GTEK AFRIKA
MULTI-FUEL PLANT
500 KVA DIESEL GENERATOR
CURRENT ESCOM TARIFFS TO LM
CURRENT COSTS ANALYSIS
QUESTIONS & ANSWERS…
Q : How long will it take to build the plant?
A : 8 Weeks.
Q: What is the ideal duration of the Power Generation Contract?
A : 10-20 Years.
Q : How do we obtain the required plastics?
A : We secured the following suppliers:
* Landfill Sites (100T pm)
* Somerset Plastic / Tyre Exchange (30T pm)
* Pearston Plastic / Tyre Exchange (30T pm)
* Cookhouse Plastic Exchange (30T pm)
* Industry Collection Points (30T pm)
COMMUNITY EMPOWERMENT
IPP PLANT
PEARSTON EXCHANGE
SOMERSET EAST
EXCHANGE
COOKHOUSE
EXCHANGE
(QUESTIONS & ANSWERS CONTINUED…)
Q : How will the operation of the plant work?
A : Operators will be present at all time ensuring
that the plant run at full capacity via the
on-board control room.
Q : Can we monitor the litres produced?
A : Yes, via a on-board PLC meter we can monitor
the production of the plant at anytime, from the
office and in real-time
Q : Customers other than Blue Crane Municipality?
A : Other Municipalities, Mines, Manufacturing Companies
(QUESTIONS & ANSWERS CONTINUED…)
Q : Will the multi-fuel plant be movable?
A : Yes, a mobile trailer will form the base on
which the plant is built
the plant will be built, as illustrated: