Modernization Experiences in Karnataka, India
•Contents
•Performance assessment-External & Internal indicators
•Follow-up action on Modernization activities
•Allied modernization activities
ABOUT KARNATAKA ➢ Karnataka is the Seventh largest Indian State by
Area.
➢ Geographical area of the State :1,91,791 Sq. Km(191.00 Lakh Ha.) accounting for 5.83% of thetotal area of the country.
Cultivable Command Area
of the State
140.60 Lakh Ha.
Net Sown Area of the State 107.00 Lakh Ha.
Ultimate Irrigation Potential of the State from all
sources :
➢ Major & Medium Irrigation : 38.93 Lakh Ha.
➢ Minor Irrigation : 10.00 Lakh Ha.
➢ Ground Water : 16.00 Lakh Ha.
TOTAL : 64.93 Lakh Ha.
✓ Irrigation Potential of 29.00 Lakh Ha. achieved
under Major & Medium Irrigation up to March 2017.
➢ Mean annual rainfall of the State is 1,355 mm.
➢ More than 73% of this rainfall is received due tothe South – West monsoon.
3
MASSCOTE Workshops -Karnataka
Hemavathy
Almatti Lifts
NLBC & NRBC
VNC & TLBC
25-05-2018
2
MASSCOTE application in Karnataka, India
• MASSCOTE applied to 7 large irrigation projects
• Around 300 engineers at various levels trained – hands-on
• Over a million hectares command covered by MASSCOTE
• MASSCOTE methodology extensively field tested inKarnataka
• A friendly tool for all stakeholders to understand thesystem comprehensively
• Capacity building-in new concepts of canal operation & modernization
• Typology of irrigation systems has emerged
• Testing and validating MASSLIS and MASSMUS
External Indicator -GLBC and Bhadra output per cropped area
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
Lam
Pao
, Tha
iland
Dez
, Ira
n
Gui
lan,
Iran
Sey
han,
Tur
key
Maj
alga
on, I
ndia
Dan
tiwad
a, In
dia
Bha
kra,
Indi
a
Mud
a, M
alay
sia
Kem
ubu,
Mal
aysi
a
Ben
i Am
ir, M
oroc
co
Offi
ce d
u N
iger
, Mal
i
Rio
Yaq
ui A
lto, D
R
Coe
llo, C
olom
bia
Sal
daña
, Col
ombi
a
Cup
atitz
io, M
exic
o
Rio
May
o, M
exic
o
Cam
Sun
, Vie
tnam
IWM
I1. O
utp
ut p
er c
rop
ped
are
a ($
/ha)
.
ch110
BHADRA = US $ 1700 /ha
GLBC US $1844/ha
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
Lam
Pao
, Tha
iland
Dez
, Ira
n
Gui
lan,
Iran
Sey
han,
Tur
key
Maj
alga
on, I
ndia
Dan
tiwad
a, In
dia
Bha
kra,
Indi
a
Mud
a, M
alay
sia
Kem
ubu,
Mal
aysi
a
Ben
i Am
ir, M
oroc
co
Offi
ce d
u N
iger
, Mal
i
Rio
Yaq
ui A
lto, D
R
Coe
llo, C
olom
bia
Sal
daña
, Col
ombi
a
Cup
atitz
io, M
exic
o
Rio
May
o, M
exic
o
Cam
Sun
, Vie
tnam
IWM
I3.
Ou
tpu
t p
er
un
it ir
rig
. su
pp
ly (
$/c
u. m
.)
.
ch112
Bhadra US $ 0.1265/m3
GLBC US $ 0.23/m3
External Indicator -
GLBC and Bhadra output per unit of water used
HIGH INEQUITY along TLBC MC and SCRICE upstream the canals and along the river–
Dry crops at TAIL END(Land use map of Raichur district)
25-05-2018
3
HIGH LAND PRODUCTIVITY (TLBC+VNC) 3200 $/YEAR/IRRIGATED AREA
HIGH WATER
PRODUCTIVITY(TLBC+VNC)
0.63 $/M3
Interventions due to MASSCOTE- Results and Impact
• Complete re-engineering of the whole rehabilitation package of Bennithora system
• Measuring devices (flumes) installed for the first time on canals
• Redesigning of canal offtakes and regulators in Gandorinalaproject for better canal operation
• Water reached stretches beyond 110 km upto 200 km (for first time) in Bhadra system
• Telemetry system of data acquisition and transmission in GLBC & 6 other projects
IMPLEMENTATION STRATEGY FOR MODERNIZATION
1.The policy issues ;
i. Revised approach to hydraulic equity
ii. Accept the need for flexible Cropping patterns.
iii. Shift from protective to productive irrigation
iv. Service oriented management (SOM) and explicit IWRM
v. Revisiting the concept and practices of “Payment for water services”
2. Improve the internal performance indicators
3. Improve the water use efficiency
4. Capacity building at all levels
5. Establishing a centre of excellence in WRD (AC-IWRM)
6. Plan for Modernization, Monitoring and Evaluation
25-05-2018
4
Vision G-B
An economically sustainable and equitable water delivery system
which supports growth of agriculture wealth by increasing
recycling and conjunctive use.
Vision Bhadra
A modern, economically sustainable, multi purpose water resource
project maximizing agricultural output and water productivity
through adoption of modern irrigation management techniques,
participatory management by stake holders, greatly enhancing
the quality of life of the people and economic outputs while
preserving and enhancing the quality of environment.
Suggestions for one YearTLBC-Canal Operation improvements-Short term
• Allocation of water to the distributaries to be determined by installing measuring devices at initial reaches of outlets.
• Water to be supplied to the tail enders first
• Providing hand held GPS to each sub-division to measure cropped area of the individual farmer
• Silt removal and jungle clearance of the distributaries has to be done before start of season.
• Action for arresting the leakages found in some outlets, gates of escapes, certain reaches of embankments of distributaries and in aqueducts to be made
• Water Management to be done from tail end to upstream.
• Regulation of water flow in Main canal & second level and tertiary off-take points
• Offtake operators to be outsourced in case of in-adequate staff for water management
• WUCS assisted with finance and administration.
TLBC-Canal Operation improvements-Long term
• CANAL:
• TLBC should be covered under GIS for maintenance of canal, providing information to farmers, for tax collection.
• Creation of Balancing Reservoir as per topography of ground to give assured water to tail end.
• Automation of Canal Network system(Priority - Main Canal)
• Some of the users are constructing big size farm ponds along distributories. They are to be properly Planned & Regulated.
• The reaches of the canal which are passing near public places are to be provided with RCC Cut & Cover.
• Provide inlets in the hillock reaches of cannal along with catch water drain
• Security task force should be formed to give assured quantam of water to all stakeholders
FOLLOW-UP ACTION
25-05-2018
5
BENNITHORA PROJECT-Measuring device on main canals
FLUME ON RBC
FLUME ON LBC
BENNITHORA-Measuring device on distributary
KEY FINDINGS AND FOLLOW-UP ACTION OF GB- RAP / MASSCOTE
BUFFER STORAGE @ Km 10 OF
RBC ON BENNITHORA
BENNITORA RBC KM 68
Operation cost is too high. One single management centre for two projects instead of three (30,000 Ha). In Bennitora Project, one division and three sub-divisions are shifted to other projects thereby reducing the operation cost by 26% and one sub division from Gandorinala is shifted to other project thereby reducing the cost of operation by 30%
KEY FINDINGS AND FOLLOW-UP ACTION OF GB- RAP / MASSCOTE
COST ANALYSIS IN %
STAFF
80%
ADMINISTRATIVES
EXPENCES
4%
OTHERS
9%
TRANSPORTATION
6%
COMMUNICATION
1%
25-05-2018
6
BENNITHORA PROJECT
WEIRS ON RBC AT SENSITIVE OFF-TAKES
2
3
1
BRIDGE-CUM-BARRAGES :
1) In between Malakood-Tonasanhalli
2) Near Kalagurti
3) Near Kalahipparaga
BARRAGES :
1) In between Kanasur-Bennur
2) Near Hebbal.
INDEX
Barrage
Bridge-cum-barrage
Water balancing reservoirs under Bennithora Project
BENNITHORA PROJECT
CONSTRUCION OF BRIDGE-CUM-BARRAGE ACROSS NAGOORHALLA NEAR TADKAL
DIVERSION
FOUNDATION WORK
KEY FINDINGS AND FOLLOW-UP ACTION OF GB- RAP
/ MASSCOTE
CONSTRUCTION OF BRIDGE / BARRAGE
AT TADKAL (Km 60 of Gandorinala)
25-05-2018
7
Infrastructure improvement
Bennithora: Improved service road LBC 21 km
Bhadra Modernization
Bhadra Modernization GLBC
25-05-2018
8
FLOW MEASUREMENT & TELEMETRY • Flow measurement & telemetry is introduced in 6 projects;
- Bhadra,
- Upper Tunga,
- Gondi,
-VNC
-Tungabhadra Canals &
-Singatalur LIS.
• Discharge and water level measured and transmitted in real time
• Main canals : Transit Time Flow meters.
• Distributaries : Radar Type flow meters.
Bhadra Right Bank Canal – Telemetry
Main Canals
have Transit
Time Type
Flow Meters
Distributaries &
Branch Canals
have Radar Type
Flow Meters
Allied modernization activities
WATER CONSERVATION MEASURES
Karnataka has initiated many water conservation measuresto enhance water use efficiency, increase the area underirrigation, prevent land degradation due to water logging andsalinity and to improve productivity of land and water.
➢Micro-irrigation
➢Modernization
➢Tank filling schemes (drinking water & groundwater recharge)
➢ Pick-ups, Barrages, check dams
➢SCADA & Automation-NLBC Canal System
➢Canal top solar pv projects
➢Dam Rehabilitation and Improvement Programme (DRIP)
32
25-05-2018
9
MICRO-IRRIGATION
➢ To enhance Water Use Efficiency (WUE) in irrigation projects , aparadigm shift in the method of application of water fromflood/furrow irrigation to micro-irrigation is under implementation inseveral projects of the State, thereby increasing the WUE to over80% from the present 50% in flow irrigation.
➢The projects under implementation are:
1. Upper Bhadra - 2,25,515 Ha Drip (Ongoing)2. Singtalur LIS - 87,793 Ha Drip3. Shiggaon LIS - 13,500 Ha Sprinkler (Implemented)4. Ramthal LIS - 24,000 Ha Drip (Implemented)5. Koppal LIS - 1,12,000 Ha Drip6. Savanur LIS - 15,500 Ha Drip7.Nandawadagi - 36,100 Ha Drip7.Purigalli LIS - 10,250 Ha Drip
Total - 5,24,658 Ha
33
Shiggaon LIS
Ramthal LIS
34
Sl
no
Project Cost of the
project in
Million (INR)
Length of canal
modernisation in
Km
Present status
1 Narayanpura Left
Bank canal- ERM
42990.18 600.00 Completed
2. Tungabhadra left bank
canal
31610.35 2000.00 Under progress
3. Kolachi RBC 1010.04 49.00 Under progress
4. Gondhi Anecut canals
modernisation
1120.00 123.00 Under progress
5. Tunga Anecut Canals 3090.00 160.00 Under progress
6. Cauvery Basin
a) Anecut Canals 23 Nos 16430.36 1330.00 Completed
b) Canals under reservoir 15900.96 910.81 9 completed 10
Under Progress
Total 11,2160.89 5172.81
Modernization-Canal improvements
➢Plans are afoot to undertake modernisation of Malaprabha, Vijaynagar channel , Upper Mullamari and Gandorinala,Narayanapura Right bank canal , Harangi left and right bank canals , Harohalli, Bangaradoddi, Hangood series, Kanvacanals, Markonahalli, Vishveshwaraiah Canal network (2nd phase) , Hebballa chennaiah, Sahukar Chennaiah, Hebballa leftbank canal, Suvarnavathi Left and Right bank canals for a total length of about 2500 Kms with a estimated amount ofINR.50000 Million
35
MODERNIZATION OF CANALS
Rampura Canal
Nugu left bank Canal
NLBC Main Canal
IBC Main Canal36
25-05-2018
10
TANK FILLING SCHEMES
➢ To meet the drinking water needs in water stressed areas and
for groundwater recharge, a large number tank filling schemes
are taken up. Notable among them are
Sl
no
Project No of
tanks
Present status
1. Mambapur, Bhuthanal, Begum
talab, Bubleshwar, Tidagundi &
Sarwad in Bijapur Dist.
7
Completed
2. Kaginele 23 Completed
3. Ubrani-Amrutapura 146Completed
4. 6 Nos of tank filling schemes
completed in Cauvery Basin
(Kanva, Alamburu etc..)
114
Completed
5. Rajanahalli 25 22 Completed, 3 under
progress
Total 315
37
Sl
no
Project No of tanks Present status
1. Hiranyakeshi 22 Nearing completion
2. Tunga lift 32 Nearing completion
3. Anachi,Sankh& Bhuyyar 25 Nearing completion
4. Yettinahole 527 Ongoing
5. Upper Bhadra LIS 367 Ongoing
6. 23 Nos of tank filling schemes
under progress in Cauvery Basin
(Chikkanandhi, Sathnur,
Gandhigrama, Shriranga,
Arkalgud-Ganganalu.etc…)
387 Ongoing
Total 1360
Details of nearing completion and ongoing works
➢ It is planned to take up about 32 tank filling schemes
under which it is planned to fill up 970 Nos of tanks.
38
Tank Filling Projects in Vijayapur District
39
Bhutnal Tank Filling
Begum Talab Tank Filling Mamdapur Tank Filling
Kanva
Ubrani-Amruthapura LIS
Kadapur
40
25-05-2018
11
Construction of Barrage Pick-ups, check dams
A large number of pick-ups, barrages and check dams are
taken up for rain water harvesting
BCB across Vedavathy River near
Bageshettihalli in Hosadurga Taluk
of Chitradurga District.
Hanumsagar pickup weir in NLBC
command Chandapur Barrage across River
Manjra 41
Farmer Request
Water demand
Data Centre
Demand Approval
Outlet Gate
HR Gate
Online Information
SCADA AUTOMATION UNDER NLBC CANAL SYSTEM
42
Installation of Fully Automated Integrated Gates
43
CANAL TOP SOLAR PV PROJECTS
44
➢ A pilot project of Canal Top Solar
Power Project of 1 MW Capacity on
ARBC Main Canal is successfully
completed and commissioned.
➢ 5,000 Units of power is being
generated from the commissioned
Solar PV Project.
➢ A 10 MW Canal Top Solar PV
Project on Intake Gravity Canal of
Koppal LIS is being taken up.
25-05-2018
12
Dam Rehabilitation and Improvement Programme (DRIP)
Major dams taken up under DRIP for rehabilitationand improvement are Almatti, Narayanapura, KRS,Hidkal, Malaprabha, Hemavathy, Bhadra, Harangi,Kabini, Karanja, Lower Mullamari and Bennethora,Etc…
45
Bhadra dam pointing & grouting work
ALMATTI DAM - Upstream pointing to Masonry Joints & Placing of the
Concrete in Stilling Basin.
46
Karnataka-FAO publicationsWorking documents on modernization workshops are published
by FAO;
• Case study-Almatti (UKP).
• http://www.fao.org/nr/water/docs/masscote/applications/MASSCOTE-ALMATTI-Report31.pdf
• Case study-Bhadra.
• http://www.fao.org/nr/water/docs/masscote/applications/MASSCOTE-Bhadra-draft%20Report 2.pdf
• Case study-Gandorinala-Bennitora.
http://www.fao.org/nr/water/docs/masscote/applications/MASSCOTE-GB-Report.pdf
• Case study-GLBChttp://www.fao.org/nr/water/docs/masscote/applications/MASSCOTE-GLBC-Final.pdf
• Case study-Narayanpur (UKP)http://www.fao.org/nr/water/docs/masscote/applications/MASSCOTE_Upper_Krishna%20Project_Naryanpur.pdf
• Case study- Hemavathi . http://www.fao.org/nr/water/docs/masscote/applications/MASSCOTEinHemavathiJune2007.pdf