FEL and linac plans at MAX IV laboratory Francesca Curbis Accelerator Physics, Lund University MAX IV laboratory.
R. Corsini - CLIC 09, 15 October 2009 Discussion on test facilities future program.
Jiaru Shi(Department of Engineering Physics, Tsinghua University) Hao Zha (CERN) 2014.02.04 CLIC Workshop 2014 CLIC choke mode structure and X-band activities.
News, plans, wrap-up -- CLIC workshop, Febr. 5 th 2014-- Lucie Linssen, CLICdp, wrap-up, February 5th 2014 1 Lucie Linssen.
14.10.2008 CLIC Workshop, CERN Marc Ross, ILC Global Design Effort 1 Content: Reason ILC - PM were there – introductory plenary Tolerances and ‘CTF4’.
Study of alternative optical parameters for the ILC final focus On-going work and plans Philip Bambade Laboratoire de l’Accélérateur Linéaire Université.
W. Wuensch, rf development meeting 25-3-2015 Considerations on running normal conducting cavities cold.
Www.cea.fr June 3, 2014 Franck Peauger CEA/IRFU/SACM/LISAH High efficiency – high perveance Klystron (X-band) EnEfficiency RF sources Workshop Cockcroft.
K. Alam, CLIC workshop, October 16-18, 2007 1 CLIC workshop, 16-18 October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CTF3 ORBIT : TOOLS AND AUTOMATIC TUNING Davide Gamba [email protected] 4 February 2014 CLIC Workshop 2014 - CERN.
Technical Board ATF2 GM FF progress report A.Jeremie ATF2 GM System team: K.Artoos, C.Charrondière, A.Jeremie, J.Pfingstner (a lot of figures from him),
CLIC Workshop 2009