FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
00 Axonometric View01 Basement Demolition Plan02 Basement Demolition Reflected Ceiling Plan03 Basement Plan04 Basement Electrical & Reflected Ceiling Plan05 Sections: Longitudinal06 Sections: Cross07 Internal Elevations Entry/Living & Dining08 Internal Elevations Kitchen One09 Internal Elevations Kitchen Two10 Internal Elevations Study & Small Bedroom11 Internal Elevations Big Bedroom12 Internal Elevations Bathroom13 Internal Elevations WC14 Details15 Details16 Details17 Details18 Kitchen Plan19 Basement Kitchen Tiling Plan & Elevation20 Basement WC & Bathroom Tiling Plan & Elevations21 Basement Floorboard Plan22 Command Module Detail23 Door 8 Details24 PR‐26a Room Finishes Schedule
Drawing List
N/A1:501:501:501:501:501:501:501:201:201:501:501:501:201:51:51:51:51:201:201:201:501:51:2N/A
Scale @ A3 Revision
N/ADRAWING LIST
AAADDnonenonenoneAAnonenoneABAABnoneAABnonenonenonenone
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
N/AAXONOMETRIC 00CONSTRUCTION: 06/05/15
Room SixBig Bedroom
Room FiveSmall Bedroom
Room Five AWardrobe
Room FourStudy
Room ThreeKitchen
Room One‐AEntry
Room TwoLiving/Dining Room
Room One‐BBathroom
1 2 4
A
B
D
C
3North
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTIONBASEMENT DEMOLITION PLAN 01
Basement Demolition Plan1
Retain Combi boilerand all piping
Retain sink unit for useby site operatives
Remove/Recycle allunits and shelves
Remove existing wardrobe backto brick walls
Demolish RADsPartial demo of crosswall back to lineof new room
Remove bathtub
Remove existing cupboard
Relocate Pipes Underfloor
Conceal Pipes
1:50
General Notes:Demolitions shown in red will be removed and all temporary supportwill be the sole responsibility of the contractor. All wiring services,and pipework will be concealed in floors, ceilings and walls: some ofthese items are noted below.
Retain Structural Wall
Retain RAD
Demolish RADREV A: 17/04/15
REV A: 17/04/15Remove Toilet
REV A: 17/04/15CONSTRUCTION: 06/05/15
1 2 4
A
B
D
C
3North
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
Basement Demolition: Reflected Ceiling Plan1
BASEMENT CEILING DEMOLITION PLAN 021:50
General Notes:All Ceilings Indicated in red are suspended ceilings >250mm below the existingVictorian floor joists supporting the flat above. Suspended ceilings are built upof 2 layers of plasterboard on softwood timber supports throughout the flat.
REV A: 17/04/15Area of Lowered Suspended Ceiling
REV A: 17/04/15CONSTRUCTION: 06/05/15
OMIT:
1 2 4
A
B
D
C
3
2
15
1
15
2
14
1
16
1
14
1
17
Ext D1North
6.5 m²70.3 SF
Small BedroomRoom 5
11.0 m²118.9 SF
Big BedroomRoom 6
6.8 m²73.2 SF
EntryRoom 1-A
4.5 m²48.9 SF
StudyRoom 47.8 m²
83.6 SF
KitchenRoom 3
D1D2D3
D5D6D4
2.7 m²28.7 SF
BathroomRoom 1-C
NorthNorthNorth
18.9 m²203.7 SF
Living/Dining RoomRoom 2
W3 W1
W6
W5
W7
W2
W41.7 m²
18.0 SF
WCRoom 1-B
Ext D1
W3 W1
W5
W7
W2
4000Ext D3
WardrobeRoom 5-A
Ext D2
Legend
New Timber FloorTile FloorNew WallExisting WallGas PipingSoil PipingHeating PipingHot & Cold WaterRADs Supply & Return
.
.
CLEARMeasure on Site
1490 CLEAR
(890
) To
Be
Con
firm
ed
820 CLEAR
of niche
EQ
UAL
EQ
UAL
EQU
ALE
QU
AL
EQU
ALE
QU
AL
EQUAL EQUAL
EQU
ALEQ
UAL
700
WardrobeRoom 5-B
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTIONBASEMENT CONSTRUCTION PLAN 03
Refer to Structural Engineers Drawings
New RADs and PipingNMW‐0600‐2‐21945(w)x602(h)mm
1:50
Building Regulations Notes:
PART A: All Structural Calculations, Structural Drawings and Structural Specification to be supplied by Engineeria Structural Engineers, Mr. Dawid Powezka, [email protected] located at: Engineeria, 7 Ridgmount Street, WC1E 7AE, London, Telephone (+44) 2075 804 588.
PART B: 1‐ Escape to rear garden is allowable since garden length [< 30.0 Metres] exceeds the height of the building [7.03 metres to ridge]. 2‐ Escape from basement floor new Room4: "Study." 3‐ Room 5 "Small Bedroom" 4‐ Room 6 "Big Bedroom" 5‐ Room 1B "WC" & 6‐ Room 1C "Bath"do not require fire doors. 7‐ All habitable rooms will include ceilingmounted, interlinked, mains connected, and battery back‐up Smoke Detectors and Kitchen Heat Detector. Smoke and Heat Detectors will be Grade D category, LD3 standard.
New Ceilings will provide 60 minutes of fire‐rated separation between the basement and ground floor flats. All flex cables, ceiling lights, and other penetrations will be provided withfire‐resisting intumescent mastic carefully applied at all penetrations to the 60 minute fire‐separating ceilings. Ceiling Lights will include 60 minutes fire‐rated intumescent hoods.
All new steels will be 60 minutes fire‐rated to include the installation of two layers Fireline boards at all exposed steelwork above basement floor level and steels will be encased inconcrete with at least 75mm of cover below floor level. All new materials within the flat will be Class O for resistance to the spread of flame. Rooms 4, 5, and 6 will have at least oneoperable window for each room to serve as Part B secondary fire escape. Open area of each escape window will be at least 0.3 M2, or no less than 450mm X 450mm.
PART C: Site preparation is indicated in Structural Drawings and Structural Specification. For the full detail sections of site preparation, floor, roof and cavity insulation, and moistureresistance. Keep current level of airflow through subfloor or 150mm minimum.
PART D: Urea Formaldehyde Foam will not be specified or installed on this project.
PART E: Basement Floor Room 1‐B, 1‐C, 4, 5, 6, new internal wall is specified as sound‐insulated stud wall indicated on construction Drawing 03 to meet Part E soundtransmission requirement. No other new internal walls are required within the house. Ceiling will meet and exceed current state of PART E provision.
PART F: Air Flow through operable windows is provided in all rooms, existing and new. The litres/per second of Air Flow shall be compliant with the Approved Documents.No upgrade required.
PART G1: 1‐ Mains water will be connected by a competent plumber who will install and certify the cold water supply within copper pipes throughout the house to all bath,shower, basins and toilet installations. 2‐ Hot water will be piped to all radiators, bath, shower and basins from a combi boiler located in Room 3 "Kitchen"
PART G2: Existing Thermostatie control on the bath: 48°C
PART H: 1‐ Discharge to drains will be fully compliant for all bath, shower, basins, and toilet installations, new and existing.
PART J: GAS SAFE Registered Plumber will certify the existing Combi Boiler and the gas installation to 1‐ Room 3 "Kitchen", 2‐ capped off connection for future gas fire inRoom 2 "Living/Dining Room", and to 3‐ Gas Cooker for installation in Room 2 "Kitchen."
PART K: 1‐ Part K ‐ Flat is at ground level, therefore Park K does not apply
PART L1B: All ceiling will be filled with rockwool thermal Insulation. There is no work proposed for exterior walls and windows. Current performance of windows sashwindows workshop 3.3 w/m²/k
Gas Meters
New Bathtub & Filler
Gas piping to newcooker and gas fire
REV A: 17/04/15NMF‐0500
‐‐3‐13
290(w)x1800(h)m
m
WC Shelf above CisternREV A
REV A: 17/04/15
New Stud WallGas Safe Certificate fornew boiler position
Fix Only Gas Fire and Flue:Obtain Gas Safe Certificate
Rodding Eye to be confirmedand to remain accessible
CONSTRUCTION: 06/05/15
New
Tow
el Rail
450(w)x730(h)mm
Relocated Existing Towel Rail
REV B: 26/05/15
REV B
New RAD Position
New Door Position
REV B
REV B
NicheREV B
ART 03
1 029180
599(w)x585(h)mm
Gutter Repair and Downpiperepair for Freeholder
REV C
REV C: 12/06/15
NEW Door in new Positionby others
Flue Grille
S/S Strip
S/S Strip
S/S StripS/S StripNMF‐0500
‐‐3‐13
290(w)x1800(h)m
m
ART 03
1 029180
599(w)x585(h)mm
ART 03
1 029180
599(w)x585(h)mm
REV D: 18/06/15
REV D
REV D
REV D
REV D
REV D
REV D
REV D
Room 1A Entry, Room 2 Living/Dining Room, Room 5 Small Bedroom, Room5A & 5B Wardrobe and Room 6 Big Bedroom Floorboard Area: 45.3 sqm
W5 W6 W7 New Sashes to be installedby others in existing boxes
W1 New Sash and box by others
STEP
Basement Plan1
.
2
2
2
2
2
2
22
2
2
2
2
2
2 2 2
2
REF.
22
2
2
2
2
22
1 2 4
A
B
D
C
3
TV
TV
TVW B
North
T
Phone2
Big BedroomRoom 6
Small BedroomRoom 5
KitchenRoom 3
Living/Dining RoomRoom 2
StudyRoom 4
EntryRoom 1-A
BathroomRoom 1-C
WCRoom 1-B
H
600
400
400
Laser Pixel
Surface Mount Light
I.P. Bathroom/WC Light
Kitchen Light
Legend
SD
HD
Smoke Detector
Heat Detector
CMD Carbon Monoxide Detector
Pull Cord Light
Recessed Light
MountedLights
DoubleElectrical Outlet
SingleElectrical Outlet
TVOutlet
TelephoneOutlet
DoubleDimmer Switch
SingleDimmer Switch
DoubleSwitch
PullCord
SwitchSpur
ShaverOutlet
SmokeDectector
HeatDetector
CarbonMonoxide Detector
RetainOutlet
RetainTelephone Outlet
RetainSwitch
RetainSpur
Room 1‐AEntry 2 2 0 0 0 0 2 1 0 0 0 0 0 0 0 0 1 0
Room 1‐BWC 3 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0
Room 1‐CBathroom 3 0 0 0 0 0 0 0 1 0 1 0 0 0 0 0 0 0
Room 2Living/Dining Room 5 7 0 1 0 2 1 0 0 0 0 1 0 1 1 0 0 0
Room 3Kitchen 2 6 0 0 0 0 0 0 0 1 0 0 1 0 0 0 1 2
Room 4Study 1 2 0 1 0 0 1 0 0 0 0 1 0 0 0 0 0 0
Room 5Small Bedroom 3 2 0 1 0 0 1 0 0 0 0 1 0 0 0 1 0 0
Room 5A & 5BWardrobe 2 0 0 0 0 0 0 0 2 0 0 0 0 0 0 0 0 0
Room 6Big Bedroom 2 4 0 1 0 0 1 0 0 0 0 1 0 0 1 1 0 0
TOTAL 25 23 0 4 0 2 6 1 4 1 2 4 1 1 2 2 2 2
Exterior 2 0 0 0 0 0 0 000000 0 0 0 0 0
2
A
3
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTIONBASEMENT CEILING & ELECTRICAL PLAN 04
Basement Electrical & Reflected Ceiling Plan1
Extract Duct (core cut) operatedby pullcord switches inWC & Bathroom
1:50
Air Ducts running across fromRoom 1b " WC" & Room 1C"Bathroom" & joins together at Room4 "Study" where it leads out to thenorth exterior wall from the "ExtractDuct"
Command ModuleAlarm Control Panel + Consumer Unit above
New Alarm Indicator Unit
SD
SD
SD
SD
HD
Track Lights mounted under beam
Plaster, Midcoat & Paintceilings throughout
Illuminated Cabinet + IP outlet
General Notes:ALL LIGHT FITTINGS/ LUMINAIRES ARE FIX ONLY BY MAINCONTRACTOR; OWNER TO SUPPLY ALL LIGHTS.SMOKE AND HEAT DETECTORS ARE MAINS CONNECTED TO PART B.
Lighted Mirror
REV A: 17/04/15
CMD
Top of Cabinet Light
Existing Boiler Switch Spur & ExistingBoiler in new location
.
.
Existing Double Switch in new location
CONSTRUCTION: 06/05/15
PART M: Mobility‐impaired persons will be able to approach the main entrance,gain access by an ample door, move around at one step‐free level within groundfloor, and use a toilet facility at ground floor designed to comply with Part M to thestandard of a normal dwelling with new extensions. All new switches and socketoutlets will be at the specified heights for AD Part M. Access to the rear garden isprovided by an ample door to step free paving and gently‐sloping ramp to garden.
Part N: In 2013, Part N of Schedule 1 to the Building Regulations 2010 (as amended)and the current edition of AD N was withdrawn, with the functional requirementsand technical guidance in them subsumed into AD Part K.
PART P: 1‐ All new electrical installations will be installed by a registered competentperson under AD Part P. 3‐ NIC/EIC Registered Electrician will certify the newconsumer unit and all electrical installations within the existing house and newextensions to BS 7671.
PART Q: 1‐ ADT or equal security system to be supplied and fitted by others. MainContractor to allow access to ADT or other operative.
REV B: 07/05/15
External Lights
CMDCeiling Mounted 500x300mmaccess door
(+4) (+12) (‐6) (+1) (+1) (‐1)
TV Phone2
2
Phone
REV C: 01/06/15
REV C
REV C
REV C
1st Floor Loft2 New Lowered Ceiling and 2 new downlightsREV D
REV D: 12/06/15
Isolator Switches
Basement Plan
0
1st Floor Loft
2630
124 3
Basement Plan
0
1st Floor Loft
2630
1 2 43
1
05
2
05
North
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 05SECTIONS: 1 & 2
Section 11
Section 22
Sections Key Plan
1:50
Loft Ladder (P.I.S)
1st Floor Loft
2630
ABD C
Basement Plan
0
1st Floor Loft
2630
A B DC
4
06
5
06
3
06
North
Basement Plan
0
1st Floor Loft
2630
A B DC
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
Section 44 Section 55
06SECTIONS: 3,4,&5
Section 33
Sections Key Plan
1:50
Vent Duct
Exhaust weather‐proof louvre incore cut hole
Extract Grille
Silent Extract FanCeiling mounted500x300mm access door
Ext D1 D5 D6 D2
North
D4
1035
700
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 07
Entry North1 South3West4
Elevations Key Plan
ELEVATIONS NEW CONSTRUCTION
North Living/Dining5 East6 South7
West8
Repairs, skim,midcoat & paint
New Skirting (TYP.)
Existing Door to berepaired & refinished withprimer, undercoat & piant
New Skirting (TYP.)
Skim,midcoat & paint
New Skirting (TYP.)
Skim,midcoat & paint
New Skirting (TYP.)
Repairs, skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling LineRepairs, skim,
midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Repairs, skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Make Good Opening
1:50
New Gas Fire
Form Opening to Gas FireMain Contractor to provideelectrical and gas connectionsfor FIX ONLY GAS FIREsupplied by client
Ellipse Window Kit(P.I.S) (small one)
New RAD
Double Switch(new location)
Entry East2
Repairs, skim,midcoat & paint
Open Unit Open UnitOpen Unit
New AlarmControl Panel
Align Fireline Boardwith the rest ofthe wall
Align Downstand With bottom of Kitchen Beam
Consumer Unit
Minimum Depthof Fireplace Opening 500mm
Command Module
North
A.F.F. 913
A.F.F. 2010
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 08ELEVATIONS NEW CONSTRUCTION
Elevations Key Plan
Kitchen North1
Repairs, skim,midcoat & paint
Existing Ceiling Line
Tiling
Repairs, skim,midcoat & paint
Existing Ceiling Line
1:20
Cupboard
DrawersDrawersDishwasherUndersinkCupboard
Sink
KITCHEN IS FIX ONLY BY MAIN CONTRACTOR
FridgeFreezer
Drain Tray
CupboardCupboard
Kitchen East2
Skirting TileTopps TilesMilano Grey100x300
MInton HollinsMoss Crackle Plain 150x150
REV A: 17/07/15
REV A
REV A
North
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
South1
09ELEVATIONS NEW CONSTRUCTION
Elevations Key Plan
Repairs, skim,midcoat & paint
Existing Ceiling Line
Repairs, skim,midcoat & paint
Existing Ceiling Line
1:20
Drawers Oven Drawers
ExistingWashingMachine
Existing Boiler(new location)
KITCHEN IS FIX ONLY BY MAIN CONTRACTOR
West2
Boiler Spur Switches(new location)
Boiler Cupboard
New Flue going outto existing Core Cut
Drawers
Cupboard
Glass Shelf
Skirting TileTopps TilesMilano Grey100x300
Skirting TileTopps TilesMilano Grey100x300
NEW Door in newPositionby others
REV A: 17/07/15
REV AREV A
North
D2 D3
D1
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 10ELEVATIONS NEW CONSTRUCTION
Elevations Key Plan
Study North5
East7
South6
West8
Small Bedroom North1 East2 South3 West4
Repairs, skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
New Skirting (TYP.)
Existing Ceiling Line New Skirting (TYP.)
Existing Ceiling Line
New Skirting (TYP.)
Existing Ceiling Line
Skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
New Skirting (TYP.)
Existing Ceiling Line
Repairs, skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
1:50
'Loft Area'Leave bricksexposed on this wall 'Loft Area'
Dry Lining to bothinternal surfaces.Repairs, skim,midcoat & paint
Loft Ladder
'Loft Area'Dry Lining to allsurfaces. Repairs, skim,midcoat & paint'Loft Area'
Dry Lining to allsurfaces. Repairs, skim,midcoat & paint
Non Fire‐Rated Hatch
Handle Bar
Repairs, skim,midcoat & paint
Repairs, skim,midcoat & paint
Skim,midcoat & paint
Skim,midcoat & paint
North
D4
850
2080
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 11ELEVATIONS NEW CONSTRUCTION & DOOR SCHEDULES
Elevations Key Plan
Big Bedroom North1 East2 South3 West4
Door 1,2 & 36 Door 47 Door 5 & 68
Skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Repairs, skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Repairs, skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Skim,midcoat & paint
New Skirting (TYP.)
Existing Ceiling Line
Door Schedule
Mark Height LevelRoughWidth
RoughHeight Family and Type Description From Room: Name To Room: Name
D1 2115 Basement Plan 1540 2115 Doors_EclisseUK_ClassicGlassPocketDoorSingle:GlasslDoorLeaf_736x2030mm
plain pocket door system Small Bedroom Entry
D2 2115 Basement Plan 1540 2115 Doors_EclisseUK_ClassicGlassPocketDoorSingle:GlasslDoorLeaf_736x2030mm
plain pocket door system Study Entry
D3 2115 Basement Plan 1540 2115 Doors_EclisseUK_ClassicGlassPocketDoorSingle:GlasslDoorLeaf_736x2030mm
plain pocket door system Study Kitchen
D4 2110 Basement Plan 810 2110 Doors_IntSgl: 810x2110mm Internal Single Door Big Bedroom EntryD5 2110 Basement Plan 720 2110 Doors_IntSgl_1: 720x2110mm Internal Single Door Bathroom EntryD6 2110 Basement Plan 720 2110 Doors_IntSgl_1: 720x2110mm Internal Single Door WC Entry
1:50
Port Hole: Frosted Glassin Stainless Frame:Fix Only
Door 7 & 89
note: Install Acoustic Brushes to Lippings ofDoors D4, D5, D6
Flue Grill
Bi‐Fold Flush Panel Door with 2 leaves Small BedroomSmall Bedroom
WardrobeWardrobe
Basement PlanBasement Plan
D7D8
21102110
21102110
450450
Ext D2 by others: MEASURE ON SITE by door trade contractor
Internal Single Frosted GlassDoor
Doors_IntSgl_1: 450x2110mm x2
Doors_IntSgl_1: 450x2110mm
Ext D2 Stable Door10
North
D5A.F.F. 1245
MODULAR 2300 A.F.F.
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 12ELEVATIONS NEW CONSTRUCTION
Elevations Key Plan
Bath North1 East2South3
West4
Existing Ceiling LineExisting Ceiling Line
Repairs, skim,midcoat & paint
Existing Ceiling Line
Tiling
Illuminated Cabinet + IP outletFix Only
Tile Flooring
Tile Flooring
Tile Flooring
Relocated Existing Towel Rail
New Bathtub Align with Tiles
Tiling
Skim,midcoat & paint
Tile Flooring
New Glass Screen
New Shower Column
New ROCA Basin & Taps
1:20
21mm Marine Ply Painted
New Bath Filler
Extract Grille
OMIT Stainless Trimmingabove Skirting Tile(Typical)
OMIT Stainless Trimming above Skirting Tile (Typical)
Skirting TileTopps TilesMilano Grey100x300
Skirting Tile, Topps TilesMilano Grey, 100x300
Skirting Tile, Topps TilesMilano Grey, 100x300
Skirting Tile, Topps TilesMilano Grey, 100x300
REV A: 17/07/15
REV A
REV A
REV A
REV A
North
PR‐26a CONTRACT MEETING JCT MW 2011 28‐Apr‐15 DRAFTLaMa Studio Rafal Mamica/BEL
W.C. Fittings & FixturesItem Type Dealer Comment
1 Toilet2 Cistern3 Basin4 Basin Tap5 Mirror6 Toilet Roll Dispenser7 Towel Rail
Bathroom Fittings & FixturesItem Type Dealer Comment
1 Shower Column2 Bath Filler3 Basin4 Basin Tap5 Shower Basket6 Glass Shower Screen7 Illuminated Cabinet Mirror8 Bath Towel Cabinet9 Bathtub10 Existing Towel Rail
Bathroom Etc LTD
TBC
KaldeweiN/A
V & B ONOVA
V & B ONOVA
Bathroom Etc LTDGROHE
V & B ONOVA Bathroom Etc LTD
N/A
GROHE Bathroom Etc LTD
Bathroom Etc LTD
ROCA ELEMENT
TBC
TBC
Stelrad
Bathroom Etc LTD
TBCTBCTBCTBCTBC
TBCTBCTBCTBC
By Main Contractor By Main ContractorTBC TBC
Plumb World
Home Supply.co.uk
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 13ELEVATIONS NEW CONSTRUCTION
Elevations Key Plan
Repairs, skim,midcoat & paint
Skim,midcoat & paint
Skim,midcoat & paint
Lighted Mirror
Tile FlooringTile Flooring
Tile Flooring
Tile Flooring
New Towel Rail
New Basin & Taps
1:20
Shelf above Cistern
Toilet Roll Dispenser
100 x 100 Precast Lintel150mm min. support both sides
LED Light Above
Extract Grille
Cabinet Fix Only
OMIT Stainless Trimmingabove Skirting Tile (Typical)
OMIT StainlessTrimming aboveSkirting Tile (Typical)OMIT Stainless Trimming
above Skirting Tile (Typical)
WC North1 WC East2 WC South3 WC West4
Skirting Tile, Topps TilesMilano Grey, 100x300
Skirting Tile, Topps TilesMilano Grey, 100x300Skirting Tile, Topps Tiles
Milano Grey, 100x300
Skirting Tile,Topps Tiles
Milano Grey,100x300
REV A: 17/07/15REV B: 27/07/15
REV A
REV A
REV AREV A
Silestone Offcutfrom Kitchen
REV BSilestone Offcut
from Kitchen
REV B
Silestone Offcutfrom Kitchen
REV B
D
1035
Minimum Depth 500mm
1
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 14CONSTRUCTION DETAILS1:5
Chimney Breast Detail2
Existing Fireplace
Existing Brickwall
FLUE
Existing ChimneyBreast
NEW GAS FIRE:FIX ONLY
Existing Joists
Ceiling to Wall & Floor to Wall to Existing Detail1
Existing Brick Wall
New Plaster Board
New Skirting boards
15mm Expansion gap on all sides
18mm New Engineered Timber Floating Floor
UnderlayNew Supply and Return Heat Piping
22mm T&G Chipboard (2400x600mm Panels)Level new flooring as requiredExisting FloorboardsExisting JoistsRockwool Rolls between JoistsSupport with Polypropylene Netting where required
Allow Air Space for wiringRockwoolExisting Floor Joists100mm Soundsorbe Insulation15mm Soundsorbe Resilient Bar12.5mm Fireline BoardsIntumescent Downlighter Cover
REV A: 17/07/15
REV A: NEW GAS FIRE OPENING
Fire Line Board
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 15CONSTRUCTION DETAILS1:5
Bath Tub Detail1
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
Floor Tiling
Underlay
20mm Hardi Board for floors
Level new flooring as required
Existing Floorboards
Existing Joists
Rockwool Rolls between Joists
Support with Polypropylene Netting where required
New Bathtub
12.5mm Hardi BoardNew Tiling100mm Stud WallFilled with Rockwool
1:5
Pocket Door & Wall Detail2
125mm Finished Wall ‐ 12.5mm Plaster Board ‐ Steel FrameKaris Glass DoorsClassic 8mm Satin Glass
18mm New EngineeredTimber Floating FloorUnderlay
22mm T&G Chipboard(2400x600mm Panels)Level new flooring as required
21mm Marine Plywood
Mastic Joint
Blocking
Stainless Steel Tile Edge Trim
New Shower Column
Shower Screen
Maintain 150mm VOID belowInsulation for Ventilation
Bathtub Feet can be adjusted
Blocking
Skirting Tile, Topps TilesMilano Grey, 100x300
REV A: 17/07/15
REV A
23
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 16CONSTRUCTION DETAILS1:5
Construction Ceiling Detail1
Rockwool
Existing Floor Joists
100mm Soundsorbe Insulation Quilt
Vent Duct
Existing Masonry Wall
Living/Dining Ro
om
Big Be
droo
mFIRST FLOOR FLAT
REV A: 07/05/15
Down Stand Align with Living/DiningDownstand Height
Align Downstand Edge with the edgeof 'D6' Door frame
B
North
D
A.F.F. 1030
A.F.F. 2100
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 17COLUMN DETAIL PLAN1:20
Basement 'B1' & 'C1' Detail Plan2
Universal Column 'C1' by 'engineeria'Rock Wool and 2 x 12.5mmNew Fireline Board covered all round
Existing Wall
New Timber Stud Wall(Match Opposite Depth to 'new location'of Boiler wall)
Sliding Door Partition Wall.
Match Partition wall with edgeof 'C1' Fireline board
.
Match Partition wall with edgeof 'C1' Fireline board
WC Detail1
Waterproof Plaster Board
LEDs mounted on cupboard
WC Cupbaord
Marble Shelf
New Cistern
Existing Brick Work
Floor Tiling
Blocking
New Foul Drain Pipe
New WC
21mm Marine Ply
Galvanised SteelSupport Bracket
Key Plan
Existing Stud
Blocking
1 2
A
B
D3
North W3 W2
3795
1840
2060
0
450 450 450 450 450 2020
2060
0
1970
2014
020
235
5 600 25
390
Ext D3
Ext D2
20 625 600 15 500 600 500 20
North
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 18BASEMENT KITCHEN PLAN1:20
Basement Kitchen Plan1
Key Plan
1 2
A
B
3
StudyRoom 4
KitchenRoom 3
D2D3
North
555
970
870
200
200
1
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
Kitchen & Study Tiling Plan1
19Basement Kitchen Tiling Plan & Elevation1:20
Kitchen North Tiling2
Room 3 Kitchen & Room 4 Study Floor Tile Area: 10.45 sqmFloor Tile Under Cabinet 40mm
Room 3 Kitchen Wall Tile Area: 2.7sqm
Topps Floor TileMarmomix Gray600x200mm
WHOLE
3/4
WHOLE
3/4WHOLE
WHOLE
WHOLE
WHOLE
WHOLE
Topps Tiles, MInton HollinsMoss Crackle Plain 150x150
Stainless Strip
REV A: 17/07/15
REV A
REV A
2
D
C3
D5D6
BathroomRoom 1-C
WCRoom 1-B
MODULAR 2300 A.F.F.
A.F.F. 2100
A.F.F. 760
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION
Basement WC & Bathroom Tiling Plan1
20Basement WC & Bathroom Tiling Plan & Elevations1:20
Room 1‐B WCFloor Tile Area: 1.735 sqm
Room 1‐C BathroomFloor Tile Area: 2.74 sqm
Bathroom East2 Bathroom South3 Room 1‐C BathroomWall Tile Area: 2.85 sqm
Room 1‐B WCWall Tile Area: 4.5 sqm
WC South6Room 1‐B WCWall Tile Area: 0.74 sqm
WC North4Room 1‐B WCWall Tile Area: 0.12 sqm
WC East5
Skirting TileTopps TilesMilano Grey100x300
Top TileTBC100x300mm
Floor TileMarmomix Grey600x200mm
Field TileWellington Blue100x300mm
Top TileTBC100x300mm
Field TileWellington Blue100x300mm
Field TileWellington Blue100x300mm(on both returns and sill)
Brushed StainlessSteel Edge Trim
Stainless Trimming
Stainless Trimming
WHOLE
WHOLE
WHOLE
Field TileWellington Blue100x300mm(on bothreturns and sill)
Skirting TileTopps TilesMilano Grey100x300
Skirting TileTopps TilesMilano Grey100x300
Skirting TileTopps TilesMilano Grey100x300
REV A: 17/07/15REV B: 27/07/15
REV A
REV A
REV A
REV A
REV A
WHOLEWHOLE
WHOLE
WHOLE
WHOLE
WHOLE
WHOLE
WHOLE
WHOLE
Silestone Offcutfrom Kitchen
Silestone Offcutfrom KitchenSilestone Offcut
from Kitchen REV B
REV BREV B
1 2 4
A
B
D
C
3North
Small BedroomRoom 5
Big BedroomRoom 6
EntryRoom 1-AStudy
Room 4KitchenRoom 3
D1D2D3
D5D6
D4
BathroomRoom 1-C
NorthNorthNorth
Living/Dining RoomRoom 2
WCRoom 1-B
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 21Basement Floorboard Plan1:50
Basement Floorboard Plan1Room 1A Entry, Room 2 Living/Dining Room, Room 5 SmallBedroom, Room 5A & 5B Wardrobe and Room 6 Big BedroomFloorboard Area: 45.2 sqm
800
5002150 Above Consumer Unit
800
150500
800
120
500
12 12
150
.
North
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 22Command Module Detail1:5
Command Module Front Elevation1 Command Module Left Elevation2Command Module Open Front Elevation3
Command Module Detail Plan4
Consumer Unit
Alarm Control Panel
Ironmongerystainless steelpull ring
Magnetic Catch
6mm MDF
12mm MDF
12mm MDF
Cabinet HingeMagnetic Catch
Consumer Unit
Cabinet Hinges
Key Hooks
Command Module Open Detail Plan5
Consumer Unit
Command Module Box swings90 degrees to the left
JOINERY
22
480
4
480
6060
6012
0
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 23Door 8 Detail1:2
Door 8 Detail Plan1
4mm Toughened Frosted Glass
Rectangular BeadArchitrave
Door 8 Front Elevation2
FRONT
4mm Toughened Frosted GlassArchitrave
Glass Putty
JOINERY
Frosted Glass
Frosted Glass
250
250
12 150 12 12 150 12150
250
250
500
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 24ROOM 5 SMALL BEDROOM, PART B STEP1:5
Axonometric Part B Escape Step1
Part B Escape Step Side Elevation4
Part B Escape Step Rear Elevation2
Mitre Joint20mm Engineered OAK Floor Board
Cut out side panels to 'notch over'Skirting Board Dimensions
Skirting Board 18mm X 144mm MDF
Existing Wall
Engineered OAK Floor in situ
2 x 22mm MDF Supports
20mm Engineered OAK Floorboard
Skirting Board
Part B Escape Step Front Elevation3
20mm Engineered OAK Floorboard
20mm Engineered OAK Floorboard box
Mitre Joint
Quarter Round Moulding 18mm x 18mm MDF
Skirting Board 18mm X 144mm MDF
Quarter Round Moulding18mm x 18mm MDF
Cut out side panels to 'notch over'Skirting Board Dimensions
Skirting Board 18mm X 144mmMDF
Quarter Round Moulding18mm x 18mm MDF
Small BedroomRoom 5
Big BedroomRoom 6
EntryRoom 1-AStudy
Room 4KitchenRoom 3
BathroomRoom 1-CLiving/Dining Room
Room 2WC
Room 1-B
1
1
4
2
32
3
13
2
1
2
23
5
6
6
66
65
5
FLAT at 26a PEPYS ROAD, LONDON SE14© Copyright LaMa STUDIO LTD TEL 020 8811 122836 WOODSTOCK GROVE, UNIT 1C LONDON W12 8LE SCALE: @A3 / ORIGINAL ISSUE: 20 MAR 15
Do not Scale drawings: all dimensions to be checked on site prior to fabrication, ordering, orinstallation of materials and all discrepancies to be reported to the Architect.
ISSUE FOR CONSTRUCTION 25PR‐26a Room Finishes ScheduleN/A
Top Related