RES 3.6kWh All in OneInstallation Quick Guide
Manual Download (Refer to Installation Manual)• https://myess.samsungsdi.com/engineer/main.do• https://112.106.12.149/engineer/main.do
CAUTIONIncluded in this box are a battery and printed circuit board, and the entire weight amount to 95 kg. Therefore, special care must be taken in handling. Make sure to have at least two persons deliver and remove the package.
CAUTION• Do not operate with other components not approved by the ESS systems.
(Connecting other products in parallel to Samsung SDI's products may result in abnormal operation.) • The internet connection is required to use all functions of the ESS system. • If you have a problem, please contact the installer.• The Specifications of the product may be modified without prior notice to improve product quality.
CAUTIONThis warranty does not apply to the batteries that • are not operated in accordance with the operating manuals for their intended purposes;• have been incorrectly installed or commissioned;• have been modified, altered or operated with other components not approved by Samsung SDI;• have been physically damaged (e.g. damage from falls or transportation);• have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire) • have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient
conditions).
Wiring Schematic of Single Phase System (for UK)(See Section 5.1)
Grid
kWh(ESS Meter)
L
N
L
N
L
N
PE
kWh(Utility Meter)
L N
L N
NL PE
AC Grid Line PV1
PV2
LoadsAC Circuit Breaker
DC Disconnection SwitchAC Circuit Breaker
Samsung SDI ESS3.6kWh All-in-One
RS485CommunicationLine
PE
PV2 ArrayPV1 Array
Main Earth BarkWh
(Generation Meter)
L N
L N
Example for switchboard wiring on a TN-S network for on-grid.
Energy Meter Wiring & Setting (C2000M)(See Section 6.2)
Energy Meter Wiring & Setting (C2000M)(See Section 6.2)
Load
LAN RS485-ARS485-BSO+(FDIN)SO-(FDIN)SO+(PUSH)SO-(PUSH)
DO-Purchase
DO-BI/Feed-In
PCSS/M
Server
FANPV+
PV1
PV-
PV+
PV2
PV-
L
N
PE
Grid(Mains)L
No Use
RS-485
N
1 -0:0.0. 10
0004
A U T O M E T E R S
Reverse
C2000
1 phase 2 wire10(100) Amps 230V 50HzClass 1.0Pulse output: 10 imp/kWh(100ms)Modbus output: Autometers v.6
Lock
N NL
TX+
TX+
TX- TX-
L1 2 3 4
5 6 7 8
United Kingdom (Eng.) 04/2015. Rev1.0
Meter (C2000M) Grid / All-in-One Connection
(1) Live In L (Grid)
(2) Neutral In N (Grid)
(3) Neutral Out Load - N (All-in-One)
(4) Live Out Load - L (All-in-One)
(5) No Use -
(5) No Use -
(7) TX + RS485-A (All-in-One)
(8) TX - RS485-B (All-in-One)
SJ68-02069B
R4636Z1 1 5420Q 1 0EA
(C2000M Meter Setting) 1) Push the setting button .
→ Please keep pushing the Green button until the screen show [1-0:0.0.10] . And you can find the OBIS CODE [1-0:0.0.10] as below picture.
2) C2000M Meter is set to have default value of 1~4. Check if the value shown here is within the default range above .
* For C2000M, you can not change the setting of its values. You can only read the value that is shown in the display (Read Only). Check the Modbus address.
(All-in-One Setting)3) Set the above value as the Modbus address of the SIM.
1 -0:0.0. 10
0004
A U T O M E T E R S
Reverse
C2000
1 phase 2 wire10(100) Amps 230V 50HzClass 1.0Pulse output: 10 imp/kWh(100ms)Modbus output: Autometers v.6
Lock
Date/Time Setting
Year/Month/Day
Hour:Minute:Second
2014 4/ 11/
16 47: 12:
D0 (Bi-Direction)Meter Type :
D0-Bi/Feed-In
Modus Address
Smart Meter Selection
D0 - Meter Model Selection
10:C2000 (Autometers)
4 (1~247: *C2000 meter only)
(Press button of C2000, to “1-0:0.0.10” field)
5. Installer Account (See Section 7.4) 1) Open your mobile browser.
2) Input the URL:
- https://myess.samsungsdi .com/engineer/main.do or
- https://112.106.12.149/engineer/main.do.
3) Input your ID and password. (A new account can be provided by the wholesaler.)
4) You can see the list of ESS's.
5) Click the icon on the right to add a new ESS.
6) Input AIO information, installation information, and owner information.
7) Click the “Submit” button.
8) If it is saved successfully, you can see the success message. It may take 5 to10 minutes.
Main Menu * is mandatory
[Figure 5-1] Engineer log in page [Figure 5-2] New ESS adding page
[Figure 3-3] Initial setup page
Install Setting MenuMENU LIST
Region:
[W] (Range:0 ~ 3300 W)
[W] (Range:0 ~ 3300 W)
Country:
installed PV-1 Power:
installed PV-2 Power:
Feed In Limit percentage
Server IP
Server Port
Output Max Power
Automatic Operation type
United Kingdom London
S/N : TESTBED-0203-45678901
3300
3300
unlimited
4.6kW
112.106.12.149
80
Product Information
Date/Time Setting
Year/Month/Day
Hour:Minute:Second
(*The “Smart” type is more advanced Algorithm.)Basic ModeSmart Mode,
Install Setting
Operating Test
SAVE and ReSTART
2014 4/ 11/
16 47: 12:
D0 (Bi-Direction)Meter Type :
D0-Bi/Feed-In
Modus Address
Smart Meter Selection
D0 - Meter Model Selection
10:C2000 (Autometers)
1 (1~247: *C2000 meter only)
(Press button of C2000, to “1-0:0.0.10” field)
1) Click here
2) For the max power per string
3) Do NOT change!
5) Do NOT change! : D0
7) Set the current local time and date
8) Click “Operating Test.“
9) After clicking “SAVE and ReSTART” on the top of the window a message saying “Wait for 1 Minute and press F5” will appear → follow the message
10) Click here
4) Select an Output max power : 3.6 kW or 4.6 kW
6) Select an energy meter type : 10:C2000(Autometers)
1. Battery Tray Assembly (See Chapter 3, Section 5.4) 1) Below is a simplified illustration for assembling the battery tray.
Short cable
Long cable
[Figure 1-1] Process for Battery Assembly [Figure 1-3] Cable Stuff Method
[Figure 1-2] Battery to BMS Connection [Figure 1-4] Battery Power Connection
2) Perform internal wiring.
➀ Connect the voltage and temperature measurement cables between BMS (on the top inside the enclosure) and Tray (4 connections).
➁ Connect the power cables between Inverter and Battery Tray.
2. Connect PV, AC grid, and Energy meter (See Chapter 6)
3. SIM (System Install Manager) Connection (See Chapter 7)1) Set on your laptop (shown in Figure 3-1).
Control panel → Network and Sharing Center → Change Adapter Settings → Local Area Connector → Properties → Internet Protocol Version 4 (TCP/IP)
[Figure 3-1] Setting Laptop IP
2) Connect the jumper to the connector. (* Install Jumper is required, as shown in Figure 3-2.)
3) Connect the LAN cable between AIO and Laptop.
4) Turn the power On (AC grid On).
5) Access to SIM (System Install Manager) http://17.91.23.196:8000
6) Install the settings (shown in Figure 3-3).
Insert Jumper Wire
[Figure 3-2] Location of Jumper
4. Operating test (See Chapter 8) 6. User Account (Refer to User Guide) - Input the URL https://myess.samsungsdi.com
United Kingdom (Eng.) 04/2015. Rev1.0