Who are we & what we do.
Solarforce renewables are a leading Renewable Energy & PV installation company, Who are based
in Treforest, Situated just outside Cardiff, South wales.
Originally from an electrical background of 18 years & working on commercial sites contracting
to Kier, Balfour, Wates & other well known commercial brands as an independent.
We have been installing Commercial solar for several years throughout the UK & In this period
we have installed a variety of projects from large scale roof top solar to Solar farms. From design
stage to third party support & install only.
We are currently involved in supporting other renewable energy companies throughout the UK
who offer projects that they may wish successfully project managed & installed but do not wish
to undertake the on-site element.
With our install partner’s who provide large scale projects within the commercial sector, with
our partnership we have managed to build a reputation within our sector as being successful,
reliable, able to deliver & easy to work with.
With our professionalism, understanding of client requirements & a good working relationship
we have forged a great partnership, skillset to offer & overcome the questions often asked with
the projects provided & delivered.
J. P. Thomas Director
Solarforce renewables ltd
Office 9, JR House
Treforest Industrial Estate
Main Avenue
Pontypridd
CF37 5UR
01443 844756/07723602478
www.solarforcerenewables.com
Simplifying COMMERCIAL SOLAR
[Cite your source here.]
Our reliable and professional Solar PV installers are able to provide hassle-free renewable
energy system installations for commercial buildings. As well as Commercial Buildings, we also
install for the industrial and agricultural sector, whether in the private or the public sector, using
our extensive experience to provide a service that is well suited for businesses, framework and
organizations.
We work directly with building owners, local authorities and main contractor, to offer an
Integrated service provided for our clients from the initial assessment through to design,
installation, commissioning, in-service maintenance and remote monitoring .
With our Electricians all trained to JIB/ECS standards & our roof teams trained in all roof aspects
& most suitably “experienced” in a vast number of roof solutions & roof product makes, i.e
Schletter, Renusol,Tri-Tec & Clenergy to name a few.
We have 40 Skilled installers at our disposal to carry out your project on time and in an efficient
timely manner with a high standard, which is why we always get asked to come back & provide
our services-Ask our clients!
We are also asbestos trained ,Working at heights & mansafe.
Service Options offered
Project manage
Supply & install
Install only
Plant room
O & M
O & M –Thermogenic roof/land surveys
G59 services
G59 Relay cabinet build
Site security
Fibre optic
Earthing solutions
CCTV
Led lighting
Intrusion
Perimitter
Plant driver/Telescopic
Esos assesor
Drone photography/video
* TOP PRODUCT ‘S WE WORK ly,
it is a less complicated, more cost effective power
optimizers, WITH SOLAREDGE
INVERTERS
The Solar Edge DC-AC PV inverter is specifically designed to
work with the SolarEdge. Because MPPT and voltage
management are handled separately for each module by
the power optimizer, the inverter is only responsible for DC
to AC inversion. Consequentmore reliable solar inverter,
this also offers a fantastic O&M Solution for our/your
clients.
Design flexibility is a great
Bristol 250Kwp mutli roof install with drone photo
Bartletts 1.2Mw
Triple aspect roof top installation on a seamed roof
1 1. 5 Mw Land rover plant
Large multi roof top @ digger land, 4 x 250 Kwp
OTHER SECTORS WE SUPPORT
Some of our clients we Have Represented include:
Campbell &Kennedy-Nationwide
British Gas-Staines
Welsh water-Carno
RCT –South wales
Hafod-South wlaes
SSE –Utlity provider
Greggs baker
Crown estates
Notts schools & colleges
Pure offices
Commercial Solar PV installations
Below are sample of projects carried out by Solarforce renewables..
Solarforce has had the opportunity to work with RCT on several occasions and they are leading the way for local
authorities with Solar PV. From July 2013, we firstly installed 30KW of Solar PV onto two Sports centers. The
installations was very successful and after several months, RCT decided to add PV to several other buildings in the
Local community. With the experience and professionalism, that Solarfocre demonstrated on the initial installations,
in January and February 2014 we were selected once again to install PV to five Care homes. In total, the five care
homes added to 70KW of Solar PV. Again, RCT have relied on Solarforce to add more Solar PV to their portfolio.
Some of these included, Heddfan Offices, Llantrisant Leisure Centre and Parc Primary School with a total installation
of 251KW. We are currently progressing 25 more sites to be installed through 2015/2016.
Welsh water
Local authority sports centre
Agricutural trapezoidal 150kw
EXAMPLES OF AGRICULTRAL & LOCAL AUTHORITY
PROJECTS
“EMPOWERING PUPILS AT PARC PRIMARY SCHOOL”
Solarforce Renewables worked with the local community to provide a Primary school in
the Rhondda Cynon Taff with Solar PV. This allowed people to come together to tackle
climate change by putting clean energy back into the classroom.
76
20
22
18
56
20
35 40
20
8
8
20
20
190KW SOLAR PV INSTALLATION FOR NATIONAL UTILITY SUPPLIER
Above is the building footprint identifying where the solar P.V arrays are to be installed. The building
roof has a very shallow roof pitch of 5 degrees and when designing the system our team wanted to
get the most efficient system, which would provide the best electrical output and offer a very good
return on investment.
Product choice was key in the factor of design flexibility; the roof having a low 5-degree pitch allowed
our designers to look at all the roof aspects. This included the North roof space also, as the pitch gets
lower the Northeast and west options can improve in efficiency.
Solarforce chose to use the Solaregde product with power optimizers as this offered our client a much
more dynamic system; offering higher energy output with guarantees of a anywhere up to 25% more
electrical output, individual panel & optimizer harvesting and on-line roof top system monitoring.
Here you can see the early stages of the installation. Four of Our roof engineers were on site on Monday morning to start the
project.
Gary our lead supervisor on this project held a team discussion to identify key factors that would arise or need to be addressed
within the project, but also to get any feedback from the team that would help the installation go fault free.
The key factor identified was, that when placing the panels onto the rail over a long distance; if the rails were not measured and
fixed accurately the tolerance for fixing the panels onto the rail was very small and could miss the rail at the opposite end. Time
would need to be taken with constant measurement checks along the fixing brackets and rail installation to ensure straight lines.
The roof material is a metal sheet with a profile ridge, which would allow Solarforce to fix & run the rails to the seams along the
roof horizontally. The panels will be laid in the same way using an all-black 265-watt panel, which would also be fixed
horizontally by clamping onto the rail.
Above is the start of the project showing the rail and panels as they start to be placed in there finished position.12 panels are
now fitted with another 704 to install. Our time scale is between 3-4 weeks to complete the roof installation.
Below is an illustration of how the inverter installation would look using SMA inverters.