GTEK AFRIKA

MULTI-FUEL PLANT

Page 2: Multi-fuel plant-Godfrey Afrika–Gtek Africa

500 KVA DIESEL GENERATOR

Page 3: Multi-fuel plant-Godfrey Afrika–Gtek Africa

CURRENT ESCOM TARIFFS TO LM

Page 4: Multi-fuel plant-Godfrey Afrika–Gtek Africa

CURRENT COSTS ANALYSIS

Page 5: Multi-fuel plant-Godfrey Afrika–Gtek Africa

QUESTIONS & ANSWERS…

Q : How long will it take to build the plant?

A : 8 Weeks.

Q: What is the ideal duration of the Power Generation Contract?

A : 10-20 Years.

Q : How do we obtain the required plastics?

A : We secured the following suppliers:

* Landfill Sites (100T pm)

* Somerset Plastic / Tyre Exchange (30T pm)

* Pearston Plastic / Tyre Exchange (30T pm)

* Cookhouse Plastic Exchange (30T pm)

* Industry Collection Points (30T pm)

Page 6: Multi-fuel plant-Godfrey Afrika–Gtek Africa

COMMUNITY EMPOWERMENT

IPP PLANT

PEARSTON EXCHANGE

SOMERSET EAST

EXCHANGE

COOKHOUSE

EXCHANGE

Page 7: Multi-fuel plant-Godfrey Afrika–Gtek Africa

(QUESTIONS & ANSWERS CONTINUED…)

Q : How will the operation of the plant work?

A : Operators will be present at all time ensuring

that the plant run at full capacity via the

on-board control room.

Q : Can we monitor the litres produced?

A : Yes, via a on-board PLC meter we can monitor

the production of the plant at anytime, from the

office and in real-time

Q : Customers other than Blue Crane Municipality?

A : Other Municipalities, Mines, Manufacturing Companies

Page 8: Multi-fuel plant-Godfrey Afrika–Gtek Africa

(QUESTIONS & ANSWERS CONTINUED…)

Q : Will the multi-fuel plant be movable?

A : Yes, a mobile trailer will form the base on

which the plant is built

the plant will be built, as illustrated: