June 26 th, 2007 SPSC Yves Déclais 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1. Electronic detectors status of installation.
October 18 th, 2007 LNGSC Yves Déclais 1 OPERA/CNGS1 O scillation P roject with E mulsion-t R acking A pparatus 1.Status of the installation of the electronic.