3
Theme 10: Objectives
Theme 10: Impact Analysis and
Policy Recommendations
Impact Assessment: Electricity Access and Smart Grid
02
03
01 Rural Electricity Access: Socio Economic Status
Policy Issues & recommendations in the context of smart distribution system with storage
Social Impact Assessment: Progress update
4
Survey and Analysis of socio-economic conditions in Rural, Semi-Urban as well as Urban pilot areas- Baseline – Completed
Tentative Future Task
Post-pilot survey and analysis ofthe socio-economic conditions toevaluate impact of the project.
Tariff based on estimated LCOEin accordance with final pilot project conditions.
Potential Peak Reduction andCost Benefit Analysis of DSMprogram for pilots.
o Target and control village survey is conducted to help design the system as per expected usage pattern (peak load and storage requirements).
o Survey Sample Size – Rural, Semi Urban and Urban Pilots-o Rural- Sample Size – 200 Sample (107 Control Sample + 93 Target
Samples)o Semi-Urban- 58 Sample (20 Control Sample + 38 Target Samples)o Urban-13 Sample (03 Control Sample + 10 Target Samples)
Overall Economic Analysis
*Panki Colony fixed-rent is charged to consumers and no. of units billed are unaccounted
5
Policy Recommendations• Policy issues & recommendations in the context of smart distribution system with
storage in regard to-
1• Theme 3• Energy Storage
2• Theme 4• Micro-grid and Active Distribution System
3• Theme 5• Cyber Infrastructure and Cyber Security
4• Theme 6• DSO Functions-Energy Management
5• Theme 7• DSO- Market and Regulatory Issues
6
Energy Storage: Where do we stand
CERC Staff Paper on Energy Storage Systems (2017)
Optimum location of balancing energy storage devices, CEA (Dec. 2017)
NITI Aayog: National Mission on Transformative Mobility and Battery Storage (2019)
Flexible operation of thermal power plant for integration of Renewable Energy, CEA (Jan. 2019)
Report on optimal generation capacity mix for 2029-30, CEA, Jan. 2020
SANTULAN Report-Jan 2020 for Intra-State Reserves and Ancillary Services for Balancing
Technical Studies
Pilots
Grid-scale BESS Pilot Project Puducherry, POWERGRID, FY 2017-18 TATA Power & AES Grid-scale BESS Project of 10 MWh, Yr. 2019 TERI-WBSEDCL BESS Pilot Projects at Distribution-level* BHEL awarded TERI-BRPL BESS Pilot Project at Distribution-level-2020
under UI-ASSIST project* (* Ongoing)
TERI completed sizing and pre feasibility study of BESS for three urban pilot locations
Issuance of Purchase Order to BHEL (Given on 29 June 2020) Installation & commissioning of pilots as per allocated time
schedule (3-4 months)
Scheme
MNRE draft Scheme (2020) for round-the-clock power RE power may include solar, wind, small
hydro, or a combination thereof, with or without any ESS.
Tenders
SECI tender For firm peak power supply from RE+ storage in 2020 For RTC scheme in 2019
7
Energy Storage: Policy issues- Way Forward
Methodology for augmentation of electricity distribution infrastructure to be revisited keeping in view non-wire options such as demand-side measures and BESS
Development of aggregators market in-order to incentivize behind-the-meter storage
SERCs may consider DSM & BESS pilot projects at critical nodes of distribution network in-order to develop evidence based plans/ road-map
Community-level energy storage for management of local distribution system
Deployment of BESS as back-up power source in place of the DG sets and ancillary services
Amendment of Connectivity Regulations and Grid Code to enable BESS injection
8
Micro-grid : Existing Policy Provisions & IssuesDraft Amendments to Tariff Policy, 2016
Recognizes importance of ensuring last-mile connectivity & supply reliability
Underlines need for an appropriate regulatory framework to mandate compulsory purchase of power into the grid from micro-grids
MNRE’s Guidelines for Development of Decentralized Solar Power Plants PM-KUSUM scheme
State level policies and regulations for stand alone system States (UP, Bihar, Odisha, Jharkhand, MP & Chhattisgarh)
Enabling policy for micro-grid coordination and seamless interoperability
Facilitate business models and metering regulations(Virtual Net Metering/ Group Net Metering) to promote DER-based micro-grids at Distribution-level
Suitable incentives and regulatory approvals for P2P energy trading within DERs as well as networked micro-grids
Consider micro-grid implementation based upon IEEE Standard 1547-2018
Policy issues– Way Forward
1
2
3
4
9
Cyber Infrastructure and Cyber Security :Existing Framework
IT Act, 2000: Amended in 2008 CERT-In, 2004 National Cyber Security Policy,
2013 NCIIPC, Oct 2014- created by
Government of India under section 70 A of IT Act
Dedicated sectoral CERTscreated by MoP in 2017 including one on Distribution
ISGF/ VJTI Documentation IT Rules, 2011 framed under
the IT Act, 2000 mandates- IS/ ISO/ IEC codes of best
practices for data protection ISO:27001 is recognized as
one such recommended standard
IS-16335 : 2015 Power Control Systems-Security Requirement
Policy Issues-Way Forward
Every utility to follow NIST cyber security framework V1for improving critical infrastructure which containsrecommendations for- Identification of cyber assets and users Detection of ongoing threats & Response strategy Protection from cyber attacks (IEC 62443 standard)
& Recovery mechanism Regular internal and external audit for the cyber security
(every 6 month) Monitoring of Utilities for employing Chief Information
Security Officer (CISO) and Security Operation Centre(SOC) operators.
Detailed vulnerability/ threat/ risk analysis of DISCOMs Participation of DISCOMs/ DSOs in entire gamut of cyber
security related activities Formulation of policies for disposal of Critical Digital
Assets (CDA)
10
DSO Functions, Policy, Market & Regulatory Issues
Technical Reports/ Regulations-
• SAMAST July 2016• CABIL October 2018• SANTULAN January
2020• TANTRANSCO-
Draft for State DSM and EA-May, 2019
• UPERC (RSPV Grid Interactive Systems Gross / Net Metering) Regulations, 2019-p2p transaction
• Real Time Market in operation since June 1st 2020
Distribution System Operations presently managed by SLDC/ALDC/Franchisee.
Changing role in view of distribution systems transitioning from passive to active with enhanced focus on secure operation and reliable service
Define DSO functions in the Indian context to lay the foundation of further work
Mandate forecasting of demand profiles in State Grid Code/ Distribution Code
Facilitate Development of Retail Energy Market with focus inter-alia on peer-to-peer transaction framework
Review/ Develop Regulatory mechanism/ interventions/ for TSO/ISO-DSO coordination and resource sharing between two entities