SHIFT HAND-OVER REPORT

Installation / Facility: CS 1 Crew / Department: Drilling

Date: July 26, 2015 Time: 0600 Hrs.

Mud Status: Red

Present Operations: - M/up Cameron washing tool.

Upcoming Operations:- Wash housing bore and seal areas of hanger neck area with sea water.

Equipment Status (Including Equipment Under Repair)- SCR#10 selected with 4 Engines online.- Mud Pumps lined up to pit# 3. Pit#3 filled up with sea water.- Standpipe lined up for drilling.

Permits and/or Isolations in Place: - As required

Other Comments: - Riser filled up with clean up detergent.- Trip tank also filled up with clean up detergent. - Cont. with m/up 5” GPDS stands.- Mix pump1 to trip tank line filled with detergent.- Detergent in trip tank and Riser. - Flow line flushed, emergency kill line flushed , scalpers cleaned with sea water.

Incoming Supervisor (Name): Daniel

Position: Driller

Signature:Signature:

Outgoing Supervisor (Name): Sandeep

Position:Driller

Signature:

REV 00 SEPTEMBER 1, 2011 Form No: HQS-OPS-PP-01 FM 04