ERCOT LTSA RPG 10/17/08. 2 Introduction Objective Year of study General procedure –Transmission reliability –Economic analysis Assumptions.
2009 Summer Outlook and Sable Island Offshore Energy Project Planned Outage
Texas North Transmission Improvements
CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections Cathey Carter, PE RPG CREZ meeting 12/14/2007.
May 2009 San Angelo Power Station - Menard ERCOT Analysis.
San Angelo Power Station - Menard
SCENARIO 2 PRESENTATION
CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections