RES 3.6kWh All in One Installation Quick Guide Manual Download (Refer to Installation Manual) • https://myess.samsungsdi.com/engineer/main.do • https://112.106.12.149/engineer/main.do CAUTION Included in this box are a battery and printed circuit board, and the entire weight amount to 95 kg. Therefore, special care must be taken in handling. Make sure to have at least two persons deliver and remove the package. CAUTION • Do not operate with other components not approved by the ESS systems. (Connecting other products in parallel to Samsung SDI's products may result in abnormal operation.) • The internet connection is required to use all functions of the ESS system. • If you have a problem, please contact the installer. The Specifications of the product may be modified without prior notice to improve product quality. CAUTION This warranty does not apply to the batteries that • are not operated in accordance with the operating manuals for their intended purposes; • have been incorrectly installed or commissioned; have been modified, altered or operated with other components not approved by Samsung SDI; • have been physically damaged (e.g. damage from falls or transportation); have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire) • have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient conditions). Wiring Schematic of Single Phase System (for UK) (See Section 5.1) Grid kWh (ESS Meter) L N L N L N PE kWh (Utility Meter) L N L N N L PE AC Grid Line PV1 PV2 Loads AC Circuit Breaker DC Disconnection Switch AC Circuit Breaker Samsung SDI ESS 3.6kWh All-in-One RS485 Communication Line PE PV2 Array PV1 Array Main Earth Bar kWh (Generation Meter) L N L N Example for switchboard wiring on a TN-S network for on-grid. Energy Meter Wiring & Setting (C2000M) (See Section 6.2) Energy Meter Wiring & Setting (C2000M) (See Section 6.2) Load LAN RS485-A RS485-B SO+(FDIN) SO-(FDIN) SO+(PUSH) SO-(PUSH) DO-Purchase DO-BI/Feed-In PCS S/M Server FAN PV+ PV1 PV- PV+ PV2 PV- L N PE Grid(Mains) L No Use RS-485 N Pulse output: 10 imp/kWh(100ms) Modbus output: Autometers v.6 N N L TX+ TX+ TX- TX- L 1 2 3 4 5 6 7 8 United Kingdom (Eng.) 04/2015. Rev1.0 Meter (C2000M) Grid / All-in-One Connection (1) Live In L (Grid) (2) Neutral In N (Grid) (3) Neutral Out Load - N (All-in-One) (4) Live Out Load - L (All-in-One) (5) No Use - (5) No Use - (7) TX + RS485-A (All-in-One) (8) TX - RS485-B (All-in-One) SJ68-02069B R4636Z1 1 5420Q1 0EA (C2000M Meter Setting) 1) Push the setting button . Please keep pushing the Green button until the screen show [1-0:0.0.10] . And you can find the OBIS CODE [1-0:0.0.10] as below picture. 2) C2000M Meter is set to have default value of 1~4. Check if the value shown here is within the default range above . * For C2000M, you can not change the setting of its values. You can only read the value that is shown in the display (Read Only). Check the Modbus address. (All-in-One Setting) 3) Set the above value as the Modbus address of the SIM. 1 -0:0.0. 10 0004 AUTOMETERS Reverse C2000 1 phase 2 wire 10(100) Amps 230V 50Hz Class 1.0 Pulse output: 10 imp/kWh(100ms) Modbus output: Autometers v.6 Lock Date/Time Setting Year/Month/Day Hour:Minute:Second 2014 4 / 11 / 16 47 : 12 : D0 (Bi-Direction) Meter Type : D0-Bi/Feed-In Modus Address Smart Meter Selection D0 - Meter Model Selection 10:C2000 (Autometers) 4 (1~247: *C2000 meter only) (Press button of C2000, to “1-0:0.0.10” field)

Transcript of (See Section 6.2) Installation Quick · PDF fileInstallation Quick Guide Manual Download...

Page 1: (See Section 6.2) Installation Quick  · PDF fileInstallation Quick Guide Manual Download (Refer to Installation Manual) ... (FDIN) SO+(PUSH) SO-(PUSH) DO-Purchase DO-BI/Feed-In

RES 3.6kWh All in OneInstallation Quick Guide

Manual Download (Refer to Installation Manual)• https://myess.samsungsdi.com/engineer/main.do• https://112.106.12.149/engineer/main.do

CAUTIONIncluded in this box are a battery and printed circuit board, and the entire weight amount to 95 kg. Therefore, special care must be taken in handling. Make sure to have at least two persons deliver and remove the package.

CAUTION• Do not operate with other components not approved by the ESS systems.

(Connecting other products in parallel to Samsung SDI's products may result in abnormal operation.) • The internet connection is required to use all functions of the ESS system. • If you have a problem, please contact the installer.• The Specifications of the product may be modified without prior notice to improve product quality.

CAUTIONThis warranty does not apply to the batteries that • are not operated in accordance with the operating manuals for their intended purposes;• have been incorrectly installed or commissioned;• have been modified, altered or operated with other components not approved by Samsung SDI;• have been physically damaged (e.g. damage from falls or transportation);• have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire) • have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient

conditions).

Wiring Schematic of Single Phase System (for UK)(See Section 5.1)

Grid

kWh(ESS Meter)

L

N

L

N

L

N

PE

kWh(Utility Meter)

L N

L N

NL PE

AC Grid Line PV1

PV2

LoadsAC Circuit Breaker

DC Disconnection SwitchAC Circuit Breaker

Samsung SDI ESS3.6kWh All-in-One

RS485CommunicationLine

PE

PV2 ArrayPV1 Array

Main Earth BarkWh

(Generation Meter)

L N

L N

Example for switchboard wiring on a TN-S network for on-grid.

Energy Meter Wiring & Setting (C2000M)(See Section 6.2)

Energy Meter Wiring & Setting (C2000M)(See Section 6.2)

Load

LAN RS485-ARS485-BSO+(FDIN)SO-(FDIN)SO+(PUSH)SO-(PUSH)

DO-Purchase

DO-BI/Feed-In

PCSS/M

Server

FANPV+

PV1

PV-

PV+

PV2

PV-

L

N

PE

Grid(Mains)L

No Use

RS-485

N

1 -0:0.0. 10

0004

A U T O M E T E R S

Reverse

C2000

1 phase 2 wire10(100) Amps 230V 50HzClass 1.0Pulse output: 10 imp/kWh(100ms)Modbus output: Autometers v.6

Lock

N NL

TX+

TX+

TX- TX-

L1 2 3 4

5 6 7 8

United Kingdom (Eng.) 04/2015. Rev1.0

Meter (C2000M) Grid / All-in-One Connection

(1) Live In L (Grid)

(2) Neutral In N (Grid)

(3) Neutral Out Load - N (All-in-One)

(4) Live Out Load - L (All-in-One)

(5) No Use -

(5) No Use -

(7) TX + RS485-A (All-in-One)

(8) TX - RS485-B (All-in-One)

SJ68-02069B

R4636Z1 1 5420Q 1 0EA

(C2000M Meter Setting) 1) Push the setting button .

→ Please keep pushing the Green button until the screen show [1-0:0.0.10] . And you can find the OBIS CODE [1-0:0.0.10] as below picture.

2) C2000M Meter is set to have default value of 1~4. Check if the value shown here is within the default range above .

* For C2000M, you can not change the setting of its values. You can only read the value that is shown in the display (Read Only). Check the Modbus address.

(All-in-One Setting)3) Set the above value as the Modbus address of the SIM.

1 -0:0.0. 10

0004

A U T O M E T E R S

Reverse

C2000

1 phase 2 wire10(100) Amps 230V 50HzClass 1.0Pulse output: 10 imp/kWh(100ms)Modbus output: Autometers v.6

Lock

Date/Time Setting

Year/Month/Day

Hour:Minute:Second

2014 4/ 11/

16 47: 12:

D0 (Bi-Direction)Meter Type :

D0-Bi/Feed-In

Modus Address

Smart Meter Selection

D0 - Meter Model Selection

10:C2000 (Autometers)

4 (1~247: *C2000 meter only)

(Press button of C2000, to “1-0:0.0.10” field)

Page 2: (See Section 6.2) Installation Quick  · PDF fileInstallation Quick Guide Manual Download (Refer to Installation Manual) ... (FDIN) SO+(PUSH) SO-(PUSH) DO-Purchase DO-BI/Feed-In

5. Installer Account (See Section 7.4) 1) Open your mobile browser.

2) Input the URL:

- https://myess.samsungsdi .com/engineer/main.do or

- https://112.106.12.149/engineer/main.do.

3) Input your ID and password. (A new account can be provided by the wholesaler.)

4) You can see the list of ESS's.

5) Click the icon on the right to add a new ESS.

6) Input AIO information, installation information, and owner information.

7) Click the “Submit” button.

8) If it is saved successfully, you can see the success message. It may take 5 to10 minutes.

Main Menu * is mandatory

[Figure 5-1] Engineer log in page [Figure 5-2] New ESS adding page

[Figure 3-3] Initial setup page

Install Setting MenuMENU LIST

Region:

[W] (Range:0 ~ 3300 W)

[W] (Range:0 ~ 3300 W)

Country:

installed PV-1 Power:

installed PV-2 Power:

Feed In Limit percentage

Server IP

Server Port

Output Max Power

Automatic Operation type

United Kingdom London

S/N : TESTBED-0203-45678901

3300

3300

unlimited

4.6kW

112.106.12.149

80

Product Information

Date/Time Setting

Year/Month/Day

Hour:Minute:Second

(*The “Smart” type is more advanced Algorithm.)Basic ModeSmart Mode,

Install Setting

Operating Test

SAVE and ReSTART

2014 4/ 11/

16 47: 12:

D0 (Bi-Direction)Meter Type :

D0-Bi/Feed-In

Modus Address

Smart Meter Selection

D0 - Meter Model Selection

10:C2000 (Autometers)

1 (1~247: *C2000 meter only)

(Press button of C2000, to “1-0:0.0.10” field)

1) Click here

2) For the max power per string

3) Do NOT change!

5) Do NOT change! : D0

7) Set the current local time and date

8) Click “Operating Test.“

9) After clicking “SAVE and ReSTART” on the top of the window a message saying “Wait for 1 Minute and press F5” will appear → follow the message

10) Click here

4) Select an Output max power : 3.6 kW or 4.6 kW

6) Select an energy meter type : 10:C2000(Autometers)

1. Battery Tray Assembly (See Chapter 3, Section 5.4) 1) Below is a simplified illustration for assembling the battery tray.

Short cable

Long cable

[Figure 1-1] Process for Battery Assembly [Figure 1-3] Cable Stuff Method

[Figure 1-2] Battery to BMS Connection [Figure 1-4] Battery Power Connection

2) Perform internal wiring.

➀ Connect the voltage and temperature measurement cables between BMS (on the top inside the enclosure) and Tray (4 connections).

➁ Connect the power cables between Inverter and Battery Tray.

2. Connect PV, AC grid, and Energy meter (See Chapter 6)

3. SIM (System Install Manager) Connection (See Chapter 7)1) Set on your laptop (shown in Figure 3-1).

Control panel → Network and Sharing Center → Change Adapter Settings → Local Area Connector → Properties → Internet Protocol Version 4 (TCP/IP)

[Figure 3-1] Setting Laptop IP

2) Connect the jumper to the connector. (* Install Jumper is required, as shown in Figure 3-2.)

3) Connect the LAN cable between AIO and Laptop.

4) Turn the power On (AC grid On).

5) Access to SIM (System Install Manager) http://17.91.23.196:8000

6) Install the settings (shown in Figure 3-3).

Insert Jumper Wire

[Figure 3-2] Location of Jumper

4. Operating test (See Chapter 8) 6. User Account (Refer to User Guide) - Input the URL https://myess.samsungsdi.com