EARD Countries
The Peoples Republic of
China (PRC)
Mongolia
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
3/18
ADB Assistance to PRC and MongoliasTransport and Communication Sectors
(as of 31 December 2011)
Country Start Year
Loan Amount
($ million) % of Total Lending TA Amount
% of Total TA
($ million)
PRC 1986 13,363.0 54 68.5 18
Mongolia 1991 264.6 32 14.7 16
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
4/18
Business Opportunities
TypeNo. of TAProjects
No. of LoanProjects
Total Value(S million) Timeline
1. Consulting Services 20 4 19.75 201220142. Equipment 0 8 727.67 201220203. Civil Works 0 3 462.40 20122020
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
5/18
Consulting Services(Under Firm TAs)
TA No. Project Name ApprovalDateTAAmount($ ) TAType Required Expertise LikelyTiming
7449-MON Regional Transport
Development -Regional Logistics II
15-Dec-09 350,000 PPTA PPP specialist with
logistics experience,material handling, andeconomic and financial
2012
7692-PRC CapacityDevelopment forRailway TrackMaintenance
10-Dec-10 400,000 CDTA Track maintenance,human resourcemanagement, and largetrack maintenancemachine technicaltraining
2012
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
6/18
Consulting Services(Under Firm TAs)
TA No. Project NameApproval
Date
TAAmount
($)TA
Type Required ExpertiseLikelyTiming
7916-PRC Improving EnergyEfficiency andReducing Emissionsthrough IntelligentRailway StationBuildings
17-Nov-11 400.000 PATA Intelligent building andenergy efficiency, andbuilding automaticcontrol and data network
2012
7965-PRC Jiangxi Ji'an
Sustainable UrbanTransport
09-Dec-11 700,000 PPTA Urban transport, road
safety, hub design,economic, financial,travel forecast,environment, and social
2012
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
7/18
Consulting Services(Under Firm TAs)
TA No. Project NameApproval
Date
TAAmount
($)TA
Type Required ExpertiseLikelyTiming
7988-PRC Anhui IntermodalSustainableTransport
12-Dec-11 1,000,000 PPTA Inland waterway, port,road design and safety,logistics, economic,financial, environment,social, and capacitybuilding
2012
7962-PRC Yunnan SustainableMaintenance
12-Dec-11 800,000 PPTA Road maintenanceplanning; managementand engineering;transport informationsystem; road safety;
highway procurement;environment; socialsafeguards; pavementmanagement; GIS; androad material engineer
2012
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
8/18
Consulting Services(Under Firm TAs)
TA No. Project Name ApprovalDateTAAmount($) TAType Required Expertise LikelyTiming
7975-PRC YuxiMohanSubregional RailwayLink
13-Dec-11 800,000 PPTA Railway engineering;operation andinstitutional; economicand financial;environment and social;
logistics and regionalcooperation; transportenergy; and multimodalhub design
2013
7976-PRC Beijing SustainableUrban Transport
13-Dec-11 450,000 PATA Urban transport andtravel demandmanagement, transportfiscal and pricing
strategy, vehicleemission, transportplanning and networkmodeling, trafficmanagement and trafficmodeling
2012
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
9/18
Consulting Services(Under Firm TAs)
TA No. Project Name ApprovalDateTAAmount($) TAType Required Expertise LikelyTiming
8002-PRC HubeiYichangSustainable Urban
Transport
15-Dec-11 900,000 PPTA BRT and publictransport, travel forecast
road engineering,economic and financial,environment and social
2012
7925-PRC DevelopingMultimodalPassenger
Transport Hubs
24-Dec-11 500,000 PATA Integrated urbantransport planning,multimodal passenger
hub architect, financial,design and costing civilengineer, andinstitutional coordination
2012
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
10/18
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
11/18
Consulting Services(Under Potential TAs)
Country Indicative Project Name TA TypeIndicativeYear forADBApproval
IndicativeTA Amount($)PRC Yunnan Puer Regional
Roads Network IntegratedDevelopment
PPTA 2012 750,000
PRC Fujian Road NetworkRehabilitation and
Integrated Development
PPTA 2012 750,000
PRC Strategy for Rural LogisticsDevelopment
PATA 2013 700,000
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
12/18
Consulting Services(Under Potential TAs)
Country Indicative Project Name TA TypeIndicativeYear forADBApproval
IndicativeTA Amount($)
PRC Capacity Building for HighSpeed Train Drivers andManagement Personnel
CDTA 2013 400,000
PRC Automobile's EnvironmentalPerformance Conformity inFuel Consumption and
Pollutant Emission
PATA 2013 500,000
PRC Shaanxi Trunk RoadsImprovement
PPTA 2013 750,000
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
13/18
Consulting Services(under Loans)
Loan No. Project Name ApprovalDate Required ExpertiseCostEstimates($ million)
2600-PRC Anhui Integrated Transport
Sector Improvement
10-Dec-09 Highway financing study, and
overseas training
1.5
2802-PRC Xi'an Urban Road Network
Improvement
08-Nov-11 Project management and
training
1.5
2847-MON MFF Western Regional Road
Corridor - Tranche 1
22-Dec-11 Project management,
construction supervision, and
road maintenance
2.0
PRC 43031 Hunan Xiangjiang Inland
Waterway Transport
Institutional strengthening,
capacity building, and port
development study
1.0
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
14/18
Equipment
Loan No. Project Name ApprovalDate Type of Equipment Cost Estimates($ million)2345-PRC Westen Guangxi Roads
Development
14-Aug-07 (1) Tolling, monitoring and
communications
6.5
(2) Maintenance and safety
(3) Pavement testing
(4) Storage and container(5) Highway transport
information system
2605-PRC MFF Railway Energy
Efficiency and Safety
Enhancement
Tranche 1
15-Dec-09 Telecommunication systems;
signaling; overhead catenary;
traction substation system;
electric power cable andequipment; noise barriers;
operation, maintenance, and
safety; and fasteners
260.0
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
15/18
Equipment
Loan No. Project NameApproval
Date Type of EquipmentCost Estimates
($ million)2709-PRC Yunnan Integrated
Road NetworkDevelopment
02-Dec-10 Road maintenanceequipment
3.0
2724-PRC MFF Railway EnergyEfficiency and Safety
Enhancement
Tranche 2
14-Dec-10 Bridge bearings, heavy dutyswitches and fasteners
98.4
2765-PRC MFF Railway EnergyEfficiency and SafetyEnhancementTranche 3
20-Jul-11 Railway electrification,electric power supplysystem, noise barriers,fasteners and switches,railway telecommunication
system, railway signalingsystem, advanced railwayinspection equipment, andemergency rescueequipment
250.0
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
16/18
Equipment
Loan No. Project Name ApprovalDate Type of Equipment Cost Estimates($ million)2802-PRC Xi'an Urban Road
Network Improvement
08-Nov-11 Light signaling systems, road
lighting, traffic signal control
system, IT enforcement
system, intelligent transport
system (traffic information
collection and release, traffic
video monitoring, and camera
enforcement)
25.5
2847-MON MFF Western Regional
Road Corridor
22-Dec-11 Maintenance equipment 0.27
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
17/18
Equipment
Loan No. Project Name ApprovalDate Type of Equipment Cost Estimates($ million)PRC 43031 Hunan Xiangjiang
Inland WaterwayTransport
Turbine generator andauxiliary equipment, metalstructure of power plant andsluice structure, metalstructure of shiplock, hydraulichoist of dial gates andshiplock, dam crest cranegantry crane, tailwater gantrycrane, overhead crane,sewage crane, power supplyand distribution system andauxiliary equipment for
shiplock, power supply anddistribution system andauxiliary equipment for sluicestructure
84.0
8/2/2019 5-4 Transport_ICT-EARD Final 20Feb2012 by Cai Li
18/18
Civil Works
Loan No. Project NameApproval
Date Type of WorksCost Estimates
($ million)
2802-PRC Xi'an Urban RoadNetwork Improvement
08-Nov-11 Road subgrade, bridges,pavement, road furniture,transport hubs, CNG stations
works, and greening works
282.0
2847-MON Western Regional RoadCorridorTranche 1
22-Dec-11 103 km road works and 20 kmcommunity access roads
50.4
PRC 43031 Hunan Xiangjiang InlandWaterway Transport
Shiplock, barrage andpowerhouse road, cofferdam,
administrative buildings,shiplock control center, Yunjiport berth, Songbai port
130.0