References of Heat Recovery Boiler Plants
Extraction from the Total List of References of Heat Recovery Boiler Plants
Reference Boiler Plants in total 108
14 Plants thereof as EPC
Reference Plants 108
List of References of Heat Recovery Steam Generators
Page 2 of 2309.06.2020
CCP Plant Hoechst, Frankfurt am Main, GermanyInfraserv GmbH Co. Höchst KG
Gas turbine:
Gas turbine output:
2 x 88,7 MWel
Steam capacity:
2 x 200 t/h
Steam pressure:
123 bar (g)
Steam temperature:
520 °C
Flying take-over:
Auxiliary fuel :
Scope:
Year of commissioning:
CCP Plant Marl, GermanySiemens Gas and Power
Gas turbine:
Gas turbine output:
2 x 55 MWel
Steam capacity: 2 x HP
2 x LP23615
t/h
Steam pressure: HP
LP804,8
bar (g)
Steam temperature: HP
LP500150
°C
Flying take-over:
Auxiliary fuel :
Scope:
Year of commissioning:
2021
no
Natural gas, production residues (gaseous)
Boiler Island
EPC
2022
SGT-800
SGT-800
yes
Natural gas, production residues (gaseous)
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 3 of 2309.06.2020
CCP Plant Ineos Cologne, GermanyINEOS Köln GmbH
Gas turbine:
Gas turbine output:
25 MWel
Steam capacity: HP
RH240260
t/h
Steam pressure: HP
RH10832
bar (g)
Steam temperature: HP
RH530510
°C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Palm Paper, King's Lynn, Great BritainPalm Paper Ltd.
Gas turbine:
Gas turbine output:
32,7 MWel
Steam capacity: HP
LP 81
11,2t/ht/h
Steam pressure: HP
LP90 4,2
bar (g)bar (g)
Steam temperature: HP
LP 515145
°C°C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
2018
no
Natural gas
Boiler Island
Natural gas
Boiler Island
2020
SGT-700
GE MS5002E LE
yes
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 4 of 2309.06.2020
CHP Plant Flensburg, GermanyStadtwerke Flensburg GmbH
Gas turbine:
Gas turbine output:
50 MWel
Design pressure: HP
LP11010
t/ht/h
Steam pressure: HP
LP758,5
bar (g)bar (g)
Steam temperature: HP
LP525190
°C°C
District heating exchanger part:
Thermal input:
13 MW
Design pressure:
40 bar (g)
Allowable operation temperature:
130 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Gas Power Plant Emsland, Lingen, Germany - (Design and detail planning)RWE Power AG
Gas turbine:
Gas turbine output:
2 x 2 à 58 MWel
Steam capacity:
2 x 1140 t/h
Steam pressure:
186,7 bar (g)
Steam temperature:
535 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
EPCM
2012
Trent 60 WLE
no
Natural gas
Natural gas
Boiler Island
2015
SGT-800B
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 5 of 2309.06.2020
CCP Plant Hattorf, Philippsthal, GermanyKraftwerk Hattorf GmbH c/o E.ON Energy Projects GmbH
Gas turbine:
Gas turbine output:
32 MWel
Steam capacity:
80 t/h
Steam pressure:
62 bar (g)
Steam temperature:
500 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Varel B8, Varel, GermanyPapier- und Kartonfabrik Varel GmbH & Co. KG
Gas turbine:
Gas turbine output:
25,6 MWel
Thermal input:
53 MW
Steam capacity:
90 t/h
Steam pressure:
89 bar (g)
Steam temperature:
480 °C
Flying take-over:
Fuel:
Scope:
Year of commissioning:
Natural gas
Boiler Island
2007
2012
Solar T 65 Taurus
no
no
Natural gas
EPC
SGT-700B
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 6 of 2309.06.2020
CHP Plant Linden, Hannover, GermanyStadtwerke Hannover AG
Gas turbine:
Gas turbine output:
77 MWel
Steam capacity: HP
MP9313
t/ht/h
Steam pressure: HP
MP98,131
bar (g)bar (g)
Steam temperature: HP
MP540351
°C°C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Plattling, GermanyKraftwerk Plattling GmbH c/o E.ON Energy Projects GmbH
Gas turbine:
Gas turbine output:
77 MWel
Steam capacity:
201 t/h
Steam pressure:
92 bar (g)
Steam temperature:
532 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
2010
no
Natural gas
Boiler Island
Boiler Island
2011
PG 6111FA
GE PG 6111 FA
no
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 7 of 2309.06.2020
CHP Plant Tiefstack, Hamburg, GermanyVattenfall Europe Hamburg AG
Gas turbine:
Gas turbine output:
2 x 51,9 MWel
Steam capacity:
2 x 112 t/h
Steam pressure:
41 bar (g)
Steam temperature:
400 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CHP Plant Hafen, Münster, GermanyStadtwerke Münster GmbH
Gas turbine:
Gas turbine output:
2 x 34,15 MWel
Steam capacity:
2 x 81,5 t/h
Steam pressure:
82 bar (g)
Steam temperature:
525 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Boiler Island
2005
RB 211
yes
Natural gas / light fuel oil
Natural gas
Boiler Island
2007
Trent 60 DLE
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 8 of 2309.06.2020
CHP Plant Römerbrücke, Saabrücken, GermanyGDF SUEZ Saarland GmbH (formerly Electrabel Saarland GmbH)
Gas turbine
:
Gas turbine output:
42 MWel
Steam capacity:
115 t/h
Steam pressure:
115 bar (g)
Steam temperature:
535 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
DK6 Combined Cycle Plant, Dunkirk, FranceENGIE Thermique France
Gas turbine
:
Gas turbine output:
2 x 160 MWel
Steam capacity per each boiler: HP
RH535530
t/ht/h
Thermal output LP-part:
LP 50 MW
Steam pressure: HP
RH14431
bar (g)bar (g)
Steam temperature: HP
RH566566
°C°C
Flying take-over:
Auxiliary fuel :
Scope:
Year of commissioning:
2004
yes
Natural gas, blast furnace gas, coke gas
Boiler Island
2005
Alstom-GT 13 E
yes
Natural gas
Boiler Island
GE-LM 6000
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 9 of 2309.06.2020
CHP Plant Würzburg, GermanyThyssenKrupp Xervon Energy
Gas turbine
:
Gas turbine output:
45 MWel
Steam capacity:
125 t/h
Steam pressure:
72 bar (g)
Steam temperature:
515 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CHP Plant Niederrad, GermanyLentjes GmbH (formerly Lurgi GmbH)
Gas turbine
:
Gas turbine output:
47,7 MWel
Steam capacity:
135 t/h
Steam pressure:
69 bar (g)
Steam temperature:
530 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Boiler Island
2004
GE-PG 6581 (B)
no
Natural gas
Natural gas
Boiler Island
2005
Siemens-SGT 800
yes
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 10 of 2309.06.2020
CHP Plant III Duisburg-Wanheim, GermanyLentjes GmbH (formerly AE&E Lentjes GmbH)
Gas turbine:
Gas turbine output:
2 x 77 MWel
Steam capacity:
2 x 96 t/h
Steam pressure:
105 bar (g)
Steam temperature:
533 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Power Plant Grenzach-Wyhlen, Germany E.ON Energy Projects GmbH
Gas turbine:
Gas turbine output:
32,1 MWel
Steam capacity:
80 t/h
Steam pressure:
112 bar (g)
Steam temperature:
525 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Natural gas
EPC
2004
2004
RR-RB 211T
no
no
no
Boiler Island
GE-PG 6111 (FA)
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 11 of 2309.06.2020
Gas Turbine Heating Power Plant Augsburg-Ost, GermanyKraftanlagen Anlagentechnik München GmbH
Gas turbine
:
Gas turbine output:
30,8 MWel
Thermal output boiler:
50 MWth
Design pressure:
23 bar (g)
Flow temperature:
130 °C
Return flow temperature:
58 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
MVV Enamic Ludwigshafen, GermanyMVV Enamic GmbH (formerly MVV Industriekraftwerk Ludwigshafen GmbH)
Gas turbine
:
Gas turbine output:
8,5 MWel
Steam capacity:
25 t/h
Steam pressure:
57 bar (g)
Steam temperature:
455 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
2003
no
Natural gas
Boiler Island
Boiler Island
2004
Solar-Taurus 70
GE-LM 2500 PR DLE
no
Natural gas
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 12 of 2309.06.2020
CHP Plant Rzeszow, PolandLentjes GmbH (formerly Lurgi Energie und Entsorgung GmbH)
Gas turbine:
Gas turbine output:
61,9 MWel
Steam capacity:
110 t/h
Steam pressure:
98 bar (g)
Steam temperature:
540 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
FBC Plant Grovehurst, Kent, Great BritainLentjes GmbH
Steam capacity:
38,8 t/h
Steam pressure:
26,5 bar (g)
Steam temperature:
345 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
2002
no
no
Boiler Island
no
Boiler Island
2003
Siemens-V64.3a
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 13 of 2309.06.2020
CHP Plant Lublin-Wrotków, Lublin, PolandLentjes GmbH (formerly Lurgi Lentjes Energie)
Gas turbine:
Gas turbine output:
155 MWel
Steam capacity:
251 t/h
Steam pressure:
85 bar (g)
Steam temperature:
528 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Gendorf, Burgkirchen, GermanyInfraserv Bayernwerk Gendorf GmbH
Gas turbine:
Gas turbine output:
43 MWel
Steam capacity:
130 t/h
Steam pressure:
71 bar (g)
Steam temperature:
510 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Boiler Island
2002
SGT-800
yes
Natural gas, Hydrogen
no
Boiler Island
2002
Siemens V 94
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 14 of 2309.06.2020
Power Plant 1+2, Baku, AzerbaijanJacobs Comprimo GmbH
Gas turbine:
Gas turbine output:
2 x 56 MWel
Steam capacity:
2 x 221 t/h
Steam pressure:
20 bar (g)
Steam temperature:
289 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Raubling, GermanyRaubling Papier GmbH, Heinzel Group (formerly Mondi Packaging Raubling GmbH)
Gas turbine:
Gas turbine output:
11,3 MWel
Steam capacity:
85 t/h
Steam pressure:
90 bar (g)
Steam temperature:
502 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Natural gas, bio gas
EPC
2001
2001
Solar-Mars 100
yes
no
Natural gas
Boiler Island
ABB-GT 8
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 15 of 2309.06.2020
YPF Methanol Plant, Plaza Huincul, ArgentinaAir Liquide (formerly Lurgi Öl Gas Chemie GmbH)
Process heat generator:
Energy source:
Thermal input:
67,3 MWth
Gas inlet temperature:
980 °C
Gas outlet temperature:
130 °C
Medium flows:
Scope:
Year of commissioning:
CCP Plant Lachendorf, GermanyDrewsen Spezialpapiere GmbH & Co. KG
Gas turbine:
Gas turbine output:
6,9 MWel
Steam capacity:
65 t/h
Design pressure:
46 bar (g)
Steam temperature:
460 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
yes
Natural gas
EPC
2000
Boiler Island
2000
Solar-Taurus 60
Reformer
Waste gas
Process gas, steam, fuel gas, air
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 16 of 2309.06.2020
CCP Plant Wasserburg, GermanyE.ON Energy Projects GmbH
Gas turbine:
Gas turbine output:
6,75 MWel
Steam capacity:
55 t/h
Steam pressure:
64 bar (g)
Steam temperature:
510 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CHP Lausward, Düsseldorf, GermanyStadtwerke Düsseldrof AG
Gas turbine:
Gas turbine output:
70 MWel
Steam capacity:
103 t/h
Steam pressure:
87 bar (g)
Steam temperature:
541 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
2000
no
no
Boiler Island
EPC
2000
Siemens-V64
Solar-Taurus 70
yes
Natural gas
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 17 of 2309.06.2020
CHP Plant Merheim, Cologne, GermanyRheinEnergie AG (formerly: GEW Köln)
Gas turbine:
Gas turbine output:
5 MWel
Steam capacity:
53 t/h
Steam pressure:
85 bar (g)
Steam temperature:
525 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Erfurt-East, GermanySWE Stadtwerke Erfurt GmbH
Gas turbine:
Gas turbine output:
2 x 25 MWel
Steam capacity:
2 x 85 t/h
Steam pressure:
80 bar (g)
Steam temperature:
525 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
EPC
1999
GE-LM 2500
yes
Natural gas, light fuel oil
Natural gas, light fuel oil
EPC
1999
Solar-Taurus 50
yes
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 18 of 2309.06.2020
SVA Neu-Ulm, GermanyThyssenKrupp EnCoke
Steam capacity:
7,9 t/h
Steam pressure:
39 bar (g)
Steam temperature:
400 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
EPZ AMER 9, Geertruidenberg, The NetherlandsAir Liquide Global E&C Solutions Germany (formerly Lurgi Umwelt)
Energy source:
Steam capacity:
27,1 t/h
Steam pressure:
58 bar (g)
Steam temperature:
320 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Boiler Island
1999
Process gas
no
no
no
Boiler Island
1999
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 19 of 2309.06.2020
PCK Schwedt, Schwedt, GermanyPCK Raffinerie GmbH
Energy source:
Steam capacity:
21,4 t/h
Steam pressure:
36 bar (g)
Steam temperature:
270 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
SVZ Schwarze Pumpe, Brandenburg, GermanyLEAG (formerly Schwarze Pumpe GmbH)
Gas turbine:
Gas turbine output:
40 MWel
Steam capacity:
182 t/h
Steam pressure:
96 bar (g)
Steam temperature:
525 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Light fuel oil, synthetic gas
Boiler Island
1997
1998
GE-Frame 6
yes
no
no
Boiler Island
Sewage Water Combustion
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 20 of 2309.06.2020
Power Plant Obernburg, GermanyKraftwerk Obernburg GmbH
Gas turbine:
Gas turbine output:
70 MWel
Steam capacity:
130 t/h
Design pressure:
88 bar (g)
Steam temperature:
515 °C
Flying take-over:
Auxiliary fuel :
Scope:
Year of commissioning:
CCP Plant Dotternhausen, GermanyHolcim (Süddeutschland) GmbH (formerly Rohrbach Zement GmbH & Co. KG)
Energy source:
Steam capacity:
11,6 t/h
Steam pressure:
58 bar (g)
Steam temperature:
500 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
1997
yes
no
Boiler Island
Boiler Island
1997
Waste gas downstream rotary furnace
Siemens-V 64
yes
Turbine exhaust gas, natural gas (referred to 8 degree air intake)
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 21 of 2309.06.2020
CHP Plant Leipzig-North, GermanyStadtwerke Leipzig GmbH
Gas turbine:
Gas turbine output:
2 x 70 MWel
Steam capacity:
2 x 125 t/h
Design pressure:
85 bar (g)
Steam temperature:
512 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Europa Carton, Hoya, GermanyAF-Consult Switzerland AG (formerly Colenco AG)
Steam capacity:
45 t/h
Steam pressure:
64 bar (g)
Steam temperature:
450 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
1996
no
no
Boiler Island
Natural gas
Boiler Island
1996
Siemens-V 64
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 22 of 2309.06.2020
Power Plant Schwarzheide, Brandenburg, GermanyBASF SE
Gas turbine:
Gas turbine output:
40,4 MWel
Steam capacity:
2 x 130 t/h
Steam pressure:
80 bar (g)
Steam temperature:
480 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Refinery Heide, Hemmingstedt, GermanyShell Deutschland Oil GmbH (formerly DEA)
Gas turbine:
Gas turbine output:
10 MWel
Steam capacity:
135 t/h
Steam pressure:
75 bar (g)
Steam temperature:
520 °C
Flying take-over:
Auxiliary fuel :
Scope:
Year of commissioning:
Boiler Island
1995
GE-Frame 3
no
Turbine exhaust gas, gas, heavy fuel oil (referred to 8 degree air intake)
Natural gas, Fuel oil
Boiler Island
1995
GE-Frame 6
no
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group
List of References of Heat Recovery Steam Generators
Page 23 of 2309.06.2020
Power Plant Hamburg, GermanyADM Hamburg AG (formerly Oelmühle Hamburg AG)
Gas turbine:
Gas turbine output:
2 x 6 MWel
Steam capacity:
2 x 65 t/h
Design pressure:
19 bar (g)
Saturated steam temperature:
198 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
CCP Plant Hengelo, The NetherlandsNouryon Industrial Chemicals (formerly Akzo Nobel, before that Salinco)
Gas turbine:
Gas turbine output:
40,5 MWel
Steam capacity:
175 t/h
Design pressure:
103 bar (ü)
Steam temperature:
525 °C
Flying take-over:
Auxiliary fuel:
Scope:
Year of commissioning:
Natural gas
EPC
1993
1993
GE-Frame 6
no
no
Natural gas
Boiler Island
RR-Typhoon
Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group