Substation Automation
based on IEC 61850
Claes Rytoft
ABB Power Systems
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 2/20
event recording
protection
Copper cables
SA conventional
MMI / Control Board
SCADA- distribu tion, metering
Coppe
r
cables
Copper cables
Bay cubicle
GIS
BayNetworks
RTU
NCC
serial communication
to other bays
GIS
Copper cablesBay cubicle
SA with interbay bus
SASGateway /
Protocol Conv.
NCC
ABBNetworkPartner AG
C
E
COM581
IED
IED
Gateway /
Protocol Conv.
Sensors &
actuators
to other
bays
serial communication
ABBNetworkPartner AG
C
E
COM581
SA with interbay &
process bus
GIS
Bay cubicle
SAS
NCC
IED
IED
Development of SA
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 3/20
IEC and IEEE joined forces in 1999 and
defined…IEC 61850
” COMMUNICATION NETWORKS AND SYSTEMS IN SUBSTATIONS”
EPRI
IEC 61850 - first global standard in the Utili ty f ield
– Supported by ANSI/IEEE
Developed by 60 experts from Europe and North
America – Includes the UCA 2.0 as a subset
Starts to Influence related electr ic areas
– Wind power, Hydro power, Distributed Energy
Implementation in progress by all major vendors
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 4/20
Fundamentals for the Standard
Free configuration The standard supports different philosophies
and allow a free allocation of functions e.g. it must
work equally well for centralized (RTU like) ordecentralized (SAS like) systems.
Interoperability The ability for IED’s from one or several
manufacturer to exchange information and use
the information for the their own functions.
Long term stability The standard is future proof , i.e. it is able to follow
progress in communication technology as well asnew system requirements.
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 5/20
Part 6Substation Configuration Language (SCL)
Communication model (Data model and Services) Parts 7-1 to 7-4
Communication requirements Part 5
System and Project management Part 4
Glossary Part 2
Introduction and overview Part 1
General requirements Part 3
Part 10Conformance testing
Part 9
Sampled Values (Process Bus)
Part 9-1 : serial
unidirectional point-to-point
Part 9-2 : Mapping on
IEEE 802.3(Ethernet)Part 8
Part 8-1 : Mapping for
MMS-TCP/IP-Ethernet
Part 8-x : for Future Use
Station Bus
IEC 61850 - more than just a protocol
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 6/20
Evolution in SA Communication
Integral solution for the entire SA domain
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 7/20
Circuit Breaker QA1_L1/XCBR
Gas density mon.
QA1_L1/SIMG
HardwareObjects
SoftwareFunctions
Control
QA1/CSWI
QC1/CSWI
QB9/CSWI
Distance
Protection
PDIS
LN functionLN function--related in the substationrelated in the substation
Isolator
QC1/XSWI
Earthing Switch
QB9_L1/XSWI
Gas density mon.
QB9_L1/SIMG
Introduction of Data Modeling in Logical Nodes
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 8/20
Client Server
CommunicationSampled
Values
ApplicationData Model (Objects,Services)
Ethernet Link Layer
Ethernet Physical Layer with Priority tagging (100 Mbit/s)
Realtime –
Priority communication
IP
TCP
MMS
Mapping (split data model from communication)
GOOSE*
StackInterface
Abstract
Communication
Services
Interface (ACSI)
ISO/OSI – Stack
Hierarchical set of
Rules how information is coded fortransmission
* Generic Object Oriented Substation Event
Communication Services Overview
3 services available for data access and transfer :
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 9/20
Ongoing Discussions – Next Step
IEC 62344
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 10/20
A supplier’s experience
• Driving force in standardization
committees
– 13 permanent members in TC57
• Extensive interoperability
testing with with other major
suppliers 2001- 2004
• IEC61850 References
– First IEC61850 based system
in service Dec 2004
– 60+ SA systems sold
Part 6Substation Configur ation Language (SCL)
Communication model Parts 7-1 to 7-4
Communication requirements Part 5
System and Proj ect management Part 4
Glossary Part 2
Introduction and overview Part 1
General requirements Part 3
Part 10Conformance testing
Part 8/9Part 9-1
Part 9-2
Part 8-1 : Mapping for
MMS-TCP/IP-Ethernet
Part 8-x : for Future Use
100 Mbit/s redundant swit ched Ethernet ring
Bay Level
Station Level/ Gateway
IEC101
GPS
Kema Simulator
Kema
Anal yser
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 11/20
A supplier’s IEC 61850 Offerings
Protection & Control IEDs for all T&D applications –
61850 compliance certified by KEMA
Overhead lines
Underground cables
Multi terminal Circuits
Transformers & Reactors
Generators & Large Machines
Busbar & Breaker
Composite Objects
High Voltage Switchgear
Station Products
Station-HMI - MicroSCADA Pro
Gateways, Remote control and data access
Verified 61850 based System Solutions – ABB 61850System Verification Center certified by UCA
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 12/20
IED 670 – designed for IEC 61850
• IED670 can be configured for basically
any transmission application through
an extensive Application FunctionLibrary
• Unique ability to allocate functions to
any IED allowing for optimized, highlycompact solutions
• IED670 can have up to 24 analog
inputs and 14 I/O boards
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 13/20
REA Arc Protection
REF Feeder Protection
REX Feeder Protection
REJ, REU Feeder REM Machine Protection
RET Transformer Protection
REC Feeder Automation
REL Line Protection REB Busbar Protection
REG Generator Protection
SPACOM Product family
RER, COM Communication adapters & Gateways
Established
Substation Automation Products
All products adapted to IEC 61850
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 14/20
BCS
BPS
SASStation level
Substation Automation Solutions
based on IEC 61850
Bay Control Solutions
based on IEC 61850
Bay Protection Solutions
based on IEC 61850
ABB’s IEC 61850 Solutions
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 15/20
A supplier's System Verification
Centre
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 16/20
SVC (System Verification Center) qualified by UCA
IEC 61850; SVC Recognized
conformance test center
June 2006 - The SVC (in Baden/Switzerland)
certified by the UCA International UsersGroup to be an IEC 61850 Competence
Center.
The SVC is thereby entitled to officially certifyIEC 61850 conformity.
The SVC is, together with KEMA, the only
test center worldwide that has reached this
status.
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 17/20
A supplier’s IEC 61850-compliant
solutions around the globe
• SA-System orders November 2006,(with ABB and 3rd party IEDs):
– Total of: 100 Substations
• Projects with ABB IEDs: 150-200
(various system integrators):
• Overall ABB involved in > 250 IEC
61850 projects
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 18/20
IEC 61850
Profile Company A
Profile Company B
Interoperable
Interoperable? - An example:
IEC61850 defines three types of
data exchange communication
services – but only one of these
must be supported to beinteroperable !
Interoperable Interoperability
Each mixing of devices with systems from
different manufactures must carefully beclarified in respect of the implementedprofile.
Interoperability yes, but…..
• A communication profile defines the SUBSET of a standard
• Different Profiles may conform to the standard but still not be interoperable
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 19/20
Key players• An important part of the standard has been successfully tested
between the key suppliers
• Different interpretation of the standard was detected during the tests
• ABB, and 2 of our main competitors have synchronized theirIEC61850 implementation
Interoperable Profile
One manufacturer…
private
Two manufacturers…
by chanceThree manufacturers …
interoperabili ty !
7/23/2019 Abb iec61850
http://slidepdf.com/reader/full/abb-iec61850 20/20
• Cost effective solutions supporting reuse of engineering
data over time and a reduced need for training
• The data model will contribute to long term stable
solutions.
• Interoperable
• Main stream technology path for major suppliers –
Availability