METALITE® PANEL SYSTEM Prefabricated, Insulated, Metal Backed, Lightweight Exterior Wall Panels
METALITE Installation Details
DS112
Metalite® Panel System
TABLE OF CONTENTS
DETAIL NOTEPAGE
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
METALITE PANEL ML 0.0.01 1
FOUNDATION DETAIL ML 0.0.02 2
HEAD/ SILL/ JAMB DETAIL ML 0.0.03 3
PARAPET DETAIL ML 0.0.04 4
WALL/ ROOF INTERSECTION ML 0.0.05 5
ROOF TERMINATION/ GRAVEL STOP ML 0.0.06 6
INSIDE CORNER ML 0.0.07 7
OUTSIDE CORNER ML 0.0.08 8
PANEL JOINTS ML 0.0.09 9
FASCIA PANEL ML 0.0.10 10
SCREEN WALL ML 0.0.11 11
BLIND PANEL ATTACHMENT OPTION ML 0.0.12 12
FASTENING PATTERN ML 0.0.13 13
COMPONENTS ML 0.0.14 14
DRYVIT MAKES NO REPRESENTATION REGARDING
CONFORMITY OF ITS SUGGESTIONS TO MODEL BUILDING
CODES, ENGINEERING CRITERIA, SPECIFIC APPLICATIONS,
OR PROJECT LOCATIONS. ALL COMPONENTS INDICATED IN
ILLUSTRATIONS, AS WELL AS OTHERS THAT MAY BE
REQUIRED FOR THE INTEGRITY OF THE SYSTEM SHALL BE
DESIGNED, DETAILED, AND ENGINEERED BY
REPRESENTATIVES OF THE ARCHITECT, OWNER, OR
CONTRACTOR TO BE IN CONFORMANCE WITH MODEL
CODES, ARCHITECTURAL, AND ENGINEERING
REQUIREMENTS PERTAINING TO SPECIFIC BUILDING
PROJECTS.
DRYVIT MAKES NO WARRANTY, EXPRESSED OR IMPLIED,
AS TO THE ARCHITECTURAL DESIGN, OR ENGINEERING, OF
PROJECTS UTILIZING DRYVIT SYSTEMS OR PRODUCTS.
THE LIABILITIES OF DRYVIT SHALL BE AS STATED IN THE
DRYVIT STANDARD WARRANTY. CONTACT DRYVIT FOR A
FULL AND COMPLETE COPY OF THIS WARRANTY.
©Dryvit Systems, Inc. 2017
©
Issued: 4/2017
Metalite® Panel System
ML 0.0.01
Metalite Panel System
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
Dryvit Systems, Inc. 2017
Issued: 4/2017
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
©©
DRYVIT BASE COAT
DRYVIT
REINFORCING MESH
EXPANDED
POLYSTYRENE
INSULATION BOARD
DRYVIT FINISH
METALITE SUBSTRATE
APPROVED-
METALITE FASTENER
J-CHANNEL CLOSURE
J-CHANNEL CLOSURE
APPROVED-
METALITE FASTENER
METALITE SUBSTRATE
DRYVIT BASE COAT
DRYVIT
REINFORCING MESH
EXPANDED
POLYSTYRENE
INSULATION BOARD
DRYVIT FINISH
METALITE SUBSTRATE
DRYVIT BASE COAT
DRYVIT
REINFORCING MESH
EXPANDED
POLYSTYRENE
INSULATION BOARD
DRYVIT FINISH
DRYVIT DEMANDIT SMOOTH
OR COLOR PRIME ON SURFACES
WHICH WILL RECEIVE SEALANT
DRYVIT DEMANDIT SMOOTH
OR COLOR PRIME ON SURFACES
WHICH WILL RECEIVE SEALANT
J-CHANNEL CLOSURE
TOP OF METALITE PANEL
(BOTTOM SIMILAR)
METALITE FASTENER
Metalite® Panel System
METALITE SUBSTRATE
ML 0.0.02
Foundation Details
DRYVIT METALITE PANEL
DRYVIT COMPATIBLE SEALANT
AND CLOSED CELL BACKER
ROD BY OTHERS
DRYVIT COMPATIBLE SEALANT
AND CLOSED CELL BACKER
ROD BY OTHERS
STIFFENER/CONNECTOR BAR
ALTERNATE
3/4" MIN
(19 mm)
CONTINUOUS FLASHING AS
REQUIRED BY OTHERS
METALITE SUBSTRATE
DRYVIT METALITE PANEL
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
DRYVIT DEMANDIR SMOOTH
OR COLOR PRIME ON SURFACES
WHICH WILL RECEIVE SEALANT
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
Metalite® Panel System
ML 0.0.03
Head / Sill / Jamb Detail
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. METALITE IS NOT INTENDED TO CARRY ANY LOADS FORWINDOWS, DOORS, EQUIPMENT, ETC.
HEAD
JAMB SILL
METALITE SUBSTRATE
DRYVIT METALITE PANEL
3/4" MIN
(19 mm)
DRYVIT COMPATIBLE SEALANT
AND CLOSED CELL BACKER
ROD BY OTHERS
METALITE SUBSTRATE
DRYVIT METALITE PANEL
3/4" MIN
(19 mm)
DRYVIT COMPATIBLE
SEALANT AND CLOSED
CELL BACKER
ROD BY OTHERS
CONTINUOUS FLASHING
AS REQUIRED BY OTHERS
J-CHANNEL CLOSURE
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
DRYVIT COMPATIBLE SEALANT
AND CLOSED CELL BACKER
ROD BY OTHERS
3/4" MIN
(19 mm)
CONTINUOUS FLASHING AS
REQUIRED BY OTHERS
METALITE SUBSTRATE
DRYVIT METALITE PANEL
BUILDING GIRT
STIFFENER/CONNECTION BAR
J-CHANNEL CLOSURE
Metalite® Panel System
ML 0.0.04
Parapet Detail
METAL CAP FLASHING
BY OTHERS, SEE NOTE 3
STIFFENER/CONNECTION BAR
METALITE SUBSTRATE
DRYVIT COMPATIBLE SEALANT
BY OTHERS
DRYVIT METALITE PANEL
2 1/2" MIN
(64 mm)
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. ROOF ASSEMBLY, SHEATHING AND CAP FLASHING AREINSTALLED IN THE FIELD AND NOT COMPONENTS OF THEPANEL SYSTEM.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
Metalite® Panel System
ML 0.0.05
Wall / Roof Intersection
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
STIFFENER/CONNECTION BAR
METALITE SUBSTRATE
DRYVIT COMPATIBLE SEALANT
BY OTHERS
DRYVIT METALITE PANEL
2 1/2" MIN
(64 mm)
CONTINUOUS FLASHING AS
REQUIRED BY OTHERS
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
Metalite® Panel System
ML 0.0.06
Roof Termination / Gravel Stop
METAL CAP FLASHING
BY OTHERS, SEE NOTE 3
STIFFENER/CONNECTION BAR
METALITE SUBSTRATE
DRYVIT COMPATIBLE SEALANT
BY OTHERS
DRYVIT METALITE PANEL
2 1/2" MIN
(64 mm)
J-CHANNEL CLOSURE
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. ROOF ASSEMBLY, SHEATHING AND CAP FLASHING AREINSTALLED IN THE FIELD AND NOT COMPONENTS OF THEPANEL SYSTEM.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
Metalite® Panel System
ML 0.0.07
Inside Corner
DRYVIT COMPATIBLE SEALANT
BY OTHERS
DRYVIT METALITE PANEL
3/4" MIN
(19 mm)
DRYVIT DEMANDIT® SMOOTH OR
COLOR PRIMEᵀᴹAPPLIED TO
SURFACES WHICH WILL
RECEIVE SEALANT
DRYVIT METALITE PANEL
METALITE SUBSTRATE
METALITE SUBSTRATE
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. J-CHANNEL CLOSURE AT TOP AND BOTTOM OF PANELS.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
PRE-ENGINEERED CORNER
Metalite® Panel System
ML 0.0.08
Outside Corners
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. J-CHANNEL CLOSURE AT TOP AND BOTTOM OF PANELS.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
DRYVIT METALITE PANEL
3/4" MIN
(19 mm)
DRYVIT DEMANDIT® SMOOTH OR
COLOR PRIMEᵀᴹ APPLIED TO SURFACES
WHICH WILL RECEIVE SEALANT
METALITE SUBSTRATE
DRYVIT COMPATIBLE SEALANT
BY OTHERS
DRYVIT METALITE PANEL
METALITE SUBSTRATE
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
PRE-ENGINEERED CORNER
Metalite® Panel System
ML 0.0.09
Panel Joints
SQUARE JOINT
OVERLAPPING JOINT
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. J-CHANNEL AT DECK PERIMETER TO CREATE FRAME.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
3/4" MIN
(19 mm)
DRYVIT METALITE PANEL
METALITE SUBSTRATE
METALITE SUBSTRATE
DRYVIT DEMANDIT® SMOOTH OR
COLOR PRIMEᵀᴹ APPLIED TO SURFACES
WHICH WILL RECEIVE SEALANT
DRYVIT COMPATIBLE SEALANT
BY OTHERS
Metalite® Panel System
ML 0.0.10
Fascia Panel
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. ROOF ASSEMBLY, SHEATHING, AND CAP FLASHING AREINSTALLED IN THE FIELD AND NOT COMPONENTS OF THEPANEL SYSTEM.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
METAL CAP FLASHING
BY OTHERS, SEE NOTE 3
STIFFENER/CONNECTION BAR
METALITE SUBSTRATE
DRYVIT COMPATIBLE SEALANT
BY OTHERS
DRYVIT METALITE PANEL
2 1/2" MIN
(64 mm)
CONNECTING SOFFIT
PROVIDE BRACE TO
BUILDING STRUCTURE
DRYVIT COMPATIBLE SEALANT
BY OTHERS
J-CHANNEL CLOSURE
DRYVIT DEMANDIR SMOOTH
OR COLOR PRIME ON SURFACES
WHICH WILL RECEIVE SEALANT
Metalite® Panel System
ML 0.0.11
Screen Wall
METAL CAP FLASHING
BY OTHERS
DRYVIT COMPATIBLE SEALANT
BY OTHERS
METALITE SUBSTRATE
2 1/2" MIN
(64 mm)
STEEL SUPPORT
BY OTHERS
J-CHANNEL CLOSURE
DRYVIT METALITE PANEL
STIFFENER/
CONNECTOR BAR SPACING
AND TYPE BY OTHERS
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. DRILL BOTTOM J-CHANNEL TO ALLOW FOR DRAINAGE,PAINT HOLES WITH RUST INHIBITING PAINT.
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
Metalite® Panel System
ML 0.0.12
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
Blind Panel Attachment Option
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
3. J-CHANNEL AT DECK PERIMETER TO CREATE FRAME.
METALITE SUBSTRATE
DRYVIT METALITE PANEL
DRYVIT COMPATIBLE SEALANT
AND CLOSED CELL BACKER
ROD BY OTHERS
EXISTING CONCRETE
SHEAR WALL
GAUGE METAL CLIP
AND Z-CLIP
ANGLE CONNECTOR
ANGLE CONNECTOR
GAUGE METAL CLIP
AND Z-CLIP
DRYVIT METALITE PANEL
DRYVIT COMPATIBLE SEALANT
AND CLOSED CELL BACKER
ROD BY OTHERS
EXISTING CONCRETE
SHEAR WALL
METALITE SUBSTRATE
Metalite® Panel System
ML 0.0.13
Typical Fastening Pattern
EPS
METALITE SUBSTRATE
APPROVED MECHANICAL
FASTENER, BY OTHERS
(SEE NOTE 4)
12" MIN
(305 mm)
12" MIN
(305 mm)
METALITE SUBSTRATE
APPROVED MECHANICAL
FASTENER, BY OTHERS
(SEE NOTE 4)
DRYVIT METALITE PANEL
NOTE:
1. DRYVIT RECOMMENDS THAT GROUND FLOORAPPLICATIONS AND ALL FACADES EXPOSED TO ABNORMALSTRESS, HIGH TRAFFIC, OR DELIBERATE IMPACT HAVE THEBASE COAT REINFORCED WITH PANZER® MESH PRIOR TOSTANDARD OR STANDARD PLUSᵀᴹ MESH. LOCATION OFHIGH IMPACT ZONES SHOULD BE INDICATED ON CONTRACTDRAWINGS.
2. OFFSET VERTICAL EPS JOINTS FOR PANEL WIDERTHAN 4'-0".
3. WIPE END OF METALITE SUBSTRATE WITH DEGREASINGAGENT PRIOR TO BASE COAT APPLICATION.
4. MECHANICAL FASTENERS SHALL BE DESIGNED FOR THESPECIFIC PROJECT LOADS AND CONDITIONS BY THE PANELFABRICATOR OR ERECTOR (SEE DS133).
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
Dryvit Systems, Inc. 2017
Issued: 4/2017
©©
Metalite® Panel System
ML 0.0.14
Components
©Dryvit Systems, Inc. 2017
©
The architecture, engineering, and design of the project using the
Dryvit products is the responsibility of the project's design
professional. All systems must comply with local building codes and
standards. This detail is for general information and guidance only
and Dryvit specifically disclaims any liability for the use of this detail
and for the architecture, design, or engineering of any project. The
project design professional determines, in its sole discretion, whether
this detail or a functionally equivalent detail is best suited for the
project. Use of a functionally equivalent detail does not violate
Dryvit's warranty. This detail is subject to change without notice.
Contact Dryvit to ensure you have the most recent version.
J-CHANNEL
3"x1.5"x1.5"x.0598" CHANNEL
(76mm x 38mm x 38mm x 1.5mm)
STIFFENER/CONNECTOR BAR
3"x3"x.0598" ANGLE
(76mm x 76mm x 1.5mm)
METALITE SUBSTRATE
12.75"
(324 mm)
10.5"
(267 mm)
1.5"
(38 mm)
.0299" THICK
(0.75 mm)
Issued: 4/2017
NOTE:
1. LOAD/ SPAN VALUES ARE AVAILABLE FOR TECH 21CUSTOMERS.