Update on ISO 17078 Standards
Wayne Mabry
Coordinator - Gas Lift Manufacturing
Leader of ISO Task Group 17078
2 WJM
Objectives
• Review situation of ISO 17078.1– Side Pocket Mandrels Specification
• Review situation of ISO 17078.2– Flow control devices
• Review situation of ISO 17078.3– Latches and KOT Specification
• Time Line
3 WJM
ISO 17078-1
ISO/WD 17078‑1Petroleum and Natural Gas Industries
Down hole equipment Part 1: Side Pocket Mandrels
4 WJM
Environmental Service GradeEnvironmental service grades
Table A-1
Grade El -- Standard service Non-sour service
Grade E2 -- Stress corrosion cracking service
H2S (sour) service1
Grade E3 -- CO2 service CO2 service2
Grade E4 -- Special service Special service requirements defined by the user/purchaser
Environmental servicegrades
Characteristics
____________________
1Per NACE MR-01-75 2There are no published international standards for CO2 service. Each individual situation shall be evaluated on a case-by-case basis.
5 WJM
Design Verification Grade
D1 D2 D3 Documentation Hist. Record Required Required
See B.1 -- 1 See B.2 -- 1 See B.3 – 1
Design review (burst, Required Required Requiredcollapse, tolerance) See B.1 -- 2 See B.2 -- 2 See B.3 – 2 Burst & collapse pressure Not required Burst & collapse Not requiredtest to destruction @ See B.1 -- 3 See B.2 -- 3 See B.3 – 3 ambient temperature Pressure testing @ rated Required Required Requiredtemperature See B.1 -- 4 See B.2 -- 4 See B.3 – 4 Internal pressure cycles Not required 10 cycles 10 cycles
See B.1 -- 5 See B.2 -- 5 See B.3 – 5 Finite element analysis / Not required Not required Burst & collapsestrain gauge See B.1 – 6 See B.2 -- 6 See B.3 – 6 Flow control – install/pull @ 12 o'clock @ 12,3,6 o'clock @ 12,3,6 o'clockwith kick-over tool See B.1 -- 7 See B.2 -- 7 See B.3 – 7 Slick line operational test Not required Not required Requiredwith kick-over tool See B.1 -- 8 See B.2 -- 8 See B.4 - 8
Table B-1
6 WJM
Product Validation Grade
V1 V2 V3 Internal pressure test 100% 100% 100%
See C.1 -- 1 See C.2 -- 1 See C.3 -- 1 External pressure test 0% 5% 100%
See C.1 -- 2 See C.2 -- 2 See C.2 -- 2 Internal diameter drift test 100% 100% 100%
See C.1 -- 3 See C.2 -- 3 See C.2 -- 3 External diameter drift test 100% 100% 100%
See C.1 -- 4 See C.2 -- 4 See C.2 -- 4 Installation/removal method – 0% 5% 100%kick-over tool See C.1 -- 5 See C.2 -- 5 See C.2 -- 5
Table C-1
7 WJM
Quality Control Grade
Q1 Q2 Q3 Hardness testing 100% 100% 100%
See D.1 -- 1 See D.2 -- 1 See D.3 -- 1 Non-destructive examination Not required 5% 100%
See D.1 -- 2 See D.2 -- 2 See D.3 -- 2 For Q2, select one preferred method from the four listed methods of non-destructive testing.For Q3, radiographic examination is required.
Surface magnetic particle examination. Liquid penetrant examination.
Radiographic examination. Ultrasonic examination.
Documentation 100% coc 100% coc plus 100% coc plus
See D.1 -- 3 See D.2 -- 3 See D.3 -- 3
Table D-1
8 WJM
ISO 17078-2
ISO/WD 17078‑2Petroleum and Natural Gas Industries
Down hole equipmentPart 2: Flow control devices
9 WJM
Environmental Service GradeEnvironmental service grades
Table A-1
Grade El -- Standard service Non-sour service
Grade E2 -- Stress corrosion cracking service
H2S (sour) service1
Grade E3 -- CO2 service CO2 service2
Grade E4 -- Special service Special service requirements defined by the user/purchaser
Environmental servicegrades
Characteristics
____________________
1Per NACE MR-01-75 2There are no published international standards for CO2 service. Each individual situation shall be evaluated on a case-by-case basis.
10 WJM
Design Verification TestsProbe or Close or
Valve Compatibility Insertion Travel* Load Life Flow Back Check Open* Validation Erosion Shelf
Types Test Test Test Rate Cycle Test Test Test Test Test Test
PPO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
PPO w ck Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
IPO Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
IPO w ck Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Pilot Yes Yes Yes --- Yes Yes Yes Yes Yes Yes Yes
Differential Yes Yes Yes --- Yes Yes Yes Yes Yes Yes Yes
Constant F Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
SC – Hyd Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes ---
SC – Elect Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes Yes
Smart Yes Yes Yes* --- Yes Yes Yes Yes Yes Yes Yes
Orifice Yes --- --- --- --- Yes Yes --- Yes Yes ---
Nozzle Vent Yes --- --- --- --- Yes Yes --- Yes Yes ---
Shear Orif Yes Yes --- --- --- Yes Yes Yes* Yes Yes ---
Chem Inj Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Chem j w/o Yes Yes --- --- Yes Yes Yes Yes Yes Yes ---
Dump/Kill Yes Yes --- --- --- Yes Yes Yes* Yes Yes ---
Water Inject Yes Yes --- --- Yes Yes Yes --- Yes Yes ---
Dummy Yes --- --- --- --- --- --- --- Yes --- ---
11 WJM
Design Verification TestsProbe or
Valve Travel* Load Flow Back Check Open Close Leakage Shelf
Types Test Rate Cv Test Leak Test Test Test Rate Test
PPO Yes Yes Yes Yes Yes Yes Yes Yes
PPO w ck Yes Yes Yes Yes Yes Yes Yes Yes
IPO Yes Yes Yes Yes Yes Yes Yes Yes
IPO w ck Yes Yes Yes Yes Yes Yes Yes Yes
Pilot Yes --- Yes Yes Yes Yes Yes Yes
Differential Yes --- Yes Yes Yes Yes Yes Yes
Constant F Yes Yes Yes Yes Yes Yes Yes Yes
SC – Hyd Yes* --- Yes Yes Yes Yes Yes ---
SC – Elect Yes* --- Yes Yes Yes Yes Yes Yes
Smart Yes* --- Yes Yes Yes Yes Yes Yes
Orifice --- --- Yes Yes --- --- --- ---
Nozzle Vent --- --- Yes Yes --- --- --- ---
Shear Orif --- --- Yes Yes Yes* --- Yes ---
Chem Inj Yes Yes Yes Yes Yes Yes Yes Yes
Chem j w/o --- --- Yes Yes Yes Yes Yes ---
Dump/Kill --- --- Yes Yes Yes* --- Yes ---
Water Inject --- --- Yes Yes --- --- --- ---
Dummy --- --- --- --- --- --- --- ---
12 WJM
ISO 17078.3
ISO/WD 17078‑3Petroleum and Natural Gas Industries
Down hole equipmentPart 3: Latches and KOT’s
13 WJM
ISO 17078-3
14 WJM
ISO Gas-Lift Standard Meeting Schedule
Time Line1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Meeting Topics to be AddressedNo. Location Date Host General 17078.1 17078.2 17078.1
1 Houston, TX 02/05/98 Camco Organize ISO Gas-Lift Committee2 Houston, TX 05/04/98 Camco Draft Outline for ISO Gas-Lift Standard Document
3 Houston, TX 05/10/99 Shell Review Plan for ISO Gas-Lift Documents4 Houston, TX 11/15/99 Shell Review Plan for ISO Gas-Lift Documents
5 Houston, TX 03/01/00 Shell Review Plan for ISO Gas-Lift Documents6 Houston, TX 05/02/00 Shell Review Plan for ISO Gas-Lift Documents7 Atlanta, GA 07/25/00 Decker Tech Review ISO 17078.1 Clauses 3 - 58 Dallas, TX 10/06/00 Decker Tech Review ISO 17078.1 Clauses 6 & 7
9 Houston, TX 02/08-09/01 Weatherford Review Entire ISO 17078.111 Houston, TX 05/22-24/01 Schlumberger Complete (Almost) ISO 17078.1, Begin Work on ISO 17078.212 Houston, TX 07/18/01 Chevron Complete 1st Draft of ISO 17078.1 for WG #4 Review13 Austin, TX 09/04/01 OAC Prepare 1st Draft of ISO 17078.1 for Delivery to WG #414 Austin, TX 10/08-09/01 Univ. of Texas Review 1st Draft of ISO 17078.214 Aberdeen, UK 11/14-15/01 Shell EXPRO Continue Review of ISO 17078.2
15 Houston, TX 2/07-08/02 Prod. Assoc. Continue Review of ISO 17078.2 , Address WG #4 Comments on 17078.1
16 Houston, TX 5/09-10/02 BP Complete 1st Draft of ISO 17078.2 for WG #4 Review, Review ISO 17078.3
17 San Antonio, TX 10/03-04/02 SwRI Continue Review of ISO 17078.3
18 Houston, TX TBD TBD19 Houston, TX TBD TBD20 TBD TBD TBD
1998 1999 2000 2001 2002 2003
Blue CompletedRust ScheduledBlack To Be Scheduled
Top Related