References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat...

23
References of Heat Recovery Boiler Plants Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as EPC Reference Plants 108

Transcript of References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat...

Page 1: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

References of Heat Recovery Boiler Plants

Extraction from the Total List of References of Heat Recovery Boiler Plants

Reference Boiler Plants in total 108

14 Plants thereof as EPC

Reference Plants 108

Page 2: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 2 of 2309.06.2020

CCP Plant Hoechst, Frankfurt am Main, GermanyInfraserv GmbH Co. Höchst KG

Gas turbine:

Gas turbine output:

2 x 88,7 MWel

Steam capacity:

2 x 200 t/h

Steam pressure:

123 bar (g)

Steam temperature:

520 °C

Flying take-over:

Auxiliary fuel :

Scope:

Year of commissioning:

CCP Plant Marl, GermanySiemens Gas and Power

Gas turbine:

Gas turbine output:

2 x 55 MWel

Steam capacity: 2 x HP

2 x LP23615

t/h

Steam pressure: HP

LP804,8

bar (g)

Steam temperature: HP

LP500150

°C

Flying take-over:

Auxiliary fuel :

Scope:

Year of commissioning:

2021

no

Natural gas, production residues (gaseous)

Boiler Island

EPC

2022

SGT-800

SGT-800

yes

Natural gas, production residues (gaseous)

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 3: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 3 of 2309.06.2020

CCP Plant Ineos Cologne, GermanyINEOS Köln GmbH

Gas turbine:

Gas turbine output:

25 MWel

Steam capacity: HP

RH240260

t/h

Steam pressure: HP

RH10832

bar (g)

Steam temperature: HP

RH530510

°C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Palm Paper, King's Lynn, Great BritainPalm Paper Ltd.

Gas turbine:

Gas turbine output:

32,7 MWel

Steam capacity: HP

LP 81

11,2t/ht/h

Steam pressure: HP

LP90 4,2

bar (g)bar (g)

Steam temperature: HP

LP 515145

°C°C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

2018

no

Natural gas

Boiler Island

Natural gas

Boiler Island

2020

SGT-700

GE MS5002E LE

yes

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 4: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 4 of 2309.06.2020

CHP Plant Flensburg, GermanyStadtwerke Flensburg GmbH

Gas turbine:

Gas turbine output:

50 MWel

Design pressure: HP

LP11010

t/ht/h

Steam pressure: HP

LP758,5

bar (g)bar (g)

Steam temperature: HP

LP525190

°C°C

District heating exchanger part:

Thermal input:

13 MW

Design pressure:

40 bar (g)

Allowable operation temperature:

130 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Gas Power Plant Emsland, Lingen, Germany - (Design and detail planning)RWE Power AG

Gas turbine:

Gas turbine output:

2 x 2 à 58 MWel

Steam capacity:

2 x 1140 t/h

Steam pressure:

186,7 bar (g)

Steam temperature:

535 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

EPCM

2012

Trent 60 WLE

no

Natural gas

Natural gas

Boiler Island

2015

SGT-800B

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 5: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 5 of 2309.06.2020

CCP Plant Hattorf, Philippsthal, GermanyKraftwerk Hattorf GmbH c/o E.ON Energy Projects GmbH

Gas turbine:

Gas turbine output:

32 MWel

Steam capacity:

80 t/h

Steam pressure:

62 bar (g)

Steam temperature:

500 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Varel B8, Varel, GermanyPapier- und Kartonfabrik Varel GmbH & Co. KG

Gas turbine:

Gas turbine output:

25,6 MWel

Thermal input:

53 MW

Steam capacity:

90 t/h

Steam pressure:

89 bar (g)

Steam temperature:

480 °C

Flying take-over:

Fuel:

Scope:

Year of commissioning:

Natural gas

Boiler Island

2007

2012

Solar T 65 Taurus

no

no

Natural gas

EPC

SGT-700B

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 6: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 6 of 2309.06.2020

CHP Plant Linden, Hannover, GermanyStadtwerke Hannover AG

Gas turbine:

Gas turbine output:

77 MWel

Steam capacity: HP

MP9313

t/ht/h

Steam pressure: HP

MP98,131

bar (g)bar (g)

Steam temperature: HP

MP540351

°C°C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Plattling, GermanyKraftwerk Plattling GmbH c/o E.ON Energy Projects GmbH

Gas turbine:

Gas turbine output:

77 MWel

Steam capacity:

201 t/h

Steam pressure:

92 bar (g)

Steam temperature:

532 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

2010

no

Natural gas

Boiler Island

Boiler Island

2011

PG 6111FA

GE PG 6111 FA

no

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 7: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 7 of 2309.06.2020

CHP Plant Tiefstack, Hamburg, GermanyVattenfall Europe Hamburg AG

Gas turbine:

Gas turbine output:

2 x 51,9 MWel

Steam capacity:

2 x 112 t/h

Steam pressure:

41 bar (g)

Steam temperature:

400 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CHP Plant Hafen, Münster, GermanyStadtwerke Münster GmbH

Gas turbine:

Gas turbine output:

2 x 34,15 MWel

Steam capacity:

2 x 81,5 t/h

Steam pressure:

82 bar (g)

Steam temperature:

525 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Boiler Island

2005

RB 211

yes

Natural gas / light fuel oil

Natural gas

Boiler Island

2007

Trent 60 DLE

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 8: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 8 of 2309.06.2020

CHP Plant Römerbrücke, Saabrücken, GermanyGDF SUEZ Saarland GmbH (formerly Electrabel Saarland GmbH)

Gas turbine

:

Gas turbine output:

42 MWel

Steam capacity:

115 t/h

Steam pressure:

115 bar (g)

Steam temperature:

535 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

DK6 Combined Cycle Plant, Dunkirk, FranceENGIE Thermique France

Gas turbine

:

Gas turbine output:

2 x 160 MWel

Steam capacity per each boiler: HP

RH535530

t/ht/h

Thermal output LP-part:

LP 50 MW

Steam pressure: HP

RH14431

bar (g)bar (g)

Steam temperature: HP

RH566566

°C°C

Flying take-over:

Auxiliary fuel :

Scope:

Year of commissioning:

2004

yes

Natural gas, blast furnace gas, coke gas

Boiler Island

2005

Alstom-GT 13 E

yes

Natural gas

Boiler Island

GE-LM 6000

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 9: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 9 of 2309.06.2020

CHP Plant Würzburg, GermanyThyssenKrupp Xervon Energy

Gas turbine

:

Gas turbine output:

45 MWel

Steam capacity:

125 t/h

Steam pressure:

72 bar (g)

Steam temperature:

515 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CHP Plant Niederrad, GermanyLentjes GmbH (formerly Lurgi GmbH)

Gas turbine

:

Gas turbine output:

47,7 MWel

Steam capacity:

135 t/h

Steam pressure:

69 bar (g)

Steam temperature:

530 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Boiler Island

2004

GE-PG 6581 (B)

no

Natural gas

Natural gas

Boiler Island

2005

Siemens-SGT 800

yes

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 10: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 10 of 2309.06.2020

CHP Plant III Duisburg-Wanheim, GermanyLentjes GmbH (formerly AE&E Lentjes GmbH)

Gas turbine:

Gas turbine output:

2 x 77 MWel

Steam capacity:

2 x 96 t/h

Steam pressure:

105 bar (g)

Steam temperature:

533 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Power Plant Grenzach-Wyhlen, Germany E.ON Energy Projects GmbH

Gas turbine:

Gas turbine output:

32,1 MWel

Steam capacity:

80 t/h

Steam pressure:

112 bar (g)

Steam temperature:

525 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Natural gas

EPC

2004

2004

RR-RB 211T

no

no

no

Boiler Island

GE-PG 6111 (FA)

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 11: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 11 of 2309.06.2020

Gas Turbine Heating Power Plant Augsburg-Ost, GermanyKraftanlagen Anlagentechnik München GmbH

Gas turbine

:

Gas turbine output:

30,8 MWel

Thermal output boiler:

50 MWth

Design pressure:

23 bar (g)

Flow temperature:

130 °C

Return flow temperature:

58 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

MVV Enamic Ludwigshafen, GermanyMVV Enamic GmbH (formerly MVV Industriekraftwerk Ludwigshafen GmbH)

Gas turbine

:

Gas turbine output:

8,5 MWel

Steam capacity:

25 t/h

Steam pressure:

57 bar (g)

Steam temperature:

455 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

2003

no

Natural gas

Boiler Island

Boiler Island

2004

Solar-Taurus 70

GE-LM 2500 PR DLE

no

Natural gas

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 12: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 12 of 2309.06.2020

CHP Plant Rzeszow, PolandLentjes GmbH (formerly Lurgi Energie und Entsorgung GmbH)

Gas turbine:

Gas turbine output:

61,9 MWel

Steam capacity:

110 t/h

Steam pressure:

98 bar (g)

Steam temperature:

540 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

FBC Plant Grovehurst, Kent, Great BritainLentjes GmbH

Steam capacity:

38,8 t/h

Steam pressure:

26,5 bar (g)

Steam temperature:

345 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

2002

no

no

Boiler Island

no

Boiler Island

2003

Siemens-V64.3a

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 13: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 13 of 2309.06.2020

CHP Plant Lublin-Wrotków, Lublin, PolandLentjes GmbH (formerly Lurgi Lentjes Energie)

Gas turbine:

Gas turbine output:

155 MWel

Steam capacity:

251 t/h

Steam pressure:

85 bar (g)

Steam temperature:

528 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Gendorf, Burgkirchen, GermanyInfraserv Bayernwerk Gendorf GmbH

Gas turbine:

Gas turbine output:

43 MWel

Steam capacity:

130 t/h

Steam pressure:

71 bar (g)

Steam temperature:

510 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Boiler Island

2002

SGT-800

yes

Natural gas, Hydrogen

no

Boiler Island

2002

Siemens V 94

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 14: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 14 of 2309.06.2020

Power Plant 1+2, Baku, AzerbaijanJacobs Comprimo GmbH

Gas turbine:

Gas turbine output:

2 x 56 MWel

Steam capacity:

2 x 221 t/h

Steam pressure:

20 bar (g)

Steam temperature:

289 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Raubling, GermanyRaubling Papier GmbH, Heinzel Group (formerly Mondi Packaging Raubling GmbH)

Gas turbine:

Gas turbine output:

11,3 MWel

Steam capacity:

85 t/h

Steam pressure:

90 bar (g)

Steam temperature:

502 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Natural gas, bio gas

EPC

2001

2001

Solar-Mars 100

yes

no

Natural gas

Boiler Island

ABB-GT 8

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 15: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 15 of 2309.06.2020

YPF Methanol Plant, Plaza Huincul, ArgentinaAir Liquide (formerly Lurgi Öl Gas Chemie GmbH)

Process heat generator:

Energy source:

Thermal input:

67,3 MWth

Gas inlet temperature:

980 °C

Gas outlet temperature:

130 °C

Medium flows:

Scope:

Year of commissioning:

CCP Plant Lachendorf, GermanyDrewsen Spezialpapiere GmbH & Co. KG

Gas turbine:

Gas turbine output:

6,9 MWel

Steam capacity:

65 t/h

Design pressure:

46 bar (g)

Steam temperature:

460 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

yes

Natural gas

EPC

2000

Boiler Island

2000

Solar-Taurus 60

Reformer

Waste gas

Process gas, steam, fuel gas, air

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 16: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 16 of 2309.06.2020

CCP Plant Wasserburg, GermanyE.ON Energy Projects GmbH

Gas turbine:

Gas turbine output:

6,75 MWel

Steam capacity:

55 t/h

Steam pressure:

64 bar (g)

Steam temperature:

510 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CHP Lausward, Düsseldorf, GermanyStadtwerke Düsseldrof AG

Gas turbine:

Gas turbine output:

70 MWel

Steam capacity:

103 t/h

Steam pressure:

87 bar (g)

Steam temperature:

541 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

2000

no

no

Boiler Island

EPC

2000

Siemens-V64

Solar-Taurus 70

yes

Natural gas

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 17: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 17 of 2309.06.2020

CHP Plant Merheim, Cologne, GermanyRheinEnergie AG (formerly: GEW Köln)

Gas turbine:

Gas turbine output:

5 MWel

Steam capacity:

53 t/h

Steam pressure:

85 bar (g)

Steam temperature:

525 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Erfurt-East, GermanySWE Stadtwerke Erfurt GmbH

Gas turbine:

Gas turbine output:

2 x 25 MWel

Steam capacity:

2 x 85 t/h

Steam pressure:

80 bar (g)

Steam temperature:

525 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

EPC

1999

GE-LM 2500

yes

Natural gas, light fuel oil

Natural gas, light fuel oil

EPC

1999

Solar-Taurus 50

yes

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 18: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 18 of 2309.06.2020

SVA Neu-Ulm, GermanyThyssenKrupp EnCoke

Steam capacity:

7,9 t/h

Steam pressure:

39 bar (g)

Steam temperature:

400 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

EPZ AMER 9, Geertruidenberg, The NetherlandsAir Liquide Global E&C Solutions Germany (formerly Lurgi Umwelt)

Energy source:

Steam capacity:

27,1 t/h

Steam pressure:

58 bar (g)

Steam temperature:

320 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Boiler Island

1999

Process gas

no

no

no

Boiler Island

1999

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 19: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 19 of 2309.06.2020

PCK Schwedt, Schwedt, GermanyPCK Raffinerie GmbH

Energy source:

Steam capacity:

21,4 t/h

Steam pressure:

36 bar (g)

Steam temperature:

270 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

SVZ Schwarze Pumpe, Brandenburg, GermanyLEAG (formerly Schwarze Pumpe GmbH)

Gas turbine:

Gas turbine output:

40 MWel

Steam capacity:

182 t/h

Steam pressure:

96 bar (g)

Steam temperature:

525 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Light fuel oil, synthetic gas

Boiler Island

1997

1998

GE-Frame 6

yes

no

no

Boiler Island

Sewage Water Combustion

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 20: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 20 of 2309.06.2020

Power Plant Obernburg, GermanyKraftwerk Obernburg GmbH

Gas turbine:

Gas turbine output:

70 MWel

Steam capacity:

130 t/h

Design pressure:

88 bar (g)

Steam temperature:

515 °C

Flying take-over:

Auxiliary fuel :

Scope:

Year of commissioning:

CCP Plant Dotternhausen, GermanyHolcim (Süddeutschland) GmbH (formerly Rohrbach Zement GmbH & Co. KG)

Energy source:

Steam capacity:

11,6 t/h

Steam pressure:

58 bar (g)

Steam temperature:

500 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

1997

yes

no

Boiler Island

Boiler Island

1997

Waste gas downstream rotary furnace

Siemens-V 64

yes

Turbine exhaust gas, natural gas (referred to 8 degree air intake)

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 21: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 21 of 2309.06.2020

CHP Plant Leipzig-North, GermanyStadtwerke Leipzig GmbH

Gas turbine:

Gas turbine output:

2 x 70 MWel

Steam capacity:

2 x 125 t/h

Design pressure:

85 bar (g)

Steam temperature:

512 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Europa Carton, Hoya, GermanyAF-Consult Switzerland AG (formerly Colenco AG)

Steam capacity:

45 t/h

Steam pressure:

64 bar (g)

Steam temperature:

450 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

1996

no

no

Boiler Island

Natural gas

Boiler Island

1996

Siemens-V 64

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 22: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 22 of 2309.06.2020

Power Plant Schwarzheide, Brandenburg, GermanyBASF SE

Gas turbine:

Gas turbine output:

40,4 MWel

Steam capacity:

2 x 130 t/h

Steam pressure:

80 bar (g)

Steam temperature:

480 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Refinery Heide, Hemmingstedt, GermanyShell Deutschland Oil GmbH (formerly DEA)

Gas turbine:

Gas turbine output:

10 MWel

Steam capacity:

135 t/h

Steam pressure:

75 bar (g)

Steam temperature:

520 °C

Flying take-over:

Auxiliary fuel :

Scope:

Year of commissioning:

Boiler Island

1995

GE-Frame 3

no

Turbine exhaust gas, gas, heavy fuel oil (referred to 8 degree air intake)

Natural gas, Fuel oil

Boiler Island

1995

GE-Frame 6

no

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group

Page 23: References of Heat Recovery Boiler Plants 108...Extraction from the Total List of References of Heat Recovery Boiler Plants Reference Boiler Plants in total 108 14 Plants thereof as

List of References of Heat Recovery Steam Generators

Page 23 of 2309.06.2020

Power Plant Hamburg, GermanyADM Hamburg AG (formerly Oelmühle Hamburg AG)

Gas turbine:

Gas turbine output:

2 x 6 MWel

Steam capacity:

2 x 65 t/h

Design pressure:

19 bar (g)

Saturated steam temperature:

198 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

CCP Plant Hengelo, The NetherlandsNouryon Industrial Chemicals (formerly Akzo Nobel, before that Salinco)

Gas turbine:

Gas turbine output:

40,5 MWel

Steam capacity:

175 t/h

Design pressure:

103 bar (ü)

Steam temperature:

525 °C

Flying take-over:

Auxiliary fuel:

Scope:

Year of commissioning:

Natural gas

EPC

1993

1993

GE-Frame 6

no

no

Natural gas

Boiler Island

RR-Typhoon

Standardkessel Baumgarte GmbH - A Company of JFE Engineering Group