
ding
on th
e Co
ntra
ctor,
when
cons
isten
t with
the
gene
ral s
cope
and
quali
ty of
the
Proje
ct.
Prin
cipa
l-in-
Cha
rge
Pro
ject
Man
ager
Pro
ject
Arc
hite
ct
Sta
ff A
rchi
tect
Pro
ject
No.
Dat
e
Dra
win
g N
o.
NOT
ISSU
ED F
OR
CONS
TRUC
TION
1
A
23
45
67
89
1011
1213
1415
1617
18
12
34
56
78
910
1112
1314
1516
1718
BCDEFGHJKLMNP
ABCDEFGHJKLMNP
Copy
right
Coo
per C
arry
201
1
GS
A P
roje
ct N
umbe
r
GS
A C
ontr
act N
umbe
r
GS-1
1-P1
0-M
KC-0
026
GS-1
1-P0
9-M
KC-0
022
PRO
PERT
Y OF
UNI
TED
STAT
ES G
OVE
RNM
ENT
FOR
OFF
ICAL
USE
ONL
YDo
not
rem
ove
this
notic
ePr
oper
ly de
stroy
doc
umen
ts wh
en n
o lon
ger n
eede
d
E:\2010\20100044\d-7 drawings\revit\users\20100044_2011_hawkinse.rvt6/28/20112:31:10PM
A11
.02
06/1
6/11
2010
0044
Desig
ner
Appr
over
Chec
ker
Auth
or
SHER
IDAN
ELE
VATO
R -
REFL
ECTE
D CE
ILIN
G PL
ANS
SCOT
T PR
OJEC
T
Scot
t Buil
ding
3700
N. C
apito
l St.,
NW
Was
hingt
on, D
.C. 2
0011
♦Ar
med
For
ces R
etire
men
t Hom
e
PROJECTNUMBER:20100044PROJECTNAME:SCOTTPROJECTSHEETNUMBER:A11.02-SHERIDANELEVATOR-REFLECTEDCEILINGPLANS
ISSU
ANCE
SNo
.Dr
awing
Issu
e Des
cripti
onDa
te
SCAL
E: 1
/8" =
1'-0
"A1
1.02
A2.1
11EN
LARG
ED R
EFLE
CTED
CEI
LING
PLA
N- S
HERI
DAN
GROU
ND L
EVEL
SCAL
E: 1
/8" =
1'-0
"A1
1.02
A2.1
22EN
LARG
ED R
EFLE
CTED
CEI
LING
PLA
N- S
HERI
DAN
MAI
N LE
VEL
SCAL
E: 1
/8" =
1'-0
"A1
1.02
A2.1
33EN
LARG
ED R
EFLE
CTED
CEI
LING
PLA
N- S
HERI
DAN
2 - 3
SCAL
E: 1
/8" =
1'-0
"A1
1.02
A2.1
44EN
LARG
ED R
EFLE
CTED
CEI
LING
PLA
N- S
HERI
DAN
4 - 7
0'4'
8'16
'32
'
0'4'
8'16
'32
'0'
4'8'
16'
32'
0'4'
8'16
'32
'
LEVE
L - M
AIN
EL. 1
5' - 0
"
SHER
IDAN
FIR
ST F
LOO
REL
. 13'
- 0"
SHER
IDAN
SEC
OND
FLOO
REL
. 27'
- 0"
SHER
IDAN
THI
RD F
LOOR
EL. 3
7' - 6
"
SHER
IDAN
FOU
RTH
FLOO
REL
. 48'
- 0"
SHER
IDAN
FIF
TH F
LOOR
EL. 5
8' - 6
"
SHER
IDAN
SIX
TH F
LOO
REL
. 69'
- 0"
SHER
IDAN
SEV
ENTH
FLO
OREL
. 79'
- 6"
SHER
IDAN
T.O
. COP
ING
EL. 9
3' - 0
1/4
"
ELEV
ATOR
ROO
F LE
VEL
EL. 9
8' - 6
"
ALUM
INUM
, SIL
ICON
E GL
AZED
CURT
AINW
ALL
MUL
LION
(VER
TICA
LS)
6" S
IGHT
LINE
ALU
MIN
UMCU
RTAI
NWAL
L M
ULLI
ON
(HO
RIZO
NTAL
S)
NEW
VES
TIBU
LE C
ANO
PY
VIRA
CON
1" V
E1-2
MIN
SULA
TING
HS/
HS S
ILKS
CREE
NVE
-2M
SCR
EEN
# 2
V948
- M
EDIU
M G
RAY
VIRA
SPAN
#3
PRE-
FINI
SHED
ALU
MIN
UMFA
SCIA
AND
SOF
FIT
LEVE
L - M
AIN
EL. 1
5' - 0
"
SHER
IDAN
FIR
ST F
LOO
REL
. 13'
- 0"
SHER
IDAN
SEC
OND
FLOO
REL
. 27'
- 0"
SHER
IDAN
THI
RD F
LOOR
EL. 3
7' - 6
"
SHER
IDAN
FOU
RTH
FLOO
REL
. 48'
- 0"
SHER
IDAN
FIF
TH F
LOOR
EL. 5
8' - 6
"
SHER
IDAN
SIX
TH F
LOO
REL
. 69'
- 0"
SHER
IDAN
SEV
ENTH
FLO
OREL
. 79'
- 6"
SHER
IDAN
T.O
. COP
ING
EL. 9
3' - 0
1/4
"
ELEV
ATOR
ROO
F LE
VEL
EL. 9
8' - 6
"
ALUM
INUM
SIL
ICO
NE G
LAZE
DCU
RTAI
NWAL
L M
ULLI
ON (V
ERTI
CALS
)
6" S
IGHT
LINE
ALU
MIN
UMCU
RTAI
NWAL
L M
ULLI
ON
(HO
RIZO
NTAL
S)
NEW
VES
TIBU
LECA
NOPY
ALUM
INUM
CO
LUM
NCO
VER
VIRA
CON
1" V
E1-2
MIN
SULA
TING
HS/
HS S
ILKS
CREE
NVE
-2M
SCR
EEN
# 2
V948
- M
EDIU
M G
RAY
VIRA
SPAN
#3
PRE-
FINI
SHED
ALU
MIN
UMFA
SCIA
AND
SOF
FIT
SHER
IDAN
GRO
UND
FLOO
REL
. -1'
- 0"
SHER
IDAN
FIR
ST F
LOO
REL
. 13'
- 0"
SHER
IDAN
SEC
OND
FLO
OR
EL. 2
7' - 0
"
SHER
IDAN
THI
RD F
LOOR
EL. 3
7' - 6
"
SHER
IDAN
FOU
RTH
FLOO
REL
. 48'
- 0"
SHER
IDAN
FIF
TH F
LOOR
EL. 5
8' - 6
"
SHER
IDAN
SIX
TH F
LOO
REL
. 69'
- 0"
SHER
IDAN
SEV
ENTH
FLO
OREL
. 79'
- 6"
SHER
IDAN
T.O
. COP
ING
EL. 9
3' - 0
1/4
"
ELEV
ATO
R RO
OF L
EVEL
EL. 9
8' - 6
"
ALUM
INUM
SIL
ICO
NE G
LAZE
DCU
RTAI
NWAL
L M
ULLI
ON (V
ERTI
CALS
)
6" S
IGHT
LINE
ALU
MIN
UMCU
RTAI
NWAL
L M
ULLI
ON
(HO
RIZO
NTAL
S)
NEW
GRAD
ED T
ERRA
INRE
FER
TO C
IVIL
12' -
3"1'
- 6"
12' -
3"
5' - 10" 2' - 6" 5' - 10" 2' - 6"
LIM
ESTO
NE T
O M
ATCH
EXI
STIN
G
ANNO
DIZE
D AL
UMIN
UMST
OREF
RONT
SYS
TEM
TO
MAT
CHEX
ISTI
NG A
LUM
INUM
FIN
ISH
BLAC
K AN
NODI
ZED
ALUM
INUM
STOR
EFRO
NT S
YSTE
M T
OM
ATCH
EXI
STIN
G W
INDO
WS
VIRA
CON
1" V
RE1-
46 #
2 RA
DIAN
TLO
W -
e ON
CLE
AR H
S
VIRA
CON
1" V
E1-2
MIN
SULA
TING
HS/
HS S
ILKS
CREE
NVE
-2M
SCR
EEN
# 2
V948
- M
EDIU
M G
RAY
VIRA
SPAN
#3
SHER
IDAN
FIR
ST F
LOO
REL
. 13'
- 0"
SHER
IDAN
SEC
OND
FLO
OR
EL. 2
7' - 0
"
ALUM
INUM
COL
UMN
COVE
R
VEST
IBUL
E RO
OF
CURT
AINW
ALL
ENCL
OSU
RE
WAL
K OF
F M
ATEN
TRY
SYST
EM
ATL
AN
TA -
WA
SH
ING
TON
- N
EW
YO
RK
- N
EW
PO
RT
BE
AC
H
OO
PE
RC
CA
RR
Y
©625 N
orth
Was
hingto
n Stre
etSu
ite 20
0Al
exan
dria,
VA
2231
4(7
03) 5
19-6
152
www.
coop
ercarr
y.com
SCO
PE D
OCUM
ENTS
The
Cons
tructi
on D
ocum
ents
have
not
bee
n co
mple
ted
ther
efor
e th
is dr
awing
may
be
incom
plete
or n
ot co
ordin
ated
. Th
e do
cum
ents
issue
d ind
icate
the
gene
ral s
cope
of
the
Proje
ct. T
he C
ontra
ctor i
s res
pons
ible
for c
omple
te a
nd c
oord
inate
d pr
icing
and
Wor
k, an
d sh
all in
clude
all i
tem
s nec
essa
ry fo
r the
pro
per e
xecu
tion
and
com
pletio
nof
the
Proje
ct, w
heth
er in
dicat
ed o
r not
. Al
l com
pone
nts o
f the
Pro
ject s
hall c
omply
with
any
and
all r
equir
emen
ts of
nat
ional,
stat
e, a
nd lo
cal c
odes
. Th
e Co
ntra
ctor s
hall
infor
m th
e Ow
ner a
nd A
rchit
ect o
f any
om
ission
s, inc
onsis
tenc
ies o
r erro
rs in
the
infor
mat
ion p
rovid
ed.
If no
not
ice is
give
n an
d an
y om
ission
s, inc
onsis
tenc
ies o
rer
rors
are
disc
over
ed, t
he A
rchit
ect's
dec
ision
s on
item
s of W
ork i
nclud
ed in
the
scop
e sh
all b
e bin
ding
on th
e Co
ntra
ctor,
when
cons
isten
t with
the
gene
ral s
cope
and
quali
ty of
the
Proje
ct.
Prin
cipa
l-in-
Cha
rge
Pro
ject
Man
ager
Pro
ject
Arc
hite
ct
Sta
ff A
rchi
tect
Pro
ject
No.
Dat
e
Dra
win
g N
o.
NOT
ISSU
ED F
OR
CONS
TRUC
TION
1
A
23
45
67
89
1011
1213
1415
1617
18
12
34
56
78
910
1112
1314
1516
1718
BCDEFGHJKLMNP
ABCDEFGHJKLMNP
Copy
right
Coo
per C
arry
201
1
GS
A P
roje
ct N
umbe
r
GS
A C
ontr
act N
umbe
r
GS-1
1-P1
0-M
KC-0
026
GS-1
1-P0
9-M
KC-0
022
PRO
PERT
Y OF
UNI
TED
STAT
ES G
OVE
RNM
ENT
FOR
OFF
ICAL
USE
ONL
YDo
not
rem
ove
this
notic
ePr
oper
ly de
stroy
doc
umen
ts wh
en n
o lon
ger n
eede
d
E:\2010\20100044\d-7 drawings\revit\users\20100044_2011_hawkinse.rvt6/28/20112:31:14PM
A11
.03
06/0
1/11
2010
0044
DANA
PO
MER
OY
STEV
E SM
ITH
KENN
ETH
BROW
N
Auth
or
SHER
IDAN
ELE
VATO
R -
BUIL
DING
ELE
VATI
ONS
SCOT
T PR
OJEC
T
Scot
t Buil
ding
3700
N. C
apito
l St.,
NW
Was
hingt
on, D
.C. 2
0011
♦Ar
med
For
ces R
etire
men
t Hom
e
PROJECTNUMBER:20100044PROJECTNAME:SCOTTPROJECTSHEETNUMBER:A11.03-SHERIDANELEVATOR-BUILDINGELEVATIONS
ISSU
ANCE
SNo
.Dr
awing
Issu
e Des
cripti
onDa
te1
DESI
GN D
EVEL
OPME
NT S
UBMI
SSIO
N06
.01.20
11
SCAL
E: 1
/8" =
1'-0
"A1
1.03
A2.0
2A3
SHER
IDAN
- NO
RTH
ELEV
ATIO
NSC
ALE:
1/8
" = 1
'-0"
A11.
03A2
.02A
2SH
ERID
AN -
WES
T EL
EVAT
ION
SCAL
E: 1
/8" =
1'-0
"A1
1.03
A3.0
31SH
ERID
AN -
SOUT
H EL
EVAT
ION
SCAL
E: 1
/4" =
1'-0
"A1
1.03
A2.0
2A6
SECT
ION
- SHE
RIDA
N NE
W V
ESTI
BULE
0'4'
8'16
'32
'0'
4'8'
16'
32'
0'4'
8'16
'32
'
0'2'
4'8'
16'
SHER
IDAN
THI
RD F
LOOR
EL. 3
7' - 6
"
SHER
IDAN
SIX
TH F
LOO
REL
. 69'
- 0"
SHER
IDAN
SEV
ENTH
FLO
OREL
. 79'
- 6"
SHER
IDAN
T.O
. COP
ING
EL. 9
3' - 0
1/4
"
ELEV
ATO
R RO
OF L
EVEL
EL. 9
8' - 6
"
8' - 6"
10' - 0"
8' - 3"8' - 0" TYP.
V.I.F.
8' - 0" TYP.
V.I.F.
8' - 0" TYP.
V.I.F. 10' - 0"
NEW
WAL
KWAY
CONC
RETE
PIT
WAL
LSBE
YOND
EXIS
TING
FOU
NDAT
ION
WAL
L
EXIS
TING
PILE
CAP
PROV
IDE
BOND
BRE
AKER
PROV
IDE
KEY,
WAT
ERST
OP A
NDEP
OXY
ANCH
ORED
DOW
ELS
AT 2
4" O
N CE
NTER
PROV
IDE
KEY,
WAT
ERST
OP A
NDEP
OXY
ANCH
ORED
DOW
ELS
AT 2
4" O
N CE
NTER
EXIS
TING
PED
ESTR
IAN
TUNN
EL
HOIS
T BE
AM A
S PE
R M
FR'S
RECO
MM
ENDA
TION
VIRA
CON
1" V
E1-2
MIN
SULA
TING
HS/
HS S
ILKS
CREE
NVE
-2M
SCR
EEN
# 2
V948
- M
EDIU
M G
RAY
VIRA
SPAN
#3
ALUM
INUM
SIL
ICO
NE G
LAZE
DCU
RTAI
NWAL
L M
ULLI
ON (V
ERTI
CALS
)
6" S
IGHT
LINE
ALU
MIN
UMCU
RTAI
NWAL
L M
ULLI
ON
(HO
RIZO
NTAL
S)
CONT
INUO
US W
ATER
PRO
OFIN
G
NEW
SLA
B PO
RTIO
N
EXIS
TING
BEA
M. C
UT T
OP P
ORT
ION
AND
REIN
FORC
E ST
RUCT
URE.
PRO
VIDE
EXP
ANSI
ON J
OIN
T TY
P. A
BOVE
GRAD
E
NEW
GW
B CE
ILIN
G TY
P.
EXIS
TING
CEI
LING
TO R
EMAI
N
EXIS
TING
CEI
LING
TO R
EMAI
N
EXIS
TING
CEI
LING
TO R
EMAI
N
EXIS
TING
CEI
LING
TO R
EMAI
N
NEW
ACT
CEIL
ING
NEW
ACT
CEIL
ING
NEW
GW
B CE
ILIN
G
NEW
GW
B CE
ILIN
G
NEW
GW
B CE
ILIN
G
NEW
GW
B CE
ILIN
G
NEW
GW
B CE
ILIN
G
NEW
GW
B CE
ILIN
G
ELEV
ATOR
PIT
EL. -
5' - 0
"
LIM
ESTO
NE
6"2"9' - 10"6"2"9' - 10"6"2"10' - 6"
2' - 6 1/2"5' - 9 1/2"
APPROX. 8' - 4"2' - 2"APPROX. 8' - 4"2' - 2"8' - 4"2' - 2"
2' - 6 1/2"5' - 9 1/2" 2' - 6 1/2"5' - 9 1/2"
NEW
ALU
MIN
UM S
ILL
TO M
ATCH
EXI
STIN
G FI
NISH
NEW
ALU
MIN
UM S
TORE
FRON
T SY
STEM
TO M
ATCH
EXI
STIN
G FI
NISH
3/16
" X 1
1/4
" X 6
" N.C
. STR
APS
VINY
L FL
OOR
WOO
D TO
P &
FRON
T CO
VERE
DW
ITH
LAM
INAT
ED P
LAST
ICIN
DUCT
ION
UNIT
LEVE
L 2
LEVE
L 3
LEVE
LS 4
- 7
VIRA
CON
1" V
RE1-
46 #
2 RA
DIAN
TLO
W -
e ON
CLE
AR H
S
ATL
AN
TA -
WA
SH
ING
TON
- N
EW
YO
RK
- N
EW
PO
RT
BE
AC
H
OO
PE
RC
CA
RR
Y
©625 N
orth
Was
hingto
n Stre
etSu
ite 20
0Al
exan
dria,
VA
2231
4(7
03) 5
19-6
152
www.
coop
ercarr
y.com
SCO
PE D
OCUM
ENTS
The
Cons
tructi
on D
ocum
ents
have
not
bee
n co
mple
ted
ther
efor
e th
is dr
awing
may
be
incom
plete
or n
ot co
ordin
ated
. Th
e do
cum
ents
issue
d ind
icate
the
gene
ral s
cope
of
the
Proje
ct. T
he C
ontra
ctor i
s res
pons
ible
for c
omple
te a
nd c
oord
inate
d pr
icing
and
Wor
k, an
d sh
all in
clude
all i
tem
s nec
essa
ry fo
r the
pro
per e
xecu
tion
and
com
pletio
nof
the
Proje
ct, w
heth
er in
dicat
ed o
r not
. Al
l com
pone
nts o
f the
Pro
ject s
hall c
omply
with
any
and
all r
equir
emen
ts of
nat
ional,
stat
e, a
nd lo
cal c
odes
. Th
e Co
ntra
ctor s
hall
infor
m th
e Ow
ner a
nd A
rchit
ect o
f any
om
ission
s, inc
onsis
tenc
ies o
r erro
rs in
the
infor
mat
ion p
rovid
ed.
If no
not
ice is
give
n an
d an
y om
ission
s, inc
onsis
tenc
ies o
rer
rors
are
disc
over
ed, t
he A
rchit
ect's
dec
ision
s on
item
s of W
ork i
nclud
ed in
the
scop
e sh
all b
e bin
ding
on th
e Co
ntra
ctor,
when
cons
isten
t with
the
gene
ral s
cope
and
quali
ty of
the
Proje
ct.
Prin
cipa
l-in-
Cha
rge
Pro
ject
Man
ager
Pro
ject
Arc
hite
ct
Sta
ff A
rchi
tect
Pro
ject
No.
Dat
e
Dra
win
g N
o.
NOT
ISSU
ED F
OR
CONS
TRUC
TION
1
A
23
45
67
89
1011
1213
1415
1617
18
12
34
56
78
910
1112
1314
1516
1718
BCDEFGHJKLMNP
ABCDEFGHJKLMNP
Copy
right
Coo
per C
arry
201
1
GS
A P
roje
ct N
umbe
r
GS
A C
ontr
act N
umbe
r
GS-1
1-P1
0-M
KC-0
026
GS-1
1-P0
9-M
KC-0
022
PRO
PERT
Y OF
UNI
TED
STAT
ES G
OVE
RNM
ENT
FOR
OFF
ICAL
USE
ONL
YDo
not
rem
ove
this
notic
ePr
oper
ly de
stroy
doc
umen
ts wh
en n
o lon
ger n
eede
d
E:\2010\20100044\d-7 drawings\revit\users\20100044_2011_hawkinse.rvt6/28/20112:31:16PM
A11
.04
06/1
6/11
2010
0044
Desig
ner
Appr
over
Chec
ker
Auth
or
SHER
IDAN
ELE
VATO
R
SCOT
T PR
OJEC
T
Scot
t Buil
ding
3700
N. C
apito
l St.,
NW
Was
hingt
on, D
.C. 2
0011
♦Ar
med
For
ces R
etire
men
t Hom
e
PROJECTNUMBER:20100044PROJECTNAME:SCOTTPROJECTSHEETNUMBER:A11.04-SHERIDANELEVATOR
ISSU
ANCE
SNo
.Dr
awing
Issu
e Des
cripti
onDa
te
SCAL
E: 1
/4" =
1'-0
"A1
1.04
A2.0
1A1
BUIL
DING
SEC
TION
- SH
ERID
AN E
LEVA
TOR
SCAL
E: 1
/2" =
1'-0
"A1
1.04
2SH
ERID
AN -
WAL
L SE
CTIO
N0'
2'4'
8'16
'0'
1'2'
4'8'
ATL
AN
TA -
WA
SH
ING
TON
- N
EW
YO
RK
- N
EW
PO
RT
BE
AC
H
OO
PE
RC
CA
RR
Y
©625 N
orth
Was
hingto
n Stre
etSu
ite 20
0Al
exan
dria,
VA
2231
4(7
03) 5
19-6
152
www.
coop
ercarr
y.com
SCO
PE D
OCUM
ENTS
The
Cons
tructi
on D
ocum
ents
have
not
bee
n co
mple
ted
ther
efor
e th
is dr
awing
may
be
incom
plete
or n
ot co
ordin
ated
. Th
e do
cum
ents
issue
d ind
icate
the
gene
ral s
cope
of
the
Proje
ct. T
he C
ontra
ctor i
s res
pons
ible
for c
omple
te a
nd c
oord
inate
d pr
icing
and
Wor
k, an
d sh
all in
clude
all i
tem
s nec
essa
ry fo
r the
pro
per e
xecu
tion
and
com
pletio
nof
the
Proje
ct, w
heth
er in
dicat
ed o
r not
. Al
l com
pone
nts o
f the
Pro
ject s
hall c
omply
with
any
and
all r
equir
emen
ts of
nat
ional,
stat
e, a
nd lo
cal c
odes
. Th
e Co
ntra
ctor s
hall
infor
m th
e Ow
ner a
nd A
rchit
ect o
f any
om
ission
s, inc
onsis
tenc
ies o
r erro
rs in
the
infor
mat
ion p
rovid
ed.
If no
not
ice is
give
n an
d an
y om
ission
s, inc
onsis
tenc
ies o
rer
rors
are
disc
over
ed, t
he A
rchit
ect's
dec
ision
s on
item
s of W
ork i
nclud
ed in
the
scop
e sh
all b
e bin
ding
on th
e Co
ntra
ctor,
when
cons
isten
t with
the
gene
ral s
cope
and
quali
ty of
the
Proje
ct.
Prin
cipa
l-in-
Cha
rge
Pro
ject
Man
ager
Pro
ject
Arc
hite
ct
Sta
ff A
rchi
tect
Pro
ject
No.
Dat
e
Dra
win
g N
o.
NOT
ISSU
ED F
OR
CONS
TRUC
TION
1
A
23
45
67
89
1011
1213
1415
1617
18
12
34
56
78
910
1112
1314
1516
1718
BCDEFGHJKLMNP
ABCDEFGHJKLMNP
Copy
right
Coo
per C
arry
201
1
GS
A P
roje
ct N
umbe
r
GS
A C
ontr
act N
umbe
r
GS-1
1-P1
0-M
KC-0
026
GS-1
1-P0
9-M
KC-0
022
PRO
PERT
Y OF
UNI
TED
STAT
ES G
OVE
RNM
ENT
FOR
OFF
ICAL
USE
ONL
YDo
not
rem
ove
this
notic
ePr
oper
ly de
stroy
doc
umen
ts wh
en n
o lon
ger n
eede
d
E:\2010\20100044\d-7 drawings\revit\users\20100044_2011_hawkinse.rvt6/28/20112:31:17PM
A11
.05
06/1
6/11
2010
0044
Desig
ner
Appr
over
Chec
ker
Auth
or
SHER
IDAN
ELE
VATO
R
SCOT
T PR
OJEC
T
Scot
t Buil
ding
3700
N. C
apito
l St.,
NW
Was
hingt
on, D
.C. 2
0011
♦Ar
med
For
ces R
etire
men
t Hom
e
PROJECTNUMBER:20100044PROJECTNAME:SCOTTPROJECTSHEETNUMBER:A11.05-SHERIDANELEVATOR
ISSU
ANCE
SNo
.Dr
awing
Issu
e Des
cripti
onDa
te
ATL
AN
TA -
WA
SH
ING
TON
- N
EW
YO
RK
- N
EW
PO
RT
BE
AC
H
OO
PE
RC
CA
RR
Y
©625 N
orth
Was
hingto
n Stre
etSu
ite 20
0Al
exan
dria,
VA
2231
4(7
03) 5
19-6
152
www.
coop
ercarr
y.com
SCO
PE D
OCUM
ENTS
The
Cons
tructi
on D
ocum
ents
have
not
bee
n co
mple
ted
ther
efor
e th
is dr
awing
may
be
incom
plete
or n
ot co
ordin
ated
. Th
e do
cum
ents
issue
d ind
icate
the
gene
ral s
cope
of
the
Proje
ct. T
he C
ontra
ctor i
s res
pons
ible
for c
omple
te a
nd c
oord
inate
d pr
icing
and
Wor
k, an
d sh
all in
clude
all i
tem
s nec
essa
ry fo
r the
pro
per e
xecu
tion
and
com
pletio
nof
the
Proje
ct, w
heth
er in
dicat
ed o
r not
. Al
l com
pone
nts o
f the
Pro
ject s
hall c
omply
with
any
and
all r
equir
emen
ts of
nat
ional,
stat
e, a
nd lo
cal c
odes
. Th
e Co
ntra
ctor s
hall
infor
m th
e Ow
ner a
nd A
rchit
ect o
f any
om
ission
s, inc
onsis
tenc
ies o
r erro
rs in
the
infor
mat
ion p
rovid
ed.
If no
not
ice is
give
n an
d an
y om
ission
s, inc
onsis
tenc
ies o
rer
rors
are
disc
over
ed, t
he A
rchit
ect's
dec
ision
s on
item
s of W
ork i
nclud
ed in
the
scop
e sh
all b
e bin
ding
on th
e Co
ntra
ctor,
when
cons
isten
t with
the
gene
ral s
cope
and
quali
ty of
the
Proje
ct.
Prin
cipa
l-in-
Cha
rge
Pro
ject
Man
ager
Pro
ject
Arc
hite
ct
Sta
ff A
rchi
tect
Pro
ject
No.
Dat
e
Dra
win
g N
o.
NOT
ISSU
ED F
OR
CONS
TRUC
TION
1
A
23
45
67
89
1011
1213
1415
1617
18
12
34
56
78
910
1112
1314
1516
1718
BCDEFGHJKLMNP
ABCDEFGHJKLMNP
Copy
right
Coo
per C
arry
201
1
GS
A P
roje
ct N
umbe
r
GS
A C
ontr
act N
umbe
r
GS-1
1-P1
0-M
KC-0
026
GS-1
1-P0
9-M
KC-0
022
PRO
PERT
Y OF
UNI
TED
STAT
ES G
OVE
RNM
ENT
FOR
OFF
ICAL
USE
ONL
YDo
not
rem
ove
this
notic
ePr
oper
ly de
stroy
doc
umen
ts wh
en n
o lon
ger n
eede
d
E:\2010\20100044\d-7 drawings\revit\users\20100044_2011_hawkinse.rvt6/28/20112:31:19PM
A11
.06
06/1
6/11
2010
0044
Desig
ner
Appr
over
Chec
ker
Auth
or
SHER
IDAN
ELE
VATO
R
SCOT
T PR
OJEC
T
Scot
t Buil
ding
3700
N. C
apito
l St.,
NW
Was
hingt
on, D
.C. 2
0011
♦Ar
med
For
ces R
etire
men
t Hom
e
PROJECTNUMBER:20100044PROJECTNAME:SCOTTPROJECTSHEETNUMBER:A11.06-SHERIDANELEVATOR
ISSU
ANCE
SNo
.Dr
awing
Issu
e Des
cripti
onDa
te
GLASS FOR ELEVATOR TOWER
GLASS FOR ELEVATOR TOWER
GLASS FOR EXPANDED WINDOW OPENINGS
GLASS FOR EXPANDED WINDOW OPENINGS