Post on 12-Apr-2015
LOCATION : ANEKAL
IS CODE REFERENCE : IS 1786-2008
Actual in % Theoritical in %
10 TULSYAN 5232/2013 1.000 0.633 0.617 2.59 ± 7 Passed
10 TULSYAN 5232/2013 1.000 0.640 0.617 3.73 ± 7 Passed
10 TULSYAN 5232/2013 1.000 0.637 0.617 3.24 ± 7 Passed
12 TULSYAN 5232/2013 1.000 0.912 0.89 2.47 ± 5 Passed
12 TULSYAN 5232/2013 1.000 0.892 0.89 0.22 ± 5 Passed
12 TULSYAN 5232/2013 1.000 0.925 0.89 3.93 ± 5 Passed
10 TULSYAN 5685/2013 1.000 0.621 0.617 0.65 ± 7 Passed
10 TULSYAN 5685/2013 1.000 0.633 0.617 2.59 ± 7 Passed
10 TULSYAN 5685/2013 1.000 0.620 0.617 0.49 ± 7 Passed
12 TULSYAN 5685/2013 1.000 0.896 0.88 1.82 ± 5 Passed
VALUE & BUDGET HOUSING CORPORATION PVT LTD
ABSTRACT FOR ROLLING MARGIN OF STEEL - FOR THE MONTH OF FEB 13
DateDia of Bar
(mm)Description TC/ Invoice No.
Length
(mtrs)
Actual
wt.(Kg/m)
01.02.2013
PROJECT : VBHC - VAIBHAVA
Theoritical
wt.(Kg/m)
Difference in %Remarks
12 TULSYAN 5685/2013 1.000 0.896 0.88 1.82 ± 5 Passed
12 TULSYAN 5685/2013 1.000 0.901 0.88 2.39 ± 5 Passed
12 TULSYAN 5685/2013 1.000 0.893 0.88 1.48 ± 5 Passed
16 TULSYAN 5685/2013 1.000 1.590 1.58 0.63 ± 5 Passed
16 TULSYAN 5685/2013 1.000 1.597 1.58 1.08 ± 5 Passed
16 TULSYAN 5685/2013 1.000 1.588 1.58 0.51 ± 5 Passed
25 TULSYAN 5685/2013 1.000 3.881 3.85 0.81 ± 3 Passed
25 TULSYAN 5685/2013 1.000 3.886 3.85 0.94 ± 3 Passed
25 TULSYAN 5685/2013 1.000 3.860 3.85 0.26 ± 3 Passed
8 TULSYAN2517/2012-2013
2518/2012-20131.000 0.399 0.395 1.01 ± 7 Passed
8 TULSYAN2517/2012-2013
2518/2012-20131.000 0.381 0.395 -3.54 ± 7 Passed
8 TULSYAN2517/2012-2013
2518/2012-20131.000 0.375 0.395 -5.06 ± 7 Passed
Prepared By Checked By
19.02.2013
23.02.2013