Sichuan Small Towns Development Project by
WB Loans
Summary of EIA Reports
(Draft)
China Railway Eryuan Engineering Group Co., Ltd. National Environmental Impact Assessment Certificate Jia No. 3210
May 2010
E2491
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Contents Chapter I General ...........................................................................................................................................1 1.1 Background ................................................................................................................................................. 1
1.1.1 Project origin ..................................................................................................................................1 1.1.2 Necessity of construction ...............................................................................................................1
1.2 Basis for EA Report Preparation ................................................................................................................. 1 1.2.1 PRC Laws and Regulations............................................................................................................1 1.2.2 WB Requirements ..........................................................................................................................2 1.2.3 Industry systems of the State..........................................................................................................2 1.2.4 Main technical Guides....................................................................................................................3 1.2.5 Relevant technical documents ........................................................................................................3
1.3 EIA (Environmental Impact Assessment)Summary ................................................................................... 3 1.3.1 Environmental impact assessment category of the project.............................................................3 1.3.2 General information on preparation of environmental impact assessment reports of works..........4 1.3.3 Main assessment scope...................................................................................................................6 1.3.4 Assessment standards and environmental protection targets..........................................................6
Chapter II Project Description.......................................................................................................................14 2.1 Project location.......................................................................................................................................... 14 2.2 Construction content, scale, investment and period .................................................................................. 14 2.3 Planning compatibility .............................................................................................................................. 24 Chapter III Regional Environment Overview..........................................................................................................24 3.1 Natural condition....................................................................................................................................... 24
3.1.1 Overview of natural condition of Sichuan Province.....................................................................24 3.1.2 Overview of natural condition of works.......................................................................................25
3.2 Socio-economic environment.................................................................................................................... 33 3.2.1 Overview of social environment of Sichuan Province .................................................................33 3.2.2 Overview of social environment of works ...................................................................................34
3.3 Current environmental quality................................................................................................................... 43 3.3.1 Survey and assessment of current eco-environment quality.........................................................43 3.3.2 Survey and assessment of current water environment quality......................................................44 3.3.3 Survey and assessment of current atmosphere environment quality ............................................47 3.3.4 Survey and assessment of current acoustic environment quality .................................................47
Chapter IV Environmental Management Plan ................................................................................................47 4.1 Analysis of major pollutants...................................................................................................................... 53 4.2 Analysis of major impacts and mitigation measures ................................................................................. 54
4.2.1 Ecological environmental impact and mitigation measures .........................................................54 4.2.2 Analysis and assessment of noise environmental impact .............................................................60 4.2.3 Analysis and assessment of water environmental impact.............................................................69 4.2.4 Atmospheric environmental impact analysis and assessment ......................................................75 4.2.5 Environmental impact analysis and assessment of solid wastes...................................................81 4.2.6 Social environmental impact analysis and assessment.................................................................84
Chapter V Public Consultation and Information Disclosure..........................................................................88 5.1 Purpose of public consultation .................................................................................................................. 88 5.2 Approaches for public participation .......................................................................................................... 88 5.3 Summary of main opinions ....................................................................................................................... 94 5.4 Information Disclosure.............................................................................................................................. 97 5.5 Responses on public opinions ................................................................................................................. 101 Chapter VI Environmental Management Plan ..............................................................................................103 6.1 Environmental management institutions ................................................................................................. 103
6.1.1 Environmental management system and procedures..................................................................103 6.1.2 Environmental management institutions and the responsibility .................................................103 6.1.2 Supervision institution................................................................................................................104
6.2 Environmental Management Plan ........................................................................................................... 107 6.3 Training Program..................................................................................................................................... 107 6.4 Mitigation measures operation .................................................................................................................114
6.4.1 Expenditure budget for mitigation measures.............................................................................. 114 6.4.2 Mitigation measures operation ...................................................................................................123
6.5 Environmental monitoring plan............................................................................................................... 129 6.5.1 The Purpose of environmental monitoring.................................................................................129 6.5.2 Environmental monitoring plan..................................................................................................129
Chapter VII Summary ....................................................................................................................................133
1
Chapter I General 1.1 Background 1.1.1 Project origin
At present, the Grand Western Development Program and Urban and Rural Integrative Development Strategy, determined by the Central Government, are under full implementation in Sichuan Province, in which, as a key link, construction of small towns is of significant importance. However, current status in development of small towns in Sichuan is far from being satisfactory. In the nationwide selection for “One Thousand Powerful Towns” in 2006, the selected towns in the four provinces (municipalities) at Yangtze River Delta and Pearl River Delta, i.e. Jiangsu, Zhejiang, Shanghai and Guangdong, account for as high as 74.6%. Only four towns in Sichuan characterized by huge population were selected, which clearly shows the big gap. Therefore, promoting development of small towns, especially infrastructure construction, became an important measure to break through the existing pattern.
Sichuan Small Towns Development Project (SSTDP) by WB Loans is the infrastructure construction project approved by the State Council and sponsored by WB Loans, and also the 4th urban construction and environmental protection project by WB loans implemented in Sichuan, which was listed in the “Plan of Candidate Projects for Utilization of WB Loans during 2008-2010” (FGWZ [2007] No. 2536) in Sep. 2007 and has been listed in the “Plan of WB Loans for Fiscal Years of 2009-2011” (CGJ [2008] No. 111) by now.
In accordance with the Several Suggestions on Promoting Healthy Development of Small Towns and relevant spirits of the National Development and Reform Committee, the people’s governments at all the districts and counties strive to improve living conditions for the residents and promote development of regional economy, under the subject of scientific development and by means of speeding up construction of the key small towns.
Sichuan Provincial Development and Reform Committee approved, in succession, all the subprojects under SSTDP by WB Loans, in August 2009. The client of each subproject entrusted the organization qualified for environmental impact assessment to perform environmental impact assessment according to the Law of the People’s Republic of China on Environmental Impact Assessment and Regulations on the Administration of Construction Project Environmental Protection, and the environmental impact assessment reports of all the subprojects have already been completed now.
1.1.2 Necessity of construction
All the subprojects under SSTDP belong to municipal works in cities and towns, which include road construction, (environmental) waterway treatment, wastewater interception pipe network and construction of wastewater treatment plant. Implementation of the works contributes to local social and economic development and accelerating urban and rural integrative construction under overall planning, and is very necessary to improve regional ecological environment, to prevent flood and intercept wastewater, as well as to upgrade living quality.
1.2 Basis for EA report preparation 1.2.1 PRC laws and regulations
1. Environmental Protection Law of the People’s Republic of China
2. Law of the People’s Republic of China on the Prevention and Control of Atmospheric Pollution
3. Law of the People's Republic of China on Prevention and Control of Water Pollution
2
4. Law of the People’s Republic of China on the Prevention and Control of Environmental Pollution by Solid Waste
5. Law of the People’s Republic of China on Prevention and Control of Pollution from Environmental Noise
6. Law of the Peoples Republic of China on Water and Soil Conservation
7. Urban and Rural Planning Law of the People’s Republic of China
8. Highway Law of the People’s Republic of China
9. Law of the People’s Republic of China on Promotion of Cleaner Production
10. Law of the People's Republic of China on Environmental Impact Assessment
11. Regulations on the Protection of Basic Farmland
12. Regulations on the Administration of Construction Project Environmental Protection (Decree [1998] No. 253 of the State Council of the People’s Republic of China)
13. EIA Classification Management Regulation of Construction Project (Decree [2008] No. 2 of the Ministry of Environmental Protection)
14. Notice on Enhancing Management on Environmental Impact Assessment for Construction Projects by Loans from International Financial Organizations (HJ [1993] No. 324 of State Environmental Protection Administration)
1.2.2 WB requirements
WB requirements include 10 basic safeguard policies, among which the policy on environmental assessment (OP4. 01) is the basic requirements and also one of the main basis for preparation of environmental impact assessment reports. The proposed project neither involves international waterways (OP7.50), nor stands at the disputed area defined in OP7.60, so these two policies shall not be applied in the assessment. Other policies will be reflected in the assessment on the basis of survey analysis and screening.
WB safeguard policies Correlation Non-correlation OP 4.01 Environmental Assessment All subprojects undergo EIA works. OP 4.04 Natural Habitats OP 4.09 Pest Management OP 4.36 Forestry OP 4.37 Safety of Dams
OP 4.11 Cultural Property
Only Environmental Treatment Subproject of Hongya County
(Hongchuan Town) covers Zhoujiaci provincial heritage conservation unit.
OP 4.12 Involuntary Resettlement It covers land requisition and
demolition.
OP 4.20 Ethnic Minorities OP 7.50 Projects on International Waterways OP 7.60 Projects in Disputed Areas
1.2.3 National and industrial systems
1. Technical Standard of Highway Engineering (JTG B01�2003)
2. Code for Design of Municipal Road (CJJ 37-1990)
3. Codes for Design on Accessibility of Urban Roads and Buildings (JGJ 50-2001)
4. Code for Planting Planning and Design on Urban Road (CJJ 75-97)
5. Code of Urban Engineering Pipeline Comprehensive Planning (GB 50289-98)
3
6. Measures for the Administration of Environmental Protection of Transport Construction Projects (Order No. 5 of the Ministry of Transport in 2003)
7. Notice on Enforcement of Relevant Policies and Measures about the Several Suggestions of the CPC Central Committee and State Council on Advancing Construction of New Socialist Countryside (GBH [2006] No. 13), issued by General Office of the State Council
1.2.4 Main technical guides
Notice on the Problems Related to Ambient Noise in Environmental Impact Assessment of the Construction Projects of Highways and Railways (Including light rail) (HF [2003] No. 94)
Technical Specifications to Determinate the Suitable Areas for Environmental Noise of Urban Area (GB/T 15190 94)
Technical Guidelines for Environmental Impact Assessment (HJ/T 2.1�2.3)
Technical Guidelines for Environmental Impact Assessment - Atmospheric Environment (HJ/T2.2-2008)
Technical Guidelines for Environmental Impact Assessment - Acoustic Environment (HJ 2.4�2009)
Technical Guidelines for Environmental Impact Assessment - Non-polluted Ecological Impact (HJ/T 19�1997)
Technical Criterion for Eco-environmental Status Assessment (trail implementation) (HJ/T192�2006)
1.2.5 Relevant technical documents
Feasibility study report of each subproject;
Social impact report of each subproject;
China Sichuan Small Towns Development Project (P110632) Identification Mission: April 20-22, 2009 and May 12-15, 2009 Aide-Memoire No. 1 Final;
China Sichuan Small Towns Development Project (P110632) Pre-Appraisal Mission: March 1-8, 2010 Aide-Memoire No. 2 Draft.
1.3 EIA (Environmental Impact Assessment) summary 1.3.1 Environmental impact assessment category of the Project
The proposed project is mainly aimed at improving infrastructure and managing environment in the districts, counties and townships and towns under the jurisdiction of Sichuan Province, and laying the foundation for developing economy at poverty-stricken areas, improving living quality of the residents and reducing gaps between urban and rural areas. As the proposed project is located dispersedly and needs investment in small amount, and moreover it is known according to field survey carried out by the WB experts in environmental impact assessment, project group of Sichuan Provincial Project Management Office (PPMO) and EIA consultants of each subproject that there’s no environment sensitive area, like ecologically sensitive or fragile area, areas to be particularly protected and area of social interest within the project-affected area, the environmental impact assessment experts of PPMO and environmental impact assessment experts of World Bank Safeguard Mission suggested to classify the proposed project as the Category B project of WB in terms of environmental screening, which was already confirmed by WB.
4
1.3.2 Overview of preparation for environmental impact assessment reports of subprojects
Preparation of the environmental impact assessment documents of each subproject shall satisfy not only the requirements on environmental impact assessment examination and approval in China, but also the requirements of the safeguard policies of WB. According to the suggestions of the environmental assessment experts of World Bank Safeguard Mission, the PPMO already organized training to the EIA consultants, design institutes and consultants engaged in the project by WB loans, so that they can learn WB policies and requirements, take all the WB safeguard policies that may be involved in the project into comprehensive consideration and reflect them in the environmental impact assessment documents.
All the organizations undertaking and participating in environmental impact assessment of all the subprojects of SSTDP have the qualification certificate of environmental impact assessment issued by the Ministry of Environmental Protection of China and researchers and engineers in varied disciplines, such as sociology, human geography, ecology, environmental engineering and traffic engineering; some EIA consultants undertook environmental impact assessment for the WB loaned railway projects, metro projects and infrastructure projects in post-disaster reconstruction in cities and towns in recent years.
There are totally 8 environmental impact assessment documents for all the subprojects of SSTDP, among which 6 are environmental impact assessment reports and 2 are environmental impact assessment tables, and all shall be examined for approval by the Environmental Protection Department of Sichuan Province according to the requirements on classification management of environmental impact assessment in China.
Refer to Table 1.3-1 for general information on all the subprojects of SSTDP and the environmental impact assessment documents.
Table 1.3-1 General information on all subprojects of SSTDP and relevant environmental impact assessment documents
S/N
Name of districts
(counties) and subprojects
Description of subprojects
Construction investment (million )
Type of environmental
impact assessment documents
Preparation organization
Power of examination and approval
1Subproject of Puxing Town, Xinjin County
Construction of 15 municipal roads in the new area of the town,
upgrading and reconstruction of ABCD pipeline at the old area of the town, environmental Treatment (including No.
1 branch canal, No. 2 branch canal, Mushan Lake) and one 3500t wastewater treatment
plant
333.32 Report
School of Environment Science and Engineering,
Southwest Jiaotong University
Environmental Protection
Department of Sichuan Province
2
Rainwater and Wastewater
Pipe Network & Road
ReconstructionSubproject of
Daying County
Reconstruction of roads and rainwater and
wastewater pipelines, reconstruction of pipe
network to septic-tank of the urban area
110.503 Report China Railway Eryuan
Engineering Group Co., Ltd.
Environmental Protection
Department of Sichuan Province
5
S/N
Name of districts
(counties) and subprojects
Description of subprojects
Construction investment (million )
Type of environmental
impact assessment documents
Preparation organization
Power of examination and approval
(Penglai Town)
3
Infrastructure Construction Subproject of Yingxi Town,
Shunqing District,
Nanchong City
Comprehensive improvement of
waterways, interceptor sewer at the two
riverbanks, construction of roads and supporting
facilities
102.019 Report
Chief compiler: School of Environment
Science and Engineering,
Southwest Jiaotong University
Co-compiler: China Huaxi Engineering
Design & Construction Co., Ltd.
Environmental Protection
Department of Sichuan Province
4
Binjiang Road (Southern
Section) Road and
Wastewater Interception
Subproject of Fengming
Town, Pengshan County
Binjiang Road of 2.18km, rainwater and
wastewater pipeline and covered channel of 5.271km, crown
emergency access of 2.178m and road slope protection of 46693m2
92.7415 Report
School of Environment Science and Engineering,
Southwest Jiaotong University
Environmental Protection
Department of Sichuan Province
5
Environmental Treatment
Subproject of Hongya County
(Hongchuan Town)
Construction of main waterwayof about 4.4km
and dredging moat waterway of about
4.8km; construction of walkway at the two sides of channel revetment of
about 8.8km; construction ofgreenbelt
at the two sides of channel revetment of
about 8.8km; wastewatermain along the two sides
of waterway of about 18.76km
104.8166 Table China Railway Eryuan
Engineering Group Co., Ltd.
Environmental Protection
Department of Sichuan Province
6
Waterway Treatment Project of
Xiaoshanzi River (Downtown Section) in
Jialing District, Nanchong City
Dredging reconstruction of the existing waterway,
construction of branch waterways, construction
of walkways and greenbelts at the two
river banks, construction of small bridges over the
river, drainage work, construction of
intercepting pipeline of 7210m totally
70.4017 Table
School of Environment Science and Engineering,
Southwest Jiaotong University
Environmental Protection
Department of Sichuan Province
7
Northern Outer Ring
Road Construction Subproject of
The northern outer ring road, with the designed length of 3290m and
planned width of boundary limits of 40m,
101.2414 Report China Railway Eryuan
Engineering Group Co., Ltd.
Environmental Protection
Department of Sichuan Province
6
S/N
Name of districts
(counties) and subprojects
Description of subprojects
Construction investment (million )
Type of environmental
impact assessment documents
Preparation organization
Power of examination and approval
Zhonglong Town,
Zizhong County
is equipped with one water, rainwater and wastewater pipeline respectively and is provided with road
lamps, landscape, traffic works and other
municipal pipelines along the whole line.
8
Infrastructure Construction Subproject of Miyi County
(Panlian Town)
Municipal road work, flood control dam work and the supporting pipe
network
107.4654 Report China Railway Eryuan
Engineering Group Co., Ltd.
Environmental Protection
Department of Sichuan Province
The comprehensive summary of the environmental impact assessment report on SSTDP was prepared on the basis of the above environmental impact assessment reports of subprojects.
1.3.3 Main scope of assessment
Refer to Table 1.3-2 for the environmental impact assessment scope of each subproject.
Table 1.3-2 Assessment scope
Assessment content Assessment scope
Social environment
The directly affected area and surrounding area of works, generally including the area within 200m at the two sides along roads and the whole town where the works is located
Eco-environment
The area within 300m at the two sides along the centre line of the line, the area within 300m at the two sides along the centre line of river bank, the directly affected area and the area within 500m around plant area, and river reaches involved by the works
Acoustic environment
The area within 200m at the two sides along the centre line of roads and the area of 100m around plant area
Ambient air
The area within 200m at the two sides along the centre line of roads; the area of 200m at the two sides along the line, and the area within 500m outside of the boundary of wastewater treatment plants, which shall be extended to 1000m in the downwind direction
Surface water environment
Rivers within the area within 200m at the two sides along the center of roads; the area of 500m upstream or 1000m downstream of the bridge location for river-crossing sections; the river reach of 500m upstream of the drain outlet of wastewater treatment plants to 10km downstream of Yangliu River
1.3.4 Assessment standards and environmental protection targets
1. Assessment standards
The assessment standards of each subproject were determined according to the requirements on environmental impact assessment standards of the environmental protection bureau (city level) at the location of works (refer to annex A for details).
2. Pollution control targets and environmental protection targets
(1) Pollution control targets
7
According to field survey and survey on current status of social and ecological environment along or around each proposed subproject of SSTDP carried out by the EIA consultant of each subproject, only the Environmental Treatment Subproject of Hongya County (Hongchuan Town) involve the historical and cultural sites under government protection at the provincial level, which are located within construction control area of Zhoujiaci (refer to the Annex B), and other works involve no natural reserve, wild animals and plants under government protection, scenic spots and historical sites, or historical and cultural sites under government protection within the assessment scope.
The environmental protection targets were determined as follows, according to nature and surrounding environmental features of each subproject:
1) Impact of noise, exhaust gas and dust generated during construction period on the environmental sensitive points, like residential quarters, schools, hospitals, water sources shall be alleviated as much as possible; engineering measures and environmental protective measures shall be taken to relieve impact of water and soil erosion, and vegetation deterioration during construction period on ecological environment and surface water and underground water.
2) After implementation of the works, quality of the surface water environment and air environment shall be improved; quality of acoustic environment shall mot be worse obviously than current status.
3) Adverse impact on natural and social resources at the location of the works shall be avoided and reduced.
4) Vegetation affected during construction shall be recovered, soil and water conservation level shall be improved and regional ecological system shall be kept intact.
(2) Environmental sensitive protection targets
The environmental sensitive protection targets under SSTDP were determined as follows, according to analysis on the results of field survey and current status monitoring (refer to Table 1.3-3).
Table 1.3-3 List of environmental sensitive protection targets
Environmental Sensitive Point Works of District and
County No. Name
Impact Factor General Description of Sensitive Point
Position Relationship
1Puxing Primary
School Air and noise 8 classes, 350 people Line B, 30m
2Hospital of
Puxing Town Air and noise 30 beds Line B, 20m
3 Puxing Town Air and noise Residential houses of 2-2-storey masonry-concrete structure
Line B.10-30m Subproject of Puxing Town, Xinjin County
4 Yangliu River Water
environment and ecology
Water body of III type
Water body received by wastewater
treatment plant
8
Environmental Sensitive Point
Works of District and County
No. Name Impact Factor General Description
of Sensitive Point Position
Relationship
1Longsheng
Resettlement Community
Air and noise
7-storey houses of masonry-concrete
structure after 2000, mainly used as
resettlement. There are 2-5-storey commercial
and residential buildings around.
South side of mid Qijiang Road, 2m
2Middle school of Daying County
Air and noise
School’s occupation is about 280 sq, and the
area of structure is more than 100,000 of sq with 119 classes,
more than 400 teaching and administrative staff
and more than 8000 students
Right side of mid Qijiang Road,
156m
3 Boji Hospital Air and noise 7-storey building, 13
doctors and 35 sickbeds
Right side of east Qijiang Road,
2m
4Penglai School
of Daying County
Air and noise
Established in 1938, now there are 157 teachers and 2,587
students
West side of Shuyuan street,
80m
5Splendid Penglai
Residential Community
Air and noise
7-storey houses of masonry-concrete
structure after 2000, the houses next to the street are commercial and residential, and there are about 400
resident families
East side of Shuyuan street,
5m
6Daying Union
Hospital Air and noise
Established in September 2003, it is a general hospital which incorporated medical
treatment, precautions, health care and
rehabilitation. Now there are 56 medical personnel and more
than 80 sickbeds
End of west side of Nanhua street,
2m
7Daying Middle School, Penglai
Campus Air and noise
Established in 1906, 3-4-storey building, now there are 205 teachers
and 4,150 students
Interchange of Qilin street and Jiaotong street, north side of
Jiaotong street, 136m
Rainwater and Wastewater Pipe Network
& Road Reconstruction Subproject of Daying
County (Penglai Town)
8Residential
Community of Qilin Street
Air and noise
6-7-storey houses of masonry-concrete
structure after 2000, the houses next to the street are commercial
and residential.
Both sides of Qilin street, 5m
9
Environmental Sensitive Point
Works of District and County
No. Name Impact Factor General Description
of Sensitive Point Position
Relationship
9
Residential houses on both sides of Keguan
Street
Air and noise
3-7–storey houses of masonry-concrete
structure after 2000, the houses next to the street are commercial
and residential.
Both sides of Keguan street,
2m
10
Residential houses on both sides of Lower Jiaotong Street
Air and noise
3-5-storey houses of masonry-concrete
structure after 2000, the houses next to the street are commercial
and residential.
Both sides of lower Jiaotong
street, 2m
11
Residential houses on both sides of Luogui
Road
Air and noise
2-5-storey houses of masonry-concrete
structure after 2000, the houses next to the street are commercial
and residential.
Both sides of Luogui street,
6m
12 Qijiang Water
environment and ecology
Surface water, waters of III type
Parallel to Qijiang mid road and Qijiang east road, the closest distance is 5m
13 Gubo Brook Water
environment and ecology
Surface water, waters of III type
Flow into Qijiang from
south to north, Hongqi bridge which is under construction crosses this
brook
1Residents of Yingxi Town
Air and noise Residents in the area of right side of Yingxi river
2Residents of Yingxi Town
(being relocated)Air and noise
Scattered residents in the area of left side of Yingxi river
3No. 1 Primary
School of Yingxi Town
Air and noise
West side of Yingxi river, and teaching area’s distance to river is about 100m
4Residents of Yingxi Town
Air and noise Residents along
Naoxi river
5Vocational
Middle School of Yingxi Town
Air and noise
South side of Naoxi river, and teaching area’s distance to river is about 110m
Infrastructure Construction Subproject
of Yingxi Town, Shunqing District,
Nanchong City
6Government of Yingxi Town
Air and noise West side of Naoxi river,
300m
10
Environmental Sensitive Point
Works of District and County
No. Name Impact Factor General Description
of Sensitive Point Position
Relationship
7Residents of Yingxi Town
Air and noise
Residents within 200m area along
right side of Yingxi river
8No. 1 Primary
School of Yingxi Town
Air and noise
West side of Yingxi river, and teaching area’s distance to river is about 200m
9Residents of Yingxi Town
Air and noise Residents within 200m area along
Naoxi river
10 Vocational
Middle School of Yingxi Town
Air and noise
Southwest side of Naoxi river, and teaching
area’s distance to river is about
110m
11 Government of Yingxi Town
Air West side of Naoxi river,
300m
12 Yingxi River Water
environment and ecology
Water body of III typeWaterway treatment
13 Naoxi River Water
environment and ecology
Water body of III typeWaterway treatment
1Apartment
houses at ends Air and noise
Concentrated distribution, 6-storey of
masonry-concrete structure, 36 resident
family
K0+140 - K0+200, right of
road 12m, broadside on
2Pengshan
Vocational High School
Air and noise 5-storey of masonry-
concrete structure, 600 teachers and students
K0+480, right of road 64m, direct
on
3Tongjiangli Residential Community
Air and noise
Concentrated distribution, 2-3-storey of masonry-concrete structure, 20 resident
family
K0+980, right of road 80m,
broadside on
4Farmhouses at
ends Air and noise
Concentrated distribution, brick houses, 10 resident
family
K1+880 - K2+080, right of road 25m, direct
on
Binjiang Road (Southern Section) Road and
Wastewater Interception Subproject of Fengming Town, Pengshan County
5 Minjiang River Water
environment and ecology
Water body of III typePlanned roads
along Minjiang River
1
Disease Prevention and Control Center
of Hongya County
Air and noise 5-storey nursing home, 80 sickbeds, about 100
doctors
Right side of river, 52m
Environmental Reconstruction Subproject
of Hongya County (Hongchuan Town)
2People’s
Hospital of Hongya County
Air and noise 5-storey nursing home,
200 sickbeds, about 200 doctors
Left side of river, 37m
11
Environmental Sensitive Point
Works of District and County
No. Name Impact Factor General Description
of Sensitive Point Position
Relationship
3Hongya Middle
School Air and noise
5-storeyteaching building and 6-storey
dorm, about 2000 students, 198 teachers
Left side of river, 47m
4
Zhongbao High School of
Hongya County, Central Campus
Air and noise
4-storey teaching building and 2-storey
dorm, about 600 students which all live in dorm, 250 teachers
Left side of river, 29m
5
Hongchuan No. 2 Primary School
of Hongya County
Air and noise
One 4-storey and one 3-storey teaching
building, about 500 students and about 150
teachers
Left side of river, 100m
6Hongya
Vocational High School
Air and noise
5-storey teaching building and 3-storey
dorm, about 1300 students, about 150
teachers
Left side of river, 48m
7Residential
houses along northern moat
Air and noise 1-6-storey building, mainly established in
1990s
15 to 200m along both sides of
river
8Residential
houses along southern moat
Air and noise 1-6-storey building, mainly established in
1990s
15 to 200m along both sides of
river
10 Zhoujiaci Historical relic
Zhoujiaci belongs to the seventh batch of provincial heritage
conservation units of Sichuan Province.
Existing Zhoujiaci was established at the first year of Tongzhi Reign of Qing dynasty, and it is a duplex quadrangle courtyard composed of three main structures, namely antechamber, main hall (Guangyu Hall) and back hall, with bilateral wing-
rooms.
Located in Zhoujiaci’s
construction area
11 Qingyi River Surface water Water body of III type
The water resource for waterway
treatment is from Qingyi River,
and the downstream
flows into Qingyi River
Waterway Treatment Project (City Section) of Xiaoshanzi river, Jialing
1Baimamiao
Village Air and noise
About 100 resident family, 350 people
South side of Dushan bay branch, 60m
12
Environmental Sensitive Point
Works of District and County
No. Name Impact Factor General Description
of Sensitive Point Position
Relationship
2Jialing No. 1
Middle School (New Campus)
Air and noise 1000 teachers and
students
North side of Dushan bay branch, 20m
3Spark Computer Hope Primary
Air and noise 500 teachers and
students
River flow through buried
culvert, next to it
4Jialing No. 1
Middle School (Old Campus)
Air and noise 2000 teachers and
students South of pipe,
100m
5Nanhong
Residential Community
Air and noise About 200 resident family, 650 people
River flow through buried
culvert
6Duweiba
Residential Community
Air and noise About 150 resident family, 500 people
River flow through buried
culvert
7 Xiaoshanzi RiverWater
environment and ecology
Water body of III typeWaterway Treatment
Xiaoshanzi river, Jialing district, Nanchong city
8 Nixi River Water
environment and ecology
Water body of III typeSouth side of project area,
receives water
1 Qing’s Court Air and noise 1-3-storey farmer
house, mainly established in 1990s
(AK0 - AK0+200)
both sides, 97m
2 Zhou’s Court Air and noise 1-3-storey farmer
house, mainly established in 1990s
(AK0���� - AK0+780
AK1+040 - AK1+440)
both sides, 35m
3 Zhangjiabian Air and noise 1-3-storey farmer
house, mainly established in 1990s
(AK2 - AK2����
AK2���� - AK2�����
both sides, 20m
Northern Outer Ring RoadConstruction Works of
Zhonglong town, Zizhong county
4 Xiaoyuanzi Air and noise 1-3–storey farmer
house, mainly established in 1990s
(AK2+820 - AK2�����
both sides, 20m
1 Hexi CommunityWater
environment and ecology
About 220 resident family, mainly 1-7 storeys of masonry-concrete structure,
building of III type, most of them are used
by company or as resident house,
established in 1990s
(GJLK0+000 - GJLK0+300)
both sides, 20m
Infrastructure Construction Subproject of Miyi County (Panlian
Town)
2Commune 2 of
Shuitang VillageAir and noise
About 45 resident family, mainly 1-3 storeys of masonry-concrete structure,
building of III type, mainly established in
1990s. Xipan highway is located at the west side of the planned road, 55m to 110m
(GJLK0+300 - GJLK0+600)
both sides, 20m
13
Environmental Sensitive Point
Works of District and County
No. Name Impact Factor General Description
of Sensitive Point Position
Relationship
3Commune 3,
Shuitang VillageAir and noise
19 resident family, mainly 1-3 storeys of
masonry-concrete structure, building of
III type, mainly established in 1990s. This sensitive point is
located at the interchange of planned
west ring road and Beiqiao road. Xipan highway is located at the west side of the
planned west ring road, 40m
(GJLK0+580 - GJLK0+780 and DQJGDK0+00 - DQJGDK0+200left sides, 20m
4Group 8, Qingpi
Village Air and noise
About 90 resident family, mainly 1-3 storeys of masonry-concrete structure, building of III type,
mainly established in 1990s. Provincial road 214 is located at the east side of planned Shuidian road, 80m
(DBLK0+880 - DBLK1+000)
both sides, 16m
5Group 8, Qingpi
Village Air and noise
About 48 resident family, mainly 1-7 storeys of masonry-concrete structure, building of III type,
mainly used by company or as resident
house, and mainly established in 1990s.
(QYGD0+000 - QYGD0+220)left sides, 20m
6 Anning River Water
environment and ecology
Surface water, water area of III type,
protection area for average fish, has
functions as scenic spots, irrigation and power generation
Flow from north to south, direct through project
construction area
The above environmental protection purposes can be divided into ecological sensitive area, surface water body river and habitants residence. The ecological sensitive area only covers Zhoujiaci provincial heritage conservation unit. Waterway works of Environmental Treatment Subproject of Hongya County (Hongchuan Town) cross the construction control zone of Zhoujiaci and they are not located in protection scope of cultural property. Since their construction has little impact upon Zhoujiaci, relic protection authorities have issued a letter on approval of the project crossing the construction control zone of Zhoujiaci.
All surface water bodies of the Project belong to Yangtze River valley and they are located at different branches. SSTDP mostly covers such projects as municipal roads and environmental treatment and its main impacts upon water environment are disturbances to surface water body during construction period, which are short-term impacts controllable in local area. It has no impact during
14
operation period. In addition, environmental treatment project can intercept wastewater and reduce drainage which is favorable for improvement of water quality.
As for impacts upon residential environment of habitants, interferences to habitants near the site with construction degrading air quality and producing noises during construction period are short-term impacts controllable in local area. Traffic noises may impact habitants at both sides of the road during operation period of the road project.
Chapter II Project Description 2.1 Project location
The distribution diagram of each subproject under SSTDP shall be as follows.
Table 2.1-1 Geological location distribution of each subproject under SSTDP
S/N District & county and name of subproject Location
1 Subproject of Puxing Town, Xinjin County Puxing Town, Xinjin County,
Chengdu City
2Rainwater and Wastewater Pipe Network & Road Reconstruction Subproject in Daying County (Penglai Town)
Penglai Town, Daying County
3Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City
Yingxi Town, Shunqing District, Nanchong City
4Binjiang Road (Southern Section) Road and Wastewater Interception Subproject of Fengming Town, Pengshan County
Fengming Town, Pengshan County
5Environmental Treatment Subproject of Hongya County (Hongchuan Town)
Hongchuan Town, Hongya County
6Waterway Treatment Project of Xiaoshanzi River (Downtown Section) in Jialing District, Nanchong City
Jialing District, Nanchong City
7Northern Outer Ring Road Construction Subproject of Zhonglong Town, Zizhong County
Zhonglong Town, Zizhong County
8Infrastructure Construction Subproject of Miyi County (Panlian Town)
Panlian Town, Miyi County
2.2 Construction content, scale, investment and period See Table 2.2-1 for the construction content, scale, investment and period of each subproject under SSTDP.
15
Table 2.2-1 Summary of construction content, scale, investment and period of each subproject
S/N Project name Constructioncontent
Major project and scale
Totalinvestment
(millionyuan)
Environmentalinvestment
(million yuan)
Constructionperiod
Main project
(1) Road and water supply & drainagepipelineproject innew town: Construct 15 roads (overall length10102.7m) at thewidth of 12-30m, along with auxiliaryprojects including themajor municipal pipenetworkproject, road lighting project, traffic project, etc.;construct 10010m of water pipeline, 9695m ofwastewater pipeline, 10017m of rainwater pipelineandancillary facilities.
(2) Supply & drainagepipeline reconstruction project inold town: Construct 1100m of water pipeline, 990m ofwastewater pipelineand 1141m of rainwater pipeline.
(3) Wastewater treatment plant project: Construct onewastewater treatment plant, covering an areaof 7.45mu,with daily treatment capacity of 3500m3.
(4) Trunk and branch canal (city section) treatment projectin MumaMountain: Theoverall length if 4540m.
Aided projectRoadway lighting and traffic control system.Road, power supply facility, water supply facility andwarehouse within the wastewater treatment plant.
1Subproject ofPuxing Town,Xinjin County
Upgrading andenvironmental
governanceof 15municipal roads in
new town andABCD pipelines inold town (including
branch canal 1,branch canal 2 andMushan Lake), and
onewastewatertreatment plant
(3500t/d)
Ancillary facilityPower shall besupplied by municipal power system; watershall besupplied by the existing water plant in XinjinCounty.
333.32 8.72
Theprojectshall be
constructedfrom Juneof2010 to Juneof 2012, withtheperiod of
2 years
16
S/N Project name Constructioncontent Major project and scale
Totalinvestment
(millionyuan)
Environmentalinvestment
(million yuan)
Constructionperiod
Road project
1. Luogui Road, with the length of 3402.350m and thewidth of 25m;
2. Build Gubo Brook Binjiang Road, with the length of1301.984m and thewidth of 15m;
3. Qijiang MiddleRoad, with the length of 913.453m andthewidth of 28m;
4. Qijiang East Road, with the length of 1216.070m andthewidth of 15m;
5. Shuyuan Street, with the length of 303.260m and thewidth of 12m;
6. NanhuaStreet, with the length of 334.7340m and thewidth of 12m;
7. Qilin Street, with the length of 367.110m and the widthof 12m;
8. Keguan Street, with the length of 426.213m and thewidth of 25m;
9. Jiaotong Lower Street, with the length of 649.830m andthewidth of 25m;
Road &rainwater
andwastewater
pipelinerenovation
project
Pipenetworkproject
1. Luogui Road, with the length of rainwater pipelineof5000m (including thebranch pipeline) and thewithlength of wastewater pipelineof 5000m (including thebranch pipeline);
2. Construct theGubo Brook Binjiang Road, with thelength of rainwater pipelineof 1500m (including thebranch pipeline) and the wastewater pipelineof 1500m(including thebranch pipeline);
3. Other roads, with the rainwater and wastewater pipenetwork laid along two sides; long roads shall beidentical with the renovated section.
2
Rainwater andWastewater
PipeNetwork& Road
ReconstructionSubproject of
DayingCounty(PenglaiTown)
Road & rainwaterand wastewaterpipelinerenovationproject, septic tankconnection pipenetwork renovationproject
Septic tank connectionpipenetwork renovation
project
Theseptic tank connection pipenetwork renovation willemploy theplastic pipe(D400mm) as connection pipe toprevent thedomestic wastewater from entering theseptictank but lead it directly to themunicipal wastewater pipe;there are489 septic tanks in the town, and thus, calculatedby 8m per septic tank, 3992m of pipe will beneeded.
110.503 89
From July of2010 to
December of2011
17
S/N Project name Constructioncontent Major project and scale
Totalinvestment
(millionyuan)
Environmentalinvestment
(million yuan)
Constructionperiod
Waterwaydredgingproject
This waterway dredging covers2.75km of section alongYingxi River, commencing from Huangshiyan BridgeofYingxin Highway till Huanxi Bridge. Theaveragedepth ofdredging is0.6m and total volumeof dredging is about45360m3.
Integratedwaterwaytreatmentproject
Compositeecological
slopeprotection
project
The treatment of 2.75km of section along Yingxi River,commencing from Huangshiyan Bridgeof Yingxin Highwaytill Huanxi Bridge, will employ 5.37km of compositeecological embankment (including 2.684km of leftembankment and 2.686km of right embankment), that is, theannual flood level below will beC15 concrete foundationand retaining wall (50,100m3), theupper of which willemploy clay rock residues for thehomogeneous-slopedembankment that will adopt the eco-bags; employ C15 finestoneconcrete for capping (576m3); theeco-protection andlandscape greening will cover an areaof 58300m2; andmeanwhile, M10 mortar stone river step ladder shall besetevery 300m or so of theembankment project. The totalearthwork of theproject will be445,000 m3, the fill volumewill be258,400 m3 and thediscard volumewill be186,600m3.
3
InfrastructureConstructionSubproject ofYingxi Town,
ShunqingDistrict,
NanchongCity
Integrated waterwaytreatment,wastewater
interception pipealong two banks,
construction of roadand auxiliary facility
Roadproject Lineproject
Theembankment line renovation and road system planningalong Yingxi waterway will commence from theend ofHuangshiyan Bridge, which is in level crossing with theexisting Yingxin Road, till the north (95m) of theoriginalHuanxi Bridge in Lianghekou Villageof Yingxi Town,which is in level crossing with theplanned vertical trunk,with theoverall length of about 2.7km, the width of 24m, thedesign speed of 30km/h, thehighway gradeof urbansecondary trunk III grade, thepermanently occupied land of94m and thedemolition areaof 2614.1m2.
102.019 6.00
Theprojectplans to
commence inJanuary of2010 andexpects to
complete inDecember of2010, withtotal period
of 12 months
18
S/N Project name Constructioncontent Major project and scale
Totalinvestment
(millionyuan)
Environmentalinvestment
(million yuan)
Constructionperiod
Roadbed andpavementproject
Thewidth will be24m, thesection layout will be: 5m ofsidewalk + 7m of driveway + 7m of driveway + 5m ofsidewalk = 24m, the roadbed earthwork excavation will be6440m3, the roadbed fill will be325240m3, and theborrowed fill volume will be318800m3; thepavement willemploy 10cm of asphalt concrete, covering an areaof36624m2, theroadbed will employ 35cm of natural sand andgravel bottom and 20cm of 5% cement-stabilized macadambasepipelineproject laid under the right of sidewalk alongthe road. (1) Rainwater pipeline: D450-900, C30 socket-typereinforced concretepipe, 2608m; (2) wastewater pipeline:D300-800, C30 socket-typereinforced concretepipe,2608m;
Lightingfacility
Thewhole line will beequipped with 175 setsof double-armed road lamps
Trafficsafetyfacility
523m2 pavement marking and 15 marksand signs(single-cantilever aluminum marks)
Roadgreening
5232 square metersof greening areaand 665 greening trees
Interception pipeproject
Lay the interception pipe (with theoverall length of about4.322km) along two banks, wherein, the interception pipelaid on the left bank commences from Huangshiyan Bridgeof Yingxin Road, crossing Binjiang Road along the leftbank, till Huanxi Bridge, with the length of 2.608km; theinterception pipe laid on theright bank commences fromLailong Bridgeof Yingxi Town, crossing theembankmentalong the right bank, till thewastewater treatment plant, withthe length of about 1.714km; the interception pipeon the leftbank will meet the interception pipeon theright bankthrough the inverted siphon; employ C30 socket-typereinforced concretepipewith thediameter of D300-800; theconstruction of interception pipe will include thepipe laying,inspection well, inverted siphon, etc.
19
S/N Project name Constructioncontent Major project and scale
Totalinvestment
(millionyuan)
Environmentalinvestment
(million yuan)
Constructionperiod
Theroad fill volumewill be6440m3, the roadbed fill will be325240m3, theborrowed fill volume will be318800m3,which will be supplied by thediscard generated by theground leveling in Yingxi education park and thediscardgenerated by the waterway treatment and interception pipeproject;Theexcavation volumeof interception pipeproject will be12966m3, the fill will be10373m3 and thediscard will be2593, used for roadbed fill of this project;The total volumeof waterway dredging will beabout45360m3, used for embankment greening;
Excavation and fill
The total earthwork of compositeecological slopeprotectionproject will be445,000 m3, the fill volumewill be258,400m3 and thediscard volumewill be186,600 m3.
BinjiangRoad project
Employ asphalt concretepavement; it is recommended thatthepart of thesouthern section of Binjiang Road fromSuojiang Road to thesquarewill beconsidered by thewidthof 16m and the remained by thewidth of 20m, with theoverall length of 2180.964m.
Drainageproject
Thewastewater project will be3.1km, thediameter ofpipelinewill beD800 and theoverall length of rainwaterproject will be2.18km.
Slopeprotection
project
Theslopeprotection project will beabout 46693 squaremeters, including 11673.25 square meters for protection and35019.75 square meters for greening landscape.
Mainproject
Embankmentemergency
accessproject
Thewidth of road will be5 - 7m and the length will be2178m.
4
Binjiang Road(Southern
Section) Roadand
WastewaterInterception
Subproject ofFengming
Town,PengshanCounty
2.18km of BinjiangRoad, 5.271km of
rainwater/wastewaterand covered drain,
2.178m ofembankment
emergency accessproject and 46693m2
of slopeprotection
Aidedproject
Constructionworkshop
Oneconstruction workshop; thesiteaccess for constructionwill makeuseof theexisting road; theconstruction campwill rent houses along the line; and the temporary topsoildump occupancy will be included in theroadbed occupancy.
92.742 1.924
Commence inJanuary of
2011,completebytheend of
December of2011
20
S/N Project name Constructioncontent Major project and scale
Totalinvestment
(millionyuan)
Environmentalinvestment
(million yuan)
Constructionperiod
Length ofdrainage
pipe18750mDrainage
projectEarthwork Temporary pilling and backfillingLength ofwaterway
4401m
Sidewalk 8802m2
Theexcavation will be101,200m3
EarthworkThe fill will be13,200m3
5
EnvironmentalTreatment
Subproject ofHongyaCounty
(HongchuanTown)
Construction ofabout 4.4km of trunk
waterway, about4.8km of waterwayfor dredging; about8.8km of sidewalksalong two banks;about 8.8km of
greening belt alongtwo banks; and about
18.76km ofwastewater pipeline
along two banks.
Waterwayproject
Dredgingvolume
78857m3
104.817 0.253
Complete thewaterwayproject,drainage
project fromJuly in 2010to December
in 2011.
Drainageproject
Construct 7210m of wastewater pipeline, collect domesticwastewater nearby theriver, and drain to theconstructedinterception pipelines along HuohuaRoad and Yaomu Road.Waterway dredging and expansion, with the dredgingvolumeof 21920m3.Reconstruct 2820m of themain waterway (build theembankment), and construct 3093m of branch waterway;10006m of ecological slopeprotection; construct 32838m2
of sidewalk and 8 bridges.
Mainproject Waterway
treatmentproject
Thegreening belt along two bankswill cover 30198m2.6
WaterwayTreatmentProject of
XiaoshanziRiver
(DowntownSection) in
JialingDistrict,
NanchongCity
Dredging andrenovation of the
existing waterway,construction of
branch waterway,sidewalk and
greening belt alongtwo banks, and
cross-river bridge;drainageproject;construction of
7210m ofinterception pipeline
Aidedproject
Spoil groundThespoil will be24,117. Thespoil ground will be located insome low-lying places I Huanglianwan area.
70.402 0.45
Theconstruction
period ofXiaoshanziwaterway
will be fromFebruary in
2010 toAugust in2011; the
constructionperiod ofdrainage
project willbe from
February in2010 to April
in 2011.Length of line 3.29km
Pavement 78953m2
Sidewalk 32000m2
7 NorthernOuter Ring
RoadConstruction
Northern outer ringroad design with thelength of 3290, roadboundary limit with Culvert 6
101.241 1.33 Theconstruction
period will be3 years from
21
S/N Project name Constructioncontent Major project and scale
Totalinvestment
(millionyuan)
Environmentalinvestment
(million yuan)
Constructionperiod
Drainage 3.29kmMedian greening belt 3.29km
Roadside tree 1096Electricity into the earth 6580m
Road lamp 328Traffic project 3.29km
Fire-fighting project 54
Subproject ofZhonglong
Town,ZizhongCounty
thewidth of 40m,construction of water
supply pipe,rainwater pipeand
wastewater pipe, andconstruction of
matching road lamp,greening, trafficproject and other
municipal pipelinesSanitation facility 108
2009 to 2012
Road
Construct 5 roads: Xihuan Road, with the length of1016.860m and the width of 26m; Beiqiao Road, with thelength of 486m and thewidth of 32m; the LandscapeRoad,with the length of 284.109m and thewidth of 32m; theWater-Electricity Road, with the length of 749.908m and thewidth of 19m; Xiner Street, with the length of 375.525m andthewidth of 19m.
Pipenetwork
Lay thesupply and drainagepipelines and cable tunnel alongthe road, with the overall length of water pipelineof 2535m,theoverall length of wastewater pipelineof 2062m, theoverall length of rainwater pipelineof 2692m and theoveralllength of cable tunnel of 2889m.
8
InfrastructureConstructionSubproject ofMiyi County
(PanlianTown)
Municipal roadproject, flood controlproject, pipe network
project matchingwith road project andflood control project
Flood control
The full length will be1470m. The length of ecologicalembankment protection will be1470m. Theareaof greeningbelt will be4410 m2. Thewidth of embankment will be 3.5m(0.5m for railingsand trees, and 3.0m for flood controlroad), with that of flood control raised to 6.27-6.33m.
107.465 2.246
Theconstruction
period will be1.5 years
from July in2010 to
December in2011
22
Fig. 2.1-1 Location of Sichuan Province
23
Fig. 2.1-2 Distribution of subprojects under SSTDP
24
2.3 Planning compatibility Each subproject under SSTDP, from the preparation of project proposal to the completion of feasibility design document, has been screened level by level, reviewed by expert panel and endorsed by WB experts and domestic experts that it complies with local urban master planning and thus its implementation is highly necessary.
Chapter III Regional Environment Overview 3.1 Natural condition 3.1.1 Overview of natural condition of Sichuan Province
1. Geographic location
Sichuan Province is located in the southwest of China, in the upper reaches of Yangtze River, and at east longitude 92°21 -108°12 DQd north latitude 26°03 -34°19 � ,W�LV�1075km long from east to west and 900km wide from south to north. It borders on Chongqing Municipality in the east, Yunnan Province and Guizhou Province in the south, Tibet Autonomous Region in the west and Qinghai Province, Gansu Province and Shaanxi Province in the north. Its area reaches 485,000km2, being ranked at the 5th place among all provinces/municipalities/autonomous regions of China, next to Xinjiang Autonomous Region, Tibet Autonomous Region, Inner Mongolia Autonomous Region and Qinghai Province.
2. Topography
The topography of the whole province is complicated and varies from east to west. Sichuan is located at the first and the second ones of the three major steps in the topography of China mainland, namely, at the transition zone between Qinghai-Tibet Plateau as the first step and the plain in the middle and lower reaches of Yangtze River as the second step. The province shows a significant elevation difference, obviously higher in the west and lower in the east. The west part of Sichuan Province comprises plateau and mountain land, over 4000m in altitude; the east part of Sichuan Province comprises basin and hill, between 1000m and 3000m in altitude. The whole province can be divided into three parts, i.e., Sichuan Basin, Northwest Sichuan Plateau and
Sichuan Basin in the east part is one of the four major basins of China, 165,000km2 in area. The basin is surrounded by Qinling Mountains, with Micang Mountain and Daba Mountain in its east, Dalou Mountain in its south and Longmen Mountain and Qionglai Mountain in its northwest. The basin has a warm and humid climate, warm in winter and hot in summer, with an annual precipitation of 900-1200mm in most parts. The climate is a subtropical humid monsoon climate. The vegetation is subtropical broad leaved evergreen forest. The agriculture is double-cropped. The west part of the basin is West Sichuan Plain, where soil is fertile; this part is Dujiangyan Gravity Irrigation Area, where farmland is productive. The middle part of the basin is purple soil hills, with an altitude of 400-800m; the topography is slightly inclined towards south; Minjiang River, Tuojiang River and Jialing River flow southwards into Yangtze River from the mountain land in the north. The east part of the basin is East Sichuan Paralleled Ridge-Valley, comprising Huaying Mountain, Tongluo Mountain and Mingyue Mountain.
The northwest part of the province is Northwest Sichuan Plateau, as a corner in the southeast of Qinghai-Tibet Plateau, with an average altitude of 3000-5000m. The climate is puna. The vegetation is alpine meadow.
3. Climatic condition
25
As for Sichuan Basin central subtropical humid climate zone, the whole year is warm and humid, with an average temperature of 16-18and accumulated temperature of 4000-6000���7KH�GDLO\�UDQJH�RI�DLU�WHPSHUDWXUH�LV�VPDOO�DQG�WKH�DQQXDO�UDQJH�RI�DLU�temperature is large. Winter is warm and summer is hot. The frost-free period is 230-340 days. The cloud amount is large and the fine days are less. The sunshine time is short, only 1000-1400 hours a year, 600-800 hours less than that of the areas in the lower reaches of Yangtze River at the same latitude. The precipitation is abundant, 1000-1200mm annually, over 50% in summer, especially at night.
As for subtropical subhumid climate zone of Southwest Sichuan mountainous region, the air temperature of the whole year is high, 12-20in average annually. The daily range of air temperature is large and the annual range of air temperature is small. The morning is cold and the noon is warm. The four seasons are not distinct. The cloud amount is small and the fine days are more. The sunshine time is long, 2000-2600 hours annually. The precipitation is small. The dry season and the wet season are distinct. Totally 7 months of a year are dry season. The annual precipitation is 900-1200mm, 90% of which in the period from May to October. The river valley area has a typical dry and hot river-valley climate due to the impact of foehn wind. The mountain land has a prominent stereoscopic climate.
As for northwest Sichuan High Mountain & Plateau puna zone, the altitude difference is large. The climate has obvious stereoscopic changes. Subtropical zone, warm temperate zone, mid temperate zone, cold temperate zone, subfrigid zone, frigid zone and permafrost zone appear in turn from river valley to ridge. The cold temperate zone climate is dominant. The river valley is dry and warm. The mountain land is cold and humid. Winter is cold and summer is cool. The water heat is insufficient. The annual temperature is 4-12���7KH�DQQXDO�SUHFLSLWDWLRQ�LV����-900mm. The weather is clear and the sunshine is sufficient. The annual sunshine time is 1600-2600 hours.
The climate of Sichuan Province can be generally described as follows. The monsoon climate is prominent. The rainy season is the hot season. The local difference is obvious; the east part has warm winter, early spring, hot summer, rainy autumn, more cloud and mist, less sunshine, and long growing season; the west part is cold, with long winter, sufficient sunshine, centralized precipitation, and distinct dry season and rainy season, but without summer basically. The vertical climate change is great and the climate types are various, which do good to the comprehensive development of agriculture, forestry and animal husbandry. The climatic damage has various types, with a high frequency and a wide range, mainly including drought, rainstorm, flood and low temperature.
3.1.2 Overview of natural conditions of subprojects
See Table 3.1-1 for the natural condition of subprojects under SSTDP.
26
Table 3.1-1 Natural condition of subprojects under SSTDP
S/N Name ofsubproject
Geographiclocation
Geographic condition Topography Climatic condition
1Subproject ofPuxing Town,Xinjin County
PuxingTown,Xinjin
County,Chengdu
City
Xinjin County is located in thewest part ofSichuan Basin and at theedgeof thesouthpart of Chengdu Plain, with geographiccoordinates of north latitude 30°19 �� -33°31 �� DQG east longitude 103°42 �3 -103°55 �� � ,W ERUGHUV RQ 6KXDQJOLX &RXQW\in the east, Pengshan in the south, Dayi andQionglai in the west and Chongzhou in thenorth. Xinjin is the south gate of ChengduCity. It is 28km away from downtown areaof Chengdu, and 18km away fromSouthwest Airport. It enjoys an obviouslocation advantage.Puxing Town is located on the southwestside of Chengdu City and in the east part ofthe county seat of Xinjin. The town borderson Shuangliu County in the east, JinhuaTown in the south, Huaqiao Town in thewest across Yangliu River and HuayuanTown in the north. The site of the towngovernment is located in Puxingchang in thesouth-central part of the town and on theXinjin-Puxing Highway (Dayi-HuanglongxiHighway) as a county-level highway.
Xinjin County mainly comprises plain, but also hassome shallow hill and tableland. The plain, in theview of geologic structure, is Chengdu Cenozoicfault subsidence. Muma Mountain and ChangqiuMountain in its southeast and southwest are shallowhill and tableland, part of Longquan Mountain fault-fold zone. The plain accounts for 76.6% of the totalarea of the whole county, mainly distributed over thenortheast, the north and the northwest parts of XinjinCounty.The land is flat and the area is square and round. Thedominant topography is plain consisting of river,floodplain and terrace. The county consists of 76.6%flat area, 14.1% hill and 9.3% water surface, with analtitude of 442-673m. The plain area is distributedover the edges of the midwest and east parts and aportion of the south part, with an altitude of 442-480.The land is inclined from northwest to southeast,stepping down gradually with a gradient ratio of2.2‰. The land has a slight hypsographic feature.The plain is also distributed over the northeast, thenorth and the northwest parts of the county; supposeJinma River as a boundary, the west side of the riveris inclined from northwest to southeast, with anaverage ground gradient ratio of 1.17‰, and the eastside of the river is inclined from northeast tosouthwest, with an average ground gradient ratio of1.04%. The plain area accounts for 76.6% of the totalarea of the whole county. The southeast of thecounty seat is Muma Mountain tableland, with analtitude of 450-500. The southwest of the county islong hill, with an altitude of 500-600.
Xinjin has a subtropical humidmonsoon climate, with long frost-freeperiod, abundant precipitation anddistinct four seasons. It has thefollowing climate features due to itsgeographic location and atmosphericcirculation; winter is not freezing,summer is not sweltering, spring iswarm and easily changeable, andautumn is rich in continuous rain; theannual mean temperature is 16.4�� WKHhottest month July has an averagetemperature of 25.6�� WKH FROGHVWmonth January has an averagetemperature of 5.7�� WKH DYHUDJHtemperature of the hottest month (July)is 25.5�� DQG LWV DYHUDJH WHPSHUDWXUH DW14:00 is 28.0�� WKH H[WUHPH ORZHVWtemperature is -4.7 ; the extremehighest temperature is 36.6 ; theannual average frost-free period is 297days; the annual average precipitation is987mm.
2
Rainwater andWastewater
Pipe Network& Road
County seatof DayingCounty,Penglai
The proposed works is located in DayingCounty of Suining City. Daying County liesin the hinterland in central Sichuan, in thelower reaches of Qijiang River, and within
Daying County has a topography of hill. It mainlycomprises mid-shallow hill and also has somealluvial flat area along river. The land is higher in thesouth and the north, but lower in the middle. The
Daying County lies in Sichuan Basinmid-subtropical humid monsoonclimate zone, where it is warm and fourseasons are distinct. The annual mean
27
S/N Name ofsubproject
Geographiclocation
Geographic condition Topography Climatic condition
ReconstructionSubproject of
DayingCounty(PenglaiTown)
Town the territory of Suining City. Thegeographic coordinates arenorth latitude30°26 -30°44 DQG HDVW ORQJLWXGH ����� -105°28 � 7KH FRXQW\ LV ����NP ORQJ IURPsouth to north and 41.5km wide from east towest. The total area is 703km2, covering 8towns and 3 townships. Daying Countyborders on Zhoushan District and AnjuDistrict of Suining City in the southeast,Pengxi County of Suining City in the east,Shehong County of Suining City and SantaiCounty of Mianyang City in the north, andZhongjiang County of Deyang City andLezhi County of Ziyang City.
land is slightly inclined from northwest to east. Theaverage altitude is 429m. The highest points are atGaoguan Mountain in the north, 492m, and atZhenwu Mountain in the south, 465m. The lowestpoint is at Weijiajiao where Qijiang River meets withFujiang River, with an altitude of 271m. The altitudedifference within the county is 221m.
temperature is 17.4�� 7KH SUHFLSLWDWLRQis abundant. The annual averageprecipitation is 800.8mm. The quantityof heat is high. The annual sunshinetime is 1189.1 hours. The total annualsolar radiation is 93.37kcal/km2. Thefrost-free period is 294 days. The year’sdominant wind direction is north andnorth-west. The climatic condition issuitable for crop growing.
3
InfrastructureConstructionSubproject ofYingxi Town,
ShunqingDistrict,
NanchongCity
YingxiTown,
ShunqingDistrict,
NanchongCity
Nanchong City is located in the northeastpart of the basin of Sichuan Province. It isin the middle reaches of Jialing River. Itsgeographic coordinates are east longitude105°26 -107°2 DQG QRUWK ODWLWXGH ����� -31°51 � ,WV WRWDO DUHD LV �����NP�� ,W ERUGHUVon Guangyuan City and Bazhong City in thenorth, Dazhou City in the east, GuanganCity in the southeast, and Mianyang Cityand Suining City in the southwest.The developed area of Nanchong, includingShunqing, Gaoping and Jialing, lies in thesouth part of the city. The whole city lies inthe river valley terrace, higher in thenorthwest and lower in the southeast. Thecity development is now in process. Thecity has formed the structure featured whichJialing River as axis, north-south extension,eastward development across river, andcomprehensive development based on river.Nanchong City is 218km away fromChengdu in the west and 200km fromChongqing in the south.
Nanchong City is located in the connection zonebetween the north remote mountainous area ofSichuan Basin and the central Sichuan hill area. Theland is shallow hill, higher in northwest and lower insoutheast. The altitude within the city is 261.5-429.6m, and the downtown area has an altitude of about274.5m. The works locates in Shunqing District ofNanchong City, within the hill and low mountainarea. Since the Quaternary Period, due to theintermittent rising of earth crust, the topographyshows three-step terraces. The first-step terrace: 7-17m higher than the existing riverbed; the terrace iscomplete and relatively flat. The second-step terrace:30-45m higher than the existing riverbed; the terracesurface is primarily cut and damaged. The third-stepterrace: 60-70m higher than the existing riverbed; theterrace surface is damaged, and the slope change isobvious. The proposed works is located in thesecond-step terrace, facing no significant harmfulgeology. For stratum, the earth’s surface comprisesfarming soil and slope and alluvial clayey soil, withterrace pebble bed lying below; the bedrock isMiddle Jurassic sand-mud rock. The geologic
Nanchong City has a mid-subtropicalhumid monsoon climate. According tothe local ground meteorologicalobservation data of the past years, themaximum air temperature is 41.3 (onJuly 2, 1951), and the minimum airtemperature is -2.2� �RQ 1RY� ���1995). January is the coldest month,with a monthly average air temperatureof 6.6�� $XJXVW LV WKH KRWWHVW PRQWK�with a monthly average air temperatureof 27.8�� 7KH SUHFLSLWDWLRQ LV DEXQGDQW,with an annual average precipitation of1025.2mm. The precipitation mainlyhappens in the period from May toSeptember. The area is one of areas inChina with the lowest solar radiationand sunshine hours. The annual averagesunshine time is 1254h, accounting for29% of the available sunshine time. Theaverage total solar radiation is3864.25MJ/m2. The frost-free period is310d. The dominant wind direction in
28
S/N Name ofsubproject
Geographiclocation
Geographic condition Topography Climatic condition
The works is located in Yingxi Town,Shunqing District. Yingxi Town lies in thenorth part of Shunqing District, NanchongCity. It borderson Jingxi Township in theeast, Huafeng Township and XinfuTownship in the south, Gongxing Townshipin thewest, and Jintai Township in thenorth. It is about 10km away fromdowntown areaof Nanchong City. It isadjacent to National Highway No. 212 andprovincial highway Yingxi-XinzhengHighway. The location is advantageousandthe traffic is convenient.
structure is simple, and thestratum inclination isgentle. Thegeologic structureof batholite has thewide and gentle folds as themain part. Thestratumin MiddleTriassic Suining Formation is thick. Theearthquake reflecting horizon shows no obviousrupture, indicating that thegeologic structure issimple and therecent crust movement isbasicallystable.The works is located in Yingxi Town, where the flatareacombines with theshallow hill.
the downtown area isnorth-north-west.The wind direction frequency is 8%. Itsmain features includedistinct fourseasons, warm winter and hot summer,midsummer-drought in summer andexcessiverain in autumn.
4
Binjiang Road(Southern
Section) Roadand
WastewaterInterception
Subproject ofFengming
Town,PengshanCounty
FengmingTown,
PengshanCounty
Pengshan County is located in the southedgeof West Sichuan Plain and in the northpart of Meishan City. Geographically, it isin themiddle reachesof Minjiang River.The FuheRiver and NanheRiver enter thecounty from thenorthwest, meet inJiangkou Town, and flow southwardsout ofthecounty. Thecounty borderson Renshouin theeast, Dongpo District in thesouth,Pujiang and Qionglai in thewest, and Xinjinand Shuangliu in thenorth. Itsgeographiccoordinates are east longitude 103°40 �� -103°59 21 DQG QRUWK ODWLWXGH ����� �� -30°21 �� � ZLWK DQ DOWLWXGH RI ���-711.6m.The county is 28.7km long from east to westand 25.9km wide from south to north.The project site, Fengming Town, is locatedin the southeast part of Pengshan County. Itis within the economic zone of ChengduPlain, where the CPC county committee andcounty government of Pengshan Countyreside. The site is the political, economicand cultural center of the whole county.The proposed works is located in the east
The land within the whole county is higher in thenorth and lower in the south, with the highest pointin northwest and the lowest point in the southeast. Itis within the front belt of the transition zone betweenNorthwest Sichuan hill-plateau mountain land andSichuan Basin. The county mainly comprises asynclinal geologic structure, surrounded bymountains in the east and the west, but open in thesouth and the north. The land has a shape of “II”.The Fuhe River and Nanhe River in the upperreaches of Minjiang River met in Jiangkou Town andthen flow southwards out of the county. The east andwest sides of the flat area are shallow hill, round hill,hogback and cuesta. The gulley width is between100m and 200m.
Pengshan County is within asubtropical humid climate zone. Thealtitude difference within the county issmall. The climate change among partsof the county is not great. The annualtemperature range is within 2.l�� ,WVbasic features include the following; theclimate is warm; the precipitation isabundant; the four seasons are distinct;there is no intense heat and lessmidsummer drought in summer; floodand water-logging of various degreesappear every year; there is no severecold, less frost and snow but more coldwave and low temperature in winter;the air temperature rebounds early inspring; there is more continuous rain inautumn and temperature drops soon.
29
S/N Name ofsubproject
Geographiclocation
Geographic condition Topography Climatic condition
part of thedowntown areaof PengshanCounty, south of Pengzu Plaza, east ofprovincial highway No. 103, and 260maway on thenorth side from thecrossingbetween the road routebeginning in thenorth and Suojiang Road. It extendssouthwardsand crosses Suojiang Road,GuihuaRoad, Tongjiang Road, ZhiyuanRoad, Huaxi Road and Xinglong Road inturn and ends at Xinglong Road.
5
EnvironmentalTreatment
Subproject ofHongyaCounty
(HongchuanTown)
Siteofcounty seatof HongyaCounty,
HongchuanTown
HongyaCounty is located in thesouthwestedgeof Sichuan Basin. Its geographiccoordinates are east longitude 102°49'-103°32' and north latitude 29°24'-30°00'. Itlies in the triangle zone among Chengdu,Leshan and Ya’an. It borders on JiajiangCounty and Emeishan City in the east,Hanyuan County and Jinkouhe District inthe south, Yucheng District and RongjingCounty of Ya’an in the west, and MingshanCounty and Danleng County in the north.The county is 64km long from south tonorth, 43km wide in the north and 46kmwide in the south, and 112km, 55km, 50kmand 62km away from Chengdu, Leshan,Meishan and Ya’an, respectively.The site of the works is also the site of thecounty seat, Hongchuan Town.
Hongya County has a total area of 1896.49km2. Theland appears a step-change from southwest tonortheast, forming high mountain, mediummountain, deep hill, shallow hill, tableland, rivervalley and flat area. The topography mainlycomprises mountain land and hill. The river valleyflat area is distributed over both banks of QingyiRiver and Huaxi River, with a forest cover rate of65.8%. It is called “70% mountain, 20% water and10% farmland”.The site of the works, Hongchuan Town, is the siteof the county seat of Hongya County. The developedarea is 5km2 and the land is flat.
Hongya County has a mid-subtropicalhumid climate. It is warm and humid inthe county. The precipitation isabundant; the four seasons are distinct;the rainy season is the hot season; thedry season and the rainy season aredistinct; there is no intense heat insummer; there is no severe cold andless frost and snow in winter; the airtemperature rebounds early in spring;but there is more cold wave, lowtemperature and continuous rain, andthe temperature drops soon.The annual mean temperature is 16.8��the maximum air temperature is 36.2��the minimum air temperature is -3.3��the average annual precipitation is1493.9 mm; the recorded highestannual precipitation is 2165.4 mm; 60%of precipitation of the whole yearhappens in the period from June toAugust; the average rate of sunshine foryears in succession is 24%; the averagefrost-free period for years in successionis 303.2 days; the dominant winddirection in the county seat is east andwest; the wind direction frequency is
30
S/N Name ofsubproject
Geographiclocation
Geographic condition Topography Climatic condition
36%; the relativehumidity is 82%; theabsolute humidity is16.7%.
6
WaterwayTreatmentProject ofXiaoshanziRiver(DowntownSection) inJialingDistrict,NanchongCity
WithinJialing
District,Nanchong
City
Nanchong City is located in the northeastpart of Sichuan Basin and in the middlereachesof Jialing River. Itscoordinates arenorth latitude30035 -310 51 DQG HDVWlongitude1050 27 -1060 58 � ,W LV ���NPlong from south to north and 143km widefrom east to west. It borderson Dazhou Cityin theeast, Guangan City in the south,Suining City and Mianyang City in the westand Guangyuan City and Bazhong City inthenorth.Jialing District is acounty-leveladministrativedistrict approved by the StateCouncil in September 1993. It has a totalpopulation of 680,000. Its total area is1278km2. National Highways No. 212 andNo. 318 meet in thedistrict. Chengdu-Nanchong Expressway goes through thedistrict. Jialing District lies in thenortheastpart of Sichuan, and on thewest bank of themiddle reachesof Jialing River. Itscoordinates are east longitude 105°45 -106°00 DQG QRUWK ODWLWXGH ����� -30°52 � ,Wborders on Shunqing District in the north,Wusheng County in the south, XichongCounty and Pengxi County in the west andGaoping District in the east. It is only 3kmaway from Nanchong City, an economicand cultural center of northeast Sichuan.Chengdu, Chongqing and Nanchongtogether form a 2-hour economicdevelopment circle.The works lies in the Jialing District ofNanchong City. The works starts atBaimamiao Village, Huanglianwan Area
Nanchong City has a topography divided into twomajor parts, the north low mountain area and thesouth hill area. The land is inclined from north tosouth, with an altitude of 256-889m. The topographymainly comprises hill; shallow hill flat area, mediumhill and medium valley, and high hill and lowmountain account for 1/3, respectively.The site of the works lies in Duweiba, the downtownarea of Jialing District, Nanchong City, withinJialing River alluvial plain. It borders on JialingRiver in the east, Chaqi Mountain in the north,Fengya Mountain in the south and Dajian Mountainin the west. The land is higher in the north and lowerin the south, higher in the west and lower in the east.The area is between 268.0m and 377.2m; most offarmland is between 270.0m and 280.0m. The northof Mahuang Weir is a shallow hill belt, but half ofthe south central is below the flooded line (274.0m)of a 50a flood. The groundwater table is high. In theview of structure, the different thick layers of sandrock and mud rock form wide and gentle folds. Theinclination of rock formation is 2-7o, generally.Because the rock formation is generally flat, thestep-shape mountain ranges and valleys are formeddue to erosional cutting. The mountain top is wideand flat, or appears as a dome. Deep combe developsalong the edge of the tableland, and the surfaceappears as irregular sawtooth. The surface width isbetween scores of meters and hundreds of meters.The surface mainly comprises of mud rock. The landis flat and the effect of weathering is strong. Theheight of the rock step at the edge of the tablelandrelates closely to the thickness of sand rock.Therefore, the heights of steps are different, 10-20mgenerally, but 30-50m in some locations.
Nanchong City is located in the lowmountain and hill area in the east partof Sichuan Basin, within the subtropicalmonsoon climate zone, where cold airis active. The air temperature is notstable. The precipitation in spring andearly summer is not even. Drought isseen, but no intense heat is found insummer. The precipitation isconcentrated. More flood and water-logging are seen. Gale is foundsometimes, and hail is foundoccasionally. In autumn, the airtemperature drops soon, with morecontinuous rain. According to the localground meteorological observation dataof the past years, the maximum airtemperature is 41.3� �RQ -XO\ �� ������and the minimum air temperature is -2.2� (on Nov. 22, 1995). The annualmean temperature is 17.60�� WKH DQQXDOprecipitation is 1054.5mm; the annualevaporation capacity is 812.3mm; therelative humidity is 79%; the year’sdominant wind direction is N; theaverage wind speed is 1.4m/s, and themaximum wind speed is 19m/s.
31
S/N Name ofsubproject
Geographiclocation
Geographic condition Topography Climatic condition
and endsat entranceof Nixi Riverdownstream.
7
NorthernOuter Ring
RoadConstructionSubproject ofZhonglong
Town,ZizhongCounty
ZhonglongTown,
ZizhongCounty
Zizhong County is located in themiddlepart of Sichuan Basin, at east longitude104°27 -105°07 DQG QRUWK ODWLWXGH ����� -30°02 � =L]KRQJ &RXQW\ LV XQGHU WKHadministration of Neijiang City. It lies in thecentral belt of the connection zone betweenSichuan and Chongqing and borders onDongxing District and Shizhong District ofNeijiang City in the east, Weiyuan Countyin the south, Renshou County of MeishanCity in the west and Yanjiang District andAnyue County in the north.The works lies in Zhonglong Town (thenorth part of Zizhong County) of ZizhongCounty, where the old downtown ofZizhong County resides. It borders onTuojiang River in the south, ShuanglongTown, Liuma Town and Ganlu Town in thenorth, Sujiawan Town in the east and SuyaTownship and Guide Town in the west, andfaces Shuinan Town of Xincheng District ofZizhong County across the river.
The county seat of Zizhong County has a shape ofopen “V”. The total area of the county is 1734km2.The land is inclined from west and southwest to eastand northeast. The southwest part is low mountain,deep hill and narrow valley. The middle part isgentle hill and wide valley. Out of the total area, theshallow hill accounts for 65.7%, plateau-shape highhill 23.0%, gentle hill and wide valley 5.5%, lowmountain and narrow valley 4.4%, and river valleyflat area 1.3%.The topography around the county seat is TuojiangRiver floodplain and terrace hill. The topography isnot uniform. The relative altitude difference is 30-40m generally, 70-80m locally, and even over 100mindividually. The topography is cuesta formed bygrey sand rock and purple rock in ShaximiaoFormation. The upper part of the stratum is a coverlayer, 3-6m thick generally; the middle part of thestratum is a pebble and gravel layer, 5-7m generally,and the lower part of the stratum is a mud-sand rocklayer. It is the tectonic level of post-Jinning platformregion with stable geologic structure.
Zizhong County has a subtropicalhumid monsoon climate, distinct fourseasons, early spring, long summer,short winter and a long frost-freeperiod. There is no severe cold inwinter. The frost and snow are less. Theaverage wind speed is low. The annualprecipitation is abundant. This climateis very suitable for agriculturalproduction. But some negative factorsstill exist; the spatiotemporaldistribution is not even, and droughtand waterlogging happens sometimes;winter is dry, summer is droughty;midsummer drought often happens;continuous rain is more in autumn;sunshine hours are less.
8
InfrastructureConstructionSubproject ofMiyi County
(PanlianTown)
PanlianTown, Miyi
County
Miyi County is located on both banks ofAnning River in the northeast part ofPanzhihua City. Its geographic location is atnorth latitude 26°42'-27°10' and eastlongitude 101°44'-102°15'. The county is52.5km wide from east to west and 73.2kmlong from south to north. The total area ofthe whole county is 2153km2. It borders onDechang County in the north, Huili Countyin the east, Yanbian and Yanyuan in thewest across Yalong River, and YanbianCounty in the south.
Miyi County lies in the southeast edge of theQinghai-Tibet Plateau and on the east side of theHengduan Mountains. It borders on LongzhouMountain in the east and Yalong River in the west.Baipo Mountain is in the county area. Anning Rivergoes through the county from south to north. Thecounty area is informally called “two mountains, twovalleys and three slopes”; the two mountains areLongzhou Mountain and Baipo Mountain; the twovalleys are the east and west parts of Anning RiverValley and the valley on the east bank of YalongRiver; the three slopes are east and west slopes of
Miyi County has a stereoscopic climatebased on south-subtropical zone. Thelow mountain river valley area has asouth-subtropical dry and hot rivervalley climate, with abundant heat andrich sunshine. The precipitation isabundant. It is an area suitable forgrowth of south subtropical andsubtropical lives. The mediummountain area has subtropical andextratropical warm climates, similar tothat of Sichuan Basin, suitable for
32
S/N Name ofsubproject
Geographiclocation
Geographic condition Topography Climatic condition
Anning River Valley and east slopeof Yalong River.The averagealtitude in the county is1836.2m, withthehighest oneof 3447m and the lowest oneof980m. Thecounty has staggered valleys andmountain ranges, with significant altitudedifferences. The topography mainly comprisemedium mountain. The river valleys with an altitudebelow 1500m account for 28.69% of the total areaofthecounty; the low medium mountains with analtitudebetween 1500m and 2000m account for46.67%; thehigh medium mountains with an altitudeover 2000m account for 24.64%.Panlian Town is thesiteof thecounty seat, whereland is relatively flat.
growth of animals and plants anddevelopment of agriculture, forestry,animal husbandry, fruit industry andmedicinal materials industry. Themedium high mountain areahasextratropical and frigid cold and wetclimates, suitable for development offorestry and animal husbandry as wellas forestry sidelinesand local andspecial products.
33
3.2 Socio-economic environment 3.2.1 Overview of social environment of Sichuan Province
1. Administrative division and population
The whole province governs 21 cities/regions/prefectures and 177 counties and county-level cities (districts).
The whole province has a population of 88,150,000 as of December 31, 2007.
Sichuan Province has many ethnic groups. It has 55 minorities, with a total population of 4,220,000. There are 14 traditional minorities, i.e., Yi, Tibetan, Qiang, Miao, Hui, Mongolian, Tujia, Lisu, Man, Naxi, Buyi, Bai, Zhuang and Dai. Most of the minorities reside in Liangshan Yi Autonomous Prefecture, Ganzi Tibetan Autonomous Prefecture, Aba Tibetan and Qiang Autonomous Prefecture, Mabian Yi Autonomous County, Ebian Yi Autonomous County and Beichuan Qiang Autonomous County. All subprojects under SSTDP do not cover ethnic minority habitation and inhabitants in the Project construction area are mainly of the Han nationality.
2. Socio-economic development
The total output value of the whole province in 2009 is 1415.13 billion yuan, up by 14.5% over last year; the rate of growth is 3.5% higher than that of last year. The primary industry saw an increased value of 224.06 billion yuan, up by 4.0%; the secondary industry saw an increased value of 671.19 billion yuan, up by 19.5%; and the territory industry saw an increased value of 519.88 billion yuan, up by 12.4%. The three industries contributed to the economic growth by 4.2%, 62.8% and 33.0%, respectively. The total output value per capita is 17,339 yuan, up by 14%. The proportions among the three industries changed from the last year’s 17.6:46.2:36.2 to 15.8:47.4:36.8.
3. Resources
Sichuan is rich in energy resources. The resources mainly comprise water energy, coal and natural gas. The coal accounts for 23.5%, the natural gas and petroleum 1.5% and water energy 75%.
The theoretical reserve of water energy in the whole province reaches 143 million kw, accounting for 21.2% of the total reserve of the country, only next to Tibet. Out of the total reserve, the technically developable quantity is 103 million kw, accounting for 27.2% of the total quantity of the country, while the economically developable quantity is 76.112 million kilometers, accounting for 31.9% the total quantity of the country, and being ranked at the first place among all provinces in the country. The water energy resources are mostly distributed over three water systems, i.e., Dadu River, Jinsha River and Yalong River. The said three water systems provide 2/3 of the total water energy resources of the province and are the largest “rich mine field” of hydroelectric power in the country. Their technically developable quantity accounts for over 79.2% of their theoretical reserve and accounts for 80% of the total quantity of the whole province. The Ertan Hydropower Station on Yalong River has a installed gross capacity of 3.30 million kilometers.
The recoverable deposit of coal in the whole province is 9733 million ton. Its proven reserve accounts for 0.9% of the total reserve of the country. The petroleum and natural gas resources mainly comprise natural gas. The petroleum resources see a very small reserve. Sichuan Basin has accumulatively proven new geologic reserves of 67,960,000 ton. However, the natural gas resources in Sichuan Basin are very rich. In fact, Sichuan Basin is one of the major basins in China with petroleum and natural gas
34
resources. So far over 7000 billion m3 natural gas resources have been found. Besides, Sichuan is also rich in biological energy sources; every year the developable human and livestock dejecta quantity is 31,485,300 ton, the core wood 11,890,300 ton, the stalk 42,122,400 ton, and marsh gas 1 billion m3 approximately. The peat coal resources see a primary proven reserve of 2 billion ton. Solar energy, wind energy and terrestrial heat resources are also abundant, which can be developed and used in the future.
4. Tourism
Sichuan has rich tourist resources. It enjoys beautiful natural scenery, time-honored history and culture and distinctive national features. The quantity and quality of tourist resources have been ranked at top ones of the country. Actually, Sichuan is a famous province of tourist resources in China.
The whole province has 5 world heritages, being ranked at the second in the country, including 3 natural heritages (Jiuzhaigou, Huanglong and Sichuan giant panda habitat), 1 natural and cultural dual heritage (Emei Mountain – Leshan Giant Buddha) and 1 cultural heritage (Qingcheng Mountain – Dujiangyan). Totally 4 natural reserves of Sichuan (Jiuzhai, Wolong, Huanglong and Daocheng-Yading) are listed into the Man and Biosphere Reserve Network. Sichuan has 15 national key scenic spots, being ranked at the first in the country; in addition, it also has 75 provincial scenic spots. Sichuan has 5 resorts listed into “China’s Top 40 Tourist Resorts”. Qingcheng Mountain - Dujiangyan Scenic Spot, Emei Mountain Scenic Spot, Emei Mountain Scenic Spot and Jiuzhaigou Scenic Spot are on the list of the first batch of national 5A scenic spots. At present, Sichuan has 3 national 5A scenic spots and 34 national 4A scenic spots, 21 excellent tourist cities of China, and 21 national natural reserves, including 1 national natural reserve for giant panda. So far, the whole province has 88 established forest parks, including 31 national forest parks and 49 provincial forest parks. Moreover, Sichuan has many geologic and topographic landscapes, including 220-plus geologic relics, 2 world-class geologic parks (Xingwen and Zigong) and 12 national geologic parks; these numbers are ranked at top ones of the country. Actually, Sichuan has 7 national historical and cultural cities, ranked the first of the country; besides, it also has 55 provincial historical and cultural cities (towns), 128 national key sites protected for historical and cultural value and 337 provincial key sites protected for historical and cultural value.
All subprojects under SSTDP do not cover any natural reserve, scenic area or forest park, except for that Environmental Treatment Subproject of Hongya County (Hongchuan Town) covers Zhoujiaci provincial heritage conservation unit.
3.2.2 Overview of social environments of subprojects
See Table 3.2-1 for the social environment of subprojects under SSTDP.
35
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
1Subproject ofPuxing Town,Xinjin County
The total areaof XinjinCounty is 331.5km2,covering 11 towns and1 township, with a totalpopulation of 304,700.The urban population is107,400. The total areaof Puxing Town is42km2, covering 9villages, 2 communitiesand 117 groups, with atotal population of23875 by theend of2007, forming 6943households.
In 2008, Xinjin County reached aregional total output valueof 8758million yuan, up by 17.5% over last year.Theprimary industry saw an increasedvalueof 1055 million yuan, up by 7.2%;thesecondary industry saw an increasedvalueof 4930 yuan, up by 22.6%; andthe territory industry saw an increasedvalueof 2773 yuan, up by 12.5%. Theproportions among the three industrieswere 12.0:56.3:31.7. The three industriescontributed to theGDPby 4.6%, 71.2%and 24.2%, respectively. Calculatedbased on resident population, theregional total output valueper capitaofthewholecounty reached 28,876 yuan,up by 14.7%. In 2007, Puxing Town’sGDP was 282 million yuan; the primaryindustry saw an increased value of 72million yuan, accounting for 41.7% ofthe total number; the secondary industrysaw an increased value of 98 millionyuan, accounting for 29.8% of the totalnumber; the territory industry saw anincreased value of 94 million yuan,accounting for 28.5% of the totalnumber. The net income per capita ofpeasants was 5364 yuan.In 2008, Puxing Town’s GDP was 354million yuan; the primary industry sawan increased value of 72 million yuan,accounting for 41.7% the total number.The net income per capita of peasantswas 6192 yuan.
Primary industry: Puxing Town liesin the hill zone of Chengdu Plain,where soil is fertile and crop is rich.The agriculture mainly comprisescrop farming, including paddy,wheat, rape, garlic and pollution-freevegetables. In 2007, the planted areaof grains of Puxing Town was 53393mu (1 mu = 1/15 of a hectare), andthe total output of grains was 14,757ton. The economic crops mainlycomprise vegetable, fine fruits andnurseries. Especially, the fine fruitsindustry developed rapidly andtowards an ecologic and efficientindustry.Secondary industry: Puxing Town’senterprises started early anddeveloped fast. At present, it has 20–plus enterprises of remarkablescales, mainly comprisingconstruction and building materials,food processing, chemical industryand foundry.Territory industry: Puxing Townenjoys convenient traffic conditions,with a traffic system extending in alldirections. The urban commerciallogistics is active and thewarehousing industry is booming.Puxing Town is the maincommercial town of Xinjin County.The development of infrastructureand supporting commercial facilitiesin Puxing Town must push the
Traffic condition: Puxing Town enjoysgood traffic conditions. Chengdu-Ya’an(Chengdu-Leshan, similarly hereinafter)Expressway goes through the town fromsouth to north, with an interchange exit atPuxing Town. It also has a county-levelhighway Xinjin-Puxing Highway (Dayi-Huanglongxi Highway) (Dayi-Shuangliu-Huanglongxi) goes through the town fromeast to west. Chengdu-Ya’an Expresswayis an important economic corridor fromChengdu to Leshan and Ya’an. Xinjin-Puxing Highway (Dayi-HuanglongxiHighway) is an important branch of WestSichuan tourist ring route. Puxing Town’stwo trunks constitute very convenienttraffic channels to the outside.Power condition: Puxing Town’s power iscurrently supplied by a 220KV substationat Xujiadu of Xinbai Village within thetown. Puxing Town is provided with a10KV switching station.
36
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
further development of industries inPuxing Town.
2
Rainwater andWastewater Pipenetwork & RoadReconstructionSubproject of
Daying County(Penglai Town)
Daying County governs8 towns, 3 townships,302 villagers’committees, 21 urbanresidents’ committees,2920 villagers’ groups,and 79 urban residents’groups, with a totalpopulation of 547,500.
The national economy keeps increasing.In 2007, the county’s GDP is 3.93 billionyuan, GDP per capita 7176. The primaryindustry saw an increased value of 1089million yuan; the secondary industry sawan increased value of 1347 million yuan;the territory industry saw an increasedvalue of 791 million yuan. Theproportions among the three industrieswere 33.5: 40.5: 26. In local finance, thegeneral budgetary revenue was 46.53million yuan, up by 15%; the total retailsales income of consumer goods was1346 million yuan, up by 15%. In 2007,the annual net income per capita ofpeasants in the whole county reached3480 yuan (lower than the standard forprovincial eco-county development, �4500 yuan); the annual disposableincome per capita of urban residents was7108 yuan (lower than the standard forprovincial eco-county development, �11000 yuan).
Daying County is rich in mineralresources. Petroleum, bittern, naturalgas, halite, alluvial gold andsandstone have been proven andmined. Daying County hasremarkable reserves of bittern,which is distributed over Penglai,Xiangshan, Zhuotongjing, Hebianand Yufeng. The county hasdeveloped some tourist projects suchas the “dead sea”, generatingoutstanding benefit.
Daying County is located in the west partof Suining City, with excellent trafficconditions. According to the statistics ofthe traffic administration, the countycurrently has 1905.5km highways,including 52.5km provincial highways,69.5km county-level highways, 155.5kmtownship-level highways and 1628kmvillage-level highways. Besides, Chengdu-Dazhou Railway and Chengdu-NanchongExpressway (under construction) gothrough the county. The open waterwaysare 50km. The county also has 5kmentrance/exit ways to and from the countyas level-1 cement-pavement road(including Chengdu-NanchongExpressway Connection Line), 12kmPenglai-Lezhi Highway as level-2 cement-pavement road, 12.5km Penglai-GuanyinHighway, Santai-Xiangshan Highway, and16.5km Xiajia-Tuanjie Highway as level-2asphalt pavement road. The county seathas a level-2 bus transport center. Thecounty has extended cement-pavementroads or asphalt-pavement roads to everytown and township.
3
InfrastructureConstructionSubproject ofYingxi Town,
ShunqingDistrict,
Nanchong City
Nanchong City islocated in the northeastpart of Sichuan Basin,with an area of12494km2, covering 3districts, 5 counties, 1city and 180 towns. Bythe end of 2005, it has a
Nanchong City is a regional central city,with main industries such as silk, textile,machinery, food, chemicals, leather,garment, power, oil refining, electronicinformation and building materials. It isalso actively developing tourism. In2008, the GDP was 33527 million yuan,including the primary industry of 10.7
The transportation modes available in thedowntown area of Nanchong City includehighway transportation, watertransportation, railway transportation andair transportation, which constitute atransportation network extending to alldirections. National Highways No. 212and No. 318 go through Nanchong from
37
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
total population of7,289,400, includingnon-agriculturalpopulation of 1,438,800and agriculturalpopulation of5,850,600, with apopulation density of584/km2.Yingxi Town hasatotal areaof about57km2 and governs28administrative villagesand 3 urban residents’committees. The townhas a total populationof 42765, includingnon-agriculturalpopulation of 19000.The urbanization ratiois 44.43%. Thepopulation density is750 /km2.
billion yuan, the secondary industry of11.3 billion yuan, and the territoryindustry 11.5 billion yuan. The averageannual wage of employees was 11735yuan, and the, net income per capita ofpeasants was 2646 yuan. The agriculturewas expanded with increased output; theindustry rose again in difficult situation;the losses of enterprises weresignificantly reduced; the consumergoods retail market was still booming;the financial revenue was stablyincreased; the average annual wage ofemployees was 7764 yuan, and the netincome per capita of peasants was 2665yuan.Shunqing District is the site where Partyand government organizations arelocated and is the center of the city forpolitics, economy, trade, finance andwater & land transportations. Thecommercial services are centralized inthe center of the city. Parks,entertainment services, apartmentbuildings and residential quarters aredense. The industrial enterprises aredistributed in suburbs. A commercialzone represented by Mofan Street and acultural zone represented by Beihu Parkhave come into being. The urban trafficstructure is ring-shaped and radial.
north to south after their confluence.Dazhou-Chengdu Railway goes through.Chengdu-Nanchong ExpresswayNanchong-Guangan Expressway andNanchong Second-grade Airport havebeen put into operation. Lanzhou-Chongqing Railway already constructedand Nanchong-Chongqing Expresswayunder construction goes through thedowntown area. A highway network hasbeen developed consisting of nationalhighways, provincial highways andtownship highways supporting each other;Airways are open to Beijing, Guangzhouand Shenzhen, etc.Jialing River waterway runs northwards toGuangyuan and southwards to Chongqing.Nanchong has a developed water transportsystem since ancient times, Jialing River isopen to traffic all the year round. 10-plusbranches such as Xihe River and DongheRiver are open to traffic discontinuously.The whole city has 6 counties, county-level cities and districts where watertransport is available. The total mileageopen to traffic is 458km. There are 7 fleetswith total tonnage of 12500t. The waterroutes extend to Hubei, Hunan, Jiangxi,Anhui, Jiangsu and Shanghai in the middleand lower reaches of Yangtze River andflow into Dongting Lake, Poyang Lakeand Beiyun River. The service mileagereaches more than 3000km. Jialing Riveris the main channel for watertransportation of Nanchong, which canaccommodate 100-300t barges all the year
38
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
round. Thewaterway northward toGuangyuan can accommodate100t bargesand 160hp motor shipsall theyear round.Thewaterway southward to Chongqingcan accommodate300t barges and 300 hpmotor ships all theyear round. NanchongPort is the largest port on Jialing River,which is located in Shunqing District. It isan important port for materialstransportation within north-centralSichuan, with an annual throughput ofmore than 800,000t.Yingxi Town isclose to National HighwayG212 and Provincial Highway Yingxi-Xinzheng Highway. Itsdeveloped areashave10 main roadsand streets, with aproperty line8-36m wide.
4
Binjiang Road(Southern
Section) Roadand Wastewater
InterceptionSubproject of
Fengming Town,PengshanCounty
Pengshan Countygoverns9 townsand 4townships. The totalarea is465km2. Theworks is located atFengming Town.By theend of 2005,Pengshan County has atotal population of320,000, includingagricultural populationof 210,000, accountingfor 66.6%, and non-agricultural populationof 110,000, accountingfor 33.4%. Themainethnic group isHan,and other ethnic groupssuch asHui, Zhuang
In 2008, the county’s total output value(GDP) was 5288 million yuan, up by14.2% over last year; the county’s GDPper capita was 18399 yuan, up by 16.5%over last year; the proportions among thethree industries were 18.0: 57.8: 24.2; thelocal financial revenue was 301.96million yuan, up by 19.98% over lastyear, including general budgetaryrevenue of 183.12 million yuan, up by26.33% over last year; the financialrevenue accounted for 5.7% of the GDP;the number of industrial enterprisesabove designated size was 75; theincreased value in private economyaccounted for 52.3% of the county’sGDP. The urbanization ratio was 39.80%and the forest cover rate was 32.6%.
Pengshan County has 60-plus urban roadsat various levels, including Chengdu-Leshan Highway, and Pengshan-XiejiaHighway section going through thecounty. The land used for roads and plazasis 82.0ha., 10.78m2 per capita. A roadnetwork in the county seat has beenshaped comprising south-north PengzuRoad and Fengming Road (Chengdu-Leshan Highway county seat section) andeast-west Pengxie Road North (Pengshan-Xiejia Highway county seat section),Jianshe Road and Yingbin Road.
39
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
and Yi also reside.
5
EnvironmentalTreatment
Subproject ofHongyaCounty
(HongchuanTown)
Hongchuan Town is thesite of county seat ofHongyaCounty, in thenortheast part ofHongyaCounty. Thetotal areaof the town is42.5 km2, with a totalpopulation of more than42100. It governs14administrative villages,and 5 urban residents’committees.
In 2008, Hongya County’s GDP was4038 million yuan, up by 14.4%; thewhole society’s total investment to fixedassets was 2.46 yuan, up by 17%; thelocal finance general budgetary revenuewas 176.8 million yuan, up by 17.33%;the net income per capita of peasants was4720 yuan; the disposable income percapita of urban residents was 11084yuan, up by 12.3%..By the end of 2008, Hongchuan Townhas 52 enterprises, with an industrialoutput of 590.1 million yuan, and a totalprofit and tax amount of 172 millionyuan. The total employed was 8350.Three rural professional organizationswere established. The surplus labor forceof 17259 persons were shifted to otherfields. The total income from laborservice was 862.95 million yuan. Thetourist income was 152 million yuan.
Hongya County’s tourist industrystarted late but saw a promisingfuture. From the view of touristlocation, Hongya County is locatedbetween the preferentialdevelopment area of Chengdu fortourism and the preferentialdevelopment area of South Sichuanfor tourism. Through nearly 10-year’s development of tourism, ithas established a national AAAscenic spot-Wawu Mountain (anational forest park) and someprovincial scenic spots such asCaoyutan, building up somereputation in the region.It covers 1 provincial heritageconservation unit, namely Zhoujiaci.Zhoujiaci, belonging to the seventhbatch of provincial heritageconservation units of SichuanProvince, is located at WentangVillage, Hongchuan Town,Ximenkou, Hongya County, close toHongya Vocational High School ofSichuan. The existing Zhoujiaci wasestablished at the first year ofTongzhi Reign of Qing Dynasty andit is a duplex quadrangle courtyardcomposed of three main structures,namely antechamber, main hall(Guangyu Hall) and back hall, withbilateral wing-rooms. Totalconstruction area is 858m2, totalfloor area is 3137m2 and the grand
40
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
total area is4.7mu. TheProject islocated in theconstruction controlzoneof Zhoujiaci.
6
WaterwayTreatment
Project(DowntownSection) ofXiaoshanzi
River in JialingDistrict,
Nanchong City
The People’sGovernment ofNanchong City islocated in ShunqingDistrict. In 2003, thecity governed 180towns and 302townships. Thedeveloped area in 2009was 68km2, with anurban residentpopulation of 863,600.
Nanchong is rich in resources. It isan important base for developmentof water energy. The reserve ofpetroleum is 77.79 million ton; thereserve of natural gas is 9 billionm3; the reserve of salt rock is 1.8trillion ton, ranking as the largestnatural salt mine in west China;Jialing River goes through the city,with a reserve of water energy ofmore than 2 million kw. Nanchonghas abundant labor force anddeveloped science, technology andeducation. It is the major city ofhuman resources, science &technology and labor force resourcesin Sichuan. The population ofNanchong is ranked the secondamong all cities of Sichuan, onlynext to Chengdu.
Nanchong, Chengdu and Chongqing haveformed a greater triangular economic zone.The traffic system is well developed.National Highways No. 318 and No. 212,Chengdu-Nanchong Expressway,Nanchong-Guangan Expressway andDazhou-chengdu Railway have connectedNanchong closely with Chengdu,Chongqing, Shanghai, Guangdong andother developed cities. Nanchong GaopingAirport put into use in May 2004 andLanzhou-Chongqing Railway in planning,as well as the first city-belt expresswayamong all second-grade cities of China,Jialing River channeling works andNanchong Port will shape a water, landand air three-dimensional transportationhub for Nanchong City. In 2002,Nanchong saw a highway traffic mileageof 5571km; all the 482 towns andtownships of the city were provided withhighways, and 93.3% of villages wereopen to the traffic. The reconstruction ofhighway from Nanchong to Langzhou hasbeen fully competed, which opens a south-north channel for Nanchong, enhances thetraffic capacity from Nanchong toXichong, Nanbu and Langzong, andrealize the road network from Nanchong toeach county seat under a 2-hour economiccircle planning.
7Northern Outer
Ring RoadZizhong County has atotal area of 1734km2,
Zhonglong Town as a municipal keytown has developed fast socially and
Zhonglong Town has a long history.Early in Zhou Dynasty and the Qin
Zhonglong Town has over 79.2kmhighways at county and village levels. The
41
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
ConstructionSubproject ofZhonglong
Town, ZizhongCounty
covering 33 towns andtownships, with a totalpopulation of 1.32million. ZhonglongTown currently governs23 administrativevillages and 8 urbanresidents’ committees,with a total area of47.57km2; the farmlandarea is 23420hm2, andthe farmland area percapita is 0.55hm2; thetotal population is102,000, includingagricultural populationof 46000 and non-agricultural populationof 56000.
economically. Since 1992, it hasintroduced capital to infrastructureconstruction. The town has 2 bustransport stations, 5 markets, 16 schoolsat various levels with students of over25000, and 6 medical organizations. In2008, Zhonglong Town’s GDP was1417.8 million yuan, up by 32.3% overlast year (present price, the similarlyhereinafter); the total output of industryin present price was 948 million yuan;5.7km highways were newly constructed,including 4.2km cement-pavement roads;46 mountain ponds and 1 reservoirspillway were regulated; a totalinvestment of 56.80 million yuan wasabsorbed subject to agreements; thefamily planning rate is 93.7%. The wholetown saw a healthy and rapid trend ofdevelopment in economy and all socialundertaking also developed in aharmonious manner.
Dynasty, it was the economic,cultural and logistical center ofZizhong County. It is a principalhistorical and cultural town. It is richin natural resources and touristresources. It has national sitesprotected for historical and culturalvalue, Wenmiao and Wumiao, andprovincial scenic spots, ZhonglongMountain and Ningguo Temple.There are mineral resources such aslimestone, ceramic mud, rockmaterials and carbon, showing somepotential for development.
downtown area of Zhonglong Town islocated on the north bank of TuojiangRiver. It has good water transportationconditions. It is 140km away fromChengdu, 190km from Chongqing and30km from Neijiang. It is a transfer stationof land transportation extending toChengdu and Chongqing. Its traffic isconvenient and its location advantage isobvious.
8
InfrastructureConstructionSubproject ofMiyi County
(Panlian Town)
Miyi County has a totalpopulation of 210,000,with 23 minorities suchas Yi, Hui and Lisu; thepopulation of theminorities is 36000,accounting for 14.5%of the total populationof the county.By the beginning of2005, the county seatsaw a developed area of2.5km2; the residentpopulation in the
By the end of 2008, the whole county had atotal registered population of 215,595. Theurbanization ratio was 29.5%, up by 0.4%over last year. In 2008, the annualdisposable income per capita of the urbanresidents was 11,182 yuan, andnonproductive expenditure per capita was9292. The income of peasants increasedrapidly. In 2008, the annual net income percapita of peasants reached 5179 yuan.According to sample surveys, at the endof 2008, the total building area per capitaof urban residents of county seat of MiyiCounty was 30.65m2, and the total
The county is rich in naturalresources, especially mineralresources, which are widelydistributed. They mainly comprisevanadium titanium magnetite,granite and limestone. The basicallyproven reserves include 4.04 billionton vanadium titanium magnetite, 2billion ton granite, 1.68 billion tonlimestone, 10 million ton siliconearth and rare minerals such as gold,copper, nickel, zinc, tungsten,uranium, lead, barium, quartz andcrystal.
By the end of 2008, Miyi County had atotal highway mileage of 1083km,including 295km level-1 and level-2highways and 50km expressway. Theservice mileage of railway was 72km. Thewhole year saw a total volume of circularflow of freight by highway 344.40 milliontkm and a total volume of circular flow ofpassenger by highway 160.05 millionperson-km. There are roads and highwaysopen to traffic among the county seat,towns and townships. The section ofChengdu-Kunming Railway within thecounty was 57km, which is the trunk way
42
S/N Name ofsubproject
Administrativedivision andpopulation
Socio-economic description Resources/industries Infrastructure
developed areawas34000, approximately.
building areaper capitaof rural residentswas 35.97m2.Agriculture is thebasic industry of MiyiCounty. The traditional crop farmingmainly comprisespaddy, corn, wheat andsugarcane. In 2008, Miyi County’s totalseeded area of crops was 23302hm; thetotal output of grains was 8470t; the totaloutput of tobacco leaf was 7250t; thetotal output of fruits was 36624t; the totaloutput of vegetable was 190,200t; thetotal output of silkworm cocoon was627t; the total output of sugarcane was167953t; the total output of Chinesechestnut was 344t; the total output ofwalnut was 1945t; the total output ofpepper was 172t; the total output ofpotato and the like was 3583t; the totaloutput of corn was 11989t.Miyi County has developed variousindustrial systems covering sugarrefining, electric power, buildingmaterials, mining, smelting and printing.It has totally 1123 industrial enterprises.The industry mainly comprises sugarrefining and building materials. In 2008,the county realized an industrial outputof 1698.45 million yuan; the revenuefrom main operations of the industryabove designated size was 3672 millionyuan; the profit was 270 million yuan.
from Panzhihua to Chengdu.The framework of urban road network hasbasically come into being, but notcomplete. Currently, Miyi County’s roadsare divided into three grades, 16-18marterial road, 13m branch road and 8mpath. The framework of roads is fan-shaped, with an area of 64300m2,occupying 3.53% of the current urbanconstruction land area; the road area percapita is 5.66m2.The county seat has two water plants. Thewater source comes from back of GuangdongMountain through a diversion channel. Thewater plants and elevated tanks are jointlyused for water supply. The water supplypipeline is 32km in total. The comprehensivecapacity of the water plant is 13000m3/d; thecurrent average water supply is about8000m3/d; the water is supplied to apopulation of about 35,000. The water supplynetwork can fully cover the downtown areaand part of the outskirts. The county seat has2 waste landfill sites (1 already established,with a daily capacity of 25t; 1 underconstruction, with a daily capacity of 80t).The county has one wastewater plant, with adesigned capacity of 10000m3/d. This plantadopts the improved oxidation ditch aerationprocess. It will be constructed in two phases;the 1st phase has been completed with acapacity of 5000m3/d and will be put intopreliminary operation soon.
43
3.3 Current environmental quality 3.3.1 Survey and assessment of current eco-environment quality
1. Subproject of Puxing Town, Xinjin County
According to the field survey, there is no rare plant in the scope of works under assessment. The land types mainly comprise farmland, dryland and wild land.
2. Rainwater and Wastewater Pipe Network & Road Reconstruction Subproject of Daying County (Penglai Town)
The works is located in Penglai Town, the county seat of Daying County. All land used for works construction is within the urban planning area. This land has been planned as land for urban construction. No basic farmland protection area is concerned. Road and rainwater/wastewater pipe network reconstruction and expansion works will take advantage of the existing roads; the current state of the land is urban construction land. For the newly-constructed Binjiang Road along Bobai River and its rainwater/wastewater pipe network, the current state of the land is dryland.
Within the urban area, the ecosystem is simple. The vegetation is mainly distributed over the green belts on both sides of the existing roads and the dryland within the newly-constructed road area. The road greening mainly depends on arbor, for examples, Camphor tree and indialaurel fig. The crops in dryland mainly comprise corn, sweet potato and vegetable.
3. Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City
The nature of the land used for the works is urban construction land. It is the newly- confiscated land. This land mainly comprises farmland and also involves some house site, woodland and flood land. Within the scope of construction of the works, no rare plant, rare animal, scenic spot or historic site is concerned.
4. Binjiang Road (Southern Section) Road and Wastewater Interception Subproject of Fengming Town, Pengshan County
The scope of the proposed works under assessment mainly comprises farmland. There is a little amount of tree beside the riverbank along the line. Most of the vegetation is wild grass. Within the scope of assessment, no rare plant, rare animal, ancient tree, famous tree, scenic spot, cultural relic or historic site which needs protection is concerned.
5. Environmental Treatment Subproject of Hongya County (Hongchuan Town)
The vegetation within the area of the works mainly comprises economic forest, crop and land vegetation. According to the field survey, within the scope of land used for the works, no rare plant, ancient tree or famous tree which needs protection is concerned. Animals within the scope of construction are all commonly-seen rats, bird sand insects. No eco-sensitive target such as rare or endangered species of animal is found. The works involves the south and the north moats. There is no fish due to serious pollution. In the irrigation ditches, there are only loach and crab, other than any rare fish.
The current states of the land used for the works are farmland and construction land. According to the Planning for Protection of Basic Farmland in Hongchuan Town (2006-2020), the farmland occupied by the works has been adjusted to urban construction land in the planning.
44
6. Waterway Treatment Project (Downtown Section) of Xiaoshanzi River in Jialing District, Nanchong City
The works site is located in the Jialing District. On its both sides, there are industrial enterprises, residential quarters and commercial and administrative office buildings. The eco-environment mainly comprises the urban ecosystem. Within this ecosystem, human is the major life group. The animal community is basically comprised of the domestic animal, whose survival mainly depends on human, not natural enemies, except for part of them impacted by climate or disease. The green plant mainly comprises the planted street tree and greensward. They are the core of the ecosystem. They can beautify the condition, eliminate the pollution and purify the air. Within the scope of the works, no rare or endangered species of terrestrial animal and plant, rare or endangered species of aquatic life, or population, spawning ground, habitat or migration channel of aquatic life worthy of protection is concerned.
7. Northern Outer Ring Road Construction Subproject of Zhonglong Town, Zizhong County
The site of the works is located at the outskirts of the urban area, where human activities are frequent. The vegetation in the area is mainly the planted vegetation. The planted crops mainly comprise paddy, corn, sweet potato, soy and various vegetable.
The human activities are frequent in the works site. No wildlife is found except sparrow, rat, snake and frog.
According to investigation, the works site as well as the 1km range around the works site covers no natural reserves, scenic spot, site protected for historical and cultural value or other eco-sensitive targets.
The primary use of the land in the works site is farmland. The secondary and the thirdly uses of the land are wild land and protective green belt. The ecosystem is simple. The works does not involve any basic farmland.
8. Infrastructure Construction Subproject of Miyi County (Panlian Town)
The current states of the land used for the works are farmland and construction land. The works is located in the south part of the county seat of Miyi County and in the outskirts. Within the scope of urban area construction, the current use of land is mainly the land used for greenhouse. The natural vegetation has been basically replaced by the planted vegetation. The ecosystem within the works site is simple. There is no large-scale living environment of wildlife, except some habitats of birds such as barn swallow and sparrow.
The works site as well as the 1km range around the works site covers no national, municipal or county-level natural reserves, wildlife refuge, forest park, scenic spot, cultural relic or historic site under key protection, eco-sensitive site, or habitat of rare wild animal or plant.
3.3.2 Survey and assessment of current water environment quality
Based on the field survey and according to the works design documents, the impacted water bodies on the earth’s surface within the scope of assessment of the subprojects under SSTDP shall be confirmed. Some points shall be arranged to monitor the current condition of the water environment. For some areas where the existing monitored data is complete, the relevant statistics can be directly used. See Table 3.3-1 for the current condition of water environment of the subprojects under SSTDP.
Table 3.3-1 Current condition of water environment of subprojects under SSTDP
45
S/N Name of subproject
Current condition of water environment
Remarks
1Subproject of Puxing Town, Xinjin County
Yangliu River currently has a poor water quality, which cannot meet the requirement of category-3 water quality standard in GB3838-2002. The main substances exceeding the standard are chemical oxygen demand and ammonia nitrogen. The main cause for the unqualified water quality of Yangliu River is the waste from the areas along the river banks. Large amounts of domestic wastewater and agricultural wastewater along the river banks are discharged to Yangliu River.
Monitoring was carried out from Nov. 3-5, 2009.
2
Rainwater and Wastewater
Pipe Network & Road
Reconstruction Subproject of
Daying County (Penglai Town)
According to the monitored data, the water quality of Qijiang River is good. All water quality factors can meet the category-3 water quality standard in GB3838-2002 - Environmental Quality Standards for Surface Water. But the water quality of Gubai River is poor. Two factors, i.e., CODCr and total phosphorus, exceed the limits. But the remaining factors can meet the category-3 water quality standard. This is because of the mixed flow of the storm wastewater (domestic wastewater) in the residents’ area close to Gubai River (Hongqi Bridge and Luogui Road); this mixed flow is discharged to the rivers on the earth’s surface before proper treatment, which causes the pollution of water body and the decrease of the water quality.
Monitoring data were picked from Monthly Report Form for Surface Water Monitoring by Daying County Environmental Monitoring Station (Aug. 3, 2009).
3
Infrastructure Construction Subproject of Yingxi Town,
Shunqing District,
Nanchong City
All parameters of the water body in the evaluated section of Yingxi River can meet the category-3 water quality standard in GB3838-2002 - Environmental Quality Standards for Surface Water. But three factors, i.e., COD, BOD5 and NH3-N, of the water body in the evaluated section of Naoxi River exceed the limits. The remaining factors can meet the category-3 water quality standard in GB3838-2002 - Environmental Quality Standards for Surface Water. This is because of the urban wastewater along the river discharged to the water body.
Data from monitoring current conditions of Xihe River and Naoxi River water qualities carried out by Nanchong Environmental Monitoring Station on Nov. 3-5, 2009.
4
Binjiang Road (Southern
Section) Road and
Wastewater Interception
Subproject of Fengming
Town,
Within the evaluated section of Minjiang River-Maohe River, except chemical oxygen demand, all indicators can meet the category-3 water quality standard in GB3838-2002 - Environmental Quality Standards for Surface Water. The chemical oxygen demand can meet the standard in Cross-section I, Cross-section
Meishan Environmental Monitoring Station carried out water quality monitoring for surface water Minjiang River – Maohe River of the proposed project located valley on Oct. 14-16, 2009 and total four monitoring sections were distributed for monitoring.
46
S/N Name of subproject
Current condition of water environment
Remarks
Pengshan County
II and Cross-section III, but exceeds the limit in Cross-section IV. This is because of the domestic wastewater along the Cross-section IV; this wastewater cannot flow into the wastewater treatment plant and is therefore directly discharged to the water body.
5
Environmental Treatment
Subproject of Hongya County
(Hongchuan Town)
For the south and the north moats, because of the untreated domestic wastewater discharged directly to the river, the water quality of the rivers is quite poor. The water bodies are black and give out smell. Water weed, waste and oil appear on the river surface. The indicators of water quality of these water bodies cannot meet the category-4 water quality standard.
Survey sensory indexes on site.
6
Waterway Treatment
Project (Downtown Section) of Xiaoshanzi
River in Jialing
District, Nanchong
City
According to the monitored data of the current condition, at the cross-section 500m upstream of the regulated river section under the works, the indicators of COD, BOD5 and coliform bacteria significantly exceed the limits. This is because of the direct discharge of domestic wastewater within the area; there is no wastewater drainage pipe network on both sides of the line. The other monitored cross-section is the cross-section where Xiaoshanzi River joins Nixi River. In this cross-section, all the indicators of COD, BOD5, ammonia nitrogen and coliform bacteria significantly exceed the limits. This is because of the discharge of the farmers’ domestic wastewater and some aquiculture wastewater along the line.
Monitoring was carried out from Nov. 2-4, 2009 and total two monitoring sections were distributed for monitoring.
7
Northern Outer Ring
Road Construction Subproject of
Zhonglong Town,
Zizhong County
In 2008, the quality of the water environment of Zizhong County is good. The trunk stream of Tuojiang River has a good quality. There are totally 12 cross-sections for water quality monitoring within the whole county, including 7 cross-sections on rivers, 3 cross-sections on lakes and 2 cross-sections on drinking-water sources. The cross-sections at Shunhechang and Yinshan Town in the trunk stream of Tuojiang River see good water quality all the year round. But the water quality of Qiuxi River and Mengxi River is poor. The factors exceeding the limits are total nitrogen and total phosphorus. The quality of the water from the drinking-water sources, Zizhong Water Plant and Mengxi River Power Station, are good; their water quality can meet the category-3 water quality standard all the year round.
In accordance with Zizhong County Environmental Quality Report of 2008.
8Infrastructure Construction
The monitored data shows that the water quality of Anning River is good. The
Quote inspection data from Report for Water Quality Monitoring of Surface and
47
S/N Name of subproject
Current condition of water environment
Remarks
Subproject of Miyi County
(Panlian Town)
water quality factors can meet the category-3 water quality standard in GB3838-2002 - Environmental Quality Standards for Surface Water.
Potable Water Source Huangqiao Reservoir of Miyi County, Panzhihua City in Aug. 2009 (PHJ Zi [2009-08 SG] No. 200) by Panzhihua Environmental Monitoring Station. Three monitoring sections were distributed at Xijie Bridge of Anning River, Xiancheng Bridge and Xiaode Stone Bridge.
3.3.3 Survey and assessment of current atmosphere environment quality
Based on the field survey and according to the works design documents, the main sensitive points of atmosphere environment within the scope of assessment of the subprojects under SSTDP shall be confirmed. Some points shall be arranged to monitor the current condition of the atmosphere environment. For some areas where the existing monitored data is complete, the relevant statistics can be directly used. See Table 3.3-2 for the current condition of atmosphere environment of the subprojects under SSTDP.
According to the monitored result of the current condition as well as the statistics of the routine monitored data, except for adsorbable particles of Zhonglong Town of Zizhong County, which exceeds the limit in the routine monitoring, the site of all other works can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard.
Table 3.3-2 Current condition of atmosphere environment of subprojects under SSTDP
Name of Subprojects
Name of monitoring
point Item SO2 NO2 TSP PM10 NH3 H2S Assessment Remarks
Average (mg/m3)
0.037 0.055 0.286
Standard ( mg/m3)
0.5 0.12 0.3 1#
Actual condition
Reach the standard.Reach the standard.Reach the standard.
Average (mg/m4)
0.036 0.055 0.272 0.120.008
Assessmentstandard ( mg/m4)
0.5 0.12 0.3 - -
Subproject of Puxing Town, Xinjin County
2#
Actual condition
Reach the standard.Reach the standard.Reach the standard. - -
According to the monitored result, all SO2, NO2 and TSP can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard,indicating that the site of the works has a good atmosphere environment
Carried out by Chengdu Jinjiang
Environment Monitoring Station on Nov. 3-7,
2009.
Average (mg/m3)
0.047 0.033 0.19
Assessmentstandard ( mg/m3)
0.15 0.12 0.3 Chinese Dead Sea
Assessmentindicator
0.31 0.28 0.63
Average (mg/m3)
0.049 0.034 0.2
Standard ( mg/m3)
0.15 0.12 0.3
Office Building of
County GovernmentAssessment
indicator 0.33 0.28 0.67
Rainwater and Wastewater
Pipe Network & Road
ReconstructionSubproject in
Daying County (Penglai Town)
5-star Living
Average (mg/m3)
0.051 0.035 0.2
No significant atmospheric pollution source is found in the site; indicators of all assessment factors are much less than 1; the quality of the ambient air is good; the ambient i t
Daying Monitoring
Station sampled and monitored
atmospheric environment
quality at three regular monitoring points at the first half year
of 2009 according to Report for
48
Name of Subprojects
Name of monitoring
point Item SO2 NO2 TSP PM10 NH3 H2S Assessment Remarks
Assessmentstandard ( mg/m3)
0.15 0.12 0.3 Quarter -
Jinxiuyuan
Assessmentindicator
0.34 0.29 0.67
air can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard;the requirement of functional use can be met.
Report for Daying
Atmospheric Environment Quality of First Half
Year of 2009.
Monitored value
(mg/m3)0.038-0.078 0.024-0.036
0.084- 0.107
Assessmentstandard ( mg/m3)
0.5 0.24 0.15
Infrastructure Construction Subproject of Yingxi Town,
Shunqing District,
Nanchong City
1#
Assessmentindicator
0.076-0.156 0.1-0.15 0.56- 0.71
For the 1#point, all the SO2, NO2 and Pi of PM10 are less than 1.0, indicating that the SO2, NO2 and PM10 do not exceed the limit; the ambient air can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard.
Monitoring date:
continuous 7 days, namely
Nov. 2-8, 2009. Data
source: Monitoring
report issued by Nanchong Environment Monitoring
Center.
Monitored value
(mg/m3)0.018-0.027 0.056-0.071 0.158-0.170
Standard ( mg/m3)
0.5 0.24 0.3
Binjiang Road (Southern
Section) Road and
Wastewater Interception
Subproject of Fengming
Town, Pengshan County
1#
Actual condition
Reach the standard.Reach the standard.Reach the standard.
The quality of ambient air in the evaluated area is good, meeting the level-2 standard in GB3095-1996 - Ambient Air Quality Standard.
Data are acquired from monitoring of air around the
proposed Project carried
out by Meishan
Environment Monitoring Station on Oct. 14-18,
2009 at Pengshan Fengming Vocational
High School, aiming at pollution emission
characteristics of the Project.
Environmental Treatment
Subproject of Hongya
The current condition of the quality of ambient air in the works site is good. According to the routine monitoring data of Hongchuan Town for the period from 2007 to 2009, provided by the Monitoring Station of Hongya County, Hongchuan Town’s atmosphere environment can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard.
Regular monitoring
data for H h
49
Name of Subprojects
Name of monitoring
point Item SO2 NO2 TSP PM10 NH3 H2S Assessment Remarks
County (Hongchuan
Town)
Hongchuan Town carried
out by Hongya Monitoring
Station during 2007-2009.
Monitored value
(mg/m3)0.071-0.031 0.051-0.008 0.251-0.175
Assessmentstandard ( mg/m3)
0.5 0.24 0.3
1#, Spark Computer
Hope Primary School
Actual condition
Reach the standard.Reach the standard.Reach the standard.
Monitored value
(mg/m3)0.028-0.378 0.014-0.045 0.179-0.235
Standard ( mg/m3)
0.5 0.24 0.3
Waterway Treatment Project of
Xiaoshanzi River
(Downtown Section) in
Jialing District,
Nanchong City
2#, Jialing No. 1
Middle School (Old
Campus) Actual condition
Reach the standard.Reach the standard.Reach the standard.
Within the site of the works, the ambient air can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard.The current condition of atmosphere environment of the works site is good.
Monitoring was carried
out by Nanchong Monitoring Station on Nov. 3-9,
2009.
Monitored value
(mg/m3)0.071-0.031 0.014-0.034
0.047- 0.253
Standard ( mg/m3)
0.5 0.24 0.15 Northern Outer Ring
Road Construction Subproject of Zhonglong
Town, Zizhong County
Actual condition
Reach the standard.Reach the standard.exceed
the limit
SO2 and NO2 can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard;but part of the monitored data of PM10 exceeds the limit.
Report for Zizhong
Environmental Quality (2008)
Monitored value
(mg/m3)0.011-0.014 0.009-0.01
0.059-0.084
Infrastructure Construction Subproject of Miyi County
(Panlian
Hexi
standard ( mg/m3)
0.5 0.24 0.15
No significant atmospheric pollution source is
Technical Report for Panzhihua
Miyi Ambient i Q lity
50
Name of Subprojects
Name of monitoring
point Item SO2 NO2 TSP PM10 NH3 H2S Assessment Remarks
Town)
Assessmentindicator
0.073-0.093 0.113-0.125 0.393-0.56
found in the site; indicators of all assessment factors are much less than 1; the quality of the ambient air is good; the ambient air can meet the level-2 standard in GB3095-1996 - Ambient Air Quality Standard;the requirement of functional use can be met.
air Quality Monitoring Points (Dec. 15, 2006)
3.3.4 Survey and assessment of current acoustic environment quality
Based on the field survey and according to the works design documents, the main sensitive points of acoustic environment within the scope of assessment of the subprojects under SSTDP shall be confirmed. Some points shall be arranged to monitor the current condition of the acoustic environment. For some areas where the existing monitored data is complete, the relevant statistics can be directly used. See Table 3.3-3 for the current condition of acoustic environment of the subprojects under SSTDP.
Table 3.3-3 Current condition of acoustical environment of subprojects under SSTDP
Name of subprojects
Monitoring point No. Location of monitoring point
Day (Leq)
Night (Leq) Assessment Remarks
53.1 44.3 1
Old Urban Area Primary School
52.6 43.1
54.3 46.2 2 Old Urban Area Health Center
53.7 44.6
54.0 45.1 3
Newly-built wastewater treatment plant 54.5 44.3
64.3 54.3
Subproject of Puxing Town, Xinjin County
4Boundary between New Urban Area and Chengdu-Ya’an Expressway 63.8 54.3
According to the monitoring report, all monitoring points can meet category-2 standard, indicating that the works site’s current condition of acoustic environment is good.
Carried out by Chengdu Jinjiang
Monitoring Station on Nov. 3-
4, 2009.
1Longshengjie Resettlement Community 69.1 54.0
2Middle School of Daying County
56.0 45.1
3 Canton Hospital 70.1 54.8
Rainwater and Wastewater Pipe Network & Road ReconstructionSubproject in Daying County (Penglai
4Penglai School of Daying County
54.7 44.5
For the category-2 zone, the current condition of the hospital close to streets basically cannot meet category-2 standard in GB3096-2008 - Environmental Quality Standard for Noise; the category-3 zone can basically reach the standard; the category-4 zone can meet category-4
Monitor for continuous two
days, namely Oct. 8-9, 2009.
51
Name of subprojects
Monitoring point No.
Location of monitoring pointDay
(Leq) Night (Leq)
Assessment Remarks
5Splendid Penglai Residential Community
62.9 65.0
6 Daying Union Hospital 60.9 52.0
7Daying Middle School, Penglai Campus
57.0 60.0
8Residential Community of Qilin Street
56.9 45.1
9Residential houses on both sides of Keguan Street
71.4 54.0
10 Residential houses on both sides of Lower Jiaotong Street
68.2 53.9
(Penglai Town)
11 Residential houses on both sides of Luogui Road
67.0 52.2
4 zone can meet category-4 standard except for the first row of commercial & residential houses on both sides of the trunk road Keguan Street, whichexceed the limit; this is because the works site is located in the urban developed area, where most of roads are within or near the busy areas, with large traffic flows and frequent human activities.
53.4 43 1 Yingxi Town Luo’s Court
53 42.6
52.4 44.6 2
No. 1 Primary School of Yingxi Town 51.2 44.1
54.9 44.2 3
Vocational Middle School of Yingxi Town 54.4 43.5
50.5 42.1
Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City
4Proposed Site of Yingxi Town Wastewater Treatment Plant 49.1 41
The monitored value of noise at all points can reach the standard. The noise in the works site in daytime and at night can meet the category-2 standard in GB3096-2008 - Environmental Quality Standard for Noise.
Monitoring date: Nov. 4-5, 2009 Data source:
Monitoring report issued by Nanchong
Environment Monitoring Center
55.6 35.1 1
Residential Building at Starting Point of Works
54.5 37.6
56 37.4 2
Dormitory Building of Vocational High School 56.8 38.4
55 36.4 3
Residential Building at No. 53, Tongjiangli 55.3 41.7
54.8 39.1 4 Farmhouses at Ends
57.7 38.8
56.6 38
Binjiang Road (Southern Section) Road and Wastewater Interception Subproject of Fengming Town, Pengshan County
5 Tongjiang Road Dike 57.7 37.2
The equivalent sound levels Leq(A) at all monitoring points within the evaluated area can meet the relevant standards in GB3096-2008 - Environmental Quality Standard for Noise. Therefore, the quality of acoustic environment within the evaluated area is good.
Data are from monitoring of
acoustic environment of
the Project carried out by Meishan
Environment Monitoring
Station on Oct. 14-15, 2009.
Totally five noise monitoring points
are distributed along the
proposed road.
1Disease Prevention and Control Center of Hongya County
63.2 52.8
2People’s Hospital of Hongya County
54.3 46.5
3 Hongya Middle School 53.7 45.4
4Zhongbao High School of Hongya County, Central Campus
56.9 47.2
5Hongchuan No. 2 Primary School of Hongya County
57.8 46.3
Environmental Treatment Subproject of Hongya County (Hongchuan Town)
6Hongya Vocational High School
55.6 43.7
Because the evaluated area under the works is located in urban area and outskirts of Hongya County, no great source of noise pollution is found nearby. The major noise comes from Disease Prevention and Control Center of Hongya County, and others are social noise. The quality of acoustic environment is good. The acoustic environment can meet the category-2 standard in GB3096-2008 - Environmental Quality Standard for Noise except for sensitive points
Monitoring date is Sep. 22-25, 2009.
52
Name of subprojects
Monitoring point No.
Location of monitoring pointDay
(Leq) Night (Leq)
Assessment Remarks
7Residential houses along northern moat
54.8 46.4
8Residential houses along southern moat
55.2 44.9
except for sensitive points.
1 Baimamiao Village 48.6 45.6
2Jialing No. 1 Middle School (New Campus)
52.6 40.6
3Spark Computer Hope Primary School
51.6 38.0
4Jialing No. 1 Middle School (Old Campus)
56.5 43.6
5Nanhong Residential Community
54.0 42.3
Waterway Treatment Project of Xiaoshanzi River (Downtown Section) in Jialing District, Nanchong City
6Duweiba Residential Community
54.1 42.3
The acoustic environment of all monitoring points can meet the category-1 standard in GB3096-2008 - Environmental Quality Standard for Noise except for Jialing No. 1 Middle School (Old Campus), where noise exceeds the limit. Generally, the quality of acoustic environment within the evaluated area is good.
Monitoring date is Nov. 4-6, 2009 and there are 6
monitoring points.
1 Qing’s Court 54.3 42.7
2 Zhou’s Court 56.7 43.2
3 Zhangjiabian 52.1 44.6
Northern Outer Ring Road Construction Works of Zhonglong Town of Zizhong County
4 Xiaoyuanzi 51.9 42.1
Because the evaluated area under the works is located in urban area and outskirts, no great source of noise pollution is found nearby. The major noise is social noise. The quality of acoustic environment is good, meeting the category-2 standard in GB3096-2008 - Environmental Quality Standard for Noise.
Monitoring date is Sep. 24, 2009.
55.2 46.3
54.8 45.9 1 Hexi Residential Community
54.4 46.1
51.2 43.3
51.1 42.8 2Commune 2 of Shuitang Village
51 42.6
57.2 46.8
55.4 45.3 3Commune 3 of Shuitang Village
53.2 44.9
54.4 45.2
54.1 45.1 4 Group 8, Qingpi Village
53.9 44.8
52.2 42.1
51.9 42
Infrastructure Construction Subproject of Miyi County (Panlian Town)
5 Group 8, Qingpi Village
52 42.1
Within the scope of assessment, there are totally 5 residential communities. The quality of acoustic environment is good, meeting the category-2 standard in GB3096-2008 - Environmental Quality Standard for Noise.
Monitoring shall be carried out at
14:00-15:00 in the day and 22:30-
23:30 at night of Oct. 15-16, 2009 at the frequency
of once in the day and once at night.
There are 5 monitoring sections and
totally 15 monitoring points.
Generally, acoustic environmental quality of each subproject is high except for that individual sensitive point near the main is greatly impacted by noises and exceeds the standard.
53
Chapter IV Environmental Impacts and Measures 4.1 Analysis of major pollutants
See Table 4.1-1 for Analysis of major factors of environmental impacts of SSTDP.
Table 4.1-1 Analysis of major factors of environmental impact
Period Factors of impact
Source and stage of impact Major pollutants
Location of source of impact
Extent of impact Characteristics
Ecological environment
Earth and stone works; land acquisition
Earth and stone; waste soil and works site
Along the road or river channels; or address of wastewater treatment plant, pipe network lines
Slightly weak
Scattered and small-scale damage on vegetation and debris flow
Acoustic environment
Transportation and construction machineries
Transportation and machine
noises
Road, waterway
treatment; pipe network
construction lines or
address of wastewater treatment
plants
Slightly weak
The scope of impact is small and scattered
Ambient air
Earth and stone and transportation of
construction materials; piled
dispersed materials; smoke gas of construction machineries;
construction of asphalt road surface
TSP, PM10, NO2,CO and asphalt
smoke
Road construction
lines or address of
water supply factory and
pipe network lines
TSP is relatively
strong
Source at road surface; scope of impact is
small
Water environment
Domestic wastewater SS, COD Construction
site Slightly weak
Relatively scattered
Solid wastesHousehold rubbish and works waste by construction workers
Household and construction
rubbish
Construction site; works
building zone
Slightly weak
Works lines
Social environment
Relocation of residents; resettlement as a result of demolishing and relocation; land and resource utilization; road
occupied; traffic jam and short-term cut-off of water supply
Directly or indirectly impact the
region
Relatively Obvious
Short-term or regional impacts
Construction Period
Cultural heritage
Works construction in Hongya County
Dust and land occupied
Construction control region of Zhoujiaci
Relatively weak
Provincial-level Cultural
Protection Site
Operation period
Acoustic environment
Mostly low-speed traffic; equipment manufacturing noise of wastewater treatment plant
Road traffic noise; equipment manufacturing noise
In the proximity of road lines or address of wastewater treatment plant
Relatively weak; only relatively strong in some sections of road lines
Long-term Impact
54
Period Factors of impact
Source and stage of impact Major pollutants
Location of source of impact
Extent of impact Characteristics
Ambient air
Car exhaust; unbearable smell of
wastewater treatment plant
NO2, CO, Ammonia and other smells
Along road lines; nearby
the wastewater treatment plant
Relatively weak
Long-term impact
Ecological environment
Road, wastewater treatment factory,
protective slope and ecological vegetation
restoration
Ecological Environment is changing for
better
In the proximity of
road lines and water supply factory; pipe network lines
Slowing down debris
flow
Long-term beneficial
impact
Social environment
Smooth road network; improve environment and living environment
Directly or indirectly impact the
region
Obvious Long-term beneficial
impact
4.2 Analysis of major impacts and mitigation measures 4.2.1 Ecological environmental impacts and mitigation measures
1. Analysis of ecological environmental impacts
During construction period, major means of ecological environmental impact and damage include main works occupying land; altering the nature of land utilization; destroying vegetation; reducing the arable land along the line; low rate of coverage of vegetation. Earth and stone works causes debris flow; works activities disrupt natural ecological balance, leading to negative impact on the survival of organisms along the line.
All subprojects under SSTDP do not cover any natural reserve, scenic area or forest park, except for that Environmental Treatment Subproject of Hongya County (Hongchuan Town) crosses the construction control zone of Zhoujiaci provincial heritage conservation unit and it has been approved by local relic protection authorities (HWTF [2009] No. 29).
The works, earth and stone amount as well as works land occupied are all relatively small, posing little damage to vegetation and exerting little impact on debris flow. Through ecological protective slope in latter works stage and planting of more trees, this problem can be alleviated. The works of environmental treatment works in Hongya County (Hongchuan Town), and waterway treatment works in Xiaoshanzi River Downtown Section of Jialing District of Nanchong City belong to the issues of environmental treatment, which revolves around river channel dredging and ecological treatment. The works implementation will dramatically improve our ecological environment.
2. Mitigation measures of ecological environment
(1) Measures of vegetation protection and restoration
During the process of construction, mellow soil on the surface of arable farmland of permanently land acquisition or temporarily used land shall be kept and preserved. After construction is completed, the mellow soil shall be covered back on it as soon as possible to recover vegetation. Particularly after works is over, efforts shall be made to recover vegetations for temporarily utilized land and trees shall be planted in temporary shed slashes.
55
In selection of plant species for either side of the road, apart from taking the quick growing species of trees into consideration, shrubs from identical regions shall be transplanted to ensure the high rate of survival, blending with the nature and at the same time, heading off the invasion of plants, reliving the true color of nature. Efforts shall be made to increase the biodiversity of plant species in the corridor region; boosting the capability of fighting against diseases and pests and strengthening the stability of corridor. Besides, the selection of sprouts of tree types has been subject to strict inspection and vaccination to prevent invasion of pests.
(2) Animal protection
1) Propagation of laws and regulations on protection of wild animals and crackdown of behaviors of hunting wild animals
Intensify propagation of laws and regulations on protecting wild animals so as to inculcate the importance of protecting wild animals in construction workers; educating the public not to hunt wild animals; wild animals, if caught, shall be moved elsewhere away from roads.
2) Reasonable selection of construction period and process to minimize the impact on animals
3) Prevention of pollutions to zootope
Strengthen all sorts of sanitary management for construction workers (such as personal hygiene, excrement and domestic wastewater); prevent direct discharge of domestic wastewater; reduce water pollution; make efforts in restoration of ecological environment after construction is over to reduce the negative impact of damaged vegetation and debris flow on water quality and aquatic organisms. Meanwhile, equal attention shall be paid to prevention and vaccination of people and livestock in non-assessment region as a result of damage done by animals.
(3) Measures for prevention of invasion of exotic species
There has been no mature means of preventing invasion of exotic species during construction and operation periods of the project. In light of works characteristics, the following measures are suggested to be adopted to prevent invasion of foreign species: intensify advertising efforts to construction workers about the damage of foreign species and means of transmission; strict inspection shall be conducted on imported fruits, seeds and flowers to determine if some quarantined diseases or pests have been brought into the works zone; for current existing exotic species, utilize the opportunities of works construction to burn plants that bear fruits on the site to prevent dispersal of seeds; some forest-cutting slashes are most vulnerable to invasion of foreign species and greening efforts shall be made in temporarily used regions
(4) Protective measures of aquatic organisms
Ordinary protective measures are: intensify protection of aquatic environment to prevent the occurrences of eutrophication in some aquatic regions along the line; minimizing the impact on the environment of habitat for aquatic organisms. The following measures are suggested by EIA (Environmental Impact Assessment) to be adopted to protect aquatic organisms.
1) Protective measures for aquatic organisms during construction period
56
Thepiling of materials used for construction shall be away from water source or other water bodies; site that can be hardly washed by torrential runoff is ideal. If some construction materials are piled up near the bridge, ditches shall be dug up in the perimeter of the site where materials are piled up and retaining walls shall be erected to prevent torrential runoff from entering the water body and affecting water quality. All sorts of materials shall be equipped with facilities that shelter rain.
2) Protective measures of aquatic organisms during operation period include the following aspects:
� Vehicles that carry coal, lime and cement that are not covered are banned from traveling on road; freight containers and overloaded trucks that have oil leak or material leak are banned from traveling on roads; stick to measures guaranteeing the safety of vehicles transporting dangerous stuff and regarding handling of accidents
� Reasonably organize construction procedures and construction machineries; strictly carry out drainage design and implementation according to road construction standards and conduct education to construction workers regarding necessary protection of ecological environment
� Complete restoration of ecological environment after the project is completed to reduce the impact of vegetation damage and debris flow on aquatic organisms
3. Water and soil conservation measures
(1) Preventive measures for water and soil erosion in the area of main works
Before construction of excavation of side slope of main works, protective measures shall be adopted for the top of side slope. Tentative drainage ditch shall be set in place in the perimeter of excavation region and sand trap shall be installed along the drainage ditch. After temporary drainage ditch is used, it shall be refilled and forests are planted.
During the construction of dam filling, temporary torrent gutter shall be installed along both sides of subgrade so that rainwater can be discharged to the outside of subgrade along the torrent gutter to prevent washing of side slopes.
Masonry works of excavation and refilling side slope shall be timely protected and built as the design of side slope is stable. Meanwhile, slope surface and slope foot drainage system shall be done so that construction and masonry reinforcement can be done in an orderly manner.
Measures including grid protective slope, masonry facing wall and planting grass between grid and arch shall be adopted for side slope of subgrade of the section of excavation and filling. Water and soil can be effectively preserved while planting grass and trees on side slopes.
Given the land conditions, within the range of protected land on both sides of the roads, arbor – shrub method shall be adopted in planting in the sense that a row of shrubs can be planted amidst evergreen arbor. To prevent debris flow as a result of loose revealing of road surface within the protected region at the initial phase of planting arbor and shrubs, some quick-growing grasses shall be grown at the same time to form a comprehensive colonial system of ecology.
(2) Preventive measures for water and soil erosion in construction occupied ground
57
Temporary drainage ditch and sand trap shall be installed on the lower side before field works and utilization of temporary construction sites; after construction is complete, structures on the road surface and hardened road surface that are no longer needed shall be removed and demolished promptly and advancing to the next phase of vegetation restoration.
The excavation of borrowing site shall prevent the formation of extremely steeped side slope; ensuring drainage ditch is dug up every time before excavation. After excavation is over, earth shall be refilled to recover vegetation.
The filling volume of this project is substantially greater than the excavation volume. Hence, the waste soil of the construction can be directly used for backfill and utilization of the site, reducing the land occupied by waste soil.
Table 4.2-1 Analysis of ecological environmental impact and assessment of each subprojects under SSTDP
S/N Name of subproject Ecological environmental impact Description of measures
1
Subproject of Puxing Town, Xinjin County
Permanent land acquisition from Group 1 to Group 5 in Xilong Village of Puxing Town is 793.08mu of which arable farmland accounts for 620mu gardens occupy 33mu; forests account for 64mu; 45mu of land that is returned to grain plots to forestry; housing land occupies an area of 31.08mu The ecological environment of project region is mainly agricultural farmland; the area covered by forests is not large and categorized by the type of vegetation damaged, it mainly consists of artificial secondary forest; excluding precious protective vegetation; debris flow in the region is 12,260 tons, of which 9,180 tons were newly added amount of debris flow and the amount of debris flow of the original terrain is 3,080 tons.
Strengthen propaganda and education works of ecological environmental protection, pay attention to vegetation restoration and construction of new greenbelt in excavation slope protection and reinforcement area of the Project.
2
Rainwater and Wastewater Pipe Network & Road Reconstruction Subproject in Daying County (Penglai Town)
The area of land permanently occupied by the works is 18.27×104m2; area of permanently land acquisition is 60.1mu works site will damage vegetation, disrupt road surface and thus cause debris flow. The total amount of debris flow caused during the works construction period is approximately 700t.
1 Protect water and soils by blocks by stages: Minimize excavation area and reduce slope of excavation surface. Transport filler just before compression and reduce storage quantity of loose soils. Take full advantage of demolished building wastes and reduce new water and soil erosion caused by transportation of building wastes. Set a sedimentation basin of drainage ditch around the selected site and carry out oil removal and sedimentation treatments upon construction wastewater for at least 2 hours and monitor and discharge them upon compliance with standard. 2 Greening measures: Plants with ornamentation are preferred to highlight landscape effect under the premise of meeting the required functions. 3 Protections to ancient trees: Protect the two ancient trees on Qiqiang Road East according to existing road bypass proposal. Barriers shall be set outside the ancient tree protection fences during
58
construction and protection warning sign shall be set. 4 Transplant street trees at two sides of the road. Strictly control temporary occupied area. Restore in time upon completion of the Project the vegetations damaged by temporary facilities such as spoils during construction.
3
Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City
This project occupies a land measuring 300mu in total and the land is utilized for urban construction, belonging to newly land acquisition. The type of newly land acquisition is mainly farmland, as well as some housing lands, forests and flood land. The project occupies a relatively smaller area and does not account for basic protection zone of agricultural farmland. It is in line with the overall layout of land utilization in the urban planning. After the construction is completed, it will help to better the functions of the city. During construction period, the total area of land used for construction is 2.0mu and the types of land occupied are mostly farmland and flood land. During construction period, the accumulated amount of debris flow of works is estimated to be 1610.4 t; among which the newly added amount of debris flow is 1006.5t. After the project is completed, through road surface hardening and vegetation restoration, regional debris flow can be effectively controlled.
Reasonably plan soil and stone allocation and transportation, reduce temporary occupied ground. Ecology or cultivation of all grounds temporarily occupied shall be restored upon completion.
Strengthen propaganda works of construction workers’ environmental protection awareness.
Road greening and greening works along banks of Yingxi River shall employ local plants adapted to local climate and soil conditions. Trees impacted by land acquisition within the Project boundary, if in good growth status without pests, shall be transplanted. Prohibit introducing exotic species.
4
Binjiang Road (Southern Section) Road and Wastewater Interception Subproject of Fengming Town, Pengshan County
Vegetation is mainly a handful of arbor and huge areas of shrubs; mostly weeds (protective slope and flood land. There is a small area of farmland. According to data of land occupied by construction, based on analysis of diagram of vegetation type, the area occupied by each type of vegetation is 4.3×104m2, biomass loss is 98.03t/a. There are rare plants in the scope of assessment of the proposed project.
1 Collect and store surface mature soils as many as possible during construction and cover mature soils in time upon completion of construction for vegetation restoration. 2 Construction materials shall be stacked far away from water source and other water body. Some construction materials, if stacked near the bridge site, shall be excavated with open ditch around and set with barricade etc. Each type of material shall be equipped with rain-proof and shedding facilities. 3 Protective measures to aquatic organisms during operation period:
Prohibit vehicles transporting uncovered bulk cargos such as coals, limes and cements to get onto the road, prohibit tank trucks with oil or material leakage and overloaded trucks to get onto the road, and implement protective measures for hazardous material transportation truck to pass safely and treatment of accidents.
Reasonably organize construction procedures and machines and carry out necessary propaganda and education of ecological environmental protection upon
59
construction workers. Restore ecological environment upon
completion of the Project to reduce impacts upon aquatic organisms by vegetation damage and water and soil erosion.
5
Environmental Treatment Subproject of Hongya County (Hongchuan Town)
Rainwater and wastewater distributaries and waterway treatment works has approximately 109.27mu of permanently land acquisition; of which arable farmland is 74.81mu; construction occupies an area of 34.46mu; tentative land area is approximately 60mu; the total volume of earth and stone is 11.44×104m3; of which excavation is 10.12×104m3 and filling is 1.32×104m3
and waste is 8.80×104m3, posing insignificant impact on ecological environment. The green area along the line as a result of digging new river channels is roughly 3600m2; about 135 trees are relocated, generating small volume of earth and stone as a consequence of disrupting road surface as well as debris flow. The area of works disturbance is 0.11km2 and major works during construction period will cause a total of 75.9t of debris flow.
1 Temporary occupied ground for construction which is left upon completion of construction shall be leveled and its vegetations shall be restored. 2 Greening protection shall be carried out at two sides of riverbank to reduce water and soil erosion and beatify them. 3 Underwater constructions such as earth and stone excavation of riverbed (including waterway desilting) as well as dry pebble paving must be carried out during dry season and must be constructed to above flood control level prior to flood season to control water and soil erosion of riverbank works.
6
Waterway treatment Project in Xiaoshanzi River Downtown Section of Jialing District of Nanchong City
Construction of waterway treatment works includes excavation and filling of earth and stone as well as excavation of laying works of drainage pipes, causing regional debris flow or adding the amount of soil erosion. Through reasonable scheduling of construction procedures, expediting progress of construction and promptly refilling earth and stone, the phenomenon of debris flow is effectively controlled. After the construction of waterway treatment works, the area of forestation along river banks is 30,198m2; ecological revetment is measured 10,006 meters, which can effectively improve the ecological environmental quality along both river banks.
1 Prepare complete construction plan, reasonably arrange construction period and reduce water and soil erosion. 2 Reduce exposure period of loose ground during construction. Protection works for excavation slope and backfilling slope shall be carried out immediately upon design of stabilized slope. 3 Strengthen water and soil conservation and vegetation restoration of spoil ground.
7
Northern Outer Ring Road Construction Works of Zhonglong Town of Zizhong County
This project occupies an area of 306.13mu, of which arable farmland has an area of 291.86 mu; forest land is 2.57mu; water pond is 0.4 mu and other lands occupy an area of 11.3mu. The land occupied by road works will alter the layout of land utilization, affecting land biomass and productivity, and reducing amount of food output. Works has little effect on plant biodiversity; barely any direct impact on mammals and bird species and certain direct impact on amphibians and reptiles. A total amount of 319t of debris flow will be caused by h i k d i i
(1) Reasonably plan and well do longitudinal allocation and transportation of soils and stones to minimize temporary occupied ground; (2) Reasonably arrange construction schedule and minimize excessive construction area and reduce period for use of temporary occupied ground; (3) Spoils of the Project shall be removed in time to avoid water and soil erosion in rainy season and surface mature soils shall be collected for land reclamation; (4) Do not dump wastes produced during construction at will and place them at specified location; (5) Greenbelt restoration and compensation measures; (6) Measures for mitigation of
60
the main works during construction period.
street extension at both sides of the road; (7) Cover temporary dreg-stacking yard with dust-cover as per water and soil erosion prevention proposal and clean the yard and restore the greening immediately upon completion of construction.
8
Infrastructure Construction Subproject of Miyi County (Panlian Town)
The proposed project has a permanent area of 9.6hm2 (of which arable farmland occupies an area of 7.06hm2; housing land is 0.67hm2; urban infrastructure land has an area of 1.87hm2). The temporary area of land occupied is 4.07hm2 (of which arable farmland is 3.01hm2 and urban infrastructure land has an area of 1.06hm2). The permanent land occupied by the works will destroy vegetation, disrupt road surface, and cause debris flow. During construction period, the total amount of debris flow caused is 3,600t and newly added amount of debris flow is 3,450t.
(1) Reasonably plan and well do longitudinal allocation and transportation of soils and stones to minimize temporary occupied ground; (2) Minimize occupied ground under the premise that the construction site scope meets construction requirements of the Project; (3) Maintain mature soils as many as possible; (4) Underwater construction of flood control embankment works shall be carried out during dry season for retaining, so as to prevent waste slags from dropping into the river and to avoid fish breeding period in spring (Feb. to May) at the same time; (5) Reasonably use temporary occupied ground and reduce occupation period, restore ground functions in time upon completion of the Project; (6) Do not dump wastes produced from construction; (7) Greenbelt restoration and compensation measures; (8) Measures for mitigation of street extension at both sides of the road.
4.2.2 Analysis and assessment of noise environmental impact
1. Analysis and mitigation measures of acoustical environmental impact during construction period
(1) Analysis of acoustic environmental impact during construction period
The noise during construction period mainly refers to noise generated during the process of operations of all sorts of construction machineries, equipments and works transport vehicles. According to works characteristics, different constructions require different machineries. There are relatively many works under SSTDP, mostly all sorts of mechanical equipments required for road works and construction noise is the most evident. So far, commonly used machines mainly include: excavator, shovel loader, tire roller, paver and blender. It can be divided into fixed source and mobile source of noise. Fixed source refers mainly to construction machineries and mobile source of noise is mainly vehicles transporting materials.
The intensity of noise source of construction machineries falls in the range of 80-100dB (A). The noise generated by construction machineries during construction period of the project can basically meet the requirements of standards during day “Noise Limit for Construction Site” (GB12523-90) at a distance of 60 meters; meeting the requirements for night standard at a distance of 300 meters. Most of subprojects under SSTDP are located in construction regions of the city and peripheral regions. There are certain numbers of noise-sensitive structures in residential regions within a distance of 300 meters. The construction period is affected somehow.
(2) Mitigation measures of acoustic environmental impact during construction period
1) The Constructor must choose construction machineries that meet relevant national standards; it would be best to choose low-noise construction
61
machineries or processes and reduce noise source and sound source in a fundamental manner.
2) Require project construction to reasonably schedule construction time; carry out construction according to the requirements of site management of construction; steam hammer, large-scale crane equipments, concrete blender and other high-noise equipments are banned from use during night (22:00-6:00) to guarantee the health and rest of people in the surrounding of the construction zone. Construction camp shall be as far away from school and densely populated regions as possible so that construction shall be scheduled on weekends or in times of holidays.
3) Pay attention to maintenance of construction machineries so that machineries can maintain their best working conditions and noise can be kept to the lowest level; monitoring is carried out on the noise level of sensitive construction spots.
4) Carry out monitor on noise in sensitive regions and adopt tentative noise-lowering measures according to the situation
5) Reduce the flow of construction vehicles at night and erect speed limit sign in residential areas, attached enterprising zone and cross-roads where traffic flow is high; reasonably schedule running time and transportation lines
2. Analysis and mitigation measures of acoustic environmental impact during operation period
(1) Analysis of acoustic environmental impact during operation period
The noise impact during the operation period of each subproject under SSTDP is mainly reflected through operating noise of road traffic and wastewater treatment plant (equipment); noise impact is pretty much minimal for waterway treatment and pipe network construction
1) Road traffic noise
� Subproject of Puxing Town, Xinjin County
According to project characteristics, prediction of roads that are measured 30 meters by 24 meters shall be considered. See Table 4.2-2 for prediction results.
Table 4.2-2 Project traffic noise prediction (day) dB (A)
Distance to road center(m) Road specification 40 60 80 100 120 140 160 180 200
30 68.1 65.1 63.0 61.4 60.3 59.5 58.6 57.9 57.4 24 67.8 64.8 62.6 60.8 59.8 58.9 58.1 57.5 56.8
� Rainwater and Wastewater Pipe Network & Road Reconstruction Subproject of Daying County (Penglai Town)
There are five residential areas, three schools and two hospitals in the scope of assessment. See Table 4.2-3 for prediction results of recent environmental noise at noise sensitive points.
62
Table 4.2-3 Prediction results of environmental noise during the operation period
Value of road noise Impact dB (A)
Predicted value of environmental noise dB (A)
Standard dB (A) Out of limits dB
(A) Sensitive point Location of measuring
points Day Night Day Night Day Night Day Night
Resettlement Community of
Longsheng Street
The first row of residences
75.0 65.6 75.1 65.6 70 55 5.1 10.6
Middle School of Daying County
Teaching building
57.6 45.0 58.9 47.1 60 50 Up to the standard
Up to the standard
Canton Hospital1m in front of the building
74.9 65.6 75.0 65.6 60 50 15.0 15.6
Penglai School of Daying County
Teaching building
50.3 39.8 55.7 44.5 60 50 Up to the standard
Up to the standard
Splendid Penglai Residential Community
The first row of residences
63.5 54.0 63.7 54.3 65 55 Up to the standard
Up to the standard
Daying Union Hospital
Multi-purpose building
61.8 52.3 62.2 52.8 60 50 2.2 2.8
Daying Middle School, Penglai
Campus
Teaching building
45.5 34.6 57.3 48.0 60 50 Up to the standard
Up to the standard
Residential Community of
Qilin Street
The first row of residences
62.1 52.6 62.4 53.0 65 55 Up to the standard
Up to the standard
Residential houses on both sides of Keguan
Street
The first row of residences
73.2 63.6 73.2 63.6 70 55 3.2 8.6
Residential houses on both sides of Lower Jiaotong Street
The first row of residences
74.6 65.3 74.6 65.3 70 55 4.6 10.3
Residential houses on both sides of Luogui
Road
The first row of residences
72.7 63.4 72.8 63.5 70 55 2.8 8.5
According to Table 4.2-3, in Zone 4, all of the first rows of residences along the street within the scope of assessment on both sides of the road exceed the standard value and all in Zone 3 has met the standard. All of the prediction results of acoustic environment of the school within the scope of assessment on both sides of the road have met the standard requirements and prediction result of acoustic environment of Canton Hospital and Union Hospital along both sides of the streets within the scope of assessment have invariably exceeded the standard.
� Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City
63
Table 4.2-4 Prediction results of traffic noise
Traffic noise value at different horizontal distances from the borderline of motor vehicle lane dB (A) Name Year Time
section20 40 60 80 100 120 160 200
Day 62.15 60.8 59.85 59.09 58.46 57.92 57.01 56.27 2010
Night 53.36 52.01 50.05 49.67 47.48 45.75 45.05 43.21 Day 64.66 62.32 60.5 59.23 58.95 58.23 57.72 56.81
2015 Night 55.17 53.13 50.91 50.25 47.96 45.96 45.15 44.56 Day 71.25 65.66 62.06 59.85 59.01 58.69 58.01 57.12
2020 Night 55.75 54.66 53.06 50.85 50.01 49.69 49.01 48.12 Day 73.15 66.76 63.10 60.05 59.11 58.88 58.44 57.22
Binhe Road
2025 Night 56.05 54.26 53.36 51.00 50.25 49.79 49.00 48.30
Based on the noise prediction result during the operation period, we can conclude that: prediction result on Binhe Road: noise value can Up to the standard of Category 4a in “Environmental Quality Standard for Noise” (GB3096-2008) at a distance of more than 40 meters away from the border of motor vehicle lane of the road in both day and night; noise value can Up to the standard of Category 2 in “Environmental Quality Standard for Noise” (GB3096-2008) at a distance of more than 80 meters away from the border of motor vehicle lane of the road in day and 100 meters in night.
This project in Binhe Road is the newly built road and the west side of the road is adjacent to Yingxi River; relatively far away from residential points on the other side of the river and exerting barely any impact on this region; the east side of the road is the proposed “staff garden”; currently, the area within the site is mainly agricultural environment; mostly agricultural fields and slopes; some few farmers’ residences inside the site are being demolished and relocated and there is no environment-sensitive points that require special protection.
� Binjiang Road (Southern Section) Road and Wastewater Interception Subproject of Fengming Town, Pengshan County
Table 4.2-5 Prediction results of traffic noise in south section of Binjiang Road
Predicted value of traffic noise at different distances from the road
axis dB(A) Distance up to the standard(m)
Operating periodTime section
20 40 60 80 100 120 140 160 180 200 Category 4a
Category 2
Day 58.6 54.0 50.6 48.3 46.4 45.0 43.9 43.042.241.5 <10 16 2012
Night 52.9 48.5 44.9 42.4 40.5 38.9 37.6 36.435.434.5 15 32 Day 61.7 57.3 54.1 52.0 50.4 49.1 48.0 47.146.445.7 <10 27
2020 Night 56.9 52.4 49.1 46.7 44.8 43.5 42.4 41.540.639.9 26 55 Day 66.9 63.5 60.2 58.1 56.6 55.5 54.3 53.452.651.9 14 62
2030 Night 59.6 55.0 51.6 49.4 47.7 46.3 45.2 44.343.542.8 40 75
Table 4.2-6 Prediction results of noise sensitive point
Predicted value of sensitive point in implementing Standard
category 4a
Predicted value of sensitive point in implementing Standard
category 2 2012 2020 2030 2012 2020 2030 S/N
Name and central
chainage
Distanceto
boundary
limit of road (m)
Predictionresult
Daytime
Nighttime
Daytime
Nighttime
Daytime
Nighttime
DayTime
Nighttime
Daytime
Nighttime
Daytime
Nighttime
64
Predicted value of sensitive point in implementing Standard
category 4a
Predicted value of sensitive point in implementing Standard
category 2 2012 2020 2030 2012 2020 2030 S/N
Name and central
chainage
Distanceto
boundary
limit of road (m)
Predictionresult
Daytime
Nighttime
Daytime
Nighttime
Daytime
Nighttime
DayTime
Nighttime
Daytime
Nighttime
Daytime
Nighttime
Predicted value
63.1 54.8 65.9 58.6 68.5 61.7
1
Starting Point of
Residential Building
12m to the right of the road,
broadside on
Out of limits
/ / / 3.6 / 6.7
Predicted value
57.4 42.5 58.3 45.6 62.3 47.8
2
Pengshan Vocational
High School Dorm
64m to the right of the
road, right on
Out of limits
/ / / / 2.3 /
Predicted value
56.1 43.0 57.0 46.0 61.1 48.3
3Tongjiangli Residential Community
80m to the right of the road,
broadside on
Out of limits
/ / / / 1.1 /
Predicted value
60.0 52.5 62.3 56.1 66.5 58.8
4
Group 2, Shuangxuan Village of Lingshi Town
25m to the right of the
road, right on
Out of limits
/ / / 1.1 / 3.8
There are two standard regions implementing Category 4a in the project, which are starting point of residential building and Group 2 in Shuangxuan Village of Lingshi Town. In recent operations (2012), the predicted value of two sensitive points of residential areas mentioned above can all meet the requirements of Category 4a value limit in “Environmental Quality Standard for Noise” in both day and night
There are two Category 2 standard regions implemented for this project, which are Pengshan Vocational High School and Tongjiangli Residential Area. The two sensitive points mentioned above in recent period (2012) and medium-run period of operation (2020) can both meet the requirements of Category 2 value limit of “Environmental Quality Standard for Noise” in both day and night.
� Northern Outer Ring Road Construction Subproject of Zhonglong Town, Zizhong County
Table 4.2-7 Table of prediction results of environmental noise in Outer North Ring Road
Predicted value of traffic noise at different distances from the road axis dB(A)
Distance up to the standard (m)
Year- Time section
20 40 60 80 100 120 140 160 180 200 Category 4a
Category 2
Day 70.2 65.9 63.7 62.1 61.0 60.1 59.3 58.6 58.1 57.7<20 120 2015
Night 67.1 61.8 58.9 56.8 55.5 54.5 53.6 52.9 52.3 51.8110 280 Day 73.2 69.0 66.8 65.2 63.8 63.0 62.3 61.8 61.3 60.834 240
2025Night 70.0 65.4 62.9 61.3 60.2 59.3 58.6 57.9 57.3 56.8290 850
65
Table 4.2-8 Table of environmental impact for noise during the operation period (2015)
Predicted value, acoustic environment and exceeded value Unit: dB (A)
S/NName of sensitive
point
Distance from the
road axis(m)
Standard of implementation
Time section
Background value
Predicted value of traffic noise
Predicted value of
environmental noise
Exceeded value
Predicted value –
background Value
Day 54.3 61.2 62.0 2.0 7.7 1 Qing’s Court 97 2
Night 42.7 55.7 55.9 5.9 13.2 Day 56.7 66.7 67.1 7.1 10.4
2Zhou’s Court
35 2 Night 43.2 62.8 62.8 12.8 19.6 Day 52.1 70.2 70.3 0.3 18.2
3 Zhangjiabian 20 4a Night 44.6 67.1 67.1 12.1 22.5 Day 51.9 70.2 70.3 0.3 18.4
4 Xiaoyuanzi 20 4a Night 42.1 67.1 67.1 12.1 25.0
Through comparison and analysis of predicted value above and current monitoring result, after the implementation of works, because of impact of road traffic noises, both noise values in day and night exceed the standard. The exceeded value is 0.3-7.1dB (A) in day and 5.9-12.8dB (A) in night.
Take necessary soundproof window measures for residents near the road according to specific noise monitoring results upon completion and acceptance of the road. Reserve 400m2 soundproof windows for 54 households at 4 sensitive points where noises exceed the standard at the cost of 0.2 million and install them according to over-standard situation of actual noise monitoring result upon completion of the Project.
� Infrastructure Construction Subproject of Miyi County (Panlian Town)
Table 4.2-9 Prediction results of road traffic noise
Predicted value of traffic noise at different distances from the road axis dB(A)
Distance up to standard (m) Road
section Operation
period Time
section20 40 60 80 100 120 140 160 180 200 Category
4Category
2
Day 65.5 60.1 57.1 54.9 53.3 51.9 51.0 50.3 49.6 49.0 <20 41 2015
Night 59.0 53.4 50.1 47.8 45.9 44.7 43.6 42.8 42.0 41.3 33 61
Day 66.9 61.7 58.8 56.7 55.4 54.4 53.6 52.9 52.3 51.8 <20 51
Xihuan Road
2025 Night 60.1 54.4 51.0 48.7 47.2 45.9 44.9 44.0 43.3 42.6 37 68
Day 65.2 60.1 57.3 55.3 54.1 53.1 52.2 51.5 50.9 50.4 <20 41 2015
Night 58.9 53.1 49.8 47.5 46.0 44.7 43.7 42.9 42.1 41.5 32 59
Day 67.2 62.6 60.1 58.5 57.3 56.4 55.7 55.0 54.4 53.9 <20 61
Beiqiao Road
2025 Night 60.1 54.4 51.2 49.2 47.7 46.5 45.6 44.7 44.0 43.4 37 72
Day 62.4 57.0 54.0 51.9 50.2 48.9 47.7 46.9 46.2 45.6 <20 27 2015
Night 57.5 51.8 48.6 46.3 44.5 43.0 41.9 41.0 40.2 39.5 27 50
Day 63.7 58.2 55.1 53.0 51.3 50.2 49.3 48.6 47.9 47.3 <20 32
Landscape Avenue
2025
Night 57.8 52.1 48.7 46.3 44.7 43.4 42.4 41.5 40.7 40.1 28 51
Shuidian R d d
2015 Day 60.4 54.6 51.2 49.1 47.6 46.3 45.3 44.5 43.7 43.1 <20 21
66
Predicted value of traffic noise at different distances from the road axis dB(A)
Distance up to standard (m) Road
section Operation
period Time
section20 40 60 80 100 120 140 160 180 200 Category
4Category
2
Night 53.5 47.5 44.0 41.5 39.5 38.0 36.6 35.5 34.4 33.5 <20 30
Day 62.0 56.8 53.8 51.7 50.1 48.8 47.5 46.7 46.1 45.5 <20 26
Road and Xin’er Street
2025 Night 56.4 50.8 47.6 45.4 43.6 42.1 41.1 40.2 39.5 38.8 24 45
Table 4.2-10 Prediction results at noise sensitive points in recent operation period
Predicted value of
noise dB(A)
Standard value dB(A)
Exceeded value dB(A) S/N
Name of sensitive
point
Location of measuring
points
Distance from the
road axis (m)
Height differen
ce (m)
Day Night Day Night Day Night
Floor 1 of the first row of residential
houses
20 -5 65.9 60.1 70 55 Up to the standard 5.1
Type-4 Zone Residential
Houses 43 -4 60.8 54.5 70 55 Up to the standard Up to the standard1
Hexi Community
Category 2 Zone
Residential Houses
58 -3 59.1 52.6 60 50 Up to the standard 2.6
The 1st row of residential
houses 22 -4 65 59.3 70 55 Up to the standard 4.3
Type-4 Zone Residential
Houses 41 -3 60.5 54.5 70 55 Up to the standard Up to the standard2
Commune 2, Shuitang
Village Category 2
Zone Residential
Houses
56 -2 58.4 52.3 60 50 Up to the standard 2.3
The 1st row of residential
houses 20 -3 65.4 65.8 70 55 Up to the standard 10.8
Type-4 Zone Residential
Houses 45 -2 60.2 59.3 70 55 Up to the standard 4.3 3
Commune 3, Shuitang
Village Category 2
Zone Residential
Houses
82 -2 56.7 54.7 60 50 Up to the standard 4.7
The 1st row of residential
houses 16 4 62.9 59.9 70 55 Up to the standard 4.9
Type-4 Zone Residential
Houses 40 4 57.4 52.6 70 55 Up to the standard Up to the standard4
Group 8, Qingpi
Village�Category 2
Zone Residential
Houses
55 4 56.1 50.4 60 50 Up to the standard 0.4
67
Predicted value of
noise dB(A)
Standard value dB(A)
Exceeded value dB(A) S/N
Name of sensitive
point
Location of measuring
points
Distance from the
road axis (m)
Height differen
ce (m)
Day Night Day Night Day Night
The 1st row of residential
houses 20 3 61 57.9 70 55 Up to the standard 2.9
Type-4 Zone Residential
Houses 45 3 55.9 51.3 70 55 Up to the standardUp to the standard5
Group 8, Qingpi
Village�Category 2
Zone Residential
Houses
55 3 55 49.8 60 50 Up to the standardUp to the standard
Standard region where Category 4a standard is implemented; the predicted value of noise in day at resident-sensitive points in Type-4 regions including Hexi Community, Second Community in Shuitang Village, Third Community in Shuitang Village, Qingpi Village and a total of five places can all meet the requirements of Category 4a value limit in “Environmental Quality Standard for Noise” in recent period of project operations (2015). Night noise exceeds standard value by different extents; exceeded value falls in the range of 10.8 dB(A) - 2.9dB(A); the total population affected in the five sensitive point mentioned above (exclusive of Category 2 Zone Residents) amounts to 31 households and 110 people.
Standard region where Category 2 standard is implemented; the predicted value of noise in day at resident-sensitive points in Category 2 regions including Hexi Community, Second Community in Shuitang Village, Third Community in Shuitang Village, Qingpi Village and a total of five places can all meet the requirements of Category 2 value limit in “Environmental Quality Standard for Noise” in recent period of project operations (2015). Night noise exceeds standard value by different extents; exceeded value falls in the range of 0.4 dB(A) - 4.7dB(A); the total population affected in the five sensitive point mentioned above (exclusive of Type-4 Zone Residents) amounts to 106 households and 484 people.
Total 536m2 soundproof windows at 5 places for 67 households shall be reserved and installed at total cost of 0.268 million yuan under Infrastructure Construction Subproject of Miyi County (Panlian Town). Soundproof windows shall be installed according to actual noise monitoring results upon completion of the road.
2) Noise at plant area
Only Subproject of Puxing Town, Xinjin County under SSTDP includes factory building – wastewater treatment plant. Please see Table 4.2-10 for predicted result of noise impact during the operation period.
68
Table 4.2-11 Noise monitoring result dB (A)
Day Night No. of measuring points Leq (Background
value) Predicted value LAeq (Background
value) Predicted value
1 50.6 50.9 44.8 45.1 2 52.1 52.5 47.6 48.0 3 56.2 56.4 47.8 48.0 4 52.7 53.2 45.2 45.7
(GB3096-93)Category 2 ≤60 ≤50
The predicted value at noise prediction point of the proposed project in both day and night can all meet the requirements of Category 2 Standard in “Standard of Environmental Noise of Urban Area (GB3096-93)” and cause obvious impacts on the assessment region.
3) Noise at fixed-point source
Waste lift pump is installed in Pengshan Wastewater treatment Plant by Road and Wastewater interception Works in Southern Segment of Binjiang Road in Fengming Town of Pengshan County under each subproject under SSTDP. The intensity of noise source of water pump is 70dB-80dB; meanwhile, because water pump is installed in the inside of the pump house. Through soundproofing of pump house and distance, noise can be reduced. According to noise prediction at noise source, at a distance of 30 meters from water pump, noise can meet Category 2 standard of Environmental Quality Standard for Noise (GB3096-2008). In this project, pump house can be built inside wastewater treatment plant. It meets 100m sanitary protection distance of wastewater treatment plant (greater than 50m sanitary protection distance in pump house lay down by EIA (Environmental Impact Assessment). There are no residents within the range of 100 meters, which is why pump house will not pose any visible impact on the surrounding acoustic environment.
(2) Mitigation measures and suggestions of acoustic environment
1) Reasonable urban planning, structural layout and control of land occupation on both sides of road
In light of the fact that the both sides of newly built road is poorly developed, it is suggested that while the land functions on both sides of the road is reasonably planned, construction department, particularly in the project of real estate development, efforts shall be made to strengthen architectural layout and soundproof design, guaranteeing the interior environment of the sensitive architectures can meet the requirements of functions. A row of houses is suggested to be built along the roads and buildings of more than three-storey high that are intended for non-scientific and residential purposes are suggested to be built. In this way, it can better meet the requirements of shortage of land in cities and at the same time, block out some traffic noises for architectures in the rear row.
2) Intensification of greening
Because the land is in urban regions, therefore, the land resources are scarce and very expensive. Hence, it is unlikely that a large green belt can be established along the road. Sidewalk trees are suggested to be planted and composite, three-dimensional greening is adopted to reduce the noise impact on the environment along both sides of the road. It is suggested that real estate developers may build green belts with a certain width along one side of
69
theroad so as to lower the noise, prevent dust and improve the landscape in the neighborhood.
3) Reduction of sound source noise radiation
Implement management of vehicles into the city at night and restrict speeding at night in sensitive road segments
Strengthen management of vehicle horning and set up signs that prohibit horning and speed slowing on both sides of schools and hospitals
Strengthen maintenance and management of roads in the city; promptly repair damaged road surface and restrict the traffic of speeding, overloaded trucks.
4) Protection of noise affected point
For the works of construction works of North Outer Ring Road in Zhonglong Town of Zizhong County, adopt necessary soundproofing window measures for residents along the road based on concrete monitoring results upon the inspection and acceptance of road project completion. Reserve 2000m2 of soundproofing windows at four sensitive points where noise exceeds the standard value. The price is 1 million. Installation is done based on value exceeded for actual noise monitoring result after the project is completed
Total 536m2 soundproof windows at 5 places for 67 households shall be reserved and installed at total cost of 0.268 million yuan under Infrastructure Construction Subproject of Miyi County (Panlian Town). Soundproof windows shall be installed according to actual noise monitoring results upon completion of the road.
5) Efforts shall be intensified on monitoring regions including hospitals, schools and other sensitive regions during the operation period. If there is an exceeded value monitored, viable measures shall be adopted in a timely manner.
4.2.3 Analysis and assessment of water environmental impact
1. Analysis of water environmental impact during construction period
(1) Analysis of domestic wastewater impact
During construction period, the major source of domestic wastewater is the domestic wastewater and excrement generated when construction workers have meals and wash dishes, which mainly include plant and animal fat, detergent and other organic matters.
(2) Analysis of production wastewater impact
Wastewater discharged by gravel material processing system. The screening process of gravel material processing system requires washing with water and dust fall, which will generate wastewater. The major pollutant in the wastewater is SS and the concentration of suspended sediment in similar works wastewater is approximately 25000mg/L.
The wastewater from concrete mixing system originates from washing of concrete drum and charging bucket. In comparison with similar projects, the PH-value in the wastewater is approximately 11 and concentration of suspended solids in the wastewater is roughly 500-1000mg/L. Because of limited amount of wastewater, it poses barely any impact on the quality of river water.
70
Thesource of mud water in construction is from excavation of foundation pit in the pipe, pier foundation construction and waterway treatment foundation. The major pollutant is SS and direct discharge will increase the concentration of suspended sediments in nearby rivers during construction period, affecting river water quality and sedimentation basin shall be installed to collect it for sedimentation.
After sedimentation treatment, maintenance and repair of vehicles during construction period will produce wastewater that contains oil. If oil-containing wastewater is directly discharged into the river, it will form an oil slick on the water surface, affecting restoration of dissolved oxygen and river quality. Therefore, discharge is required after the treatment meets the standard.
2. Analysis of water environmental impact during operation period
The fever of each subproject under SSTDP can be attributed to road, waterway treatment, pipe network construction and wastewater treatment. During the operation period, apart from rainwater that is directly discharged into the water during the initial phase of road works that affect water environment, other works includes wastewater interception, emission reduction, environmental treatment and environmental improvement and there are no pollutants discharged.
After road is completed, a minuscule amount of dust, oil pollutant and rubbish is sprayed over the road surface during the transportation process. In times of precipitation, it is then washed off the road surface to surface waters, polluting surface waters to a certain extent.
3. Summary of analysis and mitigation measures of water environmental impact of each subproject
Table 4.2-12 Summary of analysis and mitigation measures of water environmental impact for each subproject under SSTDP
Construction period S/N Name of
subproject Type Analysis of impact
Measures
Analysis of impact during the operation period
71
Construction period S/N Name of
subproject Type Analysis of impact
Measures
Analysis of impact during the operation period
ManufacturingWastewater
The concentration of suspended solids in wastewater of gravel material processing system is relatively low and poses evident impacts on Water Body Five; concrete system wastewater; amount of wastewater wash is approximately 1.2m3; oil-containing wastewater; the amount of wastewater discharged during peak period is approximately 4.0m2/h.
The majority of SS in the wastewater for gravel material processing system, concrete mixing system and machine washing, after sedimentation and filtering treatment, is recycled for cleaning the site and washing gravel aggregate and only an insignificant proportion is discharged by standard. The wastewater petroleum for washing machines is controlled according to GB8978-1996 level-1 standard 10mg/L; the rate of oil removal is more than 90%. After the treatment, production wastewater is recycled and reutilized and discharge is prohibited.
1Subproject of Puxing Town, Xinjin County
Household Water
25m3/d
Simple septic tank treatment is adopted and can be used for agricultural irrigation and forestation in the proximity. Direct discharge into surface waters is banned and water discharge is zero.
Because of supplementary construction of pipe facilities, all sorts of wastewater in collection project region are collected to improve the status quo of disorganized discharge of wastewater before project construction. It will help to improve the environment of surface waters in Puxing Town. The initial estimate is according to 6800 m3/d of long-term wastewater amount, discharge of COD 744.6t/a and BOD5 474.5t/a to Yangliu River will be reduced every year, dramatically improving the environment.
72
Construction period S/N Name of
subproject Type Analysis of impact
Measures
Analysis of impact during the operation period
Production wastewater
Piers in water are not installed, which substantially minimizes the disturbance of bridge construction on waters. Mud wastewater and machine oil-containing wastewater
Build sedimentation basin in gravel quarry and carry out sedimentation treatment of silt produced as a result of washing sand and stone materials before discharge; after production wastewateras a result of concrete maintenance, construction machine washing and pipe pressure tests is collected, it will be subject to oil removal and sedimentation treatment before recycle so that no external discharge is done; waste oil, asphalt and other solid wastes in construction are banned from being dumped or thrown into the river and banned from piling up near the waters; they shall be transported to designated location timely or dealt with according to relevant regulations; construction of Hongqi Bridge piers shall be scheduled during dry period so as to reduce direct disturbance on waters. During construction of bridge piers, foundation pit contains sand and stone wastewater that should be pumped to the coast and subject to sedimentation and discharge.
2
Rainwater and Wastewater Pipe Network & Road Reconstruction Subproject of Daying County (Penglai Town)
Domestic wastewater
Amount of Domestic wastewater is 4 - 6.4t/d.
After domestic wastewater discharged by construction workers is subject to treatment of septic tank, supernatant can be used for agricultural irrigation and surface sediment is subject to treatment of anaerobic composting.
Wastewater during the operation period is mainly road surface runoff generated as a result of washing road surface by rainwater during rainy season. The road surface runoff for this project is mainly a small amount of sand and stone. The rainwater at the initial stage is collected by city rainwater and pollutant pipe network before being discharged into surface waters. During project operation period, the impact on water environment has been improved a great deal.
73
Construction period S/N Name of
subproject Type Analysis of impact
Measures
Analysis of impact during the operation period
Production wastewater
Wastewater of construction site is mixing wastewater, equipment and vehicle washing water, wastewater of washing and maintenance of working plane. The concentration of suspended solids in this wastewater is relatively higher; pH value is slightly alkaline and it contains a small amount of oil pollutant. Cofferdam construction wastewater; water seepage occurs for silt as a consequence of river desilting.
Construction wastewater: temporary sedimentation basin is built at each construction site; temporary sedimentation basin is from 10 to 20m3; oil removal sump shall be set up at equipment washing points; equipment washing water shall be subject to oil removal before going into sedimentation basin; construction wastewater shall be subject to oil removal or sedimentation treatment. After construction wastewater is subject to sedimentation treatment for over 12 hours, it can be recycled. Construction wastewater is banned from being discharged into the surface waters. 2. Water seepage in silt: Drainage ditch is set up around the perimeter of silt airing site and sedimentation tank is built at the site of congregation of drainage ditch, collecting wastewater produced during the airing process. The airing wastewater is subject to sedimentation in sedimentation tank before being pumped to Yingxi River by water pump.
3
Works of Infrastructure Construction in Yingxi Town of Shunqing District of Nanchong City
Domestic wastewater
Amount of Domestic wastewater is roughly 3m3/d.
Domestic wastewater produced by construction workers: collected and treated by public washroom in the proximity; posing insignificant impact on surrounding environment. Mitigation measures of water pollution are viable.
The wastewater during the operation period is mainly road surface runoff generated as a result of rainwater washing at the initial stage of rainy season. After road surface runoff passes through drainage ditch, suspended solids and silt in the water are subject to degradation or sedimentation. Therefore, the impact of its concentration on river flow is lowered; road management is strengthened during the operation period; pollutants that are sprayed on road surface by transportation vehicle shall be cleaned promptly to keep road surface clean
4
Road and Wastewater Interception Works of South Section of Binjiang Road in Fengming Town of Pengshan County
Production wastewater
Production wastewater produced at construction site. There is a small amount of mechanical oil pollutants produced during construction of pile foundation work.
All of the production wastewater produced at construction site is recycled for reutilization and no external emission is caused, which is why it poses no impact on the surrounding waters. During the construction of pile foundation, a tiny amount of mechanical oil pollutants may enter waters through rainfall runoff or leak, posing barely any impact on waters
During the operation period, pollutant pipe network in southern region of Binjiang has already been improved. Domestic wastewater in the city can be discharged into Pengshan wastewater treatment plant via wastewater pipe network. Each year, the weight of discharge of pollutants in wastewater into Minjiang River can be considerably
74
Construction period S/N Name of
subproject Type Analysis of impact
Measures
Analysis of impact during the operation period
Domestic wastewater
Tiny Amount
The inappropriate treatment of domestic wastewater at construction site will cause certain pollution to the surrounding waters. This project will not require building construction camps. Local farmer’s houses will be leased and existing dry pail latrine is utilized for treatment. In this way, the tiny amount of domestic wastewater produced can be subject to simple treatment before being used for agricultural fertilizers or irrigation.
River can be considerably reduced; the amount reduced for CODCr, BOD5, SS and TP is 600t/a, 324.8t/a, 512.2t/a, 5t/a and NH3-N respectively. Because of different water control indices, the amount reduced is 55.5t/a and 38.0t/a respectively. The building of drainage pipe network for this project will positively improve water quality in Mao River and Minjiang River.
Production wastewater
Equipment washing water; cofferdam construction mud
Assessment suggestions shall reasonably set up sedimentation tank; cofferdam construction mud shall be subject to sedimentation treatment before being discharged to surface waters or utilized as works waters
5
Works of Environmental Treatment Works in Hongya County (Hongchuan Town) Domestic
wastewater
Calculation based on 100 people, 15m3/d
Simple septic tank is installed so that domestic wastewater can be used for agricultural irrigation
After the project is into operation period, it will bring positive social benefits. This project is non-pollution and there is basically no discharge of pollutants after the project is completed
Production wastewater
Washing Wastewater
Sedimentation basin and filter chamber are set up in construction site; recycled after production wastewater is treated
6
Waterway Treatment Project for Xiaoshanzi Hecheng District of Jialing District of Nanchong City
Domestic wastewater
Tiny Amount Local existing wastewater treatment facilities are used to treat domestic wastewater.
This project of waterway treatment works belongs to hydraulic works construction project. There is no management zone after project is completed and therefore during the operation period, it does not involve pollution discharge and problems of environmental impacts.
7
Works of Construction works of North Outer Ring Road in Zhonglong Town of Zizhong County
Production wastewater
Construction mud water and oil pollutants as a result of washing of construction machineries by rainwater
Construction mud water is collected according to sections of construction. After sedimentation treatment, the clean water on the upper surface is recycled or sprayed. The maintenance of concrete, washing of construction machineries and pipe pressure tests and other production wastewater shall be collected before being subject to oil removal, sedimentation treatment and recycle so that no discharge is caused.
After road works is completed and subject to operations, road surface runoff will be formed. After it is collected by supplementary rainwater drainage ditch on both sides of the road, it is then discharged to agricultural ditch on the project zone, posing minimal impact to water environment in the project zone.
75
Construction period S/N Name of
subproject Type Analysis of impact
Measures
Analysis of impact during the operation period
Domestic wastewater
Tiny Amount
The construction site can be chosen near agricultural houses and after domestic wastewater by construction workers is treated through simple septic tank and eventually used as fertilizers by local farmers.
Production wastewater
Dike excavation mud wastewater; a tiny amount of oil-containing production wastewater
Production wastewater produced at the construction site mainly contains pollutants including SS and petroleum, which are treated by installing oil removal sump and temporary sedimentation tank on the site and recycled, causing no external discharge. The foundation pit water containing suspended solids as a result of excavation of pipe ditches is extracted and treated before being used for production, dust fall or greening on the site and recycled without external discharge. Underwater construction of Flood Control Dam Works shall be carried out in times of dry period, reducing the amount of mud discharged and blocking and protective measures shall be taken to prevent architectural residues from being poured into the river channels, which may worsen pollution and block river channels.
8
Infrastructure Construction Subproject of Miyi County (Panlian Town)
Domestic wastewater
Amount of discharge of household water is 3m3/d
There will be no new construction sites built for this project; local farmers’ houses shall be leased and modern septic tanks are utilized and the small amount of domestic wastewater produced shall be treated before being used as fertilizer or for irrigation purpose.
After the operations, road surface runoff is formed and collected by rainwater collection system installed on both sides of the roads. The suspended solids, sand and stones in the water are degraded or subject to sedimentation. The impact of its concentration on the river is pretty much minimal. The dike on the east coast of Anning River within the range is beautified and water environment is greatly improved. Environmental management shall be strengthened during the operation period and rubbish is banned from being poured into the river.
4.2.4 Analysis and assessment of atmospheric environmental impact
1. Analysis and assessment of atmospheric environmental impact during construction period
Subproject under SSTDP can be summed up as road, river treatment, pipeline construction and wastewater treatment plant. Atmospheric environmental impact during construction period mainly comes from construction dust, mechanical exhaust, and asphalt fumes.
(1) Construction dust
1) Impact of dust from relocation
76
During the relocation, due to overhead work and broad working surface, the dust pollution produced by the collapse of dry construction materials is particularly prominent. The quantity of dust generated is related with such factors as quantities of relocation, area of construction, wind speed during construction and method of relocation, etc.
2) Impact of dust from earthwork and foundation
During the course of subgrade excavation, land leveling, subgrade filing, foundation excavation for water plant and construction, if heavy wind blows, air pollution will be caused by the fine dust and dust.
3) Dust caused by wind in open storage yard and bare yard
Due to construction requirement, some building materials is stacked in the open air, and excavated earthwork and construction garbage is piled up on some construction points temporarily, which can produce dust in dry and windy days.
4) Dust generated by the material transporting vehicle running on the road and construction site
Dust prediction is related to the vehicle speed, vehicle weight, dust deposited on the road surface. The more deposited dust is, the more serious dust flying will be. Under same degree of cleanliness of the road surface, the higher the vehicle speed is, the larger the quantity of dust will be; At the same speed, the more dirty the road is, the larger the quantity of dust will be. Therefore, it is an effective way to reduce dust by limiting the driving speed and keeping roads clean.
During construction period, TSP pollution is serious. During loading, unloading, transportation and construction of the earthwork, and transportation of stone materials, the area affected by road construction is 200m from the both sides of the site, and the area affected by plant construction will be 100m outside of the boundary.
(2) Mechanical exhaust
At the construction site, the large and medium sized equipment is mainly powered by diesel, gasoline, when running such air pollutants as NO2, SO2, smoke etc will produce. During earthwork construction, a large number of exhausts from vehicles, excavators, bulldozers will cause the center area of the construction site waste air polluted, and make the ambient air quality declined. However, the exhaust from the construction equipment and vehicles is only a small part of the total amount, it will not have a great impact on the surrounding environment air by strengthening equipment maintenance and controlling the emission of black smoke not completely combusted.
(3) Asphalt fumes
Roads and bridges are both asphalt concrete pavement, during placement there will be asphalt smoke evaporation. According to the actual investigation of asphalt concrete pavement, if not build the asphalt concrete mixing station, only adopts commercial asphalt concrete, then the impact arrange by the volatilization of asphalt smoke will be within 10m. The road of the subproject under SSTDP is to use commercial concrete. No asphalt concrete mixing station is set, so the impact by the asphalt smoke is little. Fence is provided for separation during the construction. Therefore, the impact is acceptable.
77
(4) Atmospheric environment mitigation measures during construction period
1) When removing buildings, closing net like dust proof net shall be provided around to relief the impact of dust.
2) During the construction, the roadbed shall be compacted layer by layer, and care shall be taken to reduce dust by watering. For the vehicles carrying bulk materials with dust shall be as far as possible covered with a tarpaulin, for the vehicles transporting aggregate, overload should be limited to avoid leakage along the road, so as to reduce the fine dust pollution.
3) Powdered materials such as cement, lime, etc. should be canned, bagged, bulk transportation is prohibited, if stacking, it should be covered with tarpaulin. A tank car shall be provided to the main road, sand and gravel quarry and construction sites, regularly and in time watering is required. In this way it can effectively adsorbed the dust generated from handling, transport of the aggregate.
4) It is suggested that the construction site should be watered frequently to keep the ground wet and clean. The place where decoration materials is stacked, canvas cover shall be provided to prevent dust flying; For the truck transporting bricks and decoration materials, it will be washed when driving in and out the work yard to avoid take the dust out, and pollute road, consequently causing second dust.
5) To resume road traffic as soon as possible, avoid traffic congestion, and reduce pollution of the nearby atmospheric environment by dust from excavation, construction in rush hours should be avoided. In heavy traffic intersection, if pipe crosses the street, pipe jacking method should be used. Pipe should be laid as far as possible in sections and backfilled in time.
6) During construction period, most of transportation vehicles are fueled by gasoline (diesel), exhaust gas output and pollutants are relatively high, in order to reduce the exhaust impacting the surrounding environment, transport routes shall not cross the concentrated residential areas.
2. Analysis and assessment of atmospheric environmental impact during operation period
(1) Analysis of atmospheric environmental impact during operation period
Subproject under SSTDP can be summed up as road, river treatment, pipeline construction and wastewater treatment plant. The atmospheric environmental impact during operation period mainly comes from vehicle exhaust, noxious odors from wastewater treatment plants and wastewater pump.
The project is municipal works. Air pollution is mainly from vehicle exhaust emissions and dust during vehicle running. The main pollutants are CO, NOx, THC and TSP. With the increase of traffic volume in the region, pollutant emissions will gradually increase, which will increase the local air pollution along both sides of the road.
Under the effect of anaerobic bacteria, wastewater treatment plants, wastewater lift pump, wastewater will produce odor substances, and due to the pump mixing, odor substances from the water will spill to the atmospheric environment. The main ingredients are hydrogen sulfide, methyl mercaptan, ammonia, trimethylamine and so on.
78
(2) Mitigation measures for atmospheric environmental impact during operation period
New model of urban public buses using environment-friendly fuels such as electricity and natural gas shall be given priority to control emission of pollutants.
For automobiles powered by fuel, the quality of fuel shall be strictly controlled. Fuel with good quality shall be used, so as to reduce emission of pollutants.
For automobiles with poor performance or to be eliminated, exhaust gas purification device is needed. Exhaust emission shall be regularly checked by competent authorities of transport and communications. For vehicles of which the exhaust discharge is not up to the standards, they are not allowed to run on the road. Exhaust emission inspection regulations shall be strictly implemented. Vehicles with excessive exhaust emissions and overloading slag transporting vehicles are forbidden to run on the road.
A professional team of road maintenance, reparation and cleaning shall be established to keep roads clean and in good operation. In rainless days, tank cars shall be used to spray water to reduce dust, increase the binding force of loose soil, water stability and reduce dust.
In combination of water conservation measures, road greening shall be conducted. Street trees shall be planted to reduce dust.
(5) Control measures for odor pollution and plant area greening
To avoid odor, sanitary protection distance should be defined, 100m range outside the plant boundary shall be designated as protect zone, in this area, no settlement points can be built in the future, Within boundary and the plant, attention should be paid to kill the mosquito, flies, and transport of the sludge in time so as to reduce the odor impact. In greening design, it is suggested to strengthen boundary greening, making it form a "green barrier". In this way, it can not only reduce the odor impact, but also improve the image of Puxing Town as a small town and make the town more beautiful.
Table 4-2-13 Summary of atmospheric environmental impact analysis of subproject under SSTDP
S/N Name of subproject Atmospheric environmental impact analysis and
assessment during operation period Description of measures
1Subproject of Puxing Town, Xinjin County
Roads, for CO, in static wind, under class D and E weather conditions, roads outside (50m) can meet the relevant standards; when in small wind, the forecasted value is not exceeded. For NOX, when in small wind, it is not exceeded outside of the road (200m). When in static wind, it will not be out of limits outside of the road (50m). From overall analysis, in some local areas, due to increasing traffic flow, results in vehicle exhaust emissions increased, which increases the impact on ambient air quality along the road. Since the implementation of works improves the road network structure in the region, increase driving speed and reduce the waiting time in the intersection, automobile exhaust emissions is reduced from the macro view.
Reduction and control of excavated dusts from excavation; reduction and control of dusts of sand aggregates and concrete system; reduction and control of fuel oil exhausts.
79
S/N Name of subproject Atmospheric environmental impact analysis and
assessment during operation period Description of measures
For wastewater plant, according to sanitary protection distance calculation, the distance L is 100m, so the range of 100m around the plant area is designated as sanitary protection zone. According to investigation, there is no sensitive target in the region at present, In the future with the development of Puxing Town, no house shall be built in the protection area.
Prevention measures of foul pollution and greening in plant area.
2
Rainwater and Wastewater Pipe Network & Road Reconstruction
Subproject of Daying County (Penglai Town)
During operation period, the main atmospheric pollution source is the vehicle exhaust emission on the road The main pollutants from the exhaust is CO, CO2, smoke, hydrocarbons. The types of pollution source are dispersed and floating, and discharging height is not high, so the dispersion range of pollutants is small. Before implementation of the works, transportation network in the area is existed. After Implementation, the road layout has some change, and paved with asphalt,which improves the driving environment, let the vehicle engines in good condition. Due to regional traffic flow remaining the same before and after implementation of the project, the general vehicle exhaust emissions is slightly decreased comparing with before staring the project Implementation of the project does not pollute the atmospheric environment, but reduce the automobile exhaust pollution load to the regional atmospheric environment.
Strictly execute exhaust emission inspection system, prohibit vehicles whose exhaust emissions exceed the standard to get onto the road; scientifically organize transportation lines of vehicles; and prohibit overlimit slag trucks to get onto the road.
3
Infrastructure Construction Subproject
of Yingxi Town, Shunqing District,
Nanchong City
Automobile exhaust pollutants are concentrated in the traffic line. With the increasing of the distance from the road margin, the diffusion predicted concentration of pollutants in ambient air shall decrease gradually. According to analogy, it is obtained that the CO concentration to road center line of about 0.27-1.21mg/m3, THC concentration of about 0.0275-0.3687mg/m3, NOX concentration of 0.032-0.078mg/m3.,which meets the limit value of level 2 in the "Ambient Air Quality Standards".
As for buses in towns and cities, new types of vehicles with environment-friendly fuels such as electricity and natural gas are preferred to control pollutant emission quantity.
As for cars with fuel oils, strictly control quality of oil products, use high-quality fuel oil to reduce emission quantity of pollutants. Cars with bad performances or to be scrapped shall be added with exhaust purifiers and regularly monitored by traffic authorities for exhaust emissions. Vehicles whose exhaust cannot meet the standard shall be strictly prevented from getting onto the road.
80
S/N Name of subproject Atmospheric environmental impact analysis and
assessment during operation period Description of measures
Road, during operation period, the dust and exhaust produced by the running vehicle will cause air pollution, the main pollutants is TSP, CO, NOX and THC. The road of the works is paved with asphalt, dust pollution is less. But with the increasing of traffic flow, the automobile exhaust emission will have an increasing trend, which increases the atmospheric environment pollution along the road, therefore, it is proposed that the Authority strengthen management, strictly implement notional vehicle emissions standards, to reduce pollutants in vehicle exhaust emissions, and fulfill the greening of the road well so as to clean the air.
1 Execute vehicle inspection and prohibit vehicles with over-standard exhaust emission to get onto the road; 2 Provincial relevant departments force to add exhaust purifiers and single-vehicle pollutant emission shall comply with relevant requirements; 3 Environment management shall be strengthened. The road management department shall establish an environment management mechanism and entrust the environment monitoring unit to regularly monitor ambient airs at monitoring points specified in the EIA report.
4
Binjiang Road (Southern Section) Road and
Wastewater Interception Subproject of Fengming Town, Pengshan County
Wastewater lift pump, wastewater under anaerobic bacteria will produce odor substances, due to the mixing of pump, odor substances will spill from the water to the atmospheric environment, the main ingredients of hydrogen sulfide, methyl mercaptan, ammonia, trimethylamine and so on. Generally the impact area of pup room odor is within 50m of the resources, In the works, the pump room is arranged in yard where wastewater is treated, which is in accordance with sanitary distance of 100m, in the range, there is no resident, odor impact to the resident beyond 100m is very small.
1) Remove grille residues intercepted by grilles in time (EIA requires to remove them on the same day when they are produced) and stains; avoid long-period stacking of any solid waste in the pump house; 2) Seal transportation vehicles. Sensitive target such as human settlement shall not be carried out within 50m from fouling source of the pump house. The report shall be send to the planning department to put on records upon approval, so as to meet sanitary protection requirements. 3) In combination with ambient landscape, plant shrubs and arbors with good anti-fouling capacity such as oleander, palm and privet which not only can beatify the environment but also can reduce fouling.
5
Environmental Treatment Subproject of
Hongya County (Hongchuan Town)
No air pollutant emissions /
6
Infrastructure Construction Subproject
of Yingxi Town, Shunqing District,
Nanchong City
No air pollutant emissions /
81
S/N Name of subproject Atmospheric environmental impact analysis and
assessment during operation period Description of measures
7
Northern Outer Ring Road Construction
Subproject of Zhonglong Town, Zizhong County
After the project is open for traffic, many vehicles run on it. The main pollutants during operation period are exhaust emission of vehicles. The prediction of total emission of air pollutants: CO 4023.4t/a, NOx 254.2t/a and THC 1205.9t/a. Before starting of the works, no direct access between Zian Road and Zitai Road, it is connected by 10km bypass way. After completion, the driving distance and time is shortened, pollutant emission is largely decreased. This works, to some extent, has improve the air quality along the road, it is an environmental positive benefit
Strictly execute exhaust emission inspection system, prohibit vehicles whose exhaust emissions exceed the standard to get onto the road; scientifically organize transportation lines of vehicles; and prohibit overlimit slag trucks to get onto the road. Strengthen road management and pavement curing, maintain roads in good operation status and reduce traffic jams.
8
Infrastructure Construction Subproject of Miyi County (Panlian
Town)
During operation period, the main atmospheric pollution source is the vehicle exhaust emission on the road The main pollutants from the exhaust is CO, CO2, smoke, hydrocarbons. The types of pollution source are dispersed and floating, and discharging height is not high, so the dispersion range of pollutants is small. Since the traffic flow is change in day time and night time. Generally, pollution in the day is more serious. The road of the works is asphalt pavement, dust pollution is less. But with the increasing of traffic flow, the automobile exhaust emission will have an increasing trend, which increases the atmospheric environment pollution along the road, therefore, it is proposed that the Authority strengthens management, strictly implements national vehicle emissions standards, to reduce pollutants in vehicle exhaust emissions, and fulfill the greening of the road well so as to clean the air.
Recommend relevant departments to strengthen management, strictly execute car exhaust emission standard specified by the state, reduce emission quantity of car exhaust pollutants and plant greenbelts outside gutters at two sides of the road for air purification.
4.2.5 Analysis and assessment of environmental impact of solid wastes
1. Impact analysis of solid wastes and measures during construction period
The construction spoils, building wastes and domestic wastes will be generated during construction period. Construction workers will generate a certain amount of domestic wastes, mainly including the coal ashes, slag bricks, glasses, plastics, waste paper, peels, etc., wherein, the inorganic substances like coal ashes and slag bricks constitute the major part, while the organic substances like canteen wastes, plastics and paper scrapes constitute the minor part. As for the demolition of buildings and structures, the demolition and construction wastes generated per square meter of building area shall be calculated by empirical data of 0.1 m3. The solid wastes generated by demolition mainly include abandoned building slag, waste wood, plastics, metals, domestic wastes, etc., wherein, the abandoned building slag constitutes the major part, accounting for about 70 - 80%. The building wastes and domestic wastes generated during construction period, without disposal, will affect the soil, air and water environment as well as landscape in partial areas of the project.
Table 4.2-14 Summary of solid waste analysis and measures during construction period of each subproject
S/N Subproject name
Solid waste analysis during construction period
Mitigation measure
82
S/N Subproject name
Solid waste analysis during construction period
Mitigation measure
Building waste
The project involved in the demolition of civilian houses will generate a great amount of building wastes
Part of building wastes can be used for backfilling, while another part will be delivered to the slag landfill.
Construction spoil
No spoil is generated.
Reuse the spoils to the fullest extent possible during construction period, pile the spoils that can not be reused at suitable places nearby, and meanwhile, take the corresponding blocking and protective measures in case of new soil erosion and environmental pollution. The piling site shall make use of the wasteland, instead of farmland.
1Subproject of Puxing Town, Xinjin County
Domestic waste
200kg/d
The project shall set the domestic waste collection facilities at appropriate places and entrust local sanitation departments to sent such wastes to Chengdu urban domestic waste treatment plant for sound treatment.
Building waste4657.4m3
Construction spoil
10001m3
Try to recover and use the useful part of building wastes generated. Reasonably allocate earthwork, and deliver the discard and remaining building wastes to Daying Industrial Park for filling; random piling or placing shall be forbidden. 2
Rainwater and Wastewater Pipe network & Road Reconstruction Subproject of Daying County (Penglai Town)
Domestic waste
A small amount
The domestic wastes generated by workers during construction period will be included in the existing domestic waste collection treatment system within the area; enhance the health education for workers; random dumping shall be forbidden.
Silt The total dredging volume is 4.536×104m3
The silt shall be delivered to the drying field through closed canning vehicle, and after being dried, shall be used for greening and filling.
Construction spoil
None
3
Infrastructure Construction Subproject of Yingxi Town, Shunqing District, Nanchong City
Domestic waste
About 30kg of domestic wastes will be generated during the peak period of construction
Adopt the category management for domestic wastes, set up the temporary small waste piling point nearby the construction site, hire personnel to deliver the wastes to the urban waste treatment plant for treatment on a regular basis, and avoid the spilling in the course of delivery. In the meantime, pay special attention to the maintenance and management of temporary waste piling point, avoid the waste scattering caused by the random piling, and spray the disinfection and insecticide solutions on the piling point on a regular basis in order to reduce the breeding of mosquitoes and bacteria.
Building wasteSet up the temporary waste bins for concentrated collection and deliver to the building waste piling site nearby in a timely manner.
4Binjiang Road (Southern Section) Road and Wastewater Interception
Construction spoil
None
83
S/N Subproject name
Solid waste analysis during construction period
Mitigation measure
Subproject of Fengming Town, Pengshan County
Domestic waste
Classify and clean up the domestic wastes at the construction site, and entrust local sanitation department to deliver to the urban waste treatment plant for treatment. Enhance the maintenance and management of waste piling point, avoid the scattering caused by random piling, and meanwhile spray the disinfection and insecticide solutions on the piling point on a regular basis in order to reduce the breeding of mosquitoes and bacteria.
Building waste0.8×104m3
Construction spoil
Reasonable allocate the discard which shall be delivered to the designated spoil site in Hongya County;
Domestic waste
A small amount Set up the waste bins for concentrated collection and delivered to local environmental department for treatment.
5
Environmental Treatment Subproject of Hongya County (Hongchuan Town)
Silt Dredging It is recommended to employ the closed canning vehicles to deliver silt to the temporary piling site for drying and then for greening.
Building waste
As for building wastes, the bricks and steel can be recovered, while other building wastes shall be delivered to the designated building waste piling site.
Construction spoil
The spoils generated in the course of construction shall be delivered to the designated spoil site in Huanglianwan area for piling; the spoil site shall be leveled in a timely manner, with vegetation planted and slash restored.
Domestic waste
30kg/d
The domestic wastes shall be collected at designated places and will delivered to local sanitation departments for treatment, together with a small amount of construction spoils.
6
Waterway Treatment Project (Hecheng Section) of Xiaoshanzi in Jialing District, Nanchong City
Silt Dredging
The silt will be generated in the course of dredging. No temporary piling site will be set up along the line. The silt can be piled on one side of waterway, which, after being dried, will be delivered t the designated spoil site. The silt will be used as humus soil for greening construction of this project and other projects in the city.
Building waste 0.76×104m3
Try to recover and use the useful part of building wastes generated, and deliver the remaining wastes to the sanitation department in Zizhong County for treatment and filling in Gutianba area; random piling or placing shall be forbidden.
Construction spoil
Discard 2.54×104m3
The discard shall be used for filling in Gutianba area.
7
Northern Outer Ring Road Construction Subproject of Zhonglong Town, Zizhong County Domestic
waste
The construction site and construction camp shall set sanitation facilities like waste bins in a rational, unified and appropriate manner for concentrated collection and then deliver to the urban waste treatment plant in Zizhong County for filling on a regular basis; random dumping shall be forbidden, in case of contaminating the local environment or affecting the landscape.
84
S/N Subproject name
Solid waste analysis during construction period
Mitigation measure
Building waste0.17×104m3
Try to recover and use the useful part of building wastes generated, and deliver the remaining wastes to the sanitation department in Miyi County for treatment and filling in the southern new area; random piling or placing shall be forbidden.
Construction spoil
Discard 6.71×104m3
The discard is in a large amount. The construction spoil generated by this project will be totally delivered to Miyi Planning and Construction Bureau for filling in southern new area.
8
Infrastructure Construction Subproject of Miyi County (Panlian Town)
Domestic waste
A small amount
The domestic wastes generated by workers during construction period will be included in the existing domestic waste collection treatment system within the area; enhance the health education for workers; random dumping shall be forbidden.
2. Predication and measures of solid wastes impact during operation period
The solid wastes during operation period mainly come from the road project and wastewater treatment plant. The wastes generated in the course of road sweeping and maintenance, in a small amount, will be collected intensively and delivered to the municipal sanitation departments for unified treatment; thus they have low impacts on the environment.
Only one wastewater treatment plant shall be established for Xinjin County Subproject of SSTDP Project, with produced sludge quantity of 400t/d. Dewatered sludge can be transported to landfill for treatment based on actual condition of Puxing Town, Xinjin County that Xinjin County already has landfill.
4.2.6 Analysis and assessment of social environmental impact
1. Adverse impacts on local social environment during construction period
The adverse impacts on local social environment during construction period are mainly reflected by the land acquisition and resettlement, traffic congestion and population health.
(1) Land acquisition and resettlement
The land occupation by the project results in the loss of land and resettlement of residents. However, with the resettlement planning and implementation, as well as changing from rural residents to urban residents, re-employment training, reasonable compensation and other appropriate measures, the living standard of the affected residents will soon get back to normal and even higher than before.
(2) Impact on traffic
The project will have direct or indirect impacts on the existing traffic system in the construction area. During construction period, the number of transportation vehicles will increase, which will result in the congested traffic conditions, and may even lead to traffic jams and damages to roadway facilities, bring out traffic accidents, and thus cause traffic inconvenience.
(3) Impact on population health
During construction period, external workers will enter the site; the frequent movement of personnel may introduce exogenous diseases. Construction workers coming from high occurrence areas of infectious diseases may also bring in the infectious diseases and thus result in the spread of acute infectious diseases like malaria.
85
2. Analysis on positive effects of social environment
All subprojects under SSTDP are included in the range of urban municipal projects, including road construction, (environment) waterway treatment, wastewater interception pipe network, establishment of wastewater treatment plant, etc. The implementation of projects could help facilitate the local social and economic development, improve the environment and raise the quality of life. The positive effects are significant.
(1) Impact of the implementation of projects on promoting the regional economic development
After the completion of this project, the functional layout structure in southern area will become more scientific and reasonable, the matching facilities will become more complete, the road traffic system will become more convenient and efficient, the urban investment environment will get greatly improved, the living environment will get upgraded, and conditions for investment attraction and real estate development will become more mature, which could not only facilitate the urban construction and development, but also achieve land assessment resulting from the improvement of traffic and living environment, and thus maximize the efficiency of land resources.
(2) Improvements of QOP (quality of life) of local residents and surface water environment quality in the region
With the completion and operation of municipal infrastructure, the environment within the area will get beautified, the traffic conditions will get improved, people’s living standard will get enhanced gradually, and communications, culture & entertainment, education and health care will also develop rapidly; while in return, social causes also promote the rise of people’s cultural and living level, and thus facilitate the construction of material and spiritual civilization.
Drainage works and wastewater treatment plant of the Project shall be established to improve wastewater pipe network, collect pollution sources and realize the effects of centralized treatment, drainage upon compliance with standard, wastewater interception and discharge reduction and thereby to improve surface water environment quality of the region.
Table 4.2-15 Summary of beneficial scope and pollutant discharge reduction of each subproject
S/N Name of subproject Content of subproject Beneficial
area
Number of beneficial
people
Pollutant discharge reduction quantity
1Subproject of Puxing Town, Xinjin County
Road works, bridge works, pipeline works (rainwater,
wastewater and water supply), lighting works, traffic works,
greening works, waterway renovation works and wastewater
treatment plant works.
Puxing Town, Xinjin County
150 thousand
Pollutant discharge reductions of the region upon establishment of
the wastewater treatment plant: BOD5:
144.5t/a, CODcr: 260.4t/a, SS: 219.6t/a, NH4+-N: 37.4t/a, T-N: 34.3t/a, T-P:2.68t/a�
2
Rainwater and Wastewater Pipe Network & Road Reconstruction
Subproject of Daying County (Penglai
Town)
Reconstruction of roads and rainwater and wastewater
pipelines, reconstruction of pipe network to septic-tank of the
urban area.
Penglai Town, Daying County
86 thousand
Reduce direct discharge of 2500m3/d domestic
wastewater from Qijiang Road and
Luogui Road inhabitants into water body and lead it into wastewater treatment
86
S/N Name of subproject Content of subproject Beneficial
area
Number of beneficial
people
Pollutant discharge reduction quantity
plant for treatment and discharge it upon compliance with
standard.
3
Infrastructure Construction
Subproject of Yingxi Town, Shunqing
District, Nanchong City
Dredging works for 2.75km waterway of Yingxi River, LB-M
ecological slope protection works, new
2.661km pipeline along Binjiang Road at left bank of Yingxi River
and 4.7km intercepting main along both banks of the river.
Yingxi Town 19000
The wastewater pipe network, once
completed, can collect directly discharged
wastewater to realize centralized treatment and discharge upon
compliance with standard in the
wastewater treatment plant and can reduce pollutant discharge
quantity.
4
Binjiang Road (Southern Section)
Road and Wastewater Interception Subproject
of Fengming Town, Pengshan County
Binjiang Road of 2.18km, rainwater and wastewater
pipeline and covered channel of 5.271km, crown emergency
access of 2.178m and road slope protection of 46693m2.
Urban area, Fengming
Town, Pengshan County
79 thousand
Greatly reduce discharge load of
pollutants in wastewater to Minjiang
River and reduction quantities of CODCr, BOD5, SS and TP are
600t/a, 324.8t/a, 512.2t/a and 5t/a
respectively.
5
Environmental Treatment Subproject
of Hongya County (Hongchuan Town)
New main waterway of about 4.4km, dredged moat waterway of about 4.8km; new walkway at
the two sides of channel revetment of about 8.8km; new
greenbelt at the two sides of channel revetment of about
8.8km; wastewater main along the two sides of waterway of
about 18.76km.
Hongchuan Town,
Hongya County
More than 42.1
thousand
The wastewater pipe network, once
completed, can collect directly discharged
wastewater to realize centralized treatment and discharge upon
compliance with standard in the
wastewater treatment plant and can reduce pollutant discharge
quantities as follows: CODcr 1679t, BOD5
730 t, SS 1762t, NH4+-N 90t.
6
Waterway Treatment Project of Xiaoshanzi
River (Downtown Section) in Jialing District, Nanchong
City
Dredging and reconstruction of the existing waterway, construction of branch
waterways, construction of walkways and greenbelts at the two river banks, construction of
small bridges over the river, drainage work, construction of
intercepting pipeline of 7210m in total.
Duweiba Block and
Huanglianwan Block in Jialing
District, Nanchong
City
Around 200
thousand.
The wastewater pipe network, once
completed, can collect directly discharged
wastewater to realize centralized treatment and discharge upon
compliance with standard in the
wastewater treatment plant and can reduce pollutant discharge
quantities as follows: COD: 365t/a, BOD5:
87
S/N Name of subproject Content of subproject Beneficial
area
Number of beneficial
people
Pollutant discharge reduction quantity
146t/a, NH4-N: 36.5t/a
7
Northern Outer Ring Road Construction
Subproject of Zhonglong Town, Zizhong County
Northern outer ring road with the designed length of 3290m,
planned width of road boundary limits of 40m, each equipped
with one water supply, rainwater and wastewater pipeline
respectively and provided with road lamps, greening, traffic works and other municipal
pipelines along the whole line.
Zhonglong Town,
Zizhong County
102 thousand
/
8
Infrastructure Construction
Subproject of Miyi County (Panlian
Town)
Municipal road work, flood control dam work and pipe
network matched with them.
Panlian Town, Miyi County
39 thousand
/
(3) Impact on the traffic
After being completed, the project will greatly improve the regional traffic conditions, and impose positive impacts on perfecting the road network layout, as well as urban residents’ travel conditions and transport conditions.
(4) Impact on urban flood control
The project constructed in conjunction with Binhe Road and embankment and the waterway treatment can control the flood, and thus could effectively guarantee the development of the region and residents’ life and property, as well as facilitate the development of the county.
(5) Impact on the landscape
Most of projects are located in urban areas. The design shall fully consider the coordination of urban landscape, with plenty of flowering shrubs, groves and graceful isolated trees planted within the project site, which could wonderfully improve the landscape environment, widen the road, and make flowers and gardening plants greener and more brilliant, as well as the water cleaner.
3. Local social environment measures during construction period
(1) Resettlement plan
1) Land acquisition and resettlement
Ensure the sources of incomes and living standards of residents affected by land acquisition are not lower than before through monetary compensation, land adjustment, industrial development and employment promotion.
2) Demolition and resettlement
The affected residents will be resettled at concentrated places through unified planning and construction.
(2) Mitigation measures for traffic impact during construction period
The road construction contractors shall conduct in-depth field investigations regarding impacts of related roads on increasing traffic pressure and combine with relevant road transportation capacity in order to prepare scientific and reasonable construction transport management plan, for instance, the transportation of bulk materials and equipment should avoid the rural fair trade
88
day or market road, the entrance-exit of section under reconstruction should be equipped with prominent bypass road signs, the speeding and overloading traffic should be forbidden, select the transport route reasonably, try to avoid acoustic environmentally-sensitive areas like schools, hospitals and concentrated residential areas, set transport vehicle washing facilities at the exit of construction site, bulk materials should be transported in a covered state, etc.
In the course of road construction, set the “no passing” signs at the entrance and exit of road under construction, and lead vehicles to normal passing at the nearest places. The road construction principles stipulate that, the road shall be constructed without prejudice to the normal operation of traffic within the region. Pay attention to pedestrians in case of the occurrence of accidents.
As for the construction nearby sensitive points, without prejudice to normal construction, people should travel by designated access; the pavement should keep flat in order not to affect people’s travel, and the corresponding indicative marks should be set when the access changes its directions, for purpose of ensuring people’s safety. The section subject to a large amount of works should be equipped with protective facilities such as forbidden line, forbidden lamp, pile sign, etc. Construction workers are obliged to warn people to take notice of safety and instruct them to pass by designated route. Cross-trench bridges should be secure and reliable, with railings set on both sides.
(3) Protective measures for population health
Strengthen the health prevention measures, safety knowledge publicity as well as environmental supervision and management.
Chapter V Public Consultation and Information Disclosure 5.1 Purpose of public consultation
The purpose of the public consultation is to obtain opinions of the public directly affected by the project-affected area, to allow decision-making departments to immediately find potential problems and make timely changes as well as perfect the design programs, allowing issues reflected by the public to be resolved fundamentally, therefore, making the project's process design, environmental protective measures and environmental monitoring & management tends to be more complete and reasonable and striving to make the construction of the Project achieve optimal uniform in the environmental benefits, social benefits and economic benefits.
5.2 Approaches for public participation EIA engineers and the client will make detailed introductions on the basic situations and the main conclusions of the EIA of the proposed project to the public in the would-be affected area, including project size, the long-term and short-term impacts on the public and the environment in the construction period and the running period after the completion of project, etc, to learn the attitude, requirements and recommendations of the public on the proposed project. The public consultation methods mainly include:
Issue public notification on information in the networks and newspapers;
Visit the areas affected by the construction of the Project and put up a notice;
Have interactive talks with the public and distribute the public participation questionnaire
Individual interviews, household interviews and group interviews (discussion meetings);
Focus on sensitive areas to visit and negotiate.
89
Table 5.2-1 Summary of time and approaches of information notification of each subproject
S/NNameofsubproject
EIA stageInformation issueand briefintroduction
Informationissuer
Time Location
Web pagescreenshot and newspaper scanning
Notify the basicinformation of theProject such as theClient,environmentalassessment andconstruction unitsonthe network.
Oct. 10-25,2009
Xinjin Public InformationWebsite(http://www.xinjin.gov.cn/)
After receivingtheEIAcommission,completingenvironmentalscreening andfinalizing EIAoutlineandproposal.
Notify the basicinformation of theProject such as theClient,environmentalassessment andconstruction unitsonthe newspapers.
Oct. 26, 2009Re-publish EIA publicnotification of theProject onXinjin Daily.
1Subproject ofPuxing Town,Xinjin County
After completionof theEIA draft,conduct furthernegotiations withthepublic.
Notify EIAconclusionsandenvironmentalprotection reportsonthe network.
School ofEnvironmentScience andEngineering,SouthwestJiaotongUniversity
Feb. 20 –Mar. 5, 2010
Xinjin Public InformationWebsite(http://www.xinjin.gov.cn/).
2
Rainwater andWastewater PipeNetwork & RoadReconstructionSubproject ofDaying County(Penglai Town)
After receivingthe EIAcommission,completingenvironmentalscreening andfinalizing EIAoutline andproposal.
Conduct the firstpublic notificationon the Projectoverview and EIArelated informationvia newspaper andnetwork.
China RailwayEryuanEngineeringGroup Co., Ltd.
Oct. 14, 2009
Sichuan Economic Daily andthe website of China RailwayEryuan Engineering GroupCo., Ltd.
90
S/NNameofsubproject
EIA stageInformation issueand briefintroduction
Informationissuer
Time Location
Web pagescreenshot and newspaper scanning
After completionof theEIA draft,conduct furthernegotiations withthepublic.
Notify EIAconclusionsandenvironmentalprotection reportsonthe newspapers andnetwork.
Nov. 12,2009
Sichuan Economic Daily andthewebsiteof ChinaRailwayEryuan Engineering GroupCo., Ltd.
3
InfrastructureConstructionSubproject ofYingxi Town,Shunqing District,Nanchong City
After receivingtheEIAcommission,completingenvironmentalscreening andfinalizing EIAoutlineandproposal.
Thepublicparticipated inpublic notification(for the first time) onInfrastructureConstructionSubproject of YingxiTown, ShunqingDistrict, NanchongCity under SichuanSmall TownsDevelopmentProject by WBLoans
School ofEnvironmentScience andEngineering,SouthwestJiaotongUniversity &ChinaHuaxiEngineeringDesign &ConstructionCo.,Ltd,
Oct. 29 –Nov. 10,2009
Nanchong ShunqingGovernment Network websitehttp://www.shunqing.gov.cn/
91
S/NNameofsubproject
EIA stageInformation issueand briefintroduction
Informationissuer
Time Location
Web pagescreenshot and newspaper scanning
Thepublicparticipated inpublic notification(for thesecond time)on InfrastructureConstructionSubproject of YingxiTown, ShunqingDistrict, NanchongCity under SichuanSmall TownsDevelopmentProject by WBLoans
Nov. 11,2009
Nanchong ShunqingGovernment Network websitehttp://www.shunqing.gov.cn
After completionof theEIA draft,conduct furthernegotiations withthepublic.
Conduct apublicnotification onlocation to read theProject EIAdocumentsonNanchong Daily.
Mar. 26,2010
Nanchong Daily
4
Binjiang Road(SouthernSection) Roadand WastewaterInterceptionSubproject ofFengming Town,Pengshan County
After receivingtheEIAcommission,completingenvironmentalscreening andfinalizing EIAoutlineandproposal.
Notify the basicinformation of theProject such as theClient,environmentalassessment andconstruction unitsonthe network.
School ofEnvironmentScience andEngineering,SouthwestJiaotongUniversity
Oct. 12, 2009Pengshan People’sGovernment Networkhttp://www.scps.gov.cn
92
S/NNameofsubproject
EIA stageInformation issueand briefintroduction
Informationissuer
Time Location
Web pagescreenshot and newspaper scanning
After completionof theEIA draft,conduct furthernegotiations withthepublic.
Notify EIAconclusionsandenvironmentalprotection reportsonthe newspapers andnetwork.
Dec. 17,2009
Pengshan People’sGovernment Networkhttp://www.scps.gov.cn
After receivingtheEIAcommission,completingenvironmentalscreening andfinalizing EIAoutlineandproposal.
Notify the basicinformation of theProject such as theClient,environmentalassessment andconstruction unitsonthe newspaper (forthe firs time).
Sep. 30, 2009Sichuan Economic Daily
5
EnvironmentalTreatmentSubproject ofHongyaCounty(HongchuanTown)
After completionof theEIA draft,conduct furthernegotiations withthepublic.
Notify EIAconclusionsandenvironmentalprotection reportsonthe newspapers andnetwork.
ChinaRailwayEryuanEngineeringGroup Co., Ltd.
Nov. 12,2009
Sichuan Economic Daily andthewebsiteof ChinaRailwayEryuan Engineering GroupCo., Ltd.
6
WaterwayTreatment Projectof XiaoshanziRiver (DowntownSection) in JialingDistrict,Nanchong City
After receivingtheEIAcommission,completingenvironmentalscreening andfinalizing EIAoutlineandproposal.
Conduct a firstpublic notificationon Nanchong JialingPeople’sGovernmentWebsite.
School ofEnvironmentScience andEngineering,SouthwestJiaotongUniversity
Oct. 20, 2009Nanchong Jialing People’sGovernment Network(www.Jialing.gov.cn)
93
S/NNameofsubproject
EIA stageInformation issueand briefintroduction
Informationissuer
Time Location
Web pagescreenshot and newspaper scanning
After completingEIA draft.
Conduct a secondpublic notificationon Nanchong JialingPeople’sGovernmentWebsite.
Nov. 20,2009
Nanchong Jialing People’sGovernment Network(www.Jialing.gov.cn)
After receivingtheEIAcommission,completingenvironmentalscreening andfinalizing EIAoutlineandproposal.
Notify the basicinformation of theProject such as theClient,environmentalassessment andconstruction unitsvia newspaper andnetwork (for the firstime).
Sep. 30, 2009
Sichuan Economic Daily andthewebsiteof ChinaRailwayEryuan Engineering GroupCo., Ltd.
7
Northern OuterRing RoadConstructionSubproject ofZhonglong Town,Zizhong County
After completionof theEIA draft,conduct furthernegotiations withthepublic.
Notify EIAconclusionsandenvironmentalprotection report(simplified edition)on thenewspapersand network.
ChinaRailwayEryuanEngineeringGroup Co., Ltd.
Nov. 12,2009
Sichuan Economic Daily andthewebsiteof ChinaRailwayEryuan Engineering GroupCo., Ltd.
94
S/NNameofsubproject
EIA stageInformation issueand briefintroduction
Informationissuer
Time Location
Web pagescreenshot and newspaper scanning
After receivingtheEIAcommission,completingenvironmentalscreening andfinalizing EIAoutlineandproposal.
Notify the basicinformation of theProject such as theClient,environmentalassessment andconstruction unitsvia newspaper andnetwork (for the firstime).
Oct. 14, 2009
Sichuan Economic Daily andthewebsiteof ChinaRailwayEryuan Engineering GroupCo., Ltd.
8
InfrastructureConstructionSubproject ofMiyi County(Panlian Town)
After completionof theEIA draft,conduct furthernegotiations withthepublic.
Notify EIAconclusionsandenvironmentalprotection report(simplified edition)on thenewspapersand network.
ChinaRailwayEryuanEngineeringGroup Co., Ltd.
Nov. 12,2009
Sichuan Economic Daily andthewebsiteof ChinaRailwayEryuan Engineering GroupCo., Ltd.
Table 5.2-2 Summary of time schedule and approaches of public consultation on various subprojects
S/N Name of subproject EIA progress stageBrief introduction on informationnotification & publicparticipations
Investigator Time Location
Conducted aquestionnairesurveyby visiting households1
Subproject of Puxing Town,Xinjin County
After receiving EIAcommission, environmentalscreening, and confirmingEIA outline and plan Posted notification
School of EnvironmentScienceand Engineering,Southwest JiaotongUniversity
Sept. 10, 2009 -Sept. 25, 2009
Puxing Town, XinjinCounty
2
Rainwater and Wastewater PipeNetwork & Road ReconstructionSubproject of Daying County(Penglai Town)
After receiving theEIAcommission, environmentalscreening, and confirmingEIA outline and plan
Distributed public participationsurvey list, and investigated byvisiting households randomly
ChinaRailway EryuanEngineering Group Co.,Ltd.
Oct. 2009Project constructionarea: Penglai Town,Daying County
95
S/N Name of subproject EIA progress stageBrief introduction on informationnotification & publicparticipations
Investigator Time Location
Further negotiations with thepublic after completion of theEIA draft
Distributed public participationsurvey list, and investigated byvisiting households randomly; 3public participated symposiums
Feb. 24, 2010Feb. 26, 2010
3
InfrastructureConstructionSubproject of Yingxi Town,Shunqing District, NanchongCity
After receiving theEIAcommission, environmentalscreening, and confirmingEIA outline and plan
Distributed public participationsurvey list, and investigated byvisiting households randomly
ChinaHuaxi EngineeringDesign & ConstructionCo., Ltd,
Dec. 2009Yingxi Town,Shunqing District,Nanchong City
After receiving theEIAcommission, environmentalscreening, and confirmingEIA outline and plan
Distributed public participationsurvey list, and investigated byvisiting households randomly
Oct. 2009Fengming Town,Pengshan County
4
Binjiang Road (SouthernSection) and SewageInterception Subproject inFengming Town, PengshanCounty
Further negotiations with thepublic after completion of theEIA draft
Distributed public participationsurvey list, and investigated byvisiting households randomly
School of EnvironmentScienceand Engineering,Southwest JiaotongUniversity
Dec. 2009Fengming Town,Pengshan County
Conducted aquestionnairesurveyat theproject siteand posted thesurvey results.
Sept. 2009(Hongchuan Town,Hongya County
5Environmental TreatmentSubproject of Hongya County(Hongchuan Town)
After receiving theEIAcommission, environmentalscreening, and confirmingEIA outline and plan
2 public participated symposiums
ChinaRailway EryuanEngineering Group Co.,Ltd.
Sept. 23, 2009
New HongchuanTown, VillageCommunity inHongchuan
6
Waterway Treatment Project(Downtown Section) ofXiaoshanzi River, in JialingDistrict, Nanchong City
After receiving theEIAcommission, environmentalscreening, and confirmingEIA outline and plan
Conducted aquestionnairesurveyat theproject site
School of EnvironmentScienceand Engineering,Southwest JiaotongUniversity
Oct. 2009Jialing District,Nanchong
96
S/N Name of subproject EIA progress stageBrief introduction on informationnotification & publicparticipations
Investigator Time Location
After receiving theEIAcommission, environmentalscreening, and confirmingEIA outline and plan
Conducted aquestionnairesurveyat theproject siteand posted thesurvey results.
Oct. 2009Zhonglong Town ofZizhong County
Public participated symposium Nov. 15, 2009Meeting Room on6F of Government ofZhonglong Town
7
Northern Outer Ring RoadConstruction Subproject ofZhonglong Town of ZizhongCounty
Further negotiations with thepublic after completion of theEIA draft Conducted aquestionnairesurvey
at theproject site
ChinaRailway EryuanEngineering Group Co.,Ltd.
Nov. 2009Zhonglong Town ofZizhong County
Conducted aquestionnairesurveyat theproject siteand posted thesurvey results.
Nov. 2009Panlian Town, MiyiCounty
8InfrastructureConstructionSubproject of Miyi County(Panlian Town)
After receiving theEIAcommission, environmentalscreening, and confirmingEIA outline and plan
Public participated symposium
ChinaRailway EryuanEngineering Group Co.,Ltd.
Nov. 6, 2009OfficeofGovernment ofPanlian Town
97
5.3 Summary of main opinions Table 5.3-1 Summary of public opinions
Statistics of related questions (%)�
S/N� Name of subproject� Questions�� � � � �
Copies of survey
list (copy)
Do you belong to the group of relocation for land acquisition of this project? ��<HV����1R��
������ ����� � � � � � �
If you are in the group of relocation, are you willing to move?: ��<HV���1R��
������ ����� � � � � � �
What aspects of the project do you think adversely affected your life? ��6XUIDFH�ZDWHU�pollution; ��*URXQGZDWHU�SROOXWLRQ����1RLVH�pollution; ��$LU�SROOXWLRQ����6ROLG�ZDVWH�pollution;�
������ ������ ������ � ������
Do you think it will play a positive role in comprehensive environmental control in the area after the completion of the project? Yes; No; Maybe;�
������ � ������ � � � �
Do you think it will play a positive role in living conditions of local residents in the area after the completion of the project? ��<HV����No; ��0D\EH��
������ � ������ � � � �
Do you think it will play a positive role in local economic development of the area after the completion of the project? ��<HV����1R����Maybe;�
������ � ������ � � � �
Do you think the project will play a positive role in employment of the area? ��<HV����1R����0D\EH��
������ � ������ � � � �
��Subproject of Puxing Town,
Xinjin County�
Do you support the construction of the project? ��<HV����1R����,QGLIIHUHQW�
������ � ������ � � � �
���
1. What is your attitude towards the construction of the project? (1) Support (2) Oppose (3) No comments�
96.80% 0% 3.20% � � � �
2. What do you think the significance of the project to the urban development and social economy? (1) Significant (2) General (3) Not significant (4) No comment;
90.30% 4.80% 0% 0% � �
3. How do you know the Project? (1) Radio & television (2) Newspapers (3) Network (4) Heard about (5) Do not know;
34.70% 9.70% 20.20% 45.10% 4.80%
4. What do you think the beneficial effects the project will bring? (1) Promote economic development (2) Speed up urban construction (3) improve the living environment (4) other;
70.10% 72.60% 84.70% 0% � �
5. What do you think the environmental pollution degree of the project might cause? (1) Serious (2) Slight (3) No effect
25% 40.30% 29.80% � � � �
6. What do you think the main environmental problem of the project will be? (1) Soil Erosion (2) Air pollution (3) Noise (4) Surface water pollution (5) Landscape impact
4.80% 36.20% 70.10% 15.30% 7.30%
��Rainwater and Wastewater
Pipe network & Road Reconstruction Subproject in Daying County (Penglai
Town)�
7. What do you think the impact on your life quality brought by the construction of the project will be (1) Positive (2) Negative (3) No impact;
95.10% 0% 5.60% � � � �
����
98
Statistics of related questions (%)�
S/N� Name of subproject� Questions�� � � � �
Copies of survey
list (copy)
8. What is your opinion on house dismantling & relocation etc.? (1) Reasonable economic compensation (2) Give a newly built house (3) Improve the living conditions (4) Other
65.30% 0% 29.80% 0% � �
� �
9. Which way do you think is more effective to solve the environmental problems caused by the project? (1) Complain to the environmental protection department (2) Resort to the legal process (3) Prevent construction and operation of the project
59.70% 40.30% 0% � � � �
�
1. What is your attitude towards the construction of the project? A. Support; B. Oppose; C. Indifferent
���%� �%� �%� � � �
2. Do you think the project will contribute to the regional economic development? A. Yes; B. No; C. Indifferent
����%����%� �%� � � �
3. Do you think the project is beneficial to the improvement of the living environment and enhancement of life quality? A. Yes; B. No; C. Indifferent
���%�� �%� �%� � � �
4. What is your opinion on the project? A. Start as soon as possible; C. Premature; C. Indifferent
����%� �%� �%� � � �
5. What is your opinion on the land acquisition and demolition of illegal buildings for the project? A. Support B. Oppose C. Indifferent
����%� �%� �%� � � �
6. Do you know the region’s demolition, compensation and resettlement policy? A. Yes; B. No
����%� ��%� � � � � �
7. What do you think about current situation of environmental quality in this area? A. Bad; B. General; C. Good
��%�� ���%�� �%� � � �
8. What do you think the most negative impact on the surrounding environment of the project is? A. Natural environment; B. Social environment; C. Ecological environment
����%� ���%�����%� � � �
9. What kind of measure do you think the project should take to mitigate the impact on the environment? A. Strengthening construction management; B. Reasonable alignment; C. House removal
����%�����%� ��%� � � �
��
Infrastructure Construction Subproject of Yingxi Town,
Shunqing District, Nanchong City�
10. What the general trend do you think the impact of the project on the local environment is? A. Deterioration of environmental quality; B. No impact; C. Improvement of the environment quality
���%�����
��%������%� � � �
���
1. Are you in the range of land acquisition and resettlement of the project? ��<HV����No;
7.80% 92.20% � � � � � �
2. If you are in the group of relocation, are you willing to move?: ��<HV���1R� 95.50% 4.50% � � � � � �
3. What aspects of the project do you think adversely affected your life? ��6XUIDFH�water pollution; ��*URXQGZDWHU�SROOXWLRQ����1RLVH�SROOXWLRQ�����$LU�pollution; ��Solid waste pollution;
4.40% 1.10% 67.80% 17.80% 8.90%
��Binjiang Road (Southern
Section) and Sewage Interception Subproject in Fengming Town, Pengshan
County�
4. Do you think it will play a positive role in comprehensive environmental control in the area after the completion of the project? ��<HV����1R����0D\EH�
100% 0% 0% � � � �
���
99
Statistics of related questions (%)�
S/N� Name of subproject� Questions�� � � � �
Copies of survey
list (copy)
5. Do you think it will play a positive role in improving traffic conditions in Pengshan County after the completion of the project? ��<HV����1R����0D\EH�
38.90% 61.10% 0% � � � �
6. Do you think it will play a positive role in local economic development of the area after the completion of the project? ��Yes; ��1R����0D\EH�
86.70% 0% 13.30% � � � �
7. Do you think the project will play a positive role in employment of the area? ��<HV����1R����0D\EH�
87.80% 0% 12.20% � � � �
� �
8. Do you support the construction of the project? ��<HV����1R����,QGLIIHUHQW 100% 0% 0% � � � �
�
1. What is your attitude towards the construction of the project? (1) Support (2) Oppose (3) No comments;
82.69% 0.00% 8.65% � � � �
2. What do you think the significance of the project to the urban development and social economy? (1) Significant (2) General (3) Not significant (4) No comment;
70.19% 24.04% 0.00% 0.96% � �
3. How do you know the Project? (1) Radio & television (2) Newspapers (3) Network (4) Heard about (5) Do not know;
51.92% 21.15% 6.73% 13.46% 0.96%
4. What do you think the beneficial effects the project will bring? (1) Promote economic development (2) Speed up tourism development (3) improve the living environment (4) other;
42.31% 39.42% 22.12% 2.88% � �
5. What do you think the environmental pollution degree of the project might cause? (1) Serious (2) Slight (3) No effect
5.77% 50.00% 39.42% � � � �
6. What do you think the main environmental problem of the project will be? (1) Soil Erosion (2) Air pollution (3) Noise (4) Surface water pollution (5) Landscape impact
28.85% 7.69% 20.19% 4.81% 0.96%
7. Which way do you think is more effective to solve the environmental problems caused by the project? (1) Complain to the environmental protection department (2) Resort to the legal process (3) Prevent construction and operation of the project;
37.50% 32.69% 2.88% � � � �
8. What do you think the impact on your life quality brought by the construction of the project will be (1) Positive (2) Negative (3) No impact;
80.77% 1.92% 13.46% � � � �
��
Environmental Treatment Subproject of Hongya
County (Hongchuan Town)�
9. What is your opinion on house dismantling & relocation etc.? (1) Reasonable economic compensation (2) Give a newly built house (3) Improve the living conditions (4) Other
56.73% 9.62% 25.96% 0.00% � �
����
1. What aspects of the project do you think adversely affected your life? Surface water pollution; Groundwater pollution; Noise pollution Air pollution; Solid waste pollution;
33%� � 67%� � ���
Waterway Treatment Project (Downtown
Section) of Xiaoshanzi River in Jialing District,
Nanchong City�2. Do you think it will play a positive role in
comprehensive environmental control in the area after the completion of the project? ��<HV����1R����0D\EH�
100%�� � � � � � �
����
100
Statistics of related questions (%)�
S/N� Name of subproject� Questions�� � � � �
Copies of survey
list (copy)
3. Do you think it will play a positive role in living conditions of local residents in the area after the completion of the project? ��Yes; ��1R����0D\EH�
98.3%�� � 1.7%� � � � �
4. Do you think it will play a positive role in local economic development of the area after the completion of the project? ��Yes; ��1R����0D\EH�
83.3%�� � 16.7%� � � � �
5. Do you think the project will play a positive role in employment of the area? ��<HV����1R����0D\EH�
95%�� � 5%� � � � �
� �
6. Do you support the construction of the project? ��<HV����1R����,QGLIIHUHQW� 100%�� � � � � � �
�
1. What is your attitude towards the construction of the project? (1) Support (2) Oppose (3) No comments
87.00% 0.00% 13.00% � � � �
2. What do you think the significance of the project to the urban development and social economy? (1) Significant (2) General (3) Not significant (4) No comment;
77.00% 23.00% 0.00% 0.00% � �
3. How do you know the Project? (1) Radio & television (2) Newspapers (3) Network (4) Heard about (5) Do not know;
42.00% 10.00% 16.00% 40.00% 0.00%
4. What do you think the beneficial effects the project will bring? (1) Promote economic development (2) Speed up urban construction (3) Improve the living environment (4) other;
33.00% 56.00% 38.00% 0.00% � �
5. What do you think the environmental pollution degree of the project might cause? (1) Serious (2) Slight (3) No effect
2.00% 30.00% 67.00% � � � �
6. What do you think the main environmental problem of the project will be? (1) Soil Erosion (2) Air pollution (3) Noise (4) Surface water pollution (5) Landscape impact
12.00% 32.00% 59.00% 6.00% 1.00%
7. What do you think the impact on your life quality brought by the construction of the project will be (1) Positive (2) Negative (3) No impact;
34.00% 41.00% 28.00% � � � �
8. What is your opinion on house dismantling & relocation etc.? (1) Reasonable economic compensation (2) Give a newly built house (3) Improve the living conditions (4) Other
48.00% 52.00% 0.00% 0.00% � �
��
Northern Outer Ring Road Construction Subproject of
Zhonglong Town of Zizhong County�
9. Which way do you think is more effective to solve the environmental problems caused by the project? (1) Complain to the environmental protection department (2) Resort to the legal process (3) Prevent construction and operation of the project
78.00% 0.00% 21.00% � � � �
����
1. What is your attitude towards the construction of the project? A. Support; B. Oppose; C. Indifferent
76.80% 0% 23.20% � � � �
2. What do you think the significance of the project to the urban development and social economy? (1) Significant (2) General (3) Not significant (4) No comment;
61.70% 23.50% 0% 14.80% � �
��Infrastructure Construction Subproject of Miyi County
(Panlian Town)�
3. How do you know the Project? (1) Radio & television (2) Newspapers (3) Network (4) Heard about (5) Do not know;
39.80% 6.00% 1.20% 49.40% 3.60%
���
101
Statistics of related questions (%)�
S/N� Name of subproject� Questions�� � � � �
Copies of survey
list (copy)
4. What do you think the beneficial effects the project will bring? (1) Promote economic development (2) Speed up urban construction (3) improve the living environment (4) other;
25.70% 46.70% 26.70% 1.00% � �
5. What do you think the environmental pollution degree of the project might cause? (1) Serious (2) Slight (3) No effect
22.50% 52.50% 25.00% � � � �
6. What do you think the main environmental problem of the project will be? (1) Soil Erosion (2) Air pollution (3) Noise (4) Surface water pollution (5) Landscape impact
7.30% 31.20% 40.40% 16.50% 4.60%
7. Which way do you think is more effective to solve the environmental problems caused by the project? (1) Complain to the environmental protection department (2) Resort to the legal process (3) Prevent construction and operation of the project
49.30% 46.60% 4.10% � � � �
8. What do you think the impact on your life quality brought by the construction of the project will be (1) Positive (2) Negative (3) No impact;
37.80% 28.00% 34.10% � � � �
� �
9. What is your opinion on house dismantling & relocation etc.? (1) Reasonable economic compensation (2) Give a newly built house (3) Improve the living conditions (4) Other
43.80% 36.50% 12.50% 7.30% � �
�
5.4 Information Disclosure Seen from the survey results, it can be concluded that there is a good public response on the project; the construction of project has received the support of most of the local people; in addition, with the increasing awareness on environmental protection, most of people have put forward that it shall play a positive role on promoting urban economy and improving the living environment after completion of the project; however, there are also some environmental problems, people hope to take corresponding mitigation measures to gain effective control. The following conclusions can be drawn from above statistic results of the survey:
(1) The survey mainly focused on people living around the project area; surveyed people are characterized by representative;
(2) The majority surveyed people expressed that they are willing to support construction of the project.
(3) People believe that the construction of this project will play an important role in promoting urban economic development and improving infrastructure. Whereas, small portion of them think that the construction will impose negative impacts on regional acoustic environment and atmospheric environment; therefore, during the construction process, protection on facilities should be strengthened to ensure that local acoustic environment and atmosphere will not be destroyed.
All in all, public sentiments and opinions reflected in the survey are of high reference value on the project construction, operation and management.
5.5 Responses on public opinions During the period of EIA and negotiation with the public, EIA staff have made detailed explanations one by one on any doubt the public had and also provided feedback to the Client and design institute on those
102
environmental issues concerned by the public in time so that they will focus and improve in the design of next stage; at the same, corresponding environmental protection requirements and measures are raised in the EIA report.
103
Chapter VI Environmental Management Plan 6.1 Environmental management institutions 6.1.1 Environmental management system and procedures
Refer to Table 6.1-1 for environmental management system and procedures of the Project and to Figure 6.1-1 for frame diagram of environmental management and institutions.
Table 6.1-1 Sketch of environmental management system and procedures
Project phase Content of
environmental protection
Unit implementing
mitigation measures
Environmental protection and management department
Environmental protection and
supervision department
Construction period
Implementing mitigation measures and
handle emergent environmental problems
Construction company
Environmental Protection Bureau of
each district and county and the Client
of the project
Construction supervision institution
and provincial and municipal
environmental protection bureau
Operation period
Implementing mitigation measures and
environmental management
The Client or operation and management
unit
Environmental Protection Bureau of
each district and county
Provincial and municipal
environmental protection bureau
6.1.2 Environmental management institution and its responsibility
1. Environmental protection management institutions
Refer to Table 6.1-2 for environmental protection management institution and its responsibility.
Table 6.1-2 Environmental management institutions and the main responsibility
Name of the institution Responsibility of the institution Remarks
PPMO
Coordinate and manage Sichuan Small Towns Development Project and ensure that environmental protection conforms to requirements for World Bank safeguard policies.
There are two daily environmental protection experts. Environmental supervisor (engineer) is to be arranged during construction period for supervising the whole process of mitigation measures (pursuant to EMP and construction tender document) of each bid section.
Environmental Protection Department of Sichuan Province and municipal environmental protection bureau of the project area
Guide the Client to implement PRC Laws and Regulations on environmental protection, be responsible for review and approval, supervise implementation of all mitigation measures, and be responsible for review and acceptance of environmental protection.
Environmental Protection Department of Sichuan Province is responsible for review and approval of EIA reports for all subprojects.
Traffic Bureau of the districts and counties
Be responsible for supervision and management of mitigation measures and facilities of road works in the administrative areas during operation period
Water Conservancy Bureau of the districts and counties
Be responsible for supervision and management of mitigation measures and facilities of waterway treatment works in the administrative areas during operation period
Environmental Be responsible for supervision and management of
104
Name of the institution Responsibility of the institution Remarks
Protection Bureau of the districts and counties
environmental protection of projects of WB in the administrative areas during construction period and operation period
6.1.2 Supervision institution
Refer to Table 6.1-3 for environmental protection and supervision institutions and their responsibilities.
Table 6.1-3 Environmental protection and supervision institutions and their main responsibilities
Name of the institution Responsibility of the institution Remarks
Environmental Protection Department of Sichuan
Province
Be responsible for review and approval of EIA reports of the proposed projects, supervise implementation of all mitigation measures of the proposed projects, and be responsible for review and acceptance of environmental protection of the proposed projects.
Administrative Department of Environmental Protection Department of Sichuan
Province
Municipal environmental protection bureau
Supervise and manage environmental protection of construction projects, organize and coordinate relevant institutions to serve for environmental protection, supervise implementation of project Environmental Management Plan, be responsible for completion acceptance of environmental protection facilities of the project, confirm environmental rules and standards that shall be implemented, guide the environmental protection bureaus of the districts and counties in environmental supervision and management during construction period and operation period, accept, investigate and coordinate to handle complaint from the public and supervise improvement of environmental protection facilities and measures.
Municipal Environmental Protection Bureaus of Chengdu City, Panzhihua City, Nanchong
City, Suining City, Meishan City and Neijiang City
Eight environmental protection bureaus of the
districts and counties
Accept guide from superior environmental protection departments, supervise the Client to implement Environmental Management Plan, implement relevant laws and regulations on environmental management, coordinate all departments in environmental protection, be responsible for inspection, supervision and management of construction, completion and operation situation of environmental protection facilities in the administrative areas, accept, investigate and coordinate to handle complaints from the public and supervise improvement of environmental protection facilities and measures.
Environmental protection bureaus of two districts: Jialing District and Shunqing District
Environmental protection bureaus of six counties: Xinjin
County, Daying County, Pengshan County, Hongya
County, Zizhong County and Miyi County
Construction supervision institution
Environmental supervision in engineering preparation period mainly includes: reviewing articles about environmental protection specified in Engineering Construction Organization Plan prepared by the Construction Company, checking and confirming whether the environmental protection system established by the Construction Company is proper or not, participating in review and approval and submitting of Commencement Report of Unit Engineering, and supervising construction of all contaminant treatment works,
In next phase, the Consulting Company is determined by
bidding.
105
Name of the institution Responsibility of the institution Remarks and its implementation. Environmental supervision during construction period mainly includes: preparing Key Points for Environmental Protection according to construction organization design of each bid section, promoting environmental protection to the Construction Company so as to point out the sensitive issues of environmental pollution, proposing detailed mitigation measures according to main contaminants generated during construction process, reviewing Environmental Protection Schemes in Engineering Construction submitted by the Construction Company, inspecting whether the environmental protection system of the Construction Company is operating normally or not, inspecting implementation of mitigation measures and supervising measures for soil and water conservation. Environmental supervision during operation period includes: reviewing Conclusive Report of Environmental Protection in Construction prepared by the Construction Company, collecting completion documents of environmental protection, supervising environmental protection acceptance of the projects and preparing Conclusive Report of Environmental Supervision.
106
Fig. 6.1-1 Frame diagram of environmental management and supervision institutions of SSTDP project
107
6.2 Environmental Management Plan 1. Environmental management of the Client
The Client shall actively develop bidding design for all mitigation measures in bidding design phase. During construction period, the Client will be responsible for environmental protection management from commencement to completion and acceptance period with main contents as follows:
(1) Preparing implementation rules and management methods on environmental protection during construction period.
(2) Being responsible for incorporating bidding design results on mitigation measures into tender document and contract.
(3) Formulating annual environmental protection plan.
(4) Reviewing and arranging annual environmental protection fees.
(5) Supervising the Contractor in terms of implementation of mitigation measures.
(6) Organizing and implementing mitigation measures and monitoring issues undertaken by the Client.
(7) Coordinating with environmental protection department and other relevant departments.
(8) Preparing annual environmental protection report, monthly, quarterly and annual statements.
(9) Organizing and developing environmental protection promotion, education and training.
2. Environmental management of the Contractor
The Contractor shall be responsible for environmental protection of the involved construction activities, including:
(1) Formulating annual environmental protection plan.
(2) Inspecting construction progress, quality, operation and detection of environmental protection facilities and handling relevant problems in implementation process.
(3) Reviewing usage of annual environmental protection fee.
(4) Reporting implementation of environmental protection terms and conditions in the contract.
3. Environmental management of environmental protection department and supervision department
The local environmental protection bureaus of districts and counties and the Consulting Company shall be responsible for daily supervision and inspection and implementation of all mitigation measures. In addition, relevant involved departments such as traffic bureau and water conservancy bureau and so on shall also supervise said items.
6.3 Training Program 1. Training program
To guarantee smooth and effective implementation of environmental protection, all staff (including constructors and so on) must be trained in terms of knowledge and skills on
108
environmental protection. In addition to explanation of importance and significance of proposed projects to all staff, different training should be performed for staff according to different posts.
(1). On-the-job training of environmental management personnel
On-the-job training for environmental management personnel aims to enhance environmental management during construction period and operation period and guarantee quality of environmental monitoring and effective environmental management so as to improve the quality of the project. On-the-job training can enable the environmental management personnel to recognize major problems during construction period and get the knowledge of problems and weakness in environmental management so as to report to environmental protection department in time and adopt necessary control measures. During construction period, the management institution of the project shall invite experts on environmental protection or environmental management personnel with similar management experiences to explain possible environmental problems and the solutions on site.
(2) Training of construction management personnel and constructors for each project
Before commencement, the management personnel and constructors for the company which has won the bid shall be trained in terms of environmental knowledge so as to avoid damage to the environment due to wrong operation. Training of contract management personnel aims to clear the environmental protection liability to be borne by the Construction Company and that to constructors aims to enhance correct operation during construction period so as to minimize and avoid harm to the environment. The training may enable the engineering management personnel to get the knowledge of its obligation on environmental protection and possible results of damage to the environment so that the constructors can have intuitionistic understanding of the degree and method for protection of environmental sensitive points. According to actual situation of the project, the constructors shall be trained for one week.
(3) During project operation period, the project management institution shall hold training for the staff periodically so that the staff can get the knowledge of possible environmental problems concerning their posts and adopt necessary measures. Each staff shall be aware of environmental protection.
2 Training plan
Table 6.3-1 List of training on environmental protection of subproject in Xinjin
Method, personnel, and person-time of training
Project Training content Domestic (person)
Foreign (person)
Training time (year)
Training cost (10,000 yuan)
Environmental protection rules, construction planning, environmental
monitoring principles and codes 2
1 technical leader
2005 - 2007
7.0
Public relations 1 1 2005 - 2007
5.0
Pollution during construction period, control and management
2 1 2005 - 2007
4.0
Pipe network and road construction
Knowledge on post environmental protection
2 1 2005 - 2007
3.0
Subtotal 7 4 19.0
109
Table 6.3-2 Training plan on environmental protection of subproject in Daying
S/N Training target Training content Organizer Trainee (person)
Training time
Location Budget (10,000 yuan)
1
Staff of PMO and engineering environment
protection office (division)
Knowledge concerning environmental protection and
management The Client 2 15 days Chengdu 0.6
2
Staff of PMO and engineering environment
protection office (division)
Learn mature environmental management experience by visiting similar domestic
engineering project
The Client 2 5 days / 0.2
3
Staff of PMO and engineering environment
protection office (division)
Learn knowledge concerning environmental protection and
management, and get the knowledge of content of EIA
report of the project
The Client 2 15 days Chengdu 0.3
4
Field Management Personnel of the
Consulting Company and engineering
environment supervisor
Knowledge concerning environmental supervision,
content of the EIA report of the project, and content of relevant environmental protection and
design documents of the project
The Client and
Consulting Company
1 15 days Chengdu 0.3
6
Major Technical Management Personnel and Construction Management
Personnel of the Contractor
Knowledge concerning environmental protection and
management
The Client and
contractor 3 15 days Chengdu 0.9
7 Constructor Knowledge of the project concerning environmental
protection
The Client and
contractor 150 5 days Daying 7.5
Total / / / 9.8
Table 6.3-3 Training plan on environmental protection of subproject in Yingxi Town, Shunqing District, Nanchong City
S/N Training target Training content Organizer Trainee (person)
Training time
Location Budget (10,000 yuan)
1 Staff of PMO and engineering environment
protection office (division)
Learn knowledge concerning
environmental protection and
management, and get the knowledge of content of EIA report of the project
The Client 2 10 days Chengdu 0.5
2 Staff of PMO and
engineering environment
protection office (division)
Learn mature environmental
management experience by visiting similar
domestic engineering project
The Client 2 5 days / 0.2
110
3 Field Management
Personnel of the Consulting
Company and engineering environment supervisor
Knowledge concerning environmental
supervision, content of the EIA report of the
project, and content of relevant environmental protection and design
documents of the project
The Client and
Consulting Company
2 10 days Chengdu 0.5
4 Major Technical Management Personnel and Construction Management
Personnel of the Contractor
Knowledge concerning environmental protection and management
The Client and
contractor 3 5 days Chengdu 0.3
5
Constructor
Knowledge of the project concerning
environmental protection
The Client and
contractor 50 2 days Nanchong 1.0
Total / / / / 2.0
Table 6.3-4 Training plan on environmental protection of subproject of Fengming Town in Pengshan County
S/N Training target Training content Organizer Trainee (person)
Training time
Location Budget (10,000 yuan)
1 Staff of PMO and engineering environment protection office (division)
Learn knowledge concerning
environmental protection and management, and get the knowledge of
content of EIA report of the project
The Client
2
10 days Chengdu 0.5
2 Staff of PMO and
engineering environment
protection office (division)
Learn mature environmental
management experience by visiting similar
domestic engineering project
The Client 2 5 days / 0.2
3 Field Management Personnel of the
Consulting Company and engineering environment supervisor
Knowledge concerning environmental
supervision, content of the EIA report of the
project, and content of relevant environmental protection and design
documents of the project
The Client and
Consulting Company
2 10 days Chengdu 0.5
4 Major Technical Management Personnel and Construction Management
Personnel of the Contractor
Knowledge concerning environmental protection
and management
The Client and
contractor 3 5 days Chengdu 0.3
5 Constructor
Knowledge of the project concerning
environmental protection
The Client and
contractor 100 3 days Pengshan 3.0
Total / / / / 4.0
111
Table 6.3-5 Training plan on environmental protection of Hongya (Hongchuan Town) Subproject
S/N Training target Training content Organizer Trainee (person)
Training time
Location Budget (10,000 yuan)
1
Staff of PMO and engineering environment
protection office (division)
Knowledge concerning environmental protection and
management The Client 2 15 days Chengdu 0.6
2
Staff of PMO and engineering environment
protection office (division)
Learn mature environmental management experience by visiting similar domestic
engineering project
The Client 2 5 days / 0.2
3
Staff of PMO and engineering environment
protection office (division)
Learn knowledge concerning environmental protection and
management, and get the knowledge of content of EIA
report of the project
The Client 2 7 days Chengdu 0.3
4
Field Management Personnel of the
Consulting Company and engineering
environment supervisor
Knowledge concerning environmental supervision,
content of the EIA report of the project, and content of relevant environmental protection and
design documents of the project
The Client and
Consulting Company
1 15 days Chengdu 0.3
6
Major Technical Management Personnel and Construction Management
Personnel of the Contractor
Knowledge concerning environmental protection and
management
The Client and
contractor 2 15 days Chengdu 0.6
7 Constructor Knowledge of the project concerning environmental
protection
The Client and
contractor 100 5 days Hongchuan 5.0
Total / / / 7.0
Table 6.3-6 Training plan on environmental protection of Subproject in Jialing District of Nanchong City
S/N Training target Training content
Organizer Trainee (person)
Training time
Location Budget (10,000 yuan)
1 Staff of PMO and
engineering environment protection office (division)
Knowledge concerning
environmental protection and management
The Client 2 10 days Chengdu 0.3
2 Staff of PMO and
engineering environment protection office (division)
Learn mature environmental management experience by visiting similar
domestic engineering
project
The Client 2 5 days / 0.2
112
3 Staff of PMO and
engineering environment protection office (division)
Learn knowledge concerning
environmental protection and management, and get the
knowledge of content of EIA report of the
project
The Client 2 10 days Chengdu 0.3
4
Field Management Personnel of the Consulting Company and engineering environment supervisor
Knowledge concerning
environmental supervision,
content of the EIA report of the project,
and content of relevant
environmental protection and
design documents of
the project
The Client and
Consulting Company
1 10 days Chengdu 0.2
5
Major Technical Management Personnel and Construction Management Personnel of the Contractor
Knowledge concerning
environmental protection and management
The Client and
contractor 3 15 days Chengdu 0.9
6 Constructor
Knowledge of the project concerning
environmental protection
The Client and
contractor 80 5 days Nanchong 5.0
Total / 6.9
Table 6.3-7 Training plan on environmental protection of Subproject in Zhonglong Town of Zizhong County
S/N Training target Training content Organizer Trainee (person)
Training time Location Budget (10,000 yuan)
1
Staff of PMO and engineering environment
protection office (division)
Knowledge concerning
environmental protection and management
The Client 2 15 days Chengdu 0.6
2
Staff of PMO and engineering environment
protection office (division)
Learn mature environmental management
experience by visiting similar domestic
engineering project
The Client 2 5 days / 0.2
3
Staff of PMO and engineering environment
protection office (division)
Learn knowledge concerning
environmental protection and
management, and get the knowledge of
content of EIA report
The Client 2 15 days Chengdu 0.3
113
of the project
4
Field Management
Personnel of the Consulting
Company and engineering environment supervisor
Knowledge concerning
environmental supervision, content of the EIA report of the
project, and content of relevant
environmental protection and design
documents of the project
The Client and Consulting Company
1 15 days Chengdu 0.3
6
Major Technical Management Personnel and Construction Management
Personnel of the Contractor
Knowledge concerning
environmental protection and management
The Client and contractor
4 15 days Chengdu 1.2
7 Constructor
Knowledge of the project concerning
environmental protection
The Client and contractor
150 5 days Zizhong 7.5
Total / / / 10.1
Table 6.3-8 Training plan on environmental protection of Subproject in Miyi County (Panlian Town)
S/N Training target Training content Organizer Trainee (person)
Training time Location Budget (10,000 yuan)
1
Staff of PMO and engineering environment
protection office (division)
Knowledge concerning environmental protection and management
The Client 2 15 days Panzhihua 0.6
2
Staff of PMO and engineering environment
protection office (division)
Learn mature environmental management
experience by visiting similar domestic
engineering project
The Client 2 5 days / 0.2
3
Staff of PMO and engineering
environmental protection office
(division)
Learn knowledge concerning
environmental protection and
management, and get the knowledge of
content of EIA report of the project
The Client 2 15 days Panzhihua 0.3
4
Field Management Personnel of the
Consulting Company and engineering environment supervisor
Knowledge concerning environmental
supervision, content of the EIA report of the
project, and content of relevant environmental protection and design
documents of the project
The Client and Consulting Company
1 15 days Panzhihua 0.3
6 Major Technical
Management Personnel and
Knowledge concerning environmental protection and
The Client and contractor
3 15 days Panzhihua 0.9
114
Construction Management
Personnel of the Contractor
management
7 Constructor
Knowledge of the project concerning
environmental protection
The Client and contractor
150 5 days Miyi 7.5
Total / / / 9.8 Training on environmental protection and management, which will cost all together 686,000 yuan, shall be carried out for staff of the Client, Construction Company, and Consulting Company for each subproject of SSTDP project.
6.4 Mitigation measures operation 6.4.1 Mitigation measures and expenditure budget
Table 6.4-1 Mitigation measures and budget summary of each subproject
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Repair wastewater and gravel screening system,
to be drained after lowering groundwater
level
Sedimentation and filtration before being discharged in accordance with relevant standards, with some utilized in a comprehensive way
1.50 Water pollution
prevention and control
Domestic wastewater of constructors
Used for farming irrigation and forest land afforestation locally after treatment in the simple septic tank
0.20
Prevention against
ambient air pollution
Fuel machinery transport vehicles and
construction dust
Sprinkling for reducing dust, reasonable arrangement of construction procedures, and green belts
0.80
Prevention and control measures on
noise
Construction machinery transport vehicles
Traffic control measures, and sound insulation facilities and green belts for high-noise work areas
1.20
Domestic wastes of constructors
Solid wastes Spoil
Piling in a centralized way, arranging one spoil disposal area; and the wastes shall be treated by the municipal environment and sanitation departments.
0.20
Temporary slag yard works
Water conversancy measures, and water sprinkling and dust reduction 1.00
Construction excavation, permanent land requisition and
temporary land requisition
Compensation and restoration 1.50 Water and soil conservancy
and ecological restoration
Restoration and renovation of
construction site and slag yard
Vegetation restoration 2.00
Construction period Ambient air monitoring, soil and water loss monitoring, noise monitoring 0.22 Environment
monitoring costs Operation period Ambient air and traffic noise
monitoring 0.12
1 Subproject of Puxing Town, Xinjin County
Subtotal 8.72
115
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Control of water and soil loss
Dust cover at the temporary piling points for muck
0.05 Ecology
Vegetation restoration Reclamation and make-up planting in the temporarily occupied land
0.05
Noise from construction machines
The construction schedule shall be rationally arranged to enforce management.
Noise Noise from traffic and
transport
Traffic control shall be strengthened, and signs of horn prohibition and speed limit shall be set.
Construction slime water
After simple sedimentation and treatment, the clean water on the upper layer shall be discharged into farming irrigation channels.
0.02
Flushing water for machines
Recycled after grease trap and sedimentation 0.02
Water pollutants
Domestic wastewater and fecal sewage Used as farmyard manure
Dust from building demolition
Enclosed networks such as dust cover shall be built around the building complex
0.10
Dust Dust cloth protection and site clearance shall be arranged on the temporary yard
0.08 Atmospheric
pollutants
Dust from cars Sprinkling for dust reduction, and the washing stations shall be built for arriving and departing vehicles
0.02
Construction spoil 1.0×104m3
The spoil shall be sent to the industrial park for filling. 0.15
Domestic wastes The domestic wastes shall be treated by the environment and sanitary department.
Solid wastes
Sporadic wastes from paving
The wastes shall be recovered or timely collected locally.
Environmental management
and monitoring
Construction period
Construction environmental supervision system shall be implemented, and contractual system shall be adopted to incorporate relevant mitigation measures into the production quality management system and acceptance indicator system of each stage. The construction dust, noise, water and soil conservancy as well as other control measures shall be supervised by designated workers, and relevant laws and regulations on environmental protection shall be promulgated.
0.20
Environment monitoring
Construction period and operation period Regional ambient noise and air quality 0.10
2
Rainwater and Wastewater
Pipe network & Road
Reconstruction Works in Daying County (Penglai Town)
Subtotal 0.89
3 Infrastructure Construction Subproject of Yingxi Town,
Waste gas treatment Dust
Sprinkling and dust control on construction work surface, construction site and construction roads
0.05
116
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Material storage yard, sprinkling and dust proof on the temporary storage yard for spoil; the coverage stock and dampening materials shall be adopted.
0.05
Truck transport with van; cleaning the dropped materials on the roads along the line, and sprinkling to reduce the dust
0.10
Dust screen shall be configured for structure demolition; the construction wastes and slag shall be removed and cleared in time, with sprinkling for dust reduction
0.05
Cleaning on the construction site; and prompt greening restoration 0.05
Dust
A professional maintenance and curing team shall be established, which shall be responsible for cleaning the wastes along the road in time
0.02
Car exhaust
The traffic management shall be strengthened, and the cars with excessive exhaust must be banned from onto the roads; greening along both sides of the roads shall be strengthened so as to purify the air
0.02
Temporary sedimentation tanks shall be built on all construction sites, and the tanks range from 10 - 20m3, grease traps shall be constructed at the flushing points; discharge channels shall be built around the temporary stock yard for slag, and sedimentation tank shall be built at the catchments.
0.05
Construction wastewater
Construction management shall be strengthened along the line in rainy seasons to prevent building slag wastewater from being discharged into the river.
0.02
Waste water treatment
Rainwater on roads
Grids shall be arranged for water discharge in the rainwater pipe network, which shall be cleaned on a regular basis, so as to ensure smooth drainage of the rainwater pipeline.
0.02
Noise-insulation and vibration resistance measures shall be provided for highly noisy equipment, and blocking shall be provided for construction site.
0.05
Yingxi Town, Shunqing District,
Nanchong City
Noise treatment Equipment noise
The monitoring of construction site and sensitive points shall be strengthened, and the prevention and control measures shall be adjusted based on the monitoring results.
0.05
117
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Construction management shall be enforced, and the construction layout shall be reasonably conducted. The night construction shall be prohibited for highly noisy equipment. The transportation routes shall be reasonably specified. Measures of controlling speed and horn prohibition shall be taken, and the machinery equipment shall be repaired and maintained on a regular basis.
0.02
Traffic noise along the line shall be tested regularly, and the control measures shall be adjusted and improved combining with monitoring results.
0.10
Noise from traffic and transport
The layout of land requisition along the line shall be reasonably planned.
Construction wastes
Retaining walls shall be provided for temporary piling of earthwork, and partial excavated soil must be backfilled and utilized and excessive earthwork shall be removed and cleaned in time. The demolished wastes shall be sent to the designated slag dump, and the reasonable transportation route shall be assigned. The dropped materials must be cleaned.
0.05
Domestic wastes
The temporary collection points shall be arranged on the construction site, and disinfection and sterilization measures shall be adopted.
0.05
Solid waste treatment
Wastes on the roads along the line
The highway maintenance team shall clear the wastes in time. 0.02
Greening Greening on both sides of the roads; greening on embankments 5.00
Environmental management and monitoring
An environmental management agency shall be established during the construction period, with 2 to 3 full-time staffs, and the environmental management during the operation period shall be carried out by the Nanchong Municipal Environmental Protection Bureau; Nanchong Environmental Monitoring Station shall be responsible for environmental monitoring work; and construction environment supervision shall be carried out during the construction period.
0.10
118
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Ecological and environmental protection: temporarily occupied land, greening and vegetation on the construction site shall be recovered in time. Topsoil protection shall be provided during the construction, and backfilling shall be carried out in time.
0.10
Obeying and civilized construction management: notice boards and the complaint hotline shall be provided.
0.02
Others
Regional heritage conservation shall be strengthened, and avoiding measures must be taken.
0.01
Subtotal 6.00 Temporary
sedimentation tank on construction site
1 0.01 Water
pollution prevention and control Grease trap on
construction site 1 0.01
Temporary sound barrier
2 0.06
Earplugs 200 pairs 0.004 Ventilation and sound
insulation window 3 0.24
Noise prevention and control
Reserved noise deduction expenses / 0.11
Trash bin and solid wastes transport 3 0.01
Solid waste treatment Trash bin and solid
wastes transport 10 0.02
Noise dust measures Simple water mill 2 0.03
Scope of and measures for
environmental risks
Signs of speed limit and other information / 0.01
Measures of soil and water conservation
Measures of soil and water conservation 0.50
Staff training Training of relevant personnel 0.05
Environmental supervision
Environmental supervision during the
construction period 0.09
Environmental monitoring during the construction period
0.08 Environment monitoring Environmental
supervision during the operation period
0.10
Environmental protection acceptance
Acceptance upon completion of environmental
protection project
0.10
4 Binjiang Road
(Southern Section) and
Sewage Interception Subproject in
Fengming Town,
Pengshan County
Reserved cost Temporary mitigation measures; and 0.50
119
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Contingency measures Subtotal 1.924
Water environment
A simple septic tank shall be arranged, and domestic wastewater can be used for irrigation; existing facilities near the roads shall be utilized for maintaining and washing the machinery and equipment; the slurry of the cofferdam construction shall be discharged into the surface water after the sedimentation or reused as the process water.
0.02
Noisy machinery such as generators shall be set at remote places, far away from residential houses.
Temporary fences and other noise-reduction measures shall be offered. 0.02
Construction time shall be rationally arranged. Try to avoid night construction, or low-noise construction work shall be arranged at the night.
The traffic time for trucks shall be well coordinated to avoid traffic congestion. At night, measures such as speed reduction and horn prohibition must be prohibited.
Construction plan shall be optimized, and the construction period must be arranged reasonably. During construction bidding, measures reducing noise pollution to the environmental will be incorporated into construction organization design, which shall be identified in the contract.
Noise
pollution
According to the Notice on Strengthening Ambient Noise Monitoring and Supervision during the College Entrance Examination issued by State Environmental Protection Administration on Apr. 26, 1998, in addition to implementing relevant national standards on ambient noise to strictly control various ambient noises, any construction works which will generate excessive noise or disturb resident’s normal life shall be prohibited during the examination and within half a month before the examination.
Disposal of spoil Ecological environment Greening on both sides of waterway
People’s health
Strengthen promotion and education on health among the people on the construction area, and educator the constructors how to prevent and control common infectious diseases by issuing notices or brochures. .
Noise monitoring
Embankment construction site; schools, hospitals and centralized residential areas are identified as construction noise monitoring points.
0.015
Protection of historical
relics
The Construction Company shall protect the historic relics that are near the line with the fences. During the construction period, constructors, vehicles and machinery shall be prohibited from accessing to avoid damages to cultural relics.
0.02
Atmospheric environment
Sprinkling shall be done and vehicles shall be cleaned on a regular basis. The bulk and loss dust-contained materials shall be transported with a van covered.
0.10
Solid wastes Facilities to collect wastes temporarily 0.003
Sludge in the river way
Substrate sludge shall be transported by the enclosure tank car. The substrate sludge shall be sent to the temporary dump yard and used for the green belt after drying.
0.02
Environment monitoring
Embankment construction site; schools, hospitals and centralized residential areas are identified as construction noise and ambient air monitoring points.
0.055
5
Environmental Treatment
Subproject of Hongya County
(Hongchuan Town)
Subtotal 0.253
120
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Ecological environment
Measures of soil and water conservation
The construction plan shall be reasonably arranged to speed up construction schedule. The spoil shall be removed and cleared in time and the construction land shall be restored. The excavated sections must be backfilled in time based on the construction progress. The temporary stock yard must be covered by the membranes, and a diversion channel shall be arranged around the site. The vegetation restoration and site hardening shall be enforced in the late days of the construction. The topsoil shall be not exposed after the completion of the construction.
0.30
Protection of residential areas and other sensitive
points
The mixing plant must not be set near the protected target, and high-noise operation shall be prohibited at night.
Social environment
Traffic trunk line and passage protection
The construction plan shall be optimized, and the temporary traffic control measures shall be implemented by negotiation and coordination with tariff departments. It is suggested that construction and transport of the Construction Company should stagger the rush hour, and night transportation should be carried out under the premise of not disturbing the normal life of residents.
Acoustical environment
Prevention and control measures for noise
Management shall be strengthened during the construction period. For the densely populated area, high-noise equipment must not be used for night construction.
Atmospheric environment
Measures of preventing and controlling dust and
powder
Engineering works such as excavation and filling shall be stopped when the wind velocity is greater than Degree 4; sprinkling car shall be provided for the humidification; and the place with raw materials stored in an open air shall be covered. The transport truck shall also be covered. The dust shall be promptly cleaned on the ground of the construction, and the ground shall be humidified. The transport route shall be reasonably arranged, which shall detour the environmentally sensitive points such as hospitals and schools.
0.05
6 Waterway Treatment
Project (Downtown Section) of Xiaoshanzi
River in Jialing
District, Nanchong
City
Water environment
Prevention and control of construction
wastewater; treatment of domestic sewage
Temporary sedimentation tanks and filtration tanks shall be arranged on the construction site, where the foundation pit water and production wastewater shall be reused after treatment. The domestic wastewater shall be collected on a regular basis and transported to the outside as farmyard manure.
0.08
121
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Ecological environment
Flood, loss of water and soil and ecological
damage
Construction shall be carried out in low-water reasons, and drainage channel shall be set. The exposed soil shall be covered in time. The construction land shall be restored in time.
0.02
Subtotal 0.45
Control of water and soil loss
The temporary stored spoil shall be covered with a dust cover, and the wasted soil shall be used for filling the paddy field and dam area
0.07 Ecology
Vegetation restoration Reclamation and make-up planting in the temporarily occupied land 0.05
Noise from construction machines
The construction schedule shall be rationally arranged to enforce management.
Noise Noise from traffic and
transport
Necessary measures such as sound insulation windows shall be taken for residents along the road in the planned residential area according to specific predicted results of the EIA noise in the property development project. The four sensitive points where the noise exceeds standard stipulation shall reserve 2000m2 sound insulation windows.
1.00
Construction slime water
After simple sedimentation and treatment, the clean water on the upper layer shall be discharged into farming irrigation channels.
0.08
Flushing water for machines
Recycled after grease trap and sedimentation 0.08
Domestic sewage
Water pollutants
Fecal sewage Used as farmyard manure
Dust from building demolition
Enclosed networks such as dust cover shall be built around the building complex
0.30
Dust Dust cloth protection and site clearance shall be arranged on the temporary yard
0.08 Atmospheric
pollutants
Dust from cars Sprinkling for dust reduction, and the washing stations shall be built for arriving and departing vehicles
0.02
Solid Construction spoil 2.54×104m3
The wastes shall be transported to the Sanitation Department of Zizhong County, which shall be used as fill in paddy field and dam area
0.15
Wastes Domestic wastes The domestic wastes shall be treated by the environment and sanitary department,
7
Northern Outer Ring
Road Construction Subproject of
Zhonglong Town of Zizhong County
Sporadic wastes from
paving The wastes shall be recovered or collected locally in time
122
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Environmental management
and monitoring
Construction period
Construction environmental supervision system shall be implemented, and contractual binding system shall be adopted to incorporate relevant mitigation measures into production quality management system and acceptance indicator system. The construction dust, noise, water and soil loss as well as other control measures shall be supervised by designated workers, and relevant laws and regulations on environmental protection shall be promulgated.
0.20
Environment monitoring
Construction period and operation period Regional ambient noise and air quality 0.10
Subtotal 2.13 Control of water and
soil loss Retaining of soil, drainage channel and sedimentation tank 0.40
Ecology Vegetation restoration Reclamation and make-up planting in
the temporarily occupied land 0.16
The construction schedule shall be rationally arranged to enforce management.
Noise from construction machines
Sound fences shall be provided. 0.50
Noise
Noise from traffic and transport
Sound insulation windows shall be reserved for the residential area according to the predicted results of the EIA noise in the property development project of the planned residential area.
0.268
Construction slime water
After simple sedimentation, the clean water on the upper layer shall be reused or sprinkled locally.
0.08
Production wastewater from concrete
maintenance and curing, construction machinery washing and pipeline
pressure testing
Recycled after grease trap and sedimentation 0.08
Water pollutants
Domestic wastewater and fecal sewage
Used as farmyard manure after treatment in the septic tank
Dust Dust cloth protection and site clearance shall be arranged on the temporary yard
0.10 Atmospheric
pollutants Dust from cars
Sprinkling for dust reduction, and the washing stations shall be built for arriving and departing vehicle
0.04
Solid Construction spoil 0.17×104m3
The wastes shall be transported to the Sanitation Department of Miyi County, who shall send the wastes to the dump yard.
0.05
8 Infrastructure Construction Subproject of Miyi County
(Panlian Town)
Wastes Domestic wastes The domestic wastes shall be treated by the environment and sanitary department
123
S/N Name of
subproject Type
Item and construction content
Treatment measures Investment
(million yuan )
Environmental management
and monitoring
Construction period
Construction environmental supervision system shall be implemented, and contractual binding system shall be adopted to incorporate the relevant mitigation measures into the production quality management system and acceptance indicator system. The construction dust, noise, water and soil conservancy as well as other control measures shall be supervised by designated workers, and the relevant laws and regulations on environmental protection shall be promulgated.
0.25
Environment monitoring
Construction period and operation period
Regional ambient noise, as well as waster and air quality 0.12
Training of environment
Construction period and operation period
Training for constructors and managers 0.098
Subtotal 2.246 Total 22.613
6.4.2 Mitigation measures operation
The mitigation measures shall be incorporated into Bidding Document and Contract. Moreover, construction organization and environmental management during operation period shall be strengthened so as to better implement mitigation measures in different stages.
1. Mitigation measures operation during the design stage of the project
Table 6.4-2 Mitigation measures operation during the design stage
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Control of water and soil loss
Temporary stock yard protection,
slope protection and drainage design
Optimized scheme in design stage,
incorporated into engineering control
measures
Design Institute Design
Ecology
Vegetation restoration
Reclamation and make-up planting
within the temporary land
requisition, comprehensive
ecological treatment at the river bank
Optimized scheme in design stage,
incorporated into engineering control
measures
Design Institute Design
Noise Noise from construction
machines
The construction schedule shall be
rationally arranged to enforce
management.
Reasonable measures and suggestive
requirements shall be proposed in the design
stage.
Design Institute Design
PPMO and Construction
Company for each
subproject
124
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Traffic noise during
operation period
Traffic control measures shall be
strengthened, signs prohibiting horning or speed limit shall be arranged, and sound insulation
measures and protection distance shall be reserved.
Optimized scheme in design stage,
incorporated into engineering control
measures and reasonable suggestions and requirements may
be proposed.
Design Institute Design
Construction slime water
After simple sedimentation and
treatment, the clean water on the upper
layer shall be discharged into
farming irrigation channels.
Optimized scheme in design stage,
incorporated into engineering control
measures
Design Institute Design
Flushing water for machines
Recycled after grease trap and sedimentation
Optimized scheme in design stage,
incorporated into engineering control
measures
Design Institute Design
Water pollutants
Domestic wastewater and fecal sewage
Used as farmyard manure
Reasonable measures and suggestive
requirements shall be proposed in the design
stage.
Design Institute Design
Dust from building
demolition
Enclosed networks such as dust cover
shall be built around the building
complex.
Optimized scheme in design stage,
incorporated into engineering control
measures; and reasonable suggestions
and requirements can be proposed.
Design Institute Design
Dust
Dust cloth protection and site clearance shall be arranged on the temporary yard
Reasonable measures and suggestive
requirements shall be proposed in the design
stage.
Design Institute Design
Dust from cars
Sprinkling for dust reduction, and the washing stations shall be built for
arriving and departing vehicles
Reasonable measures and suggestive
requirements shall be proposed in the design
stage.
Design Institute Design
Atmospheric pollutants
Stink from wastewater treatment
plant
Protection distance and afforestation
enforcement
Optimized scheme in design stage,
incorporated into engineering control
measures; and reasonable suggestions
and requirements can be proposed.
Design Institute Design
125
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Car exhaust Street tree planting, etc.
Optimized scheme in design stage,
incorporated into engineering control
measures; and reasonable suggestions
and requirements can be proposed.
Design Institute Design
Construction spoil
Optimized arrangement; a soil
yard shall be arranged.
Design Institute Design
Sludge in the river way
Soil for afforestation
Design Institute Design
Sludge of wastewater
plant
Sent to the sanitary landfill
Optimized scheme in design stage,
incorporated into engineering control
measures; reasonable suggestions and
requirements can be proposed.
Design Institute Design
Domestic wastes
The domestic wastes shall be treated by the
environment and sanitary department,
Reasonable measures and suggestive
requirements shall be proposed in the design
stage.
Design Institute Design
Solid wastes
Sporadic wastes from
paving
The wastes shall be recovered or
collected locally in time.
Reasonable measures and suggestive
requirements shall be proposed in the design
stage.
Design Institute Design
Environmental management
and monitoring
Construction environmental supervision system shall be
implemented, and contractual binding system shall be adopted
to incorporate relevant mitigation measures into the production
quality management system and acceptance indicator system. The construction dust, noise, water and soil loss as well as other
control measures shall be supervised by designated workers, and relevant laws and regulations on environmental protection shall
be promulgated.
Reasonable suggestions and requirements shall
be proposed in the design stage.
Design Institute Design
Environment monitoring
Construction period and operation
period
Regional ambient noise and air quality
Reasonable suggestions and requirements shall
be proposed in the design stage.
Design Institute Design
2. Mitigation measures operation during the construction period of the works
Table 6.4-3 Mitigation measures operation during the operation period
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
126
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Control of water and soil loss
Temporary stock yard protection,
slope protection and
drainage design
Strictly in accordance with approved EIA
report (form) and design documents
Construction company
(contractor)
Construction period
Ecology
Vegetation restoration
Reclamation or make-up
planting within the temporary
land requisition,
comprehensive ecological
treatment at the river bank
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Noise Noise from construction
machines
The construction
schedule shall be rationally arranged to
enforce management.
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Construction slime water
After simple sedimentation and treatment, the clean water on the upper layer shall be
discharged into farming
irrigation channels.
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Flushing water for machines
Recycled after grease trap and sedimentation
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Water pollutants
Domestic wastewater and fecal sewage
Used as farmyard manure
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Dust from building
demolition
Enclosed networks such as dust cover shall be built around the building complex
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Atmospheric pollutants
Dust
Dust cloth protection and site clearance
shall be arranged on the temporary yard
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
PPMO and Construction
Company for each
subproject
127
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Dust from cars
Sprinkling for dust reduction,
and the washing
stations shall be built for arriving and departing vehicles
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Stink from wastewater treatment
plant
Protection distance and
greening enforcement
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Car exhaust Street tree planting, etc.
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Construction spoil
Optimized arrangement; a soil yard shall be arranged
Construction Company
(contractor)
Construction period
Sludge in the river way
Soil for greening
Strictly in accordance with approved EIA
report (form) and design documents Construction
Company (contractor)
Construction period
Domestic wastes
The domestic wastes shall be treated by the environment and sanitary department,
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Solid wastes
Sporadic wastes from
paving
The wastes shall be
recovered or collected
locally in time.
Strictly in accordance with approved EIA
report (form) and design documents
Construction Company
(contractor)
Construction period
Environmental management
and monitoring
Construction environmental supervision system shall be
implemented, and contractual binding system shall be adopted to incorporate
relevant mitigation measures into the production quality management system and
acceptance indicator system. The construction dust, noise, water and soil loss as well as other control measures shall be supervised by designated workers, and relevant laws
and regulations on environmental protection
shall be promulgated.
The supervisor and Clients shall implement all mitigation measures
The Client and
construction supervision
Construction period
128
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Environment monitoring
Construction period and operation
period
Regional ambient noise and air quality, as well as loss of water and
soil
Implementation of monitoring of noise, air as well as loss of water
and soil during the construction period
The construction
company (contractor),
and environmental
monitoring department
Construction period
2. Mitigation measures operation during the operation period of the works
Table 6.4-4 Mitigation measures operation during the operation period
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Control of water and soil loss
Temporary stock yard protection,
slope protection and drainage
design
The Client (operation
management unit)
Operation period
Ecology
Vegetation restoration
Reclamation or make-up
planting within the temporary
land requisition,
comprehensive ecological
treatment at the river bank
Maintenance and curing of vegetation during the
operation period, observation of slope
drainage etc. The Client (operation
management unit)
Operation period
Noise
Traffic noise during
operation period
Traffic control measures shall
be strengthened,
signs prohibiting horning or speed limit
shall be arranged, and
sound insulation
measures and protection
distance shall be reserved.
In accordance with approved EIA report (form) and design
documents
The Client (operation
management unit)
Operation period
Stink from wastewater treatment
plant
Protection distance and
greening enforcement
In accordance with approved EIA report (form) and design
documents
The Client (operation
management unit)
Operation period
Atmospheric pollutants
Car exhaust Street tree planting, etc.
Maintenance and curing of vegetation during the operation period, and the access of vehicles with
the excessive speed shall be restricted.
The Client (operation
management unit)
Operation period
Environmental Protection Bureaus of
each district / county
129
Environmental elements
Item and construction
content
Treatment measures
Implementation description
Implemented by Stage Supervisor
Solid wastes Sludge of
wastewater plant
Sent to the sanitary landfill
In accordance with approved EIA report (form) and design
documents
The Client (operation
management unit)
Operation period
Environment monitoring
Operation period
Regional ambient noise and air quality
Implementation of noise and air monitoring during
the operation period
The Client (operation
management unit),
Environmental Protection
Bureaus at the levels of
district and county and
environment monitoring department
Operation period
6.5 Environmental monitoring plan
6.5.1 The Purpose of environmental monitoring
The purpose of environmental monitoring is to carry out environmental protection well in the project area, to get the knowledge of generation and discharging of waste water, waste gas, noise and scraps during the construction period in time, as well as of the environment quality of the area assessed during the construction and operation period, to prevent impact of emergent pollution accidents on environment, and to provide a scientific basis for environment protection, pollution control, environment supervision and management during the construction and operation period.
6.5.2 Environmental monitoring plan
(1) Water environment monitoring plan
Table 6-5-1 Summary of Water environment monitoring plan
Construction period Operation period S/N Subproject
name Monitoring point
Monitoring content
Monitoring frequency
Monitoring point Monitoring content
Monitoring frequency
1
Subproject of Puxing
Town, Xinjin County
2 monitoring profiles, U/S and D/S of
Yangliu River in the project
area
SS and fossil oil
1 time respectively for dry and
flood seasons
2 monitoring profiles, U/S and D/S of Yangliu
River in the project area
SS and fossil oil
1 time respectively for dry and
flood seasons
2
Infrastructure Construction Subproject of
Yingxi Town,
Shunqing District,
Nanchong City
Recycled water treated
from the waste water of
aggregate processing system and concrete batching system
SS
1 time respectively for dry and
flood seasons
Monitoring section of surface water is control by routine monitoring profile in the project area,
i.e. 1 reference profile in U/S, 1 control profile in
the D/S
SS and fossil oil
Collect 2 years of data
of dry, normal and flood season
at the beginning of
operation period
3 Binjiang
Road (Southern
500m upstream of wastewater
SS and fossil oil
1 time respectively for dry and
500m upstream of wastewater
treatment plant
SS and fossil oil
1 time respectively for dry and
130
Construction period Operation period S/N Subproject
name Monitoring point
Monitoring content
Monitoring frequency
Monitoring point Monitoring content
Monitoring frequency
Section) and Sewage
Interception Subproject in
Fengming Town,
Pengshan County
treatment plant flood seasons
flood seasons
4
Infrastructure Construction Subproject of Miyi County
(Panlian Town)
Water quality monitoring of
Anning River, U/S and D/S of project
area
SS and fossil oil
1 time respectively for dry and
flood seasons
(2) Atmosphere environmental monitoring plan
Table 6-5-2 Summary of atmosphere environmental monitoring plan
Construction period Operation period S/N Subproject name Monitoring
point Monitoring
content Monitoring frequency
Monitoring point
Monitoring content
Monitoring frequency
1 Subproject of Puxing Town, Xinjin County
Construction area, area near the road, main
school, and centralized residential area in the
area
TSP, NOx, and CO
1 time for annual peak construction
period
Main school and
residential area, crowd centralized point in the economical
development zone
NOx and CO 1 time per quarter
2
Rainwater and Wastewater Pipe Network & Road Reconstruction
Works in Daying County (Penglai
Town)
Main construction
site
TSP, NOx, and CO
1 time for annual peak construction
period
NOx and CO
3
Infrastructure Construction Subproject of Yingxi Town,
Shunqing District, Nanchong City
Environmental sensitive point of upwind and downwind in construction area(1 point
for each construction
section)
TSP, NOx, and CO
1 time for annual peak construction
period
Main road cross of
Binhe road NOx and CO 1 time per
quarter
Vocational High School of Fengming
Town, Pengshan County
TSP, NOx, and CO
1 time for annual peak construction
period 4
Binjiang Road (Southern Section)
and Sewage Interception Subproject in
Fengming Town, Pengshan County
50m, 100m, 200m
downwind of bitumen
batching plant
Asphalt fumes
1 time for annual peak construction
period
Vocational High School of Fengming
Town, Pengshan County
NOx and CO 1 time per quarter
5 Environmental
Treatment Subproject of
Hongya County
Road, pipeline, dike
and bridge construction
TSP, NOx, and CO
1 time for annual peak construction
period
131
Construction period Operation period S/N Subproject name Monitoring
point Monitoring
content Monitoring frequency
Monitoring point
Monitoring content
Monitoring frequency
Hongya County (Hongchuan Town)
construction site
period
7
Northern Outer Ring Road
Construction Subproject of
Zhonglong Town of Zizhong County
Residential area near to
each construction
site
TSP, NOx, CO
1 time for annual peak construction
period
8
Infrastructure Construction
Subproject of Miyi County (Panlian
Town)
Place near to each
construction site
TSP, NOx, CO
1 time for annual peak construction
period
(3) Acoustical environmental monitoring plan
Table 6-5-3 Summary of acoustical environmental monitoring plan
Construction period Operation period S/N Subproject
name Monitoring point
Monitoring content
Monitoring frequency Monitoring point Monitoring
content Monitoring frequency
1 Subproject of Puxing Town, Xinjin County
Main construction area, area near the
road, main school and centralized residential area in the
area
Equivalent A weighted
sound pressure
level
1 time for annual peak construction
period, monitoring
1 day, 1 time
respectively for day and
night
Main school, residential area in the area, 1 point for each
side of Yingbin Avenue
Equivalent A weighted
sound pressure
level
1 time per quarter , 2
continuous days per time
2
Rainwater and Wastewater
Pipe Network & Road
Reconstruction Works in Daying County (Penglai Town)
Road, pipeline, bridge
construction site. School, hospital and centralized residential
area
Equivalent A weighted
sound pressure
level
1 time for annual peak construction
period, monitoring
1 day, 1 time
respectively for day and
night
Road boundary
Equivalent A weighted
sound pressure
level
1 time per quarter , 2
continuous days per time
3
Infrastructure Construction Subproject of Yingxi Town,
Shunqing District,
Nanchong City
Sensitive point of
construction area
boundary and nearby
area
Equivalent A weighted
sound pressure
level
Monitoring one day
during the peak
construction period, 1
time respectively for day and
night
Main road cross of Binhe Road
Equivalent A weighted
sound pressure
level
1 time per quarter , 2
continuous days per time
4
Binjiang Road (Southern
Section) and Sewage
Interception Subproject in
Fengming Town,
Dormitory building of Vocational
High School ,
Tongjiangli residential building
Equivalent A weighted
sound pressure
level
Monitoring one day
during the peak
construction period, 1
time respectively
Dormitory building of Vocational High School, Tongjiangli residential
building No. 53
Equivalent A weighted
sound pressure
level
1 time per quarter , 2
continuous days per time
132
Construction period Operation period S/N Subproject
name Monitoring point
Monitoring content
Monitoring frequency
Monitoring point Monitoring content
Monitoring frequency
Pengshan County
No. 53 for day and night
5
Environmental Treatment
Subproject of Hongya County
(Hongchuan Town)
School, hospital and centralized residential
area
Equivalent A weighted
sound pressure
level sound level
Monitoring one day
during the peak
construction period, 1
time respectively for day and
night
7
Northern Outer Ring
Road Construction Subproject of Zhonglong Town of Zizhong County
Road and pipeline
construction site
Equivalent A weighted
sound pressure
level
Monitoring one day
during the peak
construction period
Road boundary
Equivalent A weighted
sound pressure
level
1 time per quarter , 2
continuous days per time
8
Infrastructure Construction Subproject of Miyi County
(Panlian Town)
Road and pipeline
construction site
Equivalent A weighted
sound pressure
level
Monitoring one day
during the peak
construction period
Road boundary
Equivalent A weighted
sound pressure
level
1 time per quarter , 2
continuous days per time
(4) Water and soil loss monitoring plan
Table 6-5-4 Summary of water and soil loss monitoring plan
Construction period Operation period S/N Subproject
name Monitoring point
Monitoring content Monitoring frequency
Monitoring point
Monitoring content
Monitoring frequency
1 Subproject of Puxing Town, Xinjin County
Each temporary
waste disposal
area
Rain intensity, precipitation,
gradient of top and slope side, spoil stacking height,
volume and composition of spoil, erosion
amount of spoil
Once respectively before and after winter
season during the
construction period
Each temporary
waste disposal
area
Result and stability of protection measures
6 years after
operation, 1 time per
year
3
Infrastructure Construction Subproject of Yingxi Town,
Shunqing District,
Nanchong City
Temporary disposal site, mud drying
yard
Terrain and changes of temporary spoil disposal area and mud drying area, occupied area,
quantity and area of spoil, coverage rate and growth of forest and grass, and result
of temporary protection measures
Once respectively before and after winter
season during the
construction period
Temporary disposal site, mud
drying yard
Observe the result of
protection measures, the growth status of plant, and monitor the sediment
charge of the D/S river of
spoil disposal area and mud drying area
6 years after
operation, 1 time per
year
133
Construction road and site
Scouring of excavated surface
and collapse of side slope
Once respectively before and after winter
season during the
construction period
Both banks of Yingxi
River
The result after applying biological
measures and growth of forest and
grass
6 years after
operation, 1 time per
year
6.5.3 Report procedures for supervising and monitoring
The monitoring result shall be submitted to the Environmental Protection Office of the Client in written formally twice a year (submitting to Environmental Protection Office of each Operation Unit during operation period), sorted and stored by the Client. These reports are basis for the administration department concerning environmental protection and the World Bank to evaluate the achievement of each section in environmental protection, environmental impacts, and mitigation measures to be adopted if exceeding expected results.
6.6 Pubic participation and implementation suggestions during construction period
1 Information disclosure
Basic information of the project, the Client, Construction Company, and Consulting Company, as well as telephone number to receive public consultation and complaints shall be notified to the public via television, newspapers, and posts etc. before commencement of the project.
2 Handling complaint on public negotiation and environmental protection
Telephones and organizations to receive public consultation and complaints shall be established during the construction period to facilitate the public to get the knowledge of mitigation measures operation and to feed back problems which are concerned by the public. Problems concerning public interests and public concerns shall be negotiated with the public so as to reach a common understanding.
Chapter VII Summary Sichuan Small Towns Development Project by WB Loans, as an important part of the implementation of west development strategy and urban-rural coordinated development strategy, conforming to the overall planning for local cities and towns and the national industrial policy, is of great significance and wins support from majority public. There are no significance environmental constrains within the construction area of each subproject. EIA report (table) has put forward corresponding environmental measures and environmental management for environment impact generated during construction. The impact of project to the environment may be avoided and mitigated by implementing environmental measures proposed in EIA report (table) and strengthening environmental management during construction period, and thus, impacts of the implementation of projects on the environment can be prevented or mitigated. From the perspective of environmental protection, Sichuan Small Towns Development Project by WB Loans is feasible.