LQ Reaction & Impregnation Tooling Internal Review F. Nobrega, N. Andreev August 13, 2007.
Tifa
1 Possible setup for the H8 test beam F.Cerutti pIntroduction: from H8 Phase I to the system test pPossible setup in 2002-2003: Magnets on the H8 beam.
Preparation of wall position Alignment of A and C side in closed position Creation of reference system Translation of reference system to open position.
Preparation of wall position Alignment of A and C side in closed position