4 ANR-EARD by YKobayashi 11Mar2015

download 4 ANR-EARD by YKobayashi 11Mar2015

of 23

Transcript of 4 ANR-EARD by YKobayashi 11Mar2015

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    1/23

    6th ADB Business Opportunities Fair

    25 March 2015

    Environment, Natural Resourcesand Agriculture – East Asia

    By: Yoshiaki Kobayashi, EARD

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    2/23

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    3/23

    Areas of Operation

    Integrated Water Resources Management, WaterResources Development, Flood Management, DroughtManagement, Groundwater Management, IrrigationManagement, Safe Drinking Water

    Wetlands and Lakes Protection, Ecological and

    Biodiversity Management, Wastewater and SolidWaste Management, Rural and Agricultural PollutionControl and Regional Environment Protection

    High-Value Production and Market Supply-Chain

    Management, Sustainable Rural Livelihoods, LandManagement (Dry Lands, Forests, Coastal Lands),Forestry Development, Biomass Clean Energy andLow Carbon Agriculture, Food Safety and Green

     Agriculture

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    4/23

    EAER Portfolio

    Ongoing Loan and Grant ProjectsPRC: 12, Mongolia: 2

    Ongoing Technical Assistances (TAs)

    PRC: 31, Mongolia: 3, Regional: 1

    Loan Projects being Formulated (for 2015-2018)PRC: 14, Mongolia: 6

    TAs being Formulated (for 2015-2016)PRC: 11, Mongolia: 5

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    5/23

    Consulting Services (March 2015-) 

    (Ongoing Loan and Grant Projects) Loan 2941-PRC: Anhui Chao Lake EnvironnementalRéhabilitation (Total Loan Amount: $250 Million)

    Package No. CS-02 for research, demonstration, andcapacity building for non-point source pollution control(CSRN Advertisement: Q1-2 2015, Estimated ContractValue: $3 million, Consultant Selection Method: QCBS)

    Grant 0331-PRC: Shaanxi Weinan Luyang IntegratedSaline Land Management (Total Grant Amount: $2 Million)

    4 international and 3 national consultants (on individualbasis) for eco-compensation, soil management, ruralbusiness development, wetland management,migratory water bird, operations, and monitoring andevaluation.

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    6/23

    Consulting Services (March 2015-) 

    (Ongoing Loan and Grant Projects) Loan 3114-PRC: Guangdong Chaonan Water ResourcesDevelopment and Protection Demonstration (Total Loan

     Amount: $100 Million)One package for study on water resources

    protection and control measures around thereservoir areas (Estimated Contract Value: $0.55million)

     Another package for development of waterresources protection and development action(Estimated Contract Value: $0.80 million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    7/23

    Consulting Services (March 2015-) 

    (Ongoing TA)

    TA 8872-PRC: Sustainable and Climate-Resilient LandManagement in Western Region (Total TA Grant Amount:

    $5.251 Million) A consultant team (CSRN Advertisement: Q2-32015, Estimated Contract Value: $0.885 million,Consultant Selection Method: QCBS), and 7 nationalconsultants (on individual basis)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    8/23

    Consulting Services (March 2015-) 

    (New Loan and Grant Projects)

    PRC: Henan sustainable Livestock Farming and ProductSafety Demonstration (2015 Firm, Total Loan Amount:

    $75 Million)

    PRC: Gansu Featured Agriculture and Financial ServicesSystem Development (2015 Firm, Total Loan Amount:$100 Million)

    PRC: Hebei Enshi Qing River Upstream EnvironmentRehabilitation (2015 Firm, Total Loan Amount: $100Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    9/23

    Consulting Services (March 2015-) 

    (New Loan and Grant Projects)

    Mongolia: Additional Financing of Agriculture and ruralDevelopment (2015 Firm, Total Loan Amount: $50 Million)

    Mongolia: Tuul River Improvement (2015 Firm, Total Loan Amount: $20 Million)

    Mongolia: Khuvsgul Lake Protection (2015 Firm, Total Grant Amount: $2.5 Million)

    Mongolia: Strengthening Capacity for Disaster RiskManagement and Coordination in Mongolia (2015 Firm,Total Grant Amount: $2.0 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    10/23

    Consulting Services (March 2015-) 

    (New Loan and Grant Projects)

    PRC: Henan Hebi Qihe River EnvironmentalImprovement and Ecological Conservation (2015Standby, 2016 Firm, Total Loan Amount: $150 Million)

    PRC: Fujian Farmland Sustainable Utilization andDemonstration (2015 Standby, 2016 Firm, Total Loan

     Amount: $100 Million)

    PRC: Hunan Dongjiang Lake Environmental Protectionand Integrated Utilization (2015 Standby, 2016 Firm,Total Loan Amount: $130 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    11/23

    Consulting Services (March 2015-) 

    (New Loan and Grant Projects)

    PRC: Shandong Groundwater Allocation and Protection(2015 Standby, 2016 Firm, Total Loan Amount: $150

    Million)

    PRC: Jiangxi ZhenlinLake Water Resources IntegratedUtilization (2015 Standby, 2016 Firm, Total Loan Amount:$100 Million)

    Mongolia: Agri-business Development (2015 Standby,2016 Firm, Total Loan Amount: $50 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    12/23

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    13/23

    Consulting Services (March 2015-) 

    (New Loan and Grant Projects)

    PRC: Heilongjiang Jiamusi Irrigation and DrainageSystem Modernization (2016 Standby, 2017 Firm, TotalLoan Amount: $150 Million)

    PRC: Jiangxi Xinyu Kongmu River Watershed FloodControl and Environmental Improvement (2016 Standby,2017 Firm, Total Loan Amount: $150 Million)

    PRC: Shanxi Urban-Rural Water Source Protection andEnvironmental Demonstration (2016 Standby, 2017 Firm,Total Loan Amount: $100 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    14/23

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    15/23

    Consulting Services (March 2015-) 

    (New Project Preparatory TAs)

    PRC: Heilongjiang Jiamusi Modern Irrigation andDrainage System (2015 Firm, Total TA Grant Amount:

    $0.60 Million)

    PRC: Jiangxi Xinyu Kongmu River Watershed FloodControl and Environmental Improvement (2015 Firm,Total TA Grant Amount: $0.60 million)

    PRC: Shanxi Urban-Rural Water Source Protection andEnvironmental Demonstration (2015 Firm, Total TA Grant

     Amount: $0.85 million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    16/23

    Consulting Services (March 2015-) 

    (New Project Preparatory TAs)

    Mongolia: Agri-businesses Development (2015 Firm,Total TA Grant Amount: $1.00 million)

    PRC: Guizhou High Efficiency Water UtilizationDemonstration in Rocky Desertification Area (2015Standby, Total TA Grant Amount: $0.50 million)

    PRC: Shanxi Inclusive Agricultural Value ChainDevelopment (2015 Standby, Total TA Grant Amount:$0.50 million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    17/23

    Consulting Services (March 2015-) (New Policy and Advisory TAs/Capacity Development TAs)

    PRC: Gross Ecosystem Production Accounting for Eco-compensation (2015 Firm, Total TA Grant Amount: $0.50Million)

    PRC: Research on the Construction Streategic Planningof Resources-based Regional Ecological Civilization(Green Transformation) and Model Demonstration (2015Firm, Total TA Amount: $0.40 Million)

    PRC: Study on Building Ecological Security System forNational Core Region of Food Security (2015 Firm, TotalTA Amount: $0.40 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    18/23

    Consulting Services (March 2015-) (New Policy and Advisory TAs/Capacity Development TAs)

    PRC: Green Silk Road Construction - Building anEnvironment Performance Evaluation System for "OneBelt and One Road" Infrastructure Investment Project(2015 Firm, Total TA Grant Amount: $0.40 Million)

    Mongolia: Additional Financing of Agriculture and RuralDevelopment (Piggy-backed TA) (2015 Firm, Total TA

     Amount: $0.20 Million)

    Mongolia: Tuul River Improvement (2015 Firm, Total TA Amount: $1.00 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    19/23

    Consulting Services (March 2015-) (New Policy and Advisory TAs/Capacity Development TAs)

    PRC: Han River Source of Drinking Water EcologicalEnvironment Protection Strategy Research in the HubeiXiangyang City Central Area (2015 Standby, 2016 Firm,Total TA Grant Amount: $0.40 Million)

    PRC: The Development Strategy for the Pro-NationalFood Security's Policy and Industry System (2015Standby, 2016 Firm, Total TA Amount: $0.40 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    20/23

    Consulting Services (March 2015-) (New Policy and Advisory TAs/Capacity Development TAs)

    PRC: The Research about Rational Mechanism andPolicy System for Natural Ecosystem Conservation andRehabilitation (2016 Firm, Total TA Grant Amount: $0.40Million)

    PRC: Study on Natural Resource Asset Appraisal andManagement System for Chinese National KeyEcological Function Zones (2016 Firm, Total TA Amount:$0.80 Million)

    PRC: International Comparative Study on Environmental Assessment System and Reform Plan for Chinese Assessment System (2016 Firm, Total TA Amount: $0.60Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    21/23

    Consulting Services (March 2015-) (New Policy and Advisory TAs/Capacity Development TAs)

    PRC: The Development Strategy of Modern Eco-agriculture in Three Gorges Reservoir Area (2016 Firm,Total TA Grant Amount: $0.40 Million)

    PRC: Research on Resource Environmental Bearing-capacity in Jiangsu Province (2016 Firm, Total TA Grant

     Amount: $0.60 Million)

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    22/23

    Consulting Services (March 2015-) 

    (Staff Consultants) Staff consultants help ADB staff. EAER might need staff

    consultants for land acquisition and resettlement, climatechange, etc.

  • 8/9/2019 4 ANR-EARD by YKobayashi 11Mar2015

    23/23

    For More Information 

     Yoshiaki Kobayashi

    Senior Water Resources Specialist, [email protected] 

    Consultant Services Recruitment Noticeshttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4

    DE0A42F84BD3D82A8DC039?page=mainPage 

    mailto:[email protected]://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagehttp://csrn.adb.org/csrn/home.htm;jsessionid=7218F349B4DE0A42F84BD3D82A8DC039?page=mainPagemailto:[email protected]:[email protected]:[email protected]