URIOT Didier - MYRRHA accelerator 1st International Design Review 11/12/2012 1 Instrumentation& operation aspects operation aspects URIOT Didier.
Status of BEPCII Timing System Presented by Ge Lei IMAC 2006.
Commissioning of the PSB with Linac4 K.Hanke / CERN Review on PS Booster with Linac4
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer
The option of connecting Linac4 to PSB during Long Shutdown 1 (2013/14)
Welcome IMAC Members !
Status of BEPCII Timing System
THE RADIO FREQUENCY SYSTEM FOR SOLARIS TOWARDS OPERATION
Beam Diagnostics at Free Electron Lasers Gero Kube DESY / MDI [email protected] Introduction Beam Position (Intensity) Transverse Profile Diagnostics.
HIE-ISOLDE (High Intensity and Energy) project Protection of superconducting solenoids MPE work shop – December 14, 2010 G.J. Coelingh TE-MPE-CP.
HIE-ISOLDE Status & Summary of HIE-ISOLDE SC