1 Lecture #8 Purpose of SSRD Describe Capability Requirements: system subject matter measured by concrete means Describe Project, Level of Service, and.
1 Lecture #7 MBASE Process: WinWin Spiral Three principals to visualizing application development 1. Integrating four system model, each one capturing.
© A. H. Levis INCOSE L. 4 - 1 C4ISR ARCHITECTURES AND THEIR IMPLEMENTATION CHALLENGES LECTURE 4 A C4ISR ARCHITECTURE FRAMEWORK IMPLEMENTATION PROCESS CASE.
L. 5 - 1 © A. H. Levis INCOSE LECTURE 5 OBJECT ORIENTATION FOR ARCHITECTING: A CANDIDATE PROCESS LEE W. WAGENHALS ALEXANDER H. LEVIS C4ISR ARCHITECTURES.
© A. H. Levis INCOSE L. 3 - 1 C4ISR ARCHITECTURES AND THEIR IMPLEMENTATION CHALLENGES LECTURE 3 STRUCTURED ANALYSIS AND A C4ISR ARCHITECTURE DESIGN PROCESS.
1 European Security Standardisation in relation to ABC Paolo Salieri DG Enterprise and Industry FRONTEX 8 th2nd Global Conference and Exhibition on Future.
Unmanned Aircraft Systems EUROCAE Activities The European Organisation for Civil Aviation Equipment LOrganisation Européenne pour lEquipement de lAviation.
1 Practical Work and Experience With Performance Management ICAO Performance Management Symposium John Crichton, President and CEO NAV CANADA March 28,
ACG Workshop, 17 Feb 2004 – OATA project Concept of Operations (ConOps) ACG Workshop, 17 February 2004 Jose Varela and Ian Ramsay, SD/ESC.
1 Validation & Measurement Methods for the PHARE Demonstrations R A Whitaker Validation Project Leader.
WHY THE JSPA AS AN ANSWER? SARAJEVO APRIL 2013. CHANGES in PROGRESS WHY JSPA?
International Civil Aviation Organization Global ATM Operational Concept Saulo Da Silva Workshop on preparations for ANConf/12 ASBU methodology (Nairobi,