Portishead Branch Line (MetroWest Phase 1)
TR040011 Applicant: North Somerset District Council
2.11 – 2.14 Portishead Station plans Building Design: Proposed Station Buildings; Station Co-ordination Plan; 3D views; Platform Lighting & Lighting Control Layout The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, 5(2) (o) Planning Act 2008
Author: North Somerset District CouncilDate: November 2019
Document Index 2.11 Portishead Station Building Design: Proposed Station
Buildings The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, 5(2) (o) Planning Act 2008
W1097B-ARP-DRG-EAR-300001 Rev A01
2.12 Portishead Station Co-ordination Plan*
The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, 5(2) (o) Planning Act 2008
W1097B-ARP-DRG-EST-300001 Rev A02
2.13 Portishead Station 3D views The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, 5(2) (o) Planning Act 2008
W1097B-ARP-DRG-EST-300002 Rev A01
2.14 Portishead Station Platform Lighting & Lighting Control Layout (Sheets 1 and 2)**
The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, 5(2) (o) Planning Act 2008
W1097B-ARP-DRG-EMF-300001-2 Rev A02
* The architectural drawing for the Portishead Station Co-ordination plan Doc 2.12 (W1097B-ARP-DRG-EST-300001) has developed and not all of the final products are aligned. The internal layout has been superseded please refer to the internal layout of Portishead Station Building Design, Doc 2.11 (W1097B-ARP-DRG-EAR-300001) **The architectural drawings for the Portishead Station Platform Lighting and Lighting Control Layout, Doc 2.14 (W1097B-ARP-DRG-EMF-300001 and 300002) have developed and not all the ‘final’ products are aligned. The plans do not show any lighting in the non-public areas which have been re-worked.
Dra
win
g N
um
ber
Sheet Size A0 841 x 1189
Scale(s)
Drawing Number Revision
of
Sheet
Signed
Signed
Signed
Project
Status
Rev Date Description of Revisions Drawn
Designed
Drawing Title
Contractor(s)
DateSigned
Drawn
Checked
Approved
Chkd Appr
Date
Date
Date
ELR & Mileage
Alternative Reference
Suitability
Legend/Notes
N
JUNCTION
PARSON STREET
PILL
PORTISHEAD
STN
BEDMINSTER
BRISTOL TM
DOCK
PORTBURY
ROYAL
A01 JB RS RS
S2
1:100
J. BACINSKI
POD 129M
A01
15/07/19 FOR DCO APPLICATION
FIT FOR INFORMATION
PROPOSED STATION BUILDINGS
R. SNELL
QUADRA BEC
15/07/19
15/07/19
15/07/19
15/07/19
26CH
11
W1097B-ARP-DRG-EAR-300001
W1097
B-A
RP-D
RG-E
AR-3
00001
N
(METROWEST PHASE 1)
PORTISHEAD BRANCH LINE
0 2 4 6 8 10m
SCALE 1:100 @ A0
Minimum clearance (2.5m x 2.5m)
PLAN Unheated Ticket Hall & Waiting Room + single Accessible WC (metal roof)
VARIES
EAST ELEVATION
Platform edge v
Main Entrance
Main Platform Area
Lower canopy
(3.6m x 5.0m)
Ticket Hall
& Enquiries
Line of roof over
Curtain walling
Waiting
Area
Staff
Room
WC
Accessible
WC Cubicle
Plantroom
Cleaning
(2.0m x 3.0m)
(2.5m x 2.9m)
Tic
ket
Machin
e
Tic
ket
Machin
e
(2.5m x 1.4m)
Buffer
(3.5m x 3.8m)
Roof Access
Ladder
4500.0000
X
METER
+ 108.990108.980 +
108.240 +
+ 108.980
Land falls away
Land falls a
way
Land falls away
SIS
S
Cabin
et
GS
MR
Cabin
et
E&
P
Cabin
et
Bin Store
Temporary
Generator
Location
Fence line
Ticket
Office(3.2m x 2.2m)
(3.1m x 2.4m)
(2.2m x 1.6m)
Accessible
Line of fence beyond
PLATFORM ELEVATION (PART)
CAR PARK ELEVATION (PART)
ENTRANCE ELEVATION (WEST)
1 2 3 4 5 6 7
A
B
C
VARIES
CROSS SECTION X
FM32W-D
1561 x 382 x 240
WAY OUT
1 2 3 54 6 7 8 9 10 11 12
RoadPavement
PORTISHEAD
STATION
Metal shingles mechanically fixed
through OSB board and sheathing
membrane onto steel cladding rails
supported off structural steel posts
with concrete plinth (through coloured)
and pressed metal capping - all metal
to be zinc sheet to front face and capping.
Rear face to be Corus 13.5/3 profile
horizontal spanning HPS 200 coated RAL 7005
PROFILED ROOF CLADDING WITH INTEGRAL GUTTER.
MODULAR LOWER CANOPY SYSTEM WITH STEEL SUPPORTS &
METAL CAPPING OVER.
COLOURED GLASS BLOCK INFILL PANELS (TRANSLUCENT) WITH
OVER-PANEL TO ACCESSIBLE WC WITH RADAR CONTROL.
COLOUR COATED METAL FRAMED DOOR WITH SAFETY GLAZED
TO STAFF ROOM WITH SAFETY GLAZING AND INTEGRAL BLIND.
COLOUR COATED METAL FRAMED INWARD OPENING WINDOW
COLOUR COATED METAL PANEL SYSTEM TO UPPER WALL AREAS.
TICKET HALL.
SAFETY GLAZED CURTAIN WALL WINDOW SECTIONS TO ENQUIRY &
POLYESTER POWDER COATED FINISH.
METAL SECTIONED PANELS AND MAIN ENTRANCE GATES WITH
ROOF FIXINGS OVER (SPECIALIST FIXINGS FOR SHS SECTIONS).
EXPOSED BOX SECTION STEEL BEAMS AND PURLINS TO HIDE
BETWEEN.
ENDS / CORNERS WITH METAL SHINGLES SET ON FRAMING IN
BOUNDARY WALL COMPRISING NATURAL STONE FACED PANELS AT
INTEGRAL GUTTER AND MATCHING DOWN-PIPES.
COLOUR COATED METAL ROOFING SYSTEM AND FASCIA WITH
GAS-SPRUNG ROOF ACCESS HATCH FOR MAINTENANCE USE.
SET INTO FINISH.
FINE TEXTURED THROUGH COLOUR RENDER WITH IMPRINTED LOGO
12.
11.
10.
09.
08.
07.
06.
05.
04.
03.
02.
01.
R. SNELL
Dra
win
g N
um
ber
Sheet Size A0 841 x 1189
Scale(s)
Drawing Number Revision
of
Sheet
Signed
Signed
Signed
Project
Status
Rev Date Description of Revisions Drawn
Designed
Drawing Title
Contractor(s)
DateSigned
Drawn
Checked
Approved
Chkd Appr
Date
Date
Date
ELR & Mileage
Alternative Reference
Suitability
Legend/Notes
N
JUNCTION
PARSON STREET
PILL
PORTISHEAD
STN
BEDMINSTER
BRISTOL TM
DOCK
PORTBURY
ROYAL
106.03106.07 106.07
106.16
106.17
106.24
106.27
106.35
106.37
FE 106.37
106.38
106.39
106.44
106.44
106.45
FE 106.45
106.46
106.46
Palisade 1.8m H
BoB 106.47
BoB 106.47
106.48
106.48
106.48
106.49
FE 106.50
BoB 106.51BoB 106.51
106.51
Palisade 2m H
106.54
FE 106.55
EoV 106.55106.58106.58
106.5
8
106.60
FE 106.60
106.61
106.61
LINE OF POSTS
106.62
BoB 106.63
106.63
106.64
106.65
106.65
106.65
106.65
FE 106.66
106.66
106.67
106.67
FE 106.67
106.68
FE 1
06.7
0
106.71
106.72
106.74
106.76
EoV 106.77
106.77
106.77
106.82
106.82
106.83
106.8
3
106.85
106.85
106.86
106.86
106.8
6
106.87
106.88
106.88 106.89106.89
106.91
106.92
106.93
106.94
106.9
4
106.9
4
106.94
106.95
106.95
106.96
Eo
V 1
06.9
7
107.01
107.01
107.03
107.03
BoB 107.11
107.11
107.12
FE 1
07.1
6
107.18
107.1
8
107.19107.25
107.25
107.26
107.27
107.28
107.29
HF 107.31
107.32
Palisade 1.8
m H
107.32
EoV 107.33
107.33
HF 107.34
107.34
107.35 107.36
107.37
107.38
107.38
107.38
Eo
V 1
07.4
0
HF 107.41
Eo
V 1
07.4
4
107.44
ToB 107.45ToB 107.48
107.49
ToB 107.51
ToB 107.51
107.51
KB 1
07.5
2
MH 10
7.52
MH 10
7.52
To
B 1
07.5
2
107.53
107.53
KB 1
07.5
4
Pave
ment
G
107.56
EoV 107.56
G
Eo
V 1
07.5
7
G
Eo
V 1
07.5
8
107.58
G
KB 1
07.5
9
G
MH 10
7.60
KB 1
07.6
0
MH 10
7.61
G
KB 1
07.6
1
G
107.61
107.63107.63
G
107.6
3
107.64
107.64
KB 1
07.6
4
KT 1
07.6
5107.6
5
107.65107.65
KB 1
07.6
6
107.6
6
ToB 107.66
107.6
6
107.67
Pave
ment
EoV 107.
67
KT 1
07.6
7
107.6
7
107.67
Eo
V 1
07.6
7
FE 1
07.6
8107.69
107.69
107.70
107.70
107.70
107.7
1
107.71
KT 1
07.7
1
107.71
KT 1
07.7
2
107.72
WM
107.73
EoV 107.73
107.73
107.73
KT 1
07.7
3
107.73
LP
107.74
EoV 107.74
107.74
Eo
V 1
07.7
4
107.7
4
107.7
4
107.74
107.7
4
107.7
4
107.7
4
107.7
5
107.75
WM
107.7
5
EoV 107.75
107.76
107.7
6
107.76
107.77
KT 1
07.7
7
107.7
7
107.77
107.7
7
KT 1
07.7
7
Pave
ment
107.7
8
107.78
FE 1
07.7
9
ToB 107.79
Eo
V 1
07.7
9
107.7
9
107.8010
7.80
Palisade 1.8
m H
EoV 107.80
Eo
V 1
07.8
1
Eo
V 1
07.8
1
107.81
Gate
S001
E 409
734.8
93
N 286
779.5
20
H 107.82
2
107.8
2
107.8
3
Grass
107.8
3
RS R
oundabout
Inform
ation
107.8
5
107.8
6
107.88
107.89
107.89
107.8
9
107.89
107.90
107.90
107.90107.90
107.91
107.92
107.92
107.92107.92
107.92
107.94
107.94
107.94
107.94
107.94107.94
107.94
107.95
107.95
107.95
107.96
107.96
107.96
107.96
107.96
107.96 107.97
107.97
107.97
107.97107.97
107.97
107.98
109.0
9m 108.3
9m
108.0
4m
2000
Total platform length 130m
107.50
CLASS 150 CLASS 150
108.24
107.50
108.98
108.98
108.40
108.35
730
CLASS 165 165/1165/1
CLASS 165
CLASS 165 REFURBISHED CLASS 165 REFURBISHED
W
Curtain walling
METER
+ 108.990108.980 +
Straight L=1682.471m C=0mm D=0.0mm V=75mph
PM_6_5PM_6_7PM_6_6
Ch.1
8170
m
Ch.1
8180
m
Ch.1
8190
m
Ch.1
8200
m
Ch.1
8210
m
Ch.1
8220
m
Ch.1
8230
m
Ch.1
8240
m
Ch.1
8250
m
22207
Y=286803.8143
X=409706.2342
Y=286790.7220
X=409725.9666
RailwayDisused
BoB 106.38BoB 106.47
FE 106.50FE 106.51FE 106.55
Palisade 2m H
BoB 106.60
FE 106.61
HF 107.28
HF 107.40
107.40
HF 107.41
107.44
107.4
5
ToB 107.47
107.48
ToB 107.49
107.49
107.50
HF 107.51
107.55
107.5
8
107.5
8
107.65
ToB 107.66
107.6
6
EoV 107.69
107.70
107.71107.72
107.78
107.80ToB 107.80
107.90
107.90
107.94
107.95
107.95
107.95
107.96
107.96
107.97
107.97
108.04108.05 108.08
108.11108.13 108.18
Total platform length 130m
108.98
108.98
24 25 26 27 28 292322212019181716
15mph75 mph
PM_6_4PM_6_9PM_6_8
PM_6_13
PM_6_10
PM_6_10
Ch.1
8100
m
Ch.1
8110
m
Ch.1
8120
m
Ch.1
8130
m
Ch.1
8140
m
Ch.1
8150
m
Ch.1
8160
m
Ch.1
8170
m
www.arup.com
Tel +44(0)117 976 5432 Fax +44(0)117 976 5433
Bristol BS1 6JZ
63 St Thomas Street
A02 JB RS RS
S2
1:100
J. BACINSKI
POD 129MI
A02
26/09/19 FOR DCO APPLICATION
FIT FOR INFORMATION
COORDINATION PLAN
PORTISHEAD STATION
R. SNELL 26/09/19
26/09/19
26/09/19
26/09/19
28CH
11
W1097B-ARP-DRG-EST-300001
W1097
B-A
RP-D
RG-E
ST-3
00001
EXISTING FENCE GRADE I
EXISTING FENCE REMOVED
EXISTING FENCE GRADE II
EXISTING FENCE GRADE III
WITH GRADE II FENCE
EXISTING FENCE MODIFIED/REPLACED
PROPOSED FENCE GRADE II
PROPOSED FENCE GRADE III
PROPOSED FENCE GRADE I
PROPOSED TROUGHING
EXISTING TROUGHING
REMOVED TROUGHING
PROPOSED UTX
EXISTING UTX
REMOVED UTX
PROPOSED CABINET LOCATION
PROPOSED SIGNAL
EXISTING SIGNAL TO BE REMOVED
REMOVED/RELOCATED
EXISTING CABINET TO BE
MINOR CIVILS
EXISTING CABINET LOCATION
OF SAFETY
CONTINUOUS POSITIONS
AUTHORIZED WALKING ROUTE
EXISTING TROUGHING MODIFIED/REPLACE
WITH GRADE I FENCE
EXISTING FENCE MODIFIED/REPLACED
WITH GRADE III FENCE
EXISTING FENCE MODIFIED/REPLACED
MINOR EARHWORKS RETAINING STRUCTURE
NOISE BARRIER
GENERAL
PROPOSED COUNCIL FOOTPATH
PROPOSED PLATFORM DRAINAGE
PROPOSED FOUL & SURFACE WATER
VISUAL SCREEN TO PLANT AREA
PROPOSED STATION FOUNDATION
PROPOSED STATION BUILDING LAYOUT
CLASS 165 REFURBISHED
165/1
CLASS 165
CLASS 150
TRAIN TYPE
EXISTING UTILITIES
WATER MAIN
FOUL SEWER
RISING MAIN
SEWER SURFACE
HIGH VOLTAGE ELECTRICITY - BELOW GROUND
LOW VOLTAGE ELECTRICITY - BELOW GROUND
HIGH VOLTAGE ELECTRICITY - ABOVE GROUND
LOW VOLTAGE ELECTRICITY - ABOVE GROUND
GPSS PIPELINE
LOW PRESSURE GAS MAIN
MEDIUM PRESSURE GAS MAIN
HIGH PRESSURE GAS MAIN
BT CABLE - BELOW GROUND
BT CABLE ABOVE GROUND
CABLE & WIRELESS
VIRGIN MEDIA CABLE - BELOW GROUND
VERIZON BACKBONE DUCT - BELOW GROUND
licence number 0100040692
HMSO. © Crown copyright 2017. All rights reserved. Ordnance Survey
OS map data reproduced by permission of Ordnance Survey on behalf of
licence number 0100040692
HMSO. © Crown copyright 2017. All rights reserved. Ordnance Survey
OS map data reproduced by permission of Ordnance Survey on behalf of
ACCESS GATE
EMERGENCY
BRISTOL
GRADIENTS
RAMP WITH 1:21
HATCHED
FOOTPATH
COUNCIL
PROPOSED
QU
AYS A
VE
NUE
CABINET
SISS
HATCHED
FOOTPATH
COUNCIL
PROPOSED
BIN STORE
CABINET
E&P
TO PLANT AREA
VISUAL SCREEN
CANOPY
LOWER
LOCATION
GENERATOR
TEMPORARY
BUFFER STOP
NOISE BARRIER
GSMR REB
MAIN ENTRANCE
(3.6m x 5.0m)
ENQUIRIES
TICKET HALL &
TICKET MACHINE
(3.1m X 3.4m)
ROOM
STAFF
WCSERVICE
WATER
(3.5m x 3.8m)
AREA
WAITING
LADDER
ACCESS
ROOF
(3.0m x 3.3m)
PLANTROOM
MAINTENANCE REQUIREMENTS.
AROUND THE CABINETS IN COGNISANCE OF
PLANTING WILL ALSO NEED TO BE RECONSIDERED
TREES. THE EXTENT OF THE LANDSCAPING AND
AVOID IMPACTING ON THE EXISTING BANK AND
AREA TO CONTAIN IT WITHIN GRIDLINE 8-11 AND
GRIP 5 TO RATIONALISE THE CABINET/BIN STORE
IDR ON 9/1/18 AN AMENDMENT IS REQUIRED AT
IT SHOULD BE NOTED THAT AS AGREED AT THE
AREA
MAIN PLATFORM
1.5m)
(3.0m x
CLEANING
(1.7m x 3.4m)
CUBICLE
ACCESSIBLE WC
METER
TRANSFORMER
BUFFER STOP LIGHT
SIGNALLING LOC
CH2M FOOTPATH
0 2 4 6 8 10m
SCALE 1:100 @ A0
N
(METROWEST PHASE 1)
PORTISHEAD BRANCH LINE
N
LAND BOUNDARY
DEVELOPMENT CONSENT ORDER (DCO)
R. SNELL
LAYOUT REFER TO DRAWING W1097B-ARP-DRG-EAR-300001.
THE INTERNAL LAYOUT IS NOT UP TO DATE. FOR THE INTERNAL 4.
FOOTBRIDGE ETC.
INTERFACING WORKS I.E. P-WAY, LINESIDE CIVILS, TRINITY
TO RELEVANT DESIGN PACKAGE SUBMISSIONS FOR LATEST AND
MADE FROM THE APPROVED FORM 001 STATION DESIGN. REFER
THE PURPOSE OF THIS LAYOUT IS TO HIGHLIGHT THE CHANGES 3.
(ORDNANCE DATUM + 100 METRES).
ALL LEVELS ARE IN METRES ABOVE SNAKE GRID RBEPP12 2.
OTHERWISE.
ALL DIMENSIONS ARE IN METRES (m) UNLESS STATED 1.
J. BACINSKI
3A
300003
W1097
B- A
RP-D
RG-E
ST-3
00003
FO
R S
EC
TIO
N S
EE D
RA
WIN
G
W1097
B-A
RP- D
RG-E
ST-3
00003
FO
R S
EC
TIO
N S
EE D
RA
WIN
G
W1097
B-A
RP- D
RG-E
ST-3
00003
FO
R S
EC
TIO
N S
EE D
RA
WIN
G
W1097
B-A
RP-D
RG-E
ST-3
00003
FO
R S
EC
TIO
N S
EE D
RA
WIN
G
2A
300003
1A
300003
W1097
B-A
RP-D
RG-E
ST-3
00004
FO
R S
EC
TIO
N S
EE D
RA
WIN
G
1B
3000044A
300003
W1097
B-A
RP-D
RG-E
ST-3
00005
FO
R S
EC
TIO
N S
EE D
RA
WIN
G
1C
300005
Sheet Size A1 594 x 841
Dra
win
g N
um
ber
Scale(s)
Drawing Number Revision
of
Sheet
Signed
Signed
Signed
Project
Status
Rev Date Description of Revisions Drawn
Designed
Drawing Title
Contractor(s)
DateSigned
Drawn
Checked
Approved
Chkd Appr
Date
Date
Date
ELR & Mileage
Alternative Reference
Suitability
Legend/Notes
Insitu RC substructure
the concourse floor
structural topping form
Precast planks with
Secondary canopy
Bin Store & cabinet screen
Screen wall
concourse/platform level
Steel frame above detail
Platform to NR standard
over deep sewer
Transfer substructure
www.arup.com
Tel +44(0)117 976 5432 Fax +44(0)117 976 5433
Bristol BS1 6JZ
63 St Thomas Street
A01 JB RS RS
S2
J. BACINSKI
POD
A01
16/07/19 FOR DCO APPLICATION
FIT FOR INFORMATION
3D VIEWS
PORTISHEAD STATION
R. SNELL
N. PRICE
16/07/19
16/07/19
16/07/19
16/07/19
11
W1097B-ARP-DRG-EST-300002
W1097
B-A
RP-D
RG-E
ST-3
00002
Isometric View 1
Isometric View 2
(METROWEST PHASE 1)
PORTISHEAD BRANCH LINE
ON SECTIONS MM
ON PLANS M
DATUM. THEY ARE SHOWN THUS:
3. STRUCTURAL LEVELS ARE 100M ABOVE ORDNANCE
ARCHITECT'S DRAWING.
2. FOR SETTING OUT INFORMATION, REFER TO THE RELEVANT
AND SPECIFICATIONS.
RELEVANT ENGINEER'S DRAWINGS, ARCHITECT'S DRAWINGS
1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL
STABILITY DURING CONSTRUCTION.
BACK PROPPING NECESSARY TO MAINTAIN STRUCTURAL
WORKS AND SHALL PROVIDE ALL TEMPORARY BRACING AND
FABRICATION, ERECTION AND REMOVAL OF ALL TEMPORARY
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DESIGN,
DIMENSIONS ARE TO BE USED.
FROM THE COMPUTER DIGITAL DATA, ONLY FIGURED
5. DRAWINGS SHOULD NOT BE SCALED EITHER BY HAND OR
OTHERWISE.
4. ALL DIMENSIONS ARE IN MILLIMETRES UNLESS NOTED
WHICH THEY RELATE.
APPLICABLE, ARE NOTED ON THE ARUP DRAWINGS TO
THE PERMANENT WORKS DESIGN, IF AND WHERE
7. SPECIFIC TEMPORARY WORKS CONSTRAINTS ARISING FROM
R. SNELL
As Shown
2.11 cover2.112.122.132.14 Part 12.14 Part 2
Top Related